- LA COLUMNA "E" REFERIDO A MANO DE OBRA Y EQUIPO ESTAN CON FORMULA.

- SI VARIAN EL RENDIMIENTO DE LA CELDA D20 Y LAS CUADRILLAS DE D39 A D42, AUTOMATICAMENT


LAS CANTIDADES DE MANO DE OBRA Y EQUIPO SE RECALCULAN.
- ESTE MISMO FORMATO LO PUEDEN UTILIZAR PARA CUALQUIER ESPECIALIDAD: ESTRUCTURAS, ARQ
SANITARIAS E INSTALACIONES ELECTRICAS.
ANALISIS DE COSTO UNITARIO

PARTIDA Nº: 04.01 Cimientos corridos 1:10 Cemento-Hormigon+ 30% PG

CUADRILLA: 0.1 Cap + 1 Op+ 2 Of + 8 Pe

Rendimiento 25.00 m3/día


Unidad m3

DESCRIPCIONUND CUADRILLA CANTIDAD P.UNIT PARCIAL TOTAL


MATERIALES 0
PIEDRA GRANDE m3 0.5136 31.93 16.4
CEMENTO PORTLA bls 3.1000 14.12 43.76
HORMIGON (PU m3 0.8900 25.21 22.44
GASOLINA Gln 0.0800 11.02 0.88
AGUA m3 0.1070 5.00 0.54
0
0
0
0
0
0
0
COSTO MATERIALES S/. 84.02
MANO DE OBRA
CAPATAZ HH 0.1000 0.0320 14.27 0.46
OPERARIO HH 1.0000 0.3200 11.89 3.80
OFICIAL HH 2.0000 0.6400 10.64 6.81
PEON HH 8.0000 2.5600 9.61 24.6

COSTO MANO DE OBRA S/. 35.67


EQUIPO Y HERRAMIENTAS
HERRAMIENT %MO 0.030 35.67 1.07
MEZCLADORA DE HM 1.000 0.3200 17.00 5.44
HM 0.0000 0.00
HM 0.0000 0.00
HM 0.0000 0.00
HM 0.0000 0.00
HM 0.0000 0.00
HM 0.0000 0.00
COSTO EQUIPO Y HERRAMIENTAS S/. 6.51
TOTAL S/. 126.20
39 A D42, AUTOMATICAMENTE

ALIDAD: ESTRUCTURAS, ARQUITECTURA, INSTALACIONES


PRESUPUESTO COSTO DIRECTO

OBRA:
UBICACIÓN:

PROPIETARIO:

CLAVE CONCEPTO
PARTIDA 1

PARTIDA 2

PARTIDA 3

PARTIDA 4
STO COSTO DIRECTO

FECHA:

U.M. CANT. P.U. IMPORTE

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00
$0.00

TOTAL $0.00
ANALISIS DEL FACTOR DE LA MANO DE OBRA (FACT

TEXTO AZUL= CELDAS CAMBIABLES Datos


TEXTO NEGRO = CELDAS CON FÓRMULAS
AÑO
3 US.M.G (3 S.M.G.) U.M.A./SMG
Salario Nominal. Salario que se le paga directamente al trabajador INFONAVIT
Salario Integrado. Salario real, que le cuesta el trabajador al contratista.

DIAS NO TRABAJADOS AL AÑO DÍAS PAGADOS AL AÑO


g) Domingos 52.00 Días Calendario
h)Días festivos por ley 7.00 b) Aguinaldo por Ley
i)Días por costumbre 5.00 c)Prima Vacacional 25%
j)Días Sindicato d)Prima Dominical 0.25% por ley
6.00
k) Vacaciones e)Horas extra al año (especifique) por ley en días
-
l)Permisos y Enfermedad f)Prestaciones por Contrato de trabajo
m)Condiciones Climatológicas 3.00 g)Días por terminación de obra al año (CFE)
n)Horas inactivas por arrastre
o)Días no trabajados por guardia TOTAL X1 (DIAS)=

292.00
TOTAL Y1 (DIAS)= Factor para Salario Integrado X1/Y1

*Determinación del FSR calculado con importes


SALARIO PRES

CÓDIGO CATEGORÍA DIARIO CUOTA EXCEDENTE

NOMINAL FIJA 3 S.M.G.

MO1 OFICIAL ALBAÑIL $340.00 35.27 -


MO2 PEÓN $540.00 35.27 5.70
MO3 CABO $580.00 35.27 5.70
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
CTOR DE LA MANO DE OBRA (FACTOR SALARIO REAL) PARA LA REPUBLICA MEXICANA

Datos PRESTACIONES EN ESPECIE (IMSS)


CUOTA FIJA= 20.40 % 20.40
2022 EXEDENTE A 3 SAL. MIN. GRAV. DEL D.F. 1.10 % 1.10
$ 172.87 3 S.M.G $ 518.61
5% IMPORTE CUOTA FIJA 35.27
IMPORTE EXCEDENTE 5.70

AGADOS AL AÑO PRESTACIONES DEL IMSS (%)


365.00 Enfermedad y maternidad
15.00 Invalidéz y vida 1.750
1.50
por ley Cesantía en edad avanzada y retiro 3.150
Riesgos de trabajo 7.589
Guarderías 1.000
Pensionados 1.050
0 Prestaciones en dinero 0.700

381.50

1.3065 Suma en % de prestaciones del IMSS 15.24

PRESTACIONES DEL IMSS ($)

