Predimensionamiento
Predimensionamiento
Predimensionamiento
1) VIGAS
PRINCIPALES L/10 @ L/12 SECUNDARIAS L/14 @ L/16
L(m) 4.85 L(m) 2.5
L/10 (m) 0.49 L/14 (m) 0.18
L/12 (m) 0.40 L/16 (m) 0.16
SE TOMA: SE TOMA:
h (m) 0.45 h (m) 0.25
b (m) 0.25 b (m) 0.2
2) VIGA CHATA
SE TOMA: SE TOMA:
h (m) 0.2 h (m) 0.3
b (m) 0.4 b (m) 0.6
4) LOZAS MACIZAS
P (m) 22.4 SE TOMA:
L/180 (m) 0.12 e (m) 0.15
Nota: Las losas macizas se uniformizan con t= 15cm
5) COLUMNAS
Ac = Pn/α * f´c
P= 1.00 T/ m2 Porticos 1
n= 4.00 niveles Dual 1.2
f´c = 210.00 Kg/cm2 Muros 1.4
Area Trib.
Columna α Ps (T) Ac (cm2) Aprop (cm2) Cumple
(m2)
25x50 C1 6.77 0.20 27.08 644.76 1250 ok
25x50 C1 11.4 0.25 45.6 868.57 1250 ok
25x50 C1 19.39 0.28 77.56 1319.05 1250
25x30 C2 3.44 0.2 13.76 327.62 750 ok
En el Eje X:
P sismico = D+ 50%L + 0.25Lr = 1317.86 (tomamos este valor)
ZUCS/R = 0.253
Vc = 76.8 Ton /m2
Vb = 334.47 T
Z=0.25 Huaraz
U=1.3 Oficinas-comercio
S=1.20 Suelo tipo S2 (SW)
TP=0.6 s
TL=2 s
Ro=8 Porticos de concreto armado
la=1
lp=1
R=8
Peso sismico:
P=D+0.5L+0.25Lr
C=2.5
V=Cb P
CB=0.121875