Valorizacion 1 y 2 Parque Chisigle

Descargar como xls, pdf o txt
Descargar como xls, pdf o txt
Está en la página 1de 18

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA - ENERO 2021

"MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE
PROYECTO:
CUTERVO - DEPARTAMENTO DE CAJAMARCA"
CLIENTE: MUNICIPALIDAD DISTRITAL DE SOCOTA RESIDENTE OBRA: ING. DANIEL EMILIANO RODAS ALVITES
DEPARTAMENTO: CAJAMARCA PROVINCIA: CUTERVO INSPECTOR OBRA: ING. BYROL EDUARDO VEGA SANDOVAL
DISTRITO: SOCOTA MODALIDAD: ADMINISTRACION DIRECTA
PRESUP. REFERENCIAL: 114,222.74
FECHA: 20/01/2021 AL 31 /01/2021 MES: ENERO

AVANCE ACTUAL AVANCE ACUMULADO SALDO A EJECUTAR


ITEM Descripción Und. Metrado UNITARIO PARCIAL METRADO PRECIO % METRADO PRECIO % METRADO PRECIO %

01 ESTRUCTURA
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 577.60 0.21 121.30 577.60 121.30 100.00% 577.60 121.30 100.00% 0.00 0.00 0.00%
01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 577.60 1.33 768.21 577.60 768.21 100.00% 577.60 768.21 100.00% 0.00 0.00 0.00%
01.01.03 CORTE DE TERRENO NATURAL C/MAQUINARIA m3 173.28 10.30 1,784.78 173.28 1,784.78 100.00% 173.28 1,784.78 100.00% 0.00 0.00 0.00%
PERFILADO Y COMPACTADO DE TERRENO
01.01.04 m2 577.60 2.13 1,230.29 577.60 1,230.29 100.00% 577.60 1,230.29 100.00% 0.00 0.00 0.00%
NATURAL
01.02 MOVIMIENTO DE TIERRAS
EXCAVACIÓN MANUAL PARA SARDINEL H
01.02.01 m3 8.54 13.73 117.25 8.54 117.25 100.00% 8.54 117.25 100.00% 0.00 0.00 0.00%
Prom=0.35 M
01.02.02 EXCAVACIÓN MANUAL P/CIMIENTO EN BANCAS m3 8.63 16.48 142.22 8.63 142.22 100.00% 8.63 142.22 100.00% 0.00 0.00 0.00%
01.02.03 EXCAVACIÓN MANUAL P/GRADAS m3 0.81 20.60 16.69 0.81 16.69 100.00% 0.81 16.69 100.00% 0.00 0.00 0.00%
RELLENO CON MATERIAL PROPIO
01.02.04 m3 112.38 43.65 4,905.39 112.38 4,905.39 100.00% 112.38 4,905.39 100.00% 0.00 0.00 0.00%
COMPACTACIÓN CON EQUIPO LIVIANO
RELLENO COMPACTADO, MAT. PRESTAMO -
01.02.05 m3 38.40 62.28 2,391.55 38.40 2,391.55 100.00% 38.40 2,391.55 100.00% 0.00 0.00 0.00%
AFIRMADO 4" - C/EQUIPO LIVIANO
ELIMINACIÓN DE MATERIAL EXCEDENTE
01.02.07 m3 126.70 8.24 1,044.01 126.70 1,044.01 100.00% 126.70 1,044.01 100.00% 0.00 0.00 0.00%
C/VOLQUETE DE 6 M3 D<= 5KM
01.03 OBRAS DE CONCRETO
01.03.01 SOLADO
SOLADO E=2" MEZCLA 1:12 C:H PREPARACION
01.03.01.01 m2 8.63 8.20 70.77 8.63 70.77 100.00% 8.63 70.77 100.00% 0.00 0.00 0.00%
C/MEZCLADORA
01.03.02 SARDINEL
01.03.02.01 CONCRETO F'c= 175 KG/CM2 EN SARDINEL m3 12.20 335.74 4,096.03 12.20 4,096.03 100.00% 12.20 4,096.03 100.00% 0.00 0.00 0.00%
01.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 81.34 16.46 1,338.86 81.34 1,338.86 100.00% 81.34 1,338.86 100.00% 0.00 0.00 0.00%
01.03.03 CIMIENTO CORRIDO
CONCRETO CICLOPEO C:H 1:8+25% PM
01.03.03.01 m3 4.32 206.02 890.01 4.32 890.01 100.00% 4.32 890.01 100.00% 0.00 0.00 0.00%
PREPARACION C/MEZCLADORA
01.03.04 PISOS Y VEREDAS
CONCRETO F'c= 175 KG/CM2, E=0.12 M
01.03.04.01 m2 374.60 44.26 16,579.80 337.14 14,921.82 90.00% 337.14 14,921.82 90.00% 37.46 1,657.98 10.00%
PREPARACION C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO EN PISO Y
01.03.04.02 m2 29.33 6.88 201.79 26.40 181.61 90.00% 26.40 181.61 90.00% 2.93 20.18 10.00%
VEREDA
ACERO DE REFUERZO FY=4200 kg/cm2 kg 143.89 4.38 630.24 129.50 567.21 90.00% 129.50 567.21 90.00% 14.39 63.02 10.00%
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 BANCAS DE CONCRETO SEGUN DISEÑO
CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA
01.04.01.01 m3 5.40 360.46 1,946.48 4.86 1,751.84 90.00% 4.86 1,751.84 90.00% 0.54 194.65 10.00%
P/BANCAS S/DISEÑO
ENCOFRADO Y DESENCOFRADO EN BANCAS -
01.04.01.02 m2 52.87 6.88 363.75 47.58 327.37 90.00% 47.58 327.37 90.00% 5.29 36.37 10.00%
INC SOPORTE P/COBERTURA
01.04.01.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 188.68 4.38 826.42 169.81 743.78 90.00% 169.81 743.78 90.00% 18.87 82.64 10.00%
