BC - PROC.FO4 Puertas 04
BC - PROC.FO4 Puertas 04
BC - PROC.FO4 Puertas 04
FO4
VERSIÓN: 06
FORMATO FECHA: 21.04.2021
CUADRO COMPARATIVO
Página 1 de 2
CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total
1.00 TORRE MAR COSTANERA S/ 153,537.85 S/ 195,860.74 S/ 212,749.18 S/ 378,043.12 S/ 160,640.74 S/ 163,292.27 S/ 160,640.74
1.01 SUMINISTRO E INSTALACION DE PUERTAS S/. 153,537.85 S/. 195,860.74 S/. 212,749.18 S/. 378,043.12 S/. 160,640.74 S/. 163,292.27 S/. 160,640.74
CONTRAPLACADAS
01.01.01 SUMINISTRO DE PUERTAS S/. 153,537.85 S/. 195,860.74 S/. 212,749.18 S/. 378,043.12 S/. 160,640.74 S/. 163,292.27 S/. 160,640.74
01.01.01.01 EDIFICIO (20 PISOS) S/. 147,344.32 S/. 188,849.47 S/. 204,960.75 S/. 364,498.22 S/. 155,432.51 S/. 157,996.00 S/. 155,432.51
01.01.03.03.0 PUERTAS
P01:PUERTA CONTRAPLACADA
01.01.03.03.0 (0.90X2.10M) ACAB. LATEX B. PERLA und 116.00 360.58 S/. 41,827.28 116.00 473.02 S/. 54,870.32 116 473.02 S/. 54,870.32 116.00 757.94 S/. 87,921.04 116 368.33 S/. 42,726.51 116 373.44 S/. 43,318.58 116 368.33 S/. 42,726.51
P/PUERTA PRINC.HDF-HR
P02:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.80X2.10M) ACABADO LATEX und 233.00 213.64 S/. 49,778.12 233.00 266.71 S/. 62,143.43 233 300.17 S/. 69,939.61 233.00 546.88 S/. 127,423.04 233 225.03 S/. 52,431.52 233 228.86 S/. 53,323.45 233 225.03 S/. 52,431.52
BLANCO PERLA P/DORM C/SOBRELUZ
P02:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.80X2.10M) ACABADO LATEX und 54.00 213.64 S/. 11,536.56 54.00 246.11 S/. 13,289.94 54 279.38 S/. 15,086.52 54.00 519.66 S/. 28,061.64 54 198.34 S/. 10,710.23 54 202.17 S/. 10,916.94 54 198.34 S/. 10,710.23
BLANCO PERLA P/DORM
P03:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.70X2.10M) ACABADO LATEX und 194.00 193.87 S/. 37,610.78 194.00 259.88 S/. 50,416.72 194 288.47 S/. 55,963.18 194.00 535.18 S/. 103,824.92 194 221.37 S/. 42,945.24 194 225.20 S/. 43,687.87 194 221.37 S/. 42,945.24
BLANCO PERLA P/SSHH C/SOBRELUZ
P03:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.70X2.10M) ACABADO LATEX und 34.00 193.87 S/. 6,591.58 34.00 239.09 S/. 8,129.06 34 267.68 S/. 9,101.12 34.00 507.87 S/. 17,267.58 34 194.68 S/. 6,619.01 34 198.50 S/. 6,749.16 34 194.68 S/. 6,619.01
BLANCO PERLA P/SSHH
01.01.01.02 SÓTANO (3 NIVELES) S/. 3,495.14 - S/. 3,757.49 - S/. 4,141.39 S/. 6,740.58 - S/. 2,474.05 - S/. 2,516.16 S/. 2,474.05
01.01.05.02.0 PUERTAS S/. - - - S/. - - S/. - - S/. - S/. -
P05:PUERTA HDF CONTRAPLACADA
01.01.05.02.0(0.90X2.10M) CON REJILLA P/DEPOSITOS und 11.00 317.74 S/. 3,495.14 11.00 341.59 S/. 3,757.49 11 376.49 S/. 4,141.39 11.00 612.78 S/. 6,740.58 11 224.91 S/. 2,474.05 11 228.74 S/. 2,516.16 11 224.91 S/. 2,474.05
01.01.01.03 PRIMER PISO (AREAS COMUNES) - S/. 1,175.01 - S/. 1,306.04 - S/. 1,470.97 S/. 2,913.05 - S/. 1,089.75 - S/. 1,108.89 S/. 1,089.75
01.02.03.02.0 PUERTAS - S/. - - - S/. - - S/. - - S/. - S/. -