PRESTACIONES PENSIÓN RIESGO INVALIDEZ EDAD.AV. GUARDERÍA INFONAVIT

EN DINERO TRABAJO Y VIDA Y RETIRO

2.38 3.57 25.80 5.95 10.71 3.40 17.00


3.78 5.67 40.98 9.45 17.01 5.40 27.00
4.06 6.09 44.01 10.15 18.27 5.80 29.00
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
%
%
%
%
%
%

SALARIO

FSR INTEGRADO

1.7064 580.18
1.6700 901.80
1.6632 964.66
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
CUADRILLAS
1 JOR

Código Concepto Unidad Cantidad Costo Importe

-
-
-
-
TOTAL -

2 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

3 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

4 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

5 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

6 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

7 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

8 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

9 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -

10 JOR

Código Concepto Unidad Cantidad Costo Importe


-
-
-
-
-
TOTAL -
Tarjetas de análisis de precios unitarios de Básicos
* BÁSICOS Lista de elementos que componen la BASE de datos que intervienen generalmente en un Análisis de PU.
* Como se muestra en la mayor parte de las tarjetas, la mano de obra es de Albañil y peón. Esto es, porque en
obra pequeña, son ellos los que realizan la mayor parte de los trabajos. Pero para obra grande, es necesario
desglosar la mano de obra, con las categorías referentes a cada trabajo. En mi caso, estoy tomando la mano de
obra de una obra común.

AUX1 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX2 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00
M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX3 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX4 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00
M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX5 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00
Subtotal: MANO DE OBRA $0.00
COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX6 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX7 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3
Código Concepto Unidad Rend. Cantidad Costo Importe
MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX8 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX9 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00

AUX10 M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00

Subtotal: MATERIALES $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


MANO DE OBRA
$0.00
$0.00
$0.00
$0.00

Subtotal: MANO DE OBRA $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


HERRAMIENTA Y EQUIPO
$0.00
$0.00

Subtotal: HERR Y EQ $0.00


COSTO TOTAL $0.00

M3

Código Concepto Unidad Rend. Cantidad Costo Importe


EQUIPO
$0.00
$0.00
$0.00
$0.00

Subtotal: EQUIPO $0.00


COSTO TOTAL $0.00
un Análisis de PU.
ANÁLISIS, CÁLCULO E INTEGRACIÓN DE LOS COSTOS HORARIOS
DE LA MAQUINARIA Y EQUIPO DE CONSTRUCCIÓN

EQUIPO No. 1

DATOS GENERALES Gasolina X Diesel

(Pm) Precio de la maquina como nueva $0.00 (Ah )Cantidad de aceite consumido por hora

(Pn) Precio de las llantas $0.00 (Ga) Relación capacidad del carter entre

(Vm) Valor de la máquina $0.00 tiempo de cambios aceite

(Vr) Valor de resca 10 %Vm $0.00 (t) Horas enrte cambio de lubricante

(Ve) Vida económica de la máquina 0.00 Horas (Pa) Precio de lubricante

(IC) Instrumentos de captación 0.00 (Vn) Vidad de las llantas

(i) Tasa de interes anual 0.00 (Ht) Horas efectivas por turno

(Hea) Horas efectivas por año 0.00 Horas (Po) Costo horario por operación

(s) Prima anual promedio 0.00 % (Sr) Salario real del personal operador

(Ko) Mantenimiento mayor y menor 0.00 % (Ppe) Valor de piezas especiales consideradas

(Gh) Cantidad de combustible por hora 0.00 Lt (Vpe) Vida económica de las piezas especiales

(Pc) Precio del combustible $0.00 Lt

I CARGOS FIJOS

I.1 Depreciación D= (Vm-Vr)/Ve = #DIV/0!

I.2 Inversión Im= (Vm+Vr) i /2Hea = #DIV/0!

I.3 Seguros Sm= (Vm+Vr) s /2Hea = #DIV/0!

I.4 Mantenimiento Mn= Ko x D = #DIV/0!

(1) SUMA CARGOS FIJOS =

II. CONSUMOS

II.1 Combustibles CO= Gh x Pc = -

II.2 Otras fuentes de energía =

II.3 Lubricantes Lb= (Ah*Pa) = -

II.4 Llantas N= Pn/Vn = #DIV/0!

II.5 Piezas Especiales Ae= Ppe/Vpe -

(2) SUMA CONSUMOS =

III. OPERACIÓN

CATEGORÍAS CANTIDAD SALARIO REAL

OPERADOR 001 1 $0.00

$0.00

$0.00

$0.00

$0.00

(Po)=

III.1 OPERACIÓN Po=Sr/Ht


(3) SUMA OPERACIÓN
(1)+(2)+(3)=
ANÁLISIS, CÁLCULO E INTEGRACIÓN DE LOS COSTOS HORARIOS
DE LA MAQUINARIA Y EQUIPO DE CONSTRUCCIÓN

EQUIPO No.3

DATOS GENERALES Gasolina X Diesel

(Pm) Precio de la maquina como nueva $0.00 (Ah )Cantidad de aceite consumido por hora

(Pn) Precio de las llantas $0.00 (Ga) Relación capacidad del carter entre

(Vm) Valor de la máquina $0.00 tiempo de cambios aceite

(Vr) Valor de resca 10 %Vm $0.00 (t) Horas enrte cambio de lubricante

(Ve) Vida económica de la máquina 0.00 Horas (Pa) Precio de lubricante

(IC) Instrumentos de captación 1.00 (Vn) Vidad de las llantas

(i) Tasa de interes anual 0.0000 (Ht) Horas efectivas por turno

(Hea) Horas efectivas por año 0.00 Horas (Po) Costo horario por operación

(s) Prima anual promedio 0.00 % (Sr) Salario real del personal operador

(Ko) Mantenimiento mayor y menor 0.00 % (Ppe) Valor de piezas especiales consideradas

(Gh) Cantidad de combustible por hora 0.00 Lt (Vpe) Vida económica de las piezas especiales

(Pc) Precio del combustible $0.00 Lt

I CARGOS FIJOS

I.1 Depreciación D= (Vm-Vr)/Ve = #DIV/0!

