Presupuesto Global Por El Valor Total de La Carga
Presupuesto Global Por El Valor Total de La Carga
Presupuesto Global Por El Valor Total de La Carga
IMPUESTOS
AD/VALOREM $0.00 IGV DE LAS COMPRAS
IPM (2%) (CIF+AD VALOREM) $16,402.50
IGV (16%) (CIF+AD VALOREM) $131,220.01 USD 17,721.07
PERCEPCION (3.5%)(CIF+AD VA+IGV) $33,871.17
Ser. Despacho 0
TOTAL IMPUESTOS $181,493.68 (T/C 3.95) : S/69,998.22
GESTION LOGISTICA
RESUMEN DE COSTOS
FLETE + GASTOS LOGISTICOS $225,576.92
CREDITO FIZCAL $199,209.48 *****************
DETALLES DE CARGA
IMPUESTOS
USD 16,794.88
AD/VALOREM (6%)/ SE REQUIERE CERTIFICADO DE ORIGEN(0%) $0.00
IPM (2%) (CIF+AD VALOREM) $1,517.84
(T/C 3.95) : S/66,339.77
IGV (16%) (CIF+AD VALOREM) $12,142.71 IGV DE LAS COMPRAS
PERCEPCION (3.5%)(CIF+AD VA+IGV) $3,134.34
Ser. Despacho 0 USD 1744.29
TOTAL IMPUESTOS $16,794.88 (T/C
3.95) : S/6,889.45
GESTION LOGISTICA TOTAL CREDITO FIZCAL
RESUMEN DE COSTOS
FLETE + GASTOS LOGISTICOS $20,229.82
CREDITO FIZCAL $18,538.41 ***********************
DETALLES DE CARGA
GESTION LOGISTICA
TOTAL CREDITO FIZCAL
ALMACEN( FARGOLINE) $870.00 S/ 44,075.39
IGV $881.69
TOTAL GASTOS DE TERCEROS $5,779.94
RESUMEN DE COSTOS
FLETE + GASTOS LOGISTICOS $10,179.94
CREDITO FIZCAL $11,157.95 ***********************
DETALLES DE CARGA
FOB- SHENZHEN
PROVEEDOR KRISO TUBERIA
ITEM( KS-T100-PPR//KS-TD-20R) $26,173.34 FLETE 1X20STD $2,200.00
REQUERIMIENTO 1X20STD SEGURO $78.52
IMPUESTOS
(T/C3.95 : S/24,870.78
AD/VALOREM (6%)/ SE REQUIERE CERTIFICADO DE ORIGEN(0%) $0.00
IPM (2%) (CIF+AD VALOREM) $569.04
IGV DE LAS COMPRAS
IGV (16%) (CIF+AD VALOREM) $4,552.30
PERCEPCION (3.5%)(CIF+AD VA+IGV) $1,175.06
Ser. Despacho 0 USD 456.93
RESUMEN DE COSTOS
FLETE + GASTOS LOGISTICOS $5,195.45
CREDITO FIZCAL $6,753.33 ***********************
DETALLES DE CARGA
FOB- GUANGXI
PROVEEDOR KRISO CEMENTO
ITEM KS-CEMENTO $911,055.60 FLETE 1X20STD $2,550.00
REQUERIMIENTO 393X20STD SEGURO $2,368.74
FOB $911,055.60
FLETE $1,002,150.00 PARTIDA ARANCELARIA DE CEMENTO
IGV
SEGURO $2,368.74 + IPM ( CREDITO FIZCAL)
IMPUESTOS
CIF TOTAL $1,915,574.34
IGV + IPM +PERCEPCION
USD 423916.60
IMPUESTOS
AD/VALOREM(6%)/ SE REQUIERE CERTIFICADO DE ORIGEN(0%) $0.00 (T/C 3.95) : S/1,674,470.57
RESUMEN DE COSTOS
FLETE + GASTOS LOGISTICOS $2,131,413.84
CREDITO FIZCAL $596,177.19 ***********************
DETALLES DE CARGA
FOB- SHENZHEN
PROVEEDOR KRISO VIDRIO
ITEM KS-VIDRIO INCOLOR 5MM $79,291.00 FLETE 1X40HQ $2,880.00
REQUERIMIENTO 8X40HQ SEGURO $237.87
FOB $79,291.00
FLETE $23,040.00 PARTIDA ARANCELARIA DE VIDRIO
IGV +
SEGURO $237.87 IPM ( CREDITO FIZCAL)
IMPUESTOS
AD/VALOREM(SE REQUIERE CERTIFICADO DE ORIGEN(0%) $0.00
IMPUESTOS
IPM (2%) (CIF+AD VALOREM) $2,051.38 IGV + IPM +PERCEPCION
USD 22,698.49
IGV (16%) (CIF+AD VALOREM) $16,411.02 (T/C 3.95) : S/89,659.03
IGV DE LAS COMPRAS
PERCEPCION (3.5%)(CIF+AD VA+IGV) $4,236.09 USD 172,285.34
(T/C 3.95) : S/680,527.093 TOTAL
Ser. Despacho 0 CREDITO FIZCAL S/
770,186.12
TOTAL IMPUESTOS $22,698.49
GESTION LOGISTICA
RESUMEN DE COSTOS
FLETE + GASTOS LOGISTICOS $46,565.50
CREDITO FIZCAL $26,287.13 ***********************