P06:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM (0.70X2.10M) ACABADO LATEX und 1.00 193.87 S/. 193.87 1.00 259.88 S/. 259.88 1 288.47 S/. 288.47 1.00 581.05 S/. 581.05 1 221.37 S/. 221.37 1 225.20 S/. 225.20 1 221.37 S/. 221.37
BLANCO P/SSHH C/SOBRELUZ
P12:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM CON ACABADO LATEX (0.90x2.10) und 1.00 236.12 S/. 236.12 1.00 256.18 S/. 256.18 1 291.08 S/. 291.08 1.00 573.25 S/. 573.25 1 209.16 S/. 209.16 1 212.99 S/. 212.99 1 209.16 S/. 209.16
P/BAÑO DISCAPACITADOS
P07:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM (0.80X2.10M) ACABADO LATEX und 2.00 213.64 S/. 427.28 2.00 266.90 S/. 533.80 2 300.17 S/. 600.34 2.00 592.75 S/. 1,185.50 2 225.03 S/. 450.06 2 228.86 S/. 457.71 2 225.03 S/. 450.06
BLANCO P/ADMINISTRACION, KITCHNET
C/SOBRELUZ
P16:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM (0.90X2.10M) ACABADO LATEX und 1.00 317.74 S/. 317.74 1.00 256.18 S/. 256.18 1 291.08 S/. 291.08 1.00 573.25 S/. 573.25 1 209.16 S/. 209.16 1 212.99 S/. 212.99 1 209.16 S/. 209.16
BLANCO CON REJILLA P/DEPOSITO
01.01.01.04 AZOTEA (AREAS COMUNES) - S/. 1,523.38 - S/. 1,947.74 - S/. 2,176.07 S/. 3,891.27 - S/. 1,644.43 - S/. 1,671.23 S/. 1,644.43
01.03.01.02.0 PUERTAS - S/. - - - S/. - - S/. - - S/. - S/. -
P12:PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM CON ACABADO LATEX (1.00x2.10) und 1.00 236.12 S/. 236.12 1.00 298.06 S/. 298.06 1 332.93 S/. 332.93 1.00 575.73 S/. 575.73 1 250.55 S/. 250.55 1 254.38 S/. 254.38 1 250.55 S/. 250.55
P/BAÑO DISCAPACITADOS AZOTEA
P11:PUERTA CONTRAPLACADA HDF
S/SOBRELUZ
01.03.01.02.03MM CON ACABADO OLEO (1.00X2.10) und 2.00 236.12 S/. 472.24 2.00 298.06 S/. 596.12 2 332.93 S/. 665.86 2.00 575.73 S/. 1,151.46 2 250.55 S/. 501.10 2 254.38 S/. 508.75 2 250.55 S/. 501.10
P/ACCESO A TERRAZA (P 17 Y 20)
C/SOBRELUZ
P13:PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM CON ACABADO OLEO (0.80X2.10) und 1.00 213.64 S/. 213.64 1.00 266.90 S/. 266.90 1 300.17 S/. 300.17 1.00 546.87 S/. 546.87 1 225.03 S/. 225.03 1 228.86 S/. 228.86 1 225.03 S/. 225.03
P/BAÑO TERRAZA C/SOBRELUZ
P14:PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM CON ACABADO LATEX (0.70X2.10) P/ und 2.00 193.87 S/. 387.74 2.00 259.88 S/. 519.76 2 288.47 S/. 576.94 2.00 535.17 S/. 1,070.34 2 221.37 S/. 442.73 2 225.20 S/. 450.39 2 221.37 S/. 442.73
SUM ADULTOS C/SOBRELUZ
PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM (0.80X2.10m) ACABADO OLEO BLANCO und 1.00 213.64 S/. 213.64 1.00 266.90 S/. 266.90 1 300.17 S/. 300.17 1.00 546.87 S/. 546.87 1 225.03 S/. 225.03 1 228.86 S/. 228.86 1 225.03 S/. 225.03
P/Z. TÉCNICA C/SOBRELUZ
SubTotal (S/.) S/. 153,537.85 S/. 195,860.74 S/. 212,749.18 S/. 378,043.12 S/. 160,640.74 S/. 163,292.27 S/. 160,640.74
IGV (15%) S/. 23,030.68 S/. 29,379.11 S/. 31,912.38 S/. 56,706.47 S/. 24,096.11 S/. 24,493.84 S/. 24,096.11