I.2 Inversión Im= (Vm+Vr) i /2Hea = #DIV/0!

I.3 Seguros Sm= (Vm+Vr) s /2Hea = #DIV/0!

I.4 Mantenimiento Mn= Ko x D = #DIV/0!

(1) SUMA CARGOS FIJOS =

II. CONSUMOS

II.1 Combustibles CO= Gh x Pc = -

II.2 Otras fuentes de energía =

II.3 Lubricantes Lb= (Ah*Pa) = -

II.4 Llantas N= Pn/Vn = #DIV/0!

II.5 Piezas Especiales Ae= Ppe/Vpe -

(2) SUMA CONSUMOS =

III. OPERACIÓN

CATEGORÍAS CANTIDAD SALARIO REAL

#REF! 1 #REF!

$0.00

$0.00

$0.00

$0.00

(Po)=

III.1 OPERACIÓN Po=Sr/Ht


(3) SUMA OPERACIÓN
(1)+(2)+(3)=
TOS HORARIOS C-H 1 ANÁLISIS, CÁLCULO E INT
UCCIÓN DE LA MAQUINAR

EQUIPO No.2

Otro DATOS GENERALES Gasolina

h )Cantidad de aceite consumido por hora 0.02 Lt (Pm) Precio de la maquina como nueva

a) Relación capacidad del carter entre 0.60 Lt/Hr. (Pn) Precio de las llantas

tiempo de cambios aceite (Vm) Valor de la máquina

Horas enrte cambio de lubricante 0.00 Horas (Vr) Valor de resca 10 %Vm

a) Precio de lubricante $0.00 Lt (Ve) Vida económica de la máquina

n) Vidad de las llantas 0.00 Horas (IC) Instrumentos de captación

t) Horas efectivas por turno 0.00 Horas (i) Tasa de interes anual

o) Costo horario por operación $0.00 (Hea) Horas efectivas por año

r) Salario real del personal operador $0.00 (s) Prima anual promedio

pe) Valor de piezas especiales consideradas como nu $0.00 (Ko) Mantenimiento mayor y menor

pe) Vida económica de las piezas especiales 0.00 Horas (Gh) Cantidad de combustible por hora

(Pc) Precio del combustible

I CARGOS FIJOS

I.1 Depreciación

I.2 Inversión

I.3 Seguros

I.4 Mantenimiento

) SUMA CARGOS FIJOS = #DIV/0!

II. CONSUMOS

II.1 Combustibles

II.2 Otras fuentes de energía

II.3 Lubricantes

II.4 Llantas

II.5 Piezas Especiales

) SUMA CONSUMOS = -

III. OPERACIÓN

IMPORTE CATEGORÍAS CANTIDAD

0 #REF! 1

#DIV/0!

III.1 OPERACIÓN
3) SUMA OPERACIÓN
#DIV/0!
TOS HORARIOS C-H 3
UCCIÓN

Otro

h )Cantidad de aceite consumido por hora 0.00 Lt

a) Relación capacidad del carter entre 0.0000 Lt/Hr.

tiempo de cambios aceite

Horas enrte cambio de lubricante 0.00 Horas

a) Precio de lubricante $0.00 Lt

n) Vidad de las llantas 0.00 Horas

t) Horas efectivas por turno 0.00 Horas

o) Costo horario por operación $0.00

r) Salario real del personal operador #REF!

pe) Valor de piezas especiales consideradas como nu $0.00

pe) Vida económica de las piezas especiales 0.00 Horas

) SUMA CARGOS FIJOS = #DIV/0!

) SUMA CONSUMOS = -

IMPORTE

#REF!

#REF!

3) SUMA OPERACIÓN
#DIV/0!
ANÁLISIS, CÁLCULO E INTEGRACIÓN DE LOS COSTOS HORARIOS C-H 2
DE LA MAQUINARIA Y EQUIPO DE CONSTRUCCIÓN

Diesel X Otro

$0.00 (Ah )Cantidad de aceite consumido por hora 0.00 Lt

$0.00 (Ga) Relación capacidad del carter entre 0.0000 Lt/Hr.

$0.00 tiempo de cambios aceite

$0.00 (t) Horas enrte cambio de lubricante 0.00 Horas

0.00 Horas (Pa) Precio de lubricante $0.00 Lt

0.00 (Vn) Vidad de las llantas 0.00 Horas

0.0000 (Ht) Horas efectivas por turno 0.00 Horas

0.00 Horas (Po) Costo horario por operación $0.00

0.00 % (Sr) Salario real del personal operador $0.00

0.00 % (Ppe) Valor de piezas especiales consideradas como nu $0.00

0.00 Lt (Vpe) Vida económica de las piezas especiales 0.00 Horas

$0.00 Lt

D= (Vm-Vr)/Ve = #DIV/0!

