Val N°03 - Mayor Metrado 01
Val N°03 - Mayor Metrado 01
Val N°03 - Mayor Metrado 01
: C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA
UBICACIÓN
CONTRATISTA : CONSORCIO RETES VALOR REFERENCIAL : S/ 1,386,659.83 C/IGV FECHA DE INICIO CONTRACTUAL DE OBRA 07/07/2021
: ING. JUAREZ TRUJILLO IVAN C.I.P. 89100
RESIDENTE DE OBRA VALOR REFERENCIAL : S/ 1,175,135.45 S/IGV FECHA DE TERMINO CONTRAC. DE OBRA 04/10/2021
: CONSORCIO SAN JOSE
SUPERVISOR DE OBRA MONTO CONTRATADO : S/ 1,386,659.83 C/IGV SUSPENSION DE PLAZO DE EJECUCION OBRA : EN PROCESO 15/07/2021
: ING. BAUTISTA PINO, ROBERTO CARLOS C.I.P. 73526
JEFE DE SUPERVISION MONTO CONTRATADO : S/ 1,175,135.45 S/IGV PLAZO DE EJECUCION DE OBRA : 90 Dias Calendario
FECHA : 30/09/2021 FACTOR RELACION : 1.00000 :
PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VAL. ACUMULADO ACTUAL SALDO
ITEM DESCRIPCION Y/O PARTIDAS CONTRACTUALES
UND METRADO P.U. [S/.] PARCIAL [S/.] METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] %
01 PAVIMENTOS 436,120.88
01.01 OBRAS PROVISIONALES 17,336.32
01.01.01 ALMACEN, ALMACEN Y CASETA DE GUARDIANIA glb 1.00 1,500.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,500.00 100.00
01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,500.00 100.00
01.01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60x2.40 und 1.00 800.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 800.00 100.00
01.01.04 SEÑALIZACION Y SEGURIDAD EN OBRA DURANTE LA EJECUCION glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 100.00
01.01.05 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL día 1.00 7,536.32 7,536.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7,536.32 100.00
01.03.01.03 CONFORMACION Y COMPACTACION DE LA SUB BASE GRANULAR E= 0.15 CM m3 419.33 79.36 33,278.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.33 33,278.03 100.00
01.03.01.04 BASE GRANULAR E=0.15 m.COMPACTADA m3 423.81 90.32 38,278.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 423.81 38,278.52 100.00
01.03.01.05 CARGUIO DE MATERIAL EXEDENTE CON EQUIPO m3 1,430.78 10.48 14,994.57 0.00 0.00 0.00 20.92 219.24 1.46 20.92 219.24 1.46 1,409.86 14,775.33 98.54
01.03.01.06 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA D=10 km m3 1,699.28 51.35 87,258.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,699.28 87,258.03 100.00
01.03.02.03 CARPETA ASFALTICA EN CALIENTE E=2" C/EQUIPO ADQ. m2 2,795.50 38.68 108,129.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,795.50 108,129.94 100.00
01.04.01.03 LINEAS EN EL SARDINEL m2 765.40 8.22 6,291.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 765.40 6,291.59 100.00
01.05.02 REDUCTORES DE VELOCIDAD (ROMPE MUELLES) ASFALTICOS m 25.00 42.61 1,065.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 1,065.25 100.00
02.01.03 TRAZO NIVELACION Y REPLANTEO PERMANENTE EN VEREDAS m2 1,919.19 1.90 3,646.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,919.19 3,646.46 100.00
02.02.02 EXCAVACION MANUAL PARA SARDINELES PERALTADOS (0.15 X 0.40 m) m3 129.60 44.69 5,791.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 129.60 5,791.82 100.00
02.02.03 CONFORMACION DE SUB RASANTE PARA VEREDAS Y RAMPAS m2 1,881.99 9.54 17,954.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,881.99 17,954.18 100.00
02.02.04 BASE GRANULAR PARA VEREDAS E=0.15 M m2 1,881.99 19.96 37,564.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,881.99 37,564.52 100.00
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 183.80 51.35 9,438.13 0.00 0.00 0.00 285.66 14,668.64 155.42 285.66 14668.64 155.42 -101.86 -5,230.51 -55.42
02.03.03 VEREDA DE CONCRETO F'C=175 KG/CM2 E=0.10 m. , FROTACHADO SEMIPULIDO INC. CURADO
m2 1,968.00 67.71 133,253.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,968.00 133,253.28 100.00
02.03.04 JUNTAS DE DILATACION PARA VEREDAS m 949.99 6.42 6,098.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 949.99 6,098.94 100.00
02.04.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 47.81 35.85 1,713.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.81 1,713.99 100.00
02.04.03 CONCRETO EN RAMPAS F´C=175 kg/cm2 e=4", FROTACHADO Y BRUÑADO m3 21.67 262.94 5,697.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.67 5,697.91 100.00
02.06 VARIOS 17,080.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17,080.00 100.00