Total (S/.) INC. I.G.V. S/. 176,568.53 S/. 225,239.85 S/. 244,661.56 S/. 434,749.59 S/. 184,736.86 S/. 187,786.11 S/. 184,736.86
DIFERENCIA VS PPTO VENTA (S/.) COSTO DIRECTO S/. -42,322.89 S/. -59,211.33 S/. -224,505.27 S/. -7,102.89 S/. -9,754.42 S/. -7,102.89
% VS PPTO VENTA 127.57% 139% 246.22% 105% 106% 105%
ESPECIFICACIONES TÉCNICAS
TABLERO PUERTA HDF (3mm): Departamentos y areas comunes HDF-HR (4mm): P. Principal departamentos HDF-HR (4mm): Departamentos y areas HDF: Departamentos y areas comunes HDF (4mm): P. Principal departamentos HDF (4mm): P. Principal departamentos HDF (4mm): P. Principal departamentos
HDF (3mm): Interior dptos y areas comunes comunes HDF (3mm): Interior dptos y areas comunes HDF (3mm): Interior dptos y areas comunes HDF (3mm): Interior dptos y areas comunes
RUTEADO TABLERO PUERTA PRINCIPAL 6 paneles 6 paneles 6 paneles 6 paneles 5 paneles 5 paneles 5 paneles
LATEX PATO CPP: Departamentos LATEX PATO CPP: P. Principal departamentos LATEX PATO CPP: Departamentos y OLEO MATE PATO: Departamentos y OLEO MATE PATO: Departamentos y
ACABADO OLEO MATE PATO: Areas comunes OLEO MATE PATO: Interior dptos y comunes comunes PETS: Departamentos y comunes comunes comunes GLOSS: Departamentos y comunes
BISAGRAS BISAGRA OMEGA 4320 ACERO INOX BISAGRA OMEGA 4320 ACERO INOX BISAGRA OMEGA 4320 ACERO INOX BISAGRA OMEGA 4320 ACERO INOX BISAGRA CONTINENTAL ACERO INOX 201 BISAGRA CONTINENTAL ACERO INOX 201 BISAGRA CONTINENTAL ACERO INOX 201
INSTALACIÓN ARES ARES ARES ARES MADECORP MADECORP MADECORP
SOBRECOSTO SUMINISTRO DE PUERTAS 28% sobre el ppto venta 39% sobre el ppto venta 146% sobre el ppto venta 5% sobre el ppto venta 6% sobre el ppto venta 5% sobre el ppto venta
SOBRECOSTO EN ACABADO PARA PUERTAS 30.65% sobre el ppto venta 5% sobre el ppto venta -100% sobre el ppto venta 37% sobre el ppto venta 37% sobre el ppto venta 83% sobre el ppto venta
CONSIDERACIONES Y ALCANCE
1 Forma de Pago 100% contraentrega de suministro 100% contraentrega de suministro 100% contraentrega de suministro Pago quince días despues de entregado las Pago quince días despues de entregado las Pago quince días despues de entregado las
puertas puertas puertas
2 Adelanto No especifica No especifica No especifica Sin adelanto Sin adelanto Sin adelanto
3 Valorización Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación
Aglomerado tubular con retardancia al Madera pino, con triple bastidor y 2 Honeycomb: Honeycomb:
RELLENO fuego. listones horizontales como refuerzo RELLENO Cartón corrugado de 82 capas Cartón de papel karft de 82 capas
Aislamiento acústico central de madera Diseño: Panal de abeja Diseño: Panal de abeja
Item Descripción UND P. INTERIORES HDF (LATEX) P. INTERIORES HDF (OLEO) P. INTERIORES HDF-HR (LATEX) P. INTERIORES PET (LATEX) P. INTERIORES HDF (OLEO) P. INTERIORES HDF (OLEO) P. INTERIORES HDF (GLOSS)