Im= (Vm+Vr) i /2Hea = #DIV/0!

Sm= (Vm+Vr) s /2Hea = #DIV/0!

Mn= Ko x D = #DIV/0!

(1) SUMA CARGOS FIJOS = #DIV/0!

CO= Gh x Pc = -

Lb= (Ah*Pa) = -

N= Pn/Vn = #DIV/0!

Ae= Ppe/Vpe -

(2) SUMA CONSUMOS = -

CANTIDAD SALARIO REAL IMPORTE

1 $0.00 0

$0.00 0

$0.00 0

$0.00 0

$0.00 0

(Po)= #DIV/0!

Po=Sr/Ht
(3) SUMA OPERACIÓN
(1)+(2)+(3)= #DIV/0!
ANALISIS DE PRECIOS UNITARIOS 2022

0 0 0

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
1.000000 $0.00 $0.00

1.000000 $0.00 $0.00


1.000000 $0.00 $0.00

Subtotal: MATERIALES $0.00

MANO DE OBRA
$0.00 $0.00
1.0000
1.0000 $0.00 $0.00

1.0000 $0.00 $0.00

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
$0.00 $0.00
1.0000
1.0000 $0.00 $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
$0.00 $0.00
1.0000
$0.00 $0.00
1.0000
$0.00 $0.00
1.0000

Subtotal: AUXILIARES $0.00

EQUIPO
$0.00 $0.00
1.0000
$0.00 $0.00
1.0000

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00


00 0

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
$0.00 $0.00
1.0000
1.0000 $0.00 $0.00

1.0000 $0.00 $0.00

Subtotal: MATERIALES $0.00

MANO DE OBRA
$0.00 $0.00
1.0000
$0.00 $0.00
1.0000
$0.00 $0.00
1.0000

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00

Subtotal: AUXILIARES $0.00

EQUIPO
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00

00 0
Código Concepto Unidad Rend. Cantidad Costo Importe
MATERIALES
$0.00
1.0000 $0.00
1.0000 $0.00 $0.00

1.0000 $0.00 $0.00

Subtotal: MATERIALES $0.00

MANO DE OBRA
1.0000 $0.00 $0.00

0.0000 $0.00 $0.00

0.0000 $0.00 $0.00

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
3 - $0.00

4 - $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
1.0000 $0.00 $ -
1.0000 $0.00 $ -
1.0000 $0.00 $ -

Subtotal: AUXILIARES $ -

EQUIPO
1.0000 $0.00 $0.0000
1.0000 $0.00 $0.0000

Subtotal:EQUIPO $0.0000

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00

00 0
Cimentaciones

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
$0.00
1.0000 $0.00
1.0000 $0.00 $0.00

1.0000 $0.00 $0.00

Subtotal: MATERIALES $0.00

MANO DE OBRA
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
$0.00
1.0000 $0.00
$0.00
1.00000 $0.00

Subtotal: AUXILIARES $0.00

EQUIPO
$0.00
1.0000 $0.00
$0.00
1.0000 $0.00

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00

#REF!
Cimentaciones

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
2.150000 $0.00 $0.00

$0.00 $0.00
2.85
$0.00 $0.00
0.09
$0.00 $0.00
0.5
Subtotal: MATERIALES $0.00

MANO DE OBRA
$0.00 $0.00
0.1000
$0.00 $0.00
1.0000
$0.00 $0.00
1.0000

$0.00
Subtotal: MANO DE OBRA

HERRAMIENTA Y EQUIPO
1.000000 $0.00 $0.00

1.000000 $0.00 $0.00

$0.00
Subtotal: HERRAMIENTA Y EQUIPO

AUXILIARES
3.000000 $0.00 $0.00

4.000000 $0.00 $0.00

$0.00 $0.00

Subtotal: AUXILIARES $0.00

EQUIPO
7.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00

#REF!
Cimentaciones

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
2.000000 $0.00 $0.00

3.000000 $0.00 $0.00

4.000000 $0.00 $0.00

5.000000 $0.00 $0.00

Subtotal: MATERIALES $0.00


MANO DE OBRA
1.000000 $0.00 $0.00

2.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: AUXILIARES $0.00

EQUIPO
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00

#REF!
Cimentaciones

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
2.000000 $0.00 $0.00

3.000000 $0.00 $0.00

4.000000 $0.00 $0.00

5.000000 $0.00 $0.00

Subtotal: MATERIALES $0.00

MANO DE OBRA
1.000000 $0.00 $0.00

2.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: AUXILIARES $0.00

EQUIPO
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00

#REF!

Código Concepto Unidad Rend. Cantidad Costo Importe


MATERIALES
2.000000 $0.00 $0.00

3.000000 $0.00 $0.00

4.000000 $0.00 $0.00

5.000000 $0.00 $0.00

Subtotal: MATERIALES $0.00

MANO DE OBRA
1.000000 $0.00 $0.00

2.000000 $0.00 $0.00


3.000000 $0.00 $0.00

Subtotal: MANO DE OBRA $0.00

HERRAMIENTA Y EQUIPO
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: HERRAMIENTA Y EQUIPO $0.00

AUXILIARES
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal: AUXILIARES $0.00

EQUIPO
3.000000 $0.00 $0.00

3.000000 $0.00 $0.00

Subtotal:EQUIPO $0.00

Costo directo $0.00

INDIRECTO $0.00

UTILIDADES $0.00

COSTO TOTAL $0.00


CONCRETO F´C

(KG/CM2)

F´C=100, (GUARNICIONES, BANQUETAS Y FIRMES.)