02.06.01 REPOSICION DE MARCOS Y TAPAS DE CONEXION DOMICILIARIA DE AGUA und 34.00 120.00 4,080.00 0.00 0.00 0.00 10.00 1,200.00 29.41 10.00 1200.00 29.41 24.00 2,880.00 70.59
02.06.02 REPOSICION DE MARCOS Y TAPAS DE CONEXION DOMICILIARIA DE DESAGUE und 34.00 100.00 3,400.00 0.00 0.00 0.00 10.00 1,000.00 29.41 10.00 1000.00 29.41 24.00 2,400.00 70.59
02.06.03 SERVICIO DE REUBICACION DE POSTES DE LUZ Y TELEFONIA glb 6.00 1,600.00 9,600.00 0.00 0.00 0.00 4.00 6,400.00 66.67 4.00 6400.00 66.67 2.00 3,200.00 33.33
03.01.02 TRAZO, NIVELES Y REPLANTEO m 1,342.72 20.94 28,116.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,342.72 28,116.56 100.00
03.02.02 RELLENO CON MATERIAL DE CULTIVO m3 25.14 31.44 790.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.14 790.40 100.00
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 62.85 51.35 3,227.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.85 3,227.35 100.00
04.03.02 CONEXIONES DOMICILIARIAS DE AGUA und 41.00 277.15 11,363.15 0.00 0.00 0.00 2.00 554.30 4.88 2.00 554.30 4.88 39.00 10,808.85 95.12
05 ALCANTARILLA 58,268.89
05.01 TRABAJOS PRELIMINARES 4,886.97
05.01.01 TRAZO Y REPLANTEO m2 33.00 148.09 4,886.97 0.00 0.00 0.00 27.00 3,998.43 81.82 27.00 3998.43 81.82 6.00 888.54 18.18
05.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 16.50 43.02 709.83 0.00 0.00 0.00 4.50 193.59 27.27 4.50 193.59 27.27 12.00 516.24 72.73
05.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 19.80 51.35 1,016.73 0.00 0.00 0.00 26.65 1,368.48 134.60 26.65 1368.48 134.60 -6.85 -351.75 -34.60
05.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 2,863.67 5.86 16,781.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,863.67 16,781.11 100.00
06.02.02 EQUIPOS DE PROTECCION INDVIDUAL glb 1.00 3,305.63 3,305.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,305.63 100.00
06.02.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 2,434.35 2,434.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,434.35 100.00
VALORIZACION MAYOR METRADO N° 01 - SETIEMBRE 2021 (CORRESPONDIENTE AL PERIODO DEL 01-09-21 AL 30-09-21)
: C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA
UBICACIÓN
CONTRATISTA : CONSORCIO RETES VALOR REFERENCIAL : S/ 1,386,659.83 C/IGV FECHA DE INICIO CONTRACTUAL DE OBRA 07/07/2021
: ING. JUAREZ TRUJILLO IVAN C.I.P. 89100
RESIDENTE DE OBRA VALOR REFERENCIAL : S/ 1,175,135.45 S/IGV FECHA DE TERMINO CONTRAC. DE OBRA 04/10/2021
: CONSORCIO SAN JOSE
SUPERVISOR DE OBRA MONTO CONTRATADO : S/ 1,386,659.83 C/IGV SUSPENSION DE PLAZO DE EJECUCION OBRA : EN PROCESO 15/07/2021
: ING. BAUTISTA PINO, ROBERTO CARLOS C.I.P. 73526
JEFE DE SUPERVISION MONTO CONTRATADO : S/ 1,175,135.45 S/IGV PLAZO DE EJECUCION DE OBRA : 90 Dias Calendario
FECHA : 30/09/2021 FACTOR RELACION : 1.00000 :
PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VAL. ACUMULADO ACTUAL SALDO
ITEM DESCRIPCION Y/O PARTIDAS CONTRACTUALES
UND METRADO P.U. [S/.] PARCIAL [S/.] METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] %
06.02.04 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 4,181.32 4,181.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,181.32 100.00
: C.P. SAN MARTIN DE RETES DEL DISTRITO DE HUARAL - PROVINCIA DE HUARAL - DEPARTAMENTO DE LIMA
UBICACIÓN
CONTRATISTA : CONSORCIO RETES VALOR REFERENCIAL : S/ 1,386,659.83 C/IGV FECHA DE INICIO CONTRACTUAL DE OBRA 07/07/2021
: ING. JUAREZ TRUJILLO IVAN C.I.P. 89100
RESIDENTE DE OBRA VALOR REFERENCIAL : S/ 1,175,135.45 S/IGV FECHA DE TERMINO CONTRAC. DE OBRA 04/10/2021
: CONSORCIO SAN JOSE
SUPERVISOR DE OBRA MONTO CONTRATADO : S/ 1,386,659.83 C/IGV SUSPENSION DE PLAZO DE EJECUCION OBRA : EN PROCESO 15/07/2021
: ING. BAUTISTA PINO, ROBERTO CARLOS C.I.P. 73526
JEFE DE SUPERVISION MONTO CONTRATADO : S/ 1,175,135.45 S/IGV PLAZO DE EJECUCION DE OBRA : 90 Dias Calendario
FECHA : 30/09/2021 FACTOR RELACION : 1.00000 :
PRESUPUESTO BASE VALORIZACION ANTERIOR VALORIZACION ACTUAL VAL. ACUMULADO ACTUAL SALDO
ITEM DESCRIPCION Y/O PARTIDAS CONTRACTUALES
UND METRADO P.U. [S/.] PARCIAL [S/.] METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] % METRADO MONTO [S/.] %
TOTAL VALORIZADO SIN IGV (A+B+C) 1,175,135.45 0.00 61,143.80 61,143.80 1,134,366.37
TOTAL VALORIZADO CON IGV 18.00% 211,524.38 0.00 11,005.88 11,005.88 204,185.95