RESERVORIO 2 M3-R-03 - 2m3
RESERVORIO 2 M3-R-03 - 2m3
RESERVORIO 2 M3-R-03 - 2m3
0.15
S
=
1%
0.70
0.65 0.10
0.10
PROYECCION TAPA TP-01
DADO DE CONCRETO
0.40x0.40x0.40
7 8 10
11 9 13
CANASTILLA
ESPECIFICACIONES TECNICAS
20
14
TUBERIA DE SALIDA
VALVULA
12 CONCRETO MUROS f'c = 210 Kg/cm2
1.90 1.60 A ESFERICA 0.60
A' T. SALIDA
0.10
13
Tub. Limpia
PVC SAP 2" 9
12 10
11
PLANTA 11
=
1% ESCALA: 1/20 10
S
9
7 14
6
17 PLANILLA DE ARMADURA DEL RESERVORIO DE 2.00 M3
15
0.15 1.60 0.15 ARMADURA LOSA DE TECHO LONGITUD VECES LONG. X ML.
1 2
3 1/4" 3/8"
1.90
4
5 1.23
1 4
3 0.30 0.05 3/8 1.58 7.00 11.06
16 2
1.23
1.90
0.10 0.30 3/8 1.63 29.00 47.27
1
1.15 0.60 0.15
1.90
3/8 1.90 22.00 41.80
0.05 0.60
ESCALA: 1/15 3/8 0.60 6.00 3.60
Hipoclorador de
DETALLE A LONG. TOTAL POR 0.00 191.53
S = 1% 0.10
4 4
15 Tub. Limpia
PVC SAP 2"
0.15 0.10 0.15
19
18
16
17
PROYECTO:
OCTUBRE-2016 INDICADAS
CPU