F´C=150, (PISOS, CADENAS Y CASTILLOS.)

F´C=200, (LOSAS, TRABES, ZAPATAS Y MUROS.)

F´C=250, (COLUMNAS Y LOSAS ESPECIALES.)

F´C=300, (CONCRETO DE ALTA RESISTENCIA)

% DESPERDICIO DURANTE LA FAB. Y COLOCACIÓN.

1 SACO APROX. = 33 LTS. = 1.74 BOTES 5 PALAS APROX, = 1 BOTE DE 19 LTS.

1 CARRETILLA APROX. = 3.5 BOTES DE CONCRETO. 1 CARRETILLA APROX. =5 BOTES DE ARENA

DETALLE DE VARILLAS CORRUGADAS

No. Ø pulg. Ø mm. Kg/m. mm2 pulg. 2

0.0143 ALAMBRE #18

2.5 (1/4") 6.35 0.251 ALAMBRÓN

3 (3/8") 9.5 0.557 71 0.11

4 (1/2") 12.7 0.996 127 0.2

5 (5/8") 15.9 1.56 199 0.31

6 (3/4") 19.1 2.25 287 0.44

MORTERO-ARENA

MORTERO - ARENA 1.:4 (PISOS Y FIRMES)

MORTERO - ARENA 1.:5 (APLANADOS: ENJARRE, SARPEO)

MORTERO - ARENA 1.:6 (PEGADO DE BLOQUES)

MORTERO - ARENA 1.:7

MORTERO - ARENA 1.:8 (CIMIENTOS DE MAMPOSTERÍA)

% DESPERDICIO DURANTE LA FABRICACIÓN Y COLOC.

GANCHOS Y DOBLECES (cm) EMPALME "e" (cm)

Ø pulg. a b c d LOSA Y COL.

F´C=150

(1/4") 4 9 3 7 40

(3/8") 6 13 4 8 40

(1/2") 8 17 5 10 50
(5/8") 10 21 6 11 65

(3/4") 11 26 8 12 75
Tarjetas de Bolsillo, para verificación de tiempos y rendimientos.

CEM. ARE GRAV. AGUA VOL.

(SACO) (BOTE) (BOTE) (BOTE) (M3)

1 7.50 8.00 3.00 0.175

1 5.50 6.50 2.50 0.151

1 4.00 6.00 2.00 0.133

1 3.50 5.00 1.75 0.120

1 2.50 4.50 1.25 0.103

3% 10% 10% 30% 5%

DETALLE DE VARILLAS CORRUGADAS

No. Ø pulg. Ø mm. Kg/m. mm2 pulg. 2

7 (7/8") 22.2 3.034 387 0.6

8 (1") 25.4 3.975 507 0.79

9 (1 1/8") 28.6 5.033 642 0.99

10 (1 1/4") 31.8 6.225 794 1.23

11 (1 3/8") 34.9 7.503 957 1.48

12 (1 1/2") 38.1 8.938 1140 1.77

MORT. ARE AGUA VOL.

(BOTE) (BOTE) (BOTE) (M3)

1 4.00 3.00 0.095

1 5.00 2.50 0.110

1 6.00 2.00 0.127

1 7.00 1.75 0.146

1 8.00 1.25 0.168

3% 3% 10% 30%

EMPALME "e" (cm) DETALLE

LOSA Y COL. NERVADURA d c

F´C=200 F´C=150 F´C=200


a
b
25 60 40

30 60 45 5

40 75 60
50 95 70

e
60 115 85
ón de tiempos y rendimientos.

CONCRETO F´C CEM.

(KG/CM2) (TON)

FC=100, RN., AGR. MAX. 20 MM. 0.2750

FC=150, RN., AGR. MAX. 20 MM. 0.3275

FC=200, RN., AGR. MAX. 20 MM. 0.3697

FC=250, RN., AGR. MAX. 20 MM. 0.4130

FUENTE: BIMSA

% DESPERDICIO DURANTE LA FAB. Y COLOCACIÓN. 3%

MUROS (TABIQUE ROJO RECOCIDO Y TABICÓN)

(M2)

TRR 7×14×28 CM. DE 7CM. ESP. (CAPUCHINO), MORTERO CON JUNTAS DE 1.5 CM.

TRR 7×14×28 CM. DE 14CM. ESP. (A SOGA), MORTERO CON JUNTAS DE 1.5 CM.

TRR 7×14×28 CM. DE 28CM. ESP. (A TIZÓN), MORTERO CON JUNTAS DE 1.5 CM.

TABICÓN 10×14×28 CM. DE 10CM. ESP. (CAPUCHINO), MORT CON JUNTAS DE 1.5 CM.

TABICÓN 10×14×28 CM. DE 14CM. ESP. (A SOGA), MORT. CON JUNTAS DE 1.5 CM.

TABICÓN 10×14×28 CM. DE 28CM. ESP. (A TIZÓN), MORT. CON JUNTAS DE 1.5 CM.

MEZCLA

MORTERO-ARENA

MORTERO - ARENA 1.:4

MORTERO - ARENA 1.:5

MORTERO - ARENA 1.:6

MORTERO - ARENA 1.:7

MORTERO - ARENA 1.:8

% DESPERDICIO DURANTE LA FABRICACIÓN Y COLOC.

