CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO - AFECTADO POR LA SUSPENSIÓN DE PLAZO N° 01 (21/02/23 AL 14/05/23)
N° ITEM DESCRIPCION UNIDAD SUB TOTAL MES 1 MES 2 Suspensión MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10
23 al 31 ene. 1 al 20 feb. 21 Feb al 14 15 al 31 may. 1 al 30 jun. 1 al 31 jul. 1 al 31 ago. 1 al 30 set. 1 al 31 Oct. 1 al 30 Nov. 1 al 11 Dic.
2023 2023 May 2023 2023 2023 2023 2023 2023 2023 2023 2023
01 PAVIMENTACIÓN 3,397,661.87 186,727.82 29,378.11 43,753.04 250,697.55 604,311.02 584,833.35 549,769.72 542,260.35 426,443.30 60,997.61
01.01 OBRAS PROVISIONALES 52,322.63 18,539.95 1,958.00 1,680.72 2,949.29 3,047.59 2,858.48 2,346.78 2,425.00 2,346.78 14,170.04
01.01.01 CASETA, OFICINA Y ALMACEN glb 4,800.00 2,400.00 400.00 341.42 602.51 622.59 433.48
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 8.50M X 3.60 M und 2,051.07 2,051.07 0.00
01.01.03 MANTENIMIENTO Y DESVIO DE TRANSITO día 18,696.00 701.10 1,558.00 1,339.30 2,346.78 2,425.00 2,425.00 2,346.78 2,425.00 2,346.78 782.26
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 26,775.56 13,387.78 0.00 13,387.78
01.02 TRABAJOS PRELIMINARES 36,254.14 14,861.86 0.00 0.00 4,113.90 8,502.06 8,502.06 274.26 0.00 0.00 0.00
01.02.01 TRAZO Y REPLANTEO DURANTE LA OBRA m2 14,861.86 14,861.86 0.00
01.02.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO EXISTENTES m3 21,392.28 0.00 0.00 4,113.90 8,502.06 8,502.06 274.26
01.03 SEGURIDAD Y SALUD EN EL TRABAJO 157,705.60 5,913.97 -1,175.41 2,809.22 4,922.46 5,086.54 5,086.54 4,922.46 5,086.54 4,922.46 1,640.82
01.03.01 SEGURIDAD Y SALUD EN EL TRABAJO glb 39,215.60 1,470.59 3,267.97 2,809.22 4,922.46 5,086.54 5,086.54 4,922.46 5,086.54 4,922.46 1,640.82
01.03.02 PLAN DE SEGURIDAD Y SALUD FRENTE AL COVID-19 (DEDUCTIVO) glb 118,490.00 4,443.38 -4,443.38
01.04 MOVIMIENTO DE TIERRAS 290,562.36 125,557.90 28,595.52 31,868.13 56,237.87 40,217.11 8,085.83 0.00 0.00 0.00 0.00
01.04.01 CORTE A NIVEL DE SUB RASANTE CON MAQUINARIA m3 42,833.73 21,895.90 2,887.86 4,697.89 8,290.40 5,061.68
01.04.02 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 71,871.04 13,766.55 13,851.30 7,882.63 13,910.52 14,374.21 8,085.83
01.04.03 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 175,857.59 89,895.45 11,856.36 19,287.61 34,036.95 20,781.22
01.05 PAVIMENTO 2,339,732.76 21,854.14 0.00 7,394.97 178,475.62 467,666.05 467,666.05 452,580.04 442,114.42 301,981.47 0.00
01.05.01 MEJORAMIENTO DE SUB RASANTE CON OVER E=0.20m. m2 286,555.28 21,854.14 0.00 7,394.97 55,462.31 57,311.06 57,311.06 55,462.31 31,759.43
01.05.02 CONFORMACION DE SUB BASE GRANULAR E=0.20m. m2 231,287.73 0.00 0.00 28,351.40 46,257.55 46,257.55 44,765.37 46,257.55 19,398.31
01.05.03 PAVIMENTO CONCRETO F'C=280 KG/CM2 E=0.20 m m2 1,711,790.26 0.00 0.00 88,350.47 342,358.05 342,358.05 331,314.24 342,358.05 265,051.40