P. PRINCIPAL HDF (LATEX) P. PRINCIPAL HDF-HR (LATEX) P. PRINCIPAL HDF-HR (LATEX) P. PRINCIPAL PET (LATEX) P. PRINCIPAL HDF (OLEO) P. PRINCIPAL HDF (OLEO) P. PRINCIPAL HDF (GLOSS)
P. EXTERIORES HDF (OLEO) P. EXTERIORES HDF (OLEO) P. EXTERIORES HDF-HR (LATEX) P. EXTERIORES PET (OLEO) P. EXTERIORES HDF (OLEO) P. EXTERIORES HDF (OLEO) P. EXTERIORES HDF (GLOSS)
BISAGRAS ZINCADAS BISAGRAS ZINCADAS BISAGRAS ZINCADAS BISAGRAS ZINCADAS4 BISAGRAS ZINCADAS BISAGRAS ACERO INOXIDABLE BISAGRAS ZINCADAS
CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total CANT PU Sub total
1.00 TORRE MAR COSTANERA S/ 220,252.51 S/ 283,026.20 S/ 282,806.24 S/ 378,043.12 S/ 251,750.20 S/ 254,401.73 S/ 282,730.74
1.01 SUMINISTRO E INSTALACION DE PUERTAS S/. 220,252.51 S/. 283,026.20 S/. 282,806.24 S/. 378,043.12 S/. 251,750.20 S/. 254,401.73 S/. 282,730.74
CONTRAPLACADAS
01.01.01 SUMINISTRO DE PUERTAS S/. 153,537.85 S/. 195,860.74 S/. 212,749.18 S/. 378,043.12 S/. 160,640.74 S/. 163,292.27 S/. 160,640.74
01.01.01.01 EDIFICIO (20 PISOS) S/. 147,344.32 S/. 188,849.47 S/. 204,960.75 S/. 364,498.22 S/. 155,432.51 S/. 157,996.00 S/. 155,432.51
01.01.03.03.0 PUERTAS
P01:PUERTA CONTRAPLACADA
01.01.03.03.0 (0.90X2.10M) ACAB. LATEX B. PERLA und 116.00 360.58 S/. 41,827.28 116.00 473.02 S/. 54,870.32 116 473.02 S/. 54,870.32 116.00 757.94 S/. 87,921.04 116 368.33 S/. 42,726.51 116 373.44 S/. 43,318.58 116 368.33 S/. 42,726.51
P/PUERTA PRINC.HDF-HR
P02:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.80X2.10M) ACABADO LATEX und 233.00 213.64 S/. 49,778.12 233.00 266.71 S/. 62,143.43 233 300.17 S/. 69,939.61 233.00 546.88 S/. 127,423.04 233 225.03 S/. 52,431.52 233 228.86 S/. 53,323.45 233 225.03 S/. 52,431.52
BLANCO PERLA P/DORM C/SOBRELUZ
P02:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.80X2.10M) ACABADO LATEX und 54.00 213.64 S/. 11,536.56 54.00 246.11 S/. 13,289.94 54 279.38 S/. 15,086.52 54.00 519.66 S/. 28,061.64 54 198.34 S/. 10,710.23 54 202.17 S/. 10,916.94 54 198.34 S/. 10,710.23
BLANCO PERLA P/DORM
P03:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.70X2.10M) ACABADO LATEX und 194.00 193.87 S/. 37,610.78 194.00 259.88 S/. 50,416.72 194 288.47 S/. 55,963.18 194.00 535.18 S/. 103,824.92 194 221.37 S/. 42,945.24 194 225.20 S/. 43,687.87 194 221.37 S/. 42,945.24
BLANCO PERLA P/SSHH C/SOBRELUZ
P03:PUERTA CONTRAPLACADA HDF
01.01.03.03.0 3MM (0.70X2.10M) ACABADO LATEX und 34.00 193.87 S/. 6,591.58 34.00 239.09 S/. 8,129.06 34 267.68 S/. 9,101.12 34.00 507.87 S/. 17,267.58 34 194.68 S/. 6,619.01 34 198.50 S/. 6,749.16 34 194.68 S/. 6,619.01
BLANCO PERLA P/SSHH
01.01.01.02 SÓTANO (3 NIVELES) S/. 3,495.14 - S/. 3,757.49 - S/. 4,141.39 S/. 6,740.58 - S/. 2,474.05 - S/. 2,516.16 S/. 2,474.05
01.01.05.02.0 PUERTAS S/. - - - S/. - - S/. - - S/. - S/. -
P05:PUERTA HDF CONTRAPLACADA
01.01.05.02.0(0.90X2.10M) CON REJILLA P/DEPOSITOS und 11.00 317.74 S/. 3,495.14 11.00 341.59 S/. 3,757.49 11 376.49 S/. 4,141.39 11.00 612.78 S/. 6,740.58 11 224.91 S/. 2,474.05 11 228.74 S/. 2,516.16 11 224.91 S/. 2,474.05