GANCHOS Y DOBLECES (cm) EMPALME "e" (cm)

Ø pulg. a b c d LOSA Y COL. NERVADURA

F´C=150 F´C=200 F´C=150

(7/8") 14 30 9 13 90 70 135

(1") 15 34 10 14 100 75 150

(1 1/8") 17 38 11 15 115 85 170


(1 1/4") 19 43 13 16 125 95 190

(1 1/2") 23 51 15 18 150 115 230


ARE GRAV. AGUA VOL.

(M3) (M3) (M3) (M3)

0.5446 0.6591 0.2604 1.000

0.5382 0.6527 0.2532 1.000

0.5320 0.6452 0.2424 1.000

0.5371 0.6396 0.2340 1.000

10% 10% 30% 5%

LAD. MEZ. AGUA

PZAS. (M3) (M3)

24 0.0166 0.024

48 0.0397 0.048

86 0.0987 0.086

24 0.0186 0.024

33 0.0318 0.033

62 0.0781 0.062

MORT. ARE AGUA VOL.

(TON) (M3) (M3) (M3)

0.3000 1.1500 0.2900 1.00

0.2600 1.2000 0.2850 1.00

0.2250 1.2400 0.2800 1.00

0.1950 1.2700 0.2750 1.00

0.1700 1.2900 0.2700 1.00

3% 3% 10% 30%

e" (cm) DETALLE

NERVADURA d c

F´C=200
a
b
100

115 5

130
145

e
170
CATÁLOGO DE CONCEPTOS CON RENDIMIENTO POR ETAPA

Código Descripción Corta.Texto completo Unidad

DEMOLICIONES
DEM0001 DEM. CIMIENTODEMOLICION A M3
DEM0002 DEM. CIM. CONDEMOLICION A M3
DEM0004 DEM. MUROS DDEMOLICION DE
M3
DEM0009 DEM. MURO TAB
DEMOLICION A M2
DEM0010 DEM. MURO TAB
DEMOLICION A M2
DEM0014 DEM. CONC. A DEMOLICION A M3
DEM0020 DEM. PISO CONC
DEMOLICION A M2
DEM0022 DEM. PISO CONDEMOLICION A Unidad
DEM0028 DEM. APLANADO
DEMOLICION A M2
DEM0029 DEM. FALSO PLDEMOLICION A M2
DEM0043 DEM. CONC. ASDEMOLICION DE
M2

PRELIMINARES
LTZ0001 LIMPIEZA DEL LIMPIEZA DEL M2
EXC0001 EXCAV. MANUAL
EXCAVACIÓN AM3
LTZ0005 TRAZO Y NIVE TRAZO Y NIVELM2

CIMENTACIÓN
CIM0001 CIM. MANPOSTER
CIMENTACION M3
RELL01CC RELLENO CIM. RELLENO EN C M3
RELL01CM RELLENO CIM. RELLENO DE C M3

CASTILLOS Y COLUMNAS
CAST001V CASTILLO 15X15
CASTILLO CON M
CAST002V CASTILLO 15X15
CASTILLO CON M
CAST003V CASTILLO 15X15
CASTILLO CON M
CAST004V CASTILLO 15X20
CASTILLO CON M
CAST005V CASTILLO 15X20
CASTILLO CON M
CAST010V CASTILLO CON CASTILLO CON M
CAST006V CASTILLO 15X20,
CASTILLO CON M
CAST007V CASTILLO 20X20
CASTILLO CON M
CAST008V CASTILLO 20X20
CASTILLO CON M
CAST009V CASTILLO 20X20,
CASTILLO CON M

CONTRATRABES, TRABES Y CADENAS.


DALA001A DALA 15X15 , F DALA CON SECC
M
DALA002A DALA 15X15 , F DALA CON SECC
M
DALA003A DALA 15X15 , F DALA CON SECC
M
DALA004A DALA 15X20, FCDALA CON SECC
M
DALA005A DALA 15X20, FCDALA CON SECC
M
DALA006A DALA 15X20, FCDALA CON SECC
M
DALA007A DALA 20X20, FCDALA CON SECC
M
DALA008A DALA 20X20, FCDALA CON SECC
M
DALA009A DALA 20X20, FCDALA CON SECC
M

FIRMES
PLA05-100 PLANTILLA CONPLANTILLA DE M2
PIS05-100 FIRME 5 CM, FCFIRME DE CONC
M2
PIS05-150 FIRME 5 CM, FCFIRME DE CONC
M2
PIS08-150 FIRME 8 CM, FCFIRME DE CONC
M2
PIS08-200 FIRME 8 CM, FCFIRME DE CONC
M2
PIS10-150 FIRME 10 CM, FC
FIRME DE CONC
M2
PIS10-200 FIRME 10 CM, FC
FIRME DE CONC
M2
PIS15-150 FIRME 15 CM, FC
FIRME DE CONC
M2
PIS15-200 FIRME 15 CM, FC
FIRME DE CONC
M2

MUROS
MURLAD7 MURO TRR, 7 CM
MURO DE TABIQ
M2
MURLAD14 MURO TRR, 14 C
MURO DE TABIQ
M2
MURLAD28 MURO TRR, 28 C
MURO DE TABIQ
M2
MURTAB10 MURO TAB, 10 CMURO DE TABIC
M2
MURTAB14 MURO TAB, 14 CMURO DE TABIC
M2
MURTAB28 MURO TAB, 28 CMURO DE TABIC
M2
MURPRET15 MUR. PRETIL PE
MURO DE PRETI
M