01.05.04 ENCOFRADO Y DESENCOFRADO DE LOSA PARA PAVIMENTO m2 110,099.49 0.00 0.00 6,311.44 21,739.39 21,739.39 21,038.12 21,739.39 17,531.76
01.06 JUNTAS Y SELLADO 126,614.21 0.00 0.00 0.00 3,998.41 25,005.77 25,322.84 24,505.97 25,322.84 21,507.16 951.22
01.06.01 JUNTA DE CONSTRUCCION CON DOWELS m 77,469.15 0.00 0.00 3,998.41 15,493.83 15,493.83 14,994.03 15,493.83 11,995.22
01.06.02 JUNTA LONGITUDINAL E=1" m 10,863.51 0.00 0.00 2,102.61 2,172.70 2,102.61 2,172.70 2,102.61 210.28
01.06.03 JUNTA TRANSVERSAL E=1" m 16,554.54 0.00 0.00 3,204.10 3,310.91 3,204.10 3,310.91 3,204.10 320.42
01.06.04 JUNTA LATERAL E=1" m 21,727.01 0.00 0.00 4,205.23 4,345.40 4,205.23 4,345.40 4,205.23 420.52
01.07 SARDINELES DE CONCRETO 326,663.19 0.00 0.00 0.00 0.00 54,785.90 67,311.55 65,140.21 67,311.55 64,872.44 7,241.54
01.07.01 EXCAVACION DE ZANJA PARA SARDINEL m 17,162.69 0.00 0.00 3,432.54 3,546.96 3,432.54 3,546.96 3,203.69
01.07.02 ENCOFRADO Y DESENCOFRADO CARA VISTA EN SARDINELES m2 73,123.39 0.00 0.00 12,026.87 14,913.32 14,432.25 14,913.32 14,432.25 2,405.38
01.07.03 CONCRETO F'C=210 KG/CM2 PARA SARDINELES m3 161,553.81 0.00 0.00 25,848.61 33,387.79 32,310.76 33,387.79 32,310.76 4,308.10
01.07.04 ACERO CORRUGADO DE 3/8" FY= 4200 kg/cm2 GRADO 60 EN SARDINELES kg 70,858.93 0.00 0.00 12,754.61 14,644.18 14,171.79 14,644.18 14,171.79 472.38
01.07.05 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 2,920.37 0.00 0.00 584.07 603.54 584.07 603.54 545.15
01.07.06 JUNTA ASFALTICA E=1" EN SARDINELES m 1,044.00 0.00 0.00 139.20 215.76 208.80 215.76 208.80 55.68
01.08 PINTURA Y SEÑALIZACIÓN 67,806.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30,812.99 36,993.99
01.08.01 PINTADO DE PASES PEATONALES m2 10,804.22 0.00 0.00 4,321.69 6,482.53
01.08.02 PINTADO LINEAL DE PAVIMENTO m 18,181.68 0.00 0.00 7,272.67 10,909.01
01.08.03 PINTADO EN SARDINELES m 23,445.25 0.00 0.00 9,378.10 14,067.15
01.08.04 SEÑALIZACIONES VERTICALES (REGLAMENTARIAS Y PREVENTIVAS) und 8,867.25 0.00 0.00 5,675.04 3,192.21
01.08.05 SEÑALIZACIONES VERTICALES (INDICADORES DE CALLES) und 6,508.58 0.00 0.00 4,165.49 2,343.09
PROYECTO: "CONSTRUCCION DE PISTAS, VEREDAS, SARDINELES Y AREAS VERDES DE EL SECTOR NUEVA JERUSALEN, DE LA CIUDAD DE BAGUA, DISTRITO DE BAGUA, PROVINCIA DE BAGUA – AMAZONAS"
OBJETO : EJECUCION DE OBRA
ENTIDAD CONTRATANTE: GOBIERNO REGIONAL AMAZONAS
CONTRATISTA: CONSORCIO EJECUTOR BAGUA RESIDENTE: ING. ALBERTO WALTER CENTURION CHAVEZ
CONSULTOR SUPERVISION: CONSORCIO NUEVA JERUSALEN SUPERVISOR: ING. JOSÉ LUIS REQUEJO DIAZ
CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO - AFECTADO POR LA SUSPENSIÓN DE PLAZO N° 01 (21/02/23 AL 14/05/23)
N° ITEM DESCRIPCION UNIDAD SUB TOTAL MES 1 MES 2 Suspensión MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10
23 al 31 ene. 1 al 20 feb. 21 Feb al 14 15 al 31 may. 1 al 30 jun. 1 al 31 jul. 1 al 31 ago. 1 al 30 set. 1 al 31 Oct. 1 al 30 Nov. 1 al 11 Dic.