01.01.01.03 PRIMER PISO (AREAS COMUNES) - S/. 1,175.01 - S/. 1,306.04 - S/. 1,470.97 S/. 2,913.05 - S/. 1,089.75 - S/. 1,108.89 S/. 1,089.75
01.02.03.02.0 PUERTAS - S/. - - - S/. - - S/. - - S/. - S/. -
P06:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM (0.70X2.10M) ACABADO LATEX und 1.00 193.87 S/. 193.87 1.00 259.88 S/. 259.88 1 288.47 S/. 288.47 1.00 581.05 S/. 581.05 1 221.37 S/. 221.37 1 225.20 S/. 225.20 1 221.37 S/. 221.37
BLANCO P/SSHH C/SOBRELUZ
P12:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM CON ACABADO LATEX (0.90x2.10) und 1.00 236.12 S/. 236.12 1.00 256.18 S/. 256.18 1 291.08 S/. 291.08 1.00 573.25 S/. 573.25 1 209.16 S/. 209.16 1 212.99 S/. 212.99 1 209.16 S/. 209.16
P/BAÑO DISCAPACITADOS
P07:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM (0.80X2.10M) ACABADO LATEX und 2.00 213.64 S/. 427.28 2.00 266.90 S/. 533.80 2 300.17 S/. 600.34 2.00 592.75 S/. 1,185.50 2 225.03 S/. 450.06 2 228.86 S/. 457.71 2 225.03 S/. 450.06
BLANCO P/ADMINISTRACION, KITCHNET
C/SOBRELUZ
P16:PUERTA CONTRAPLACADA HDF
01.02.03.02.03MM (0.90X2.10M) ACABADO LATEX und 1.00 317.74 S/. 317.74 1.00 256.18 S/. 256.18 1 291.08 S/. 291.08 1.00 573.25 S/. 573.25 1 209.16 S/. 209.16 1 212.99 S/. 212.99 1 209.16 S/. 209.16
BLANCO CON REJILLA P/DEPOSITO
01.01.01.04 AZOTEA (AREAS COMUNES) - S/. 1,523.38 - S/. 1,947.74 - S/. 2,176.07 S/. 3,891.27 - S/. 1,644.43 - S/. 1,671.23 S/. 1,644.43
01.03.01.02.0 PUERTAS - S/. - - - S/. - - S/. - - S/. - S/. -
P12:PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM CON ACABADO LATEX (1.00x2.10) und 1.00 236.12 S/. 236.12 1.00 298.06 S/. 298.06 1 332.93 S/. 332.93 1.00 575.73 S/. 575.73 1 250.55 S/. 250.55 1 254.38 S/. 254.38 1 250.55 S/. 250.55
P/BAÑO DISCAPACITADOS AZOTEA
P11:PUERTA CONTRAPLACADA HDF
S/SOBRELUZ
01.03.01.02.03MM CON ACABADO OLEO (1.00X2.10) und 2.00 236.12 S/. 472.24 2.00 298.06 S/. 596.12 2 332.93 S/. 665.86 2.00 575.73 S/. 1,151.46 2 250.55 S/. 501.10 2 254.38 S/. 508.75 2 250.55 S/. 501.10
P/ACCESO A TERRAZA (P 17 Y 20)
C/SOBRELUZ
P13:PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM CON ACABADO OLEO (0.80X2.10) und 1.00 213.64 S/. 213.64 1.00 266.90 S/. 266.90 1 300.17 S/. 300.17 1.00 546.87 S/. 546.87 1 225.03 S/. 225.03 1 228.86 S/. 228.86 1 225.03 S/. 225.03
P/BAÑO TERRAZA C/SOBRELUZ
P14:PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM CON ACABADO LATEX (0.70X2.10) P/ und 2.00 193.87 S/. 387.74 2.00 259.88 S/. 519.76 2 288.47 S/. 576.94 2.00 535.17 S/. 1,070.34 2 221.37 S/. 442.73 2 225.20 S/. 450.39 2 221.37 S/. 442.73
SUM ADULTOS C/SOBRELUZ
PUERTA CONTRAPLACADA HDF
01.03.01.02.03MM (0.80X2.10m) ACABADO OLEO BLANCO und 1.00 213.64 S/. 213.64 1.00 266.90 S/. 266.90 1 300.17 S/. 300.17 1.00 546.87 S/. 546.87 1 225.03 S/. 225.03 1 228.86 S/. 228.86 1 225.03 S/. 225.03
P/Z. TÉCNICA C/SOBRELUZ