MUROS ESPECIALES
MURTABI1 MURO LAMBRÍN DE TABLAROCA
M2
MURTABE1 MURO LAMBRÍN DE TABLAROCA
M2
MURTABI2 MURO DE TABLAROCA A 2 CARM2
MURTABE2 MURO DE TABLAROCA A 2 CARM2
MURMIXID MURO MIXTO TABLAROCA TIPO
M2
MURMIXED MURO MIXTO TABLAROCA TIPO
M2
MURMIXIE MURO DE TABLAROCA TIPO INT
M2
MURDUR2 MURO A 2 CARAS DE DUROK. M2
PLATAB001 PLAFÓN DE TABLAROCA M2
PLAPOLI001 PLAFÓN DE POLIESTIRENO DEM2
DETTAB001 FABRICACIÓN DE DETALLES DM2
DETTAB002 FABRICACIÓN DE BOQUILLAS. ML
MDURINT MURO LAMBRIN DE DUROK M2

ENTREPISOS Y CUBIERTAS
LOSA10-200 LOSA TECHO 10LOSA DE 10 CMM2
LOSA10-250 LOSA TECHO 10LOSA DE 10 CMM2
HERRERÍA Y CANCELERÍA

PTA0001 SUMINISTRO Y SUMINISTRO Y PZA


VENT0001 SUMINISTRO Y SUMINISTRO Y PZA

ACABADOS
PIS0080 PISO DE CERÁMSUMINISTRO Y M2
PIN0001 PINTURA VINIL SUMINISTRO Y M2
PIN0002 SUMINISTRO Y SUMINISTRO Y M2
IMP0001 IMPERMEABILIZSUMINISTRO Y M2
APL0025 EMBOQ. REPELEMBOQUILLADO
M
APL0022 APLANADO PLAAPLANADO EN P
M2
PSO0001 ACABADO ESCO
ACABADO ESCO
M2
PSO0002 ACABADO PULID
ACABADO PULID
M2

FABRICACION DE MEZCLAS, MORTEROS Y CONCR


MEZ0003 MORTERO CEMENTO-ARENA 1:M3
MEZ0004 MORTERO CEMENTO-ARENA 1:M3
MEZ0005 MORTERO CEMENTO-ARENA 1:M3
MEZ0006 MORTERO CEMENTO-ARENA 1:M3
MEZ0007 MORTERO CEMENTO-ARENA 1:M3
MEZ0009 MEZCLA MORTERO-ARENA 1:3M3
MEZ0010 MEZCLA MORTERO-ARENA 1:4M3
MEZ0011 MEZCLA MORTERO-ARENA 1:5M3
MEZ0012 MEZCLA MORTERO-ARENA 1:6M3
MEZ0013 MEZCLA MORTERO-ARENA 1:7M3
MEZ0014 MEZCLA MORTERO-ARENA 1:8M3
FCO100M CONC. FC=100, CONCRETO F'C=
M3
FCO100R CONC. FC=100, CONCRETO F'C=
M3
FCO150M CONC. FC=150, CONCRETO F´C=
M3
FCO150R CONC. FC=150, CONCRETO F´C=
M3
FCO200M CONC. FC=200, CONCRETO F'C=
M3
FCO200R CONC. FC=200, CONCRETO F'C=
M3
FCO250M CONC. FC=250, CONCRETO F'C=
M3
FCO250R CONC. FC=250, CONCRETO F'C=
M3

ACARREOS
ACR0009 ACARREO CARR.
ACARREO EN CA
M3
ACR0012 ACARREO CARR
ACARREO EN CM3
ACR0013 ACARREO CARR
ACARREO EN CA
M3
ACR0037 ACARREO A MAACARREO A MAN
MIL
ACR0082A ACARREO EN CAM. A PRIM. KM.
M3

ACERO DE REFUERZO EN ESTRUCTURA


AREF2 HAB.ARM. DE AHABILITADO Y TON
AREF2.5 HAB.ARM. DE AHABILITADO Y TON
AREF3 HAB.ARM. DE AHABILITADO Y TON
AREF4 HAB.ARM. DE AHABILITADO Y TON
AREF5 HAB.ARM. DE AHABILITADO Y TON
AREF6 HAB.ARM. DE AHABILITADO Y TON
AREF8 HAB.ARM. DE AHABILITADO Y TON
AREF10 HAB.ARM. DE AHABILITADO Y TON
AREF12 HAB.ARM. DE AHABILITADO Y TON
MAL66-6/6 HAB.ARM. DE MHAB.ARM. DE MM2
MAL66-8/8 HAB.ARM. DE MHAB.ARM. DE MM2
MAL66-10/10 HAB.ARM. MALLHAB.ARM. MALLM2
ARM15X15 SUM/COL ARMEX
SUMINISTRO Y M
ARM15X20 SUM/COL ARMEX
SUMINISTRO Y M
ARM15X25 SUM/COL ARMEX
SUMINISTRO Y M

CUADRILLAS
CUAD001 CUADRILLA 001(1 PEON) JOR
CUAD005 CUADRILLA 005(5 PEONES) JOR
CUAD040 CUADRILLA 040(1ALBANIL+1PEJOR
CUAD060 CUADRILLA 060 (1 PINTOR) JOR