2023 2023 May 2023 2023 2023 2023 2023 2023 2023 2023 2023
02 CONSTRUCCION DE VEREDAS, MARTILLOS Y RAMPAS 1,321,175.41 0.00 4,995.31 0.00 12,408.99 39,959.22 285,543.61 282,443.26 290,462.09 351,613.45 53,749.48
02.01 TRABAJOS PRELIMINARES 25,083.51 0.00 4,995.31 0.00 0.00 1,591.76 7,728.04 5,982.45 4,785.95 0.00 0.00
02.01.01 TRAZO Y REPLANTEO m2 7,136.16 0.00 4,995.31 594.68 1,546.17
02.01.02 DEMOLICION DE VEREDAS EXISTENTES m2 17,947.35 0.00 0.00 997.08 6,181.87 5,982.45 4,785.95
02.02 MOVIMIENTO DE TIERRAS 182,762.90 0.00 0.00 0.00 0.00 5,782.63 47,213.74 45,690.73 47,213.74 36,862.06 0.00
02.02.01 CORTE SUPERFICIAL MANUAL HASTA 0.40M EN VEREDA INCL. UÑA m3 45,787.10 0.00 0.00 1,907.80 11,828.33 11,446.78 11,828.33 8,775.86
02.02.02 NIVELACION Y COMPACTACIÓN m2 16,634.97 0.00 0.00 554.50 4,297.37 4,158.74 4,297.37 3,326.99
02.02.03 RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR m3 67,754.88 0.00 0.00 1,129.25 17,503.34 16,938.72 17,503.34 14,680.23
02.02.04 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 52,585.95 0.00 0.00 2,191.08 13,584.70 13,146.49 13,584.70 10,078.98
02.03 OBRAS DE CONCRETO SIMPLE 826,639.10 0.00 0.00 0.00 0.00 0.00 199,834.16 206,288.61 213,164.89 206,288.60 1,062.84
02.03.01 VEREDA DE CONCRETO F'C=210 KG/CM2 PASTA 1:2 m2 716,846.60 0.00 0.00 173,237.93 179,211.65 185,185.37 179,211.65
02.03.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 75,527.50 0.00 0.00 18,572.34 18,572.34 19,191.41 18,572.34 619.07
02.03.03 JUNTA DE DILATACIÓN DE 3/4" m 6,163.61 0.00 0.00 1,232.72 1,479.27 1,528.58 1,479.27 443.77
02.03.04 BRUÑAS EN VEREDAS m 28,101.39 0.00 0.00 6,791.17 7,025.35 7,259.53 7,025.34
02.04 OTROS 286,689.90 0.00 0.00 0.00 12,408.99 32,584.83 30,767.67 24,481.47 25,297.51 108,462.79 52,686.64
02.04.01 NIVELACION DE BUZONES und 7,668.54 0.00 0.00 408.99 1,584.83 1,584.83 1,533.71 1,584.83 971.35
02.04.02 NIVELACION DE CAJAS DE DESAGUE und 45,895.52 0.00 0.00 11,091.42 11,473.88 11,856.34 11,473.88
02.04.03 NIVELACION DE CAJAS DE AGUA und 45,895.52 0.00 0.00 11,091.42 11,473.88 11,856.34 11,473.88
02.04.04 CORTE SUPERFICIAL MANUAL PARA JARDINERIA HASTA 0.25 M m3 18,047.62 0.00 0.00 13,535.72 4,511.90
02.04.05 EXCAVACION DE HOYOS PARA PLANTONES EN JARDINERIA m3 1,648.51 0.00 0.00 1,236.38 412.13
02.04.06 ACARREO MANUAL DE MATERIAL EXCEDENTE EN AREA DE JARDINERIA D=50M m3 9,458.01 0.00 0.00 7,093.51 2,364.50
02.04.07 ELIMINACION DE MATERIAL EXCEDENTE EN AREA DE JARDINERIA C/MAQ m3 14,167.10 0.00 0.00 10,625.33 3,541.77
02.04.08 INCORPORACION DE TIERRA AGRICOLA EN AREA DE JARDINERIA m3 46,905.57 0.00 0.00 35,179.18 11,726.39
02.04.09 SIEMBRA DE GRASS m2 18,336.39 0.00 0.00 11,918.65 6,417.74
02.04.10 SIEMBRA DE PLANTONES und 6,606.54 0.00 0.00 4,954.91 1,651.63
02.04.11 LIMPIEZA GENERAL DE LA OBRA m2 22,060.58 0.00 0.00 22,060.58
02.04.12 ACONDICIONAMIENTO DE SISTEMA DE AGUA Y ALCANTARILLADO glb 50,000.00 0.00 0.00 12,000.00 31,000.00 7,000.00
03 MITIGACION DE IMPACTO AMBIENTAL 63,390.00 2,377.13 3,180.00 4,508.91 10,091.47 8,222.13 8,222.13 7,956.90 8,222.13 7,956.90 2,652.30