01.01.02 ACABADO DE PUERTAS S/. 66,714.66 S/. 87,165.46 S/. 70,057.06 S/. - S/. 91,109.46 S/. 91,109.46 S/. 122,090.00
PINTURA
Glb 1.00 66,714.66 S/. 66,714.66 1.00 87,165.46 S/. 87,165.46 1 70,057.06 S/. 70,057.06 S/. - 1 91,109.46 S/. 91,109.46 1 91,109.46 S/. 91,109.46 1 122,090.00 S/. 122,090.00
SubTotal (S/.) S/. 220,252.51 S/. 283,026.20 S/. 282,806.24 S/. 378,043.12 S/. 251,750.20 S/. 254,401.73 S/. 282,730.74
IGV (15%) S/. 33,037.88 S/. 42,453.93 S/. 42,420.94 S/. 56,706.47 S/. 37,762.53 S/. 38,160.26 S/. 42,409.61
Total (S/.) INC. I.G.V. S/. 253,290.39 S/. 325,480.13 S/. 325,227.18 S/. 434,749.59 S/. 289,512.74 S/. 292,561.99 S/. 325,140.36
DIFERENCIA VS PPTO VENTA (S/.) COSTO DIRECTO S/. -62,773.69 S/. -62,553.73 S/. -157,790.61 S/. -31,497.69 S/. -34,149.22 S/. -62,478.23
% VS PPTO VENTA 128.50% 128% 171.64% 114% 116% 128%
ESPECIFICACIONES TÉCNICAS
TABLERO PUERTA HDF (3mm): Departamentos y areas comunes HDF-HR (4mm): P. Principal departamentos HDF-HR (4mm): Departamentos y areas HDF: Departamentos y areas comunes HDF (4mm): P. Principal departamentos HDF (4mm): P. Principal departamentos HDF (4mm): P. Principal departamentos
HDF (3mm): Interior dptos y areas comunes comunes HDF (3mm): Interior dptos y areas comunes HDF (3mm): Interior dptos y areas comunes HDF (3mm): Interior dptos y areas comunes
RUTEADO TABLERO PUERTA PRINCIPAL 6 paneles 6 paneles 6 paneles 6 paneles 5 paneles 5 paneles 5 paneles
LATEX PATO CPP: Departamentos LATEX PATO CPP: P. Principal departamentos LATEX PATO CPP: Departamentos y OLEO MATE PATO: Departamentos y OLEO MATE PATO: Departamentos y
ACABADO OLEO MATE PATO: Areas comunes OLEO MATE PATO: Interior dptos y comunes comunes PETS: Departamentos y comunes comunes comunes GLOSS: Departamentos y comunes
BISAGRAS BISAGRA OMEGA 4320 ACERO INOX BISAGRA OMEGA 4320 ACERO INOX BISAGRA OMEGA 4320 ACERO INOX BISAGRA OMEGA 4320 ACERO INOX BISAGRA CONTINENTAL ACERO INOX 201 BISAGRA CONTINENTAL ACERO INOX 201 BISAGRA CONTINENTAL ACERO INOX 201
INSTALACIÓN ARES ARES ARES ARES MADECORP MADECORP MADECORP
SOBRECOSTO SUMINISTRO DE PUERTAS 28% sobre el ppto venta 39% sobre el ppto venta 146% sobre el ppto venta 5% sobre el ppto venta 6% sobre el ppto venta 5% sobre el ppto venta
SOBRECOSTO EN ACABADO PARA PUERTAS 30.65% sobre el ppto venta 5% sobre el ppto venta -100% sobre el ppto venta 37% sobre el ppto venta 37% sobre el ppto venta 83% sobre el ppto venta
CONSIDERACIONES Y ALCANCE
1 Forma de Pago 100% contraentrega de suministro 100% contraentrega de suministro 100% contraentrega de suministro Pago quince días despues de entregado las Pago quince días despues de entregado las Pago quince días despues de entregado las
puertas puertas puertas
2 Adelanto No especifica No especifica No especifica Sin adelanto Sin adelanto Sin adelanto
3 Valorización Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación Quincenal para el servicio de instalación