CIMBRAS
CFZAP CIMB./DESCIM, CIMBRA Y DES M2
CDADO CIMB./DESCIM CIMBRA Y DESCM2
CCADE CIMB./DESCIM, CIMBRA Y DESCM2
CCAST CIMB./DESCIM, CIMBRA Y DESCM2
CCOL30X30 CIMB./DESCIM, CIMBRA Y DESCM2
CCOL50X50 CIMB./DESCIM, CIMBRA Y DESCM2

VACIADOS
VDACAS150 VAC. DALA Y CAVACIADO DE CO
M3
VDACAS200 VAC. DALA Y CAVACIADO DE CO
M3
VDACAS250 VAC. DALA Y CAVACIADO DE CO
M3
VCL200 VAC. COLUMNAS
VACIADO DE CO
M3
VCL250 VAC. COLUMNAS
VACIADO DE CO
M3
VZTL150 VAC. ZAP. CIM,VACIADO DE CO
M3
VZTL200 VAC. ZAP. CIM,VACIADO DE CO
M3
VZTL250 VAC. ZAP. CIM,VACIADO DE CO
M3
VCOL150 VAC, COLUMASVACIADO
S DE CO
M3
VCOL200 VAC, COLUMASVACIADO
S DE CO
M3
VCOL250 VAC, COLUMASVACIADO
S DE CO
M3
VTRABE200 VAC. TRABES S/VACIADO DE CO
M3
VTRABE250 VAC. TRABES S/VACIADO DE CO
M3
VLOSA150 VAC.. LOSAS S/E
VACIADO DE CO
M3
VLOSA200 VAC.. LOSAS S/E
VACIADO DE CO
M3
VLOSA250 VAC., LOSAS ,S/VACIADO DE CO
M3
VCIM100R VAC.. CIMENTAC
VACIADO DE CO
M3
VCIM150R VAC.. CIMENTAC
VACIADO DE CO
M3
VCIM200R VAC.. CIMENTAC
VACIADO DE CO
M3
VCIM250R VAC.. CIMENTAC
VACIADO DE CO
M3
CONCEPTOS CON RENDIMIENTO POR ETAPA

cuadrilla Rend. unidad

CUADRILLA 001 (1 PEON) 1.50 M3/JOR


CUADRILLA 001 (1 PEON) 0.60 M3/JOR
CUADRILLA 001 (1 PEON) 5.50 M3/JOR
CUADRILLA 001 (1 PEON) 12.50 M2/JOR
CUADRILLA 001 (1 PEON) 6.50 M2/JOR
CUADRILLA 001 (1 PEON) 0.65 M3/JOR
CUADRILLA 001 (1 PEON) 16.67 M2/JOR
CUADRILLA 001 (1 PEON) 7.52 Unidad/JOR
CUADRILLA 001 (1 PEON) 25.00 M2/JOR
CUADRILLA 001 (1 PEON) 19.00 M2/JOR
CUADRILLA 001 (1 PEON) 22.22 M2/JOR

CUADRILLA 001 (1 PEON) 27.03 M2/JOR


CUADRILLA 001 (1 PEON) 2.78 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 100.00 M2/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 2.75 M3/JOR


CUADRILLA 001 (1 PEON) 4.35 M3/JOR
CUADRILLA 001 (1 PEON) 4.35 M3/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 10.84 M/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.84 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.64 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.79 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 8.74 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 8.74 M/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 12.76 M/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 12.76 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.76 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.12 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 11.48 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 11.48 M/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 20.00 M2/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 15.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 6.49 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 10.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 5.00 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 PZA/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 PZA/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 12.00 M2/JOR


CUADRILLA 060 (1 PINTOR) 20.00 M2/JOR
CUADRILLA 060 (1 PINTOR) 21.45 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 30.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 26.71 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 9.00 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 45.45 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 30.00 M2/JOR

CUADRILLA 001 (1 PEON) 1.59 M3/JOR


CUADRILLA 005 (5 PEONES) 15.02 M3/JOR
CUADRILLA 001 (1 PEON) 1.59 M3/JOR
CUADRILLA 005 (5 PEONES) 15.02 M3/JOR
CUADRILLA 001 (1 PEON) 1.59 M3/JOR
CUADRILLA 005 (5 PEONES) 15.02 M3/JOR
CUADRILLA 001 (1 PEON) 1.50 M3/JOR
CUADRILLA 005 (5 PEONES) 15.00 M3/JOR

CUADRILLA 001 (1 PEON) 13.33 M3/JOR


CUADRILLA 001 (1 PEON) 5.25 M3/JOR
CUADRILLA 001 (1 PEON) 5.50 M3/JOR
CUADRILLA 001 (1 PEON) 4,347.83 MIL/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.10 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.12 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.14 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.16 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.17 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.18 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.22 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.25 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 0.28 TON/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 82.10 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 84.03 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 98.04 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 120.05 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 120.05 M/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 120.05 M/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 7.97 M2/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 7.97 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 14.01 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 14.01 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 6.95 M2/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 6.65 M2/JOR

CUADRILLA 040 (1ALBANIL+1PEON) 1.33 M3/JOR


CUADRILLA 040 (1ALBANIL+1PEON) 1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 1.33 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.10 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 2.50 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR
CUADRILLA 040 (1ALBANIL+1PEON) 3.24 M3/JOR