03.01 MITIGACION DE IMPACTO AMBIENTAL glb 63,390.00 2377.13 3,180.00 4,508.91 10,091.47 8,222.13 8,222.13 7,956.90 8,222.13 7,956.90 2,652.30
COSTO DIRECTO (A) 4,782,227.28 189,104.95 37,553.42 48,261.95 273,198.01 652,492.37 878,599.09 840,169.88 840,944.57 786,013.65 117,399.39
GASTOS GENERALES 581,117.77 22,979.30 4,563.35 5,864.61 33,197.97 79,288.35 106,763.96 102,094.20 102,188.33 95,513.34 28,664.36
UTILIDAD (C) 400,000.00 15,817.31 3,141.08 4,036.78 22,851.11 54,576.44 73,488.69 70,274.36 70,339.16 65,744.57 9,819.64
SUB TOTAL (A+B+C) 5,763,345.05 227,901.56 45,257.85 58,163.34 329,247.09 786,357.16 1,058,851.74 1,012,538.44 1,013,472.06 947,271.56 155,883.39
IGV - 0% (OFERTA SIN IGV) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MONTO TOTAL DE LA OFERTA 5,763,345.05 227,901.56 45,257.85 58,163.34 329,247.09 786,357.16 1,058,851.74 1,012,538.44 1,013,472.06 947,271.56 155,883.39
% AVANCE MENSUAL 3.95% 0.79% 1.01% 5.71% 13.64% 18.37% 17.57% 17.58% 16.44% 2.70%
% AVANCE ACUMULADO 3.95% 4.74% 5.75% 11.46% 25.11% 43.48% 61.05% 78.63% 95.07% 97.77%
PROYECTO: "CONSTRUCCION DE PISTAS, VEREDAS, SARDINELES Y AREAS VERDES DE EL SECTOR NUEVA JERUSALEN, DE LA CIUDAD DE BAGUA, DISTRITO DE BAGUA, PROVINCIA DE BAGUA – AMAZONAS"
OBJETO : EJECUCION DE OBRA
ENTIDAD CONTRATANTE: GOBIERNO REGIONAL AMAZONAS
CONTRATISTA: CONSORCIO EJECUTOR BAGUA RESIDENTE: ING. ALBERTO WALTER CENTURION CHAVEZ
CONSULTOR SUPERVISION: CONSORCIO NUEVA JERUSALEN SUPERVISOR: ING. JOSÉ LUIS REQUEJO DIAZ
CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO - AFECTADO POR LA SUSPENSIÓN DE PLAZO N° 01 (21/02/23 AL 14/05/23)
N° ITEM DESCRIPCION UNIDAD SUB TOTAL MES 1 MES 2 Suspensión MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10
23 al 31 ene. 1 al 20 feb. 21 Feb al 14 15 al 31 may. 1 al 30 jun. 1 al 31 jul. 1 al 31 ago. 1 al 30 set. 1 al 31 Oct. 1 al 30 Nov. 1 al 11 Dic.
2023 2023 May 2023 2023 2023 2023 2023 2023 2023 2023 2023
IMPORTANTE:
Debe tenerse en cuenta que el monto de Contrato Original solo llegará a valorizarse hasta el 97.77%, ello debido al deductivo de Obra N° 01 cuyo monto fue de S/ 128,400.86 que representa el 2.23% del Monto de Contrato original, lo cual
fue aprobado mediante RESOLUCION DE GERENCIA GENERAL REGIONAL N° 173-2023- GOBIERNO REGIONAL AMAZONAS/GGR, la cual aprobó el Adicional de Obra N° 01 y Deductivo vinculante de Obra N° 01, ya mencionado.
PARCIAL
3,279,171.87
52,322.63
4,800.00
2,051.07
18,696.00
26,775.56
36,254.14
14,861.86
21,392.28
39,215.60
39,215.60
0.00
290,562.36
42,833.73
71,871.04
175,857.59
2,339,732.76
286,555.28
231,287.73
1,711,790.26
110,099.49
126,614.21
77,469.15
10,863.51
16,554.54
21,727.01
326,663.19
17,162.69
73,123.39
161,553.81
70,858.93
2,920.37
1,044.00
67,806.98
10,804.22
18,181.68
23,445.25
8,867.25
6,508.58
PARCIAL
1,321,175.41
25,083.51
7,136.16
17,947.35
182,762.90
45,787.10
16,634.97
67,754.88
52,585.95
826,639.10
716,846.60
75,527.50
6,163.61
28,101.39
286,689.90
7,668.54
45,895.52
45,895.52
18,047.62
1,648.51
9,458.01
14,167.10
46,905.57
18,336.39
6,606.54
22,060.58
50,000.00
63,390.00
63,390.00
4,663,737.28
581,117.77
390,089.14
5,634,944.19
0.00
5,634,944.19