01.04.02 GRADAS DE CONCRETO
01.04.02.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3 4.63 346.86 1,605.96 4.17 1,445.37 90.00% 4.17 1,445.37 90.00% 0.46 160.60 10.00%
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN GRADAS m2 9.07 6.88 62.40 8.16 56.16 90.00% 8.16 56.16 90.00% 0.91 6.24 10.00%
01.04.02.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 146.10 4.38 639.92 131.49 575.93 90.00% 131.49 575.93 90.00% 14.61 63.99 10.00%
01.04.03 SARDINEL REFORZADO
01.04.03.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3 1.26 346.86 437.04 1.13 393.34 90.00% 1.13 393.34 90.00% 0.13 43.70 10.00%
01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 16.78 16.46 276.20 15.10 248.58 90.00% 15.10 248.58 90.00% 1.68 27.62 10.00%
01.04.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 258.96 4.38 1,134.24 233.06 1,020.82 90.00% 233.06 1,020.82 90.00% 25.90 113.42 10.00%
01.04.04 COLUMNETAS P/SOPORTE DE COBERTURA
01.04.04.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3 0.81 349.33 282.96 0.50 174.67 61.73% 0.50 174.67 61.73% 0.31 108.29 38.27%
01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 21.60 16.46 355.54 10.80 177.77 50.00% 10.80 177.77 50.00% 10.80 177.77 50.00%
01.04.04.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 236.74 4.38 1,036.92 118.37 518.46 50.00% 118.37 518.46 50.00% 118.37 518.46 50.00%
01.05 ESTRUCTURA METALICA Y EN MADERA
01.05.01 COBERTURA
01.05.01.05 COBERTURA DE TEJA ANDINA m2 28.27 72.12 2,038.83 0.00 0.00 0.00% 0.00 0.00 0.00% 28.27 2,038.83 100.00%
02 ARQUITECTURA
02.01 REVOQUES Y ENLUCIDOS
02.01.01 TARRAJEO DE SARDINEL C:A 1:5 m2 105.74 23.48 2,482.78 0.00 0.00 0.00% 0.00 0.00 0.00% 105.74 2,482.78 100.00%
TARRAJEO PRIMARIO EN BANCAS C:A 1:5 - INC.
02.01.02 m2 65.17 23.48 1,530.19 0.00 0.00 0.00% 0.00 0.00 0.00% 65.17 1,530.19 100.00%
SOPORTE P/COBERTURA
02.02 PINTURA
02.02.01 PINTURA LÁTEX A DOS MANOS m2 89.47 5.10 456.30 0.00 0.00 0.00% 0.00 0.00 0.00% 89.47 456.30 100.00%
02.03 PISOS Y PAVIMENTOS
JUNTA DE DILATACIÓN CON TEKNOPORT Y
02.03.02 m 131.78 6.45 849.98 0.00 0.00 0.00% 0.00 0.00 0.00% 131.78 849.98 100.00%
SELLADO CON ASFALTO E=1", H=0.15M
02.04 TRATAMIENTO DE AREAS VERDES
SEMBRADO DE GRASS (INCLUYE SUMINISTRO Y
02.04.01 m2 180.76 26.66 4,819.06 0.00 0.00 0.00% 0.00 0.00 0.00% 180.76 4,819.06 100.00%
SELECCIÓN)
03 INSTALACIONES ELECTRICAS
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACIÓN MANUAL LOCALIZADA m3 24.10 9.89 238.35 24.10 238.35 100.00% 24.10 238.35 100.00% 0.00 0.00 0.00%
03.01.02 REFINE Y NIVELACIÓN DE ZANJAS m2 30.12 1.65 49.70 30.12 49.70 100.00% 30.12 49.70 100.00% 0.00 0.00 0.00%
03.01.03 CAMA DE APOYO DE ARENA E=0.05M P/ZANJAS m3 1.51 127.87 193.08 1.51 193.08 100.00% 1.51 193.08 100.00% 0.00 0.00 0.00%
RELLENO CON MATERIAL PROPIO
03.01.04 m3 22.59 43.65 986.05 22.59 986.05 100.00% 22.59 986.05 100.00% 0.00 0.00 0.00%
COMPACTACIÓN CON EQUIPO LIVIANO
ELIMINACIÓN DE MATERIAL EXCEDENTE
03.01.05 m3 9.41 16.48 155.08 9.41 155.08 100.00% 9.41 155.08 100.00% 0.00 0.00 0.00%
C/MANO DE OBRA
03.02 OBRAS DE CONCRETO
CONCRETO CICLOPEO C:H 1:12+25% PM
03.02.01 m3 0.05 218.78 10.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.05 10.94 100.00%
P/CIMIENTO DE MURO - MEDIDOR
CONCRETO f'c=140 kg/cm, PARA CIMIETO DE
03.02.02 m3 0.96 297.80 285.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.96 285.89 100.00%
POSTES
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 CONCRETO f'c=140 kg/cm, PARA MEDIDOR m3 0.13 290.16 37.72 0.07 18.86 50.00% 0.07 18.86 50.00% 0.07 18.86 50.00%
03.03.02 ENCOFRADO Y DESENCOFRADO DE MURETE m2 1.70 7.57 12.87 0.85 6.43 50.00% 0.85 6.43 50.00% 0.85 6.43 50.00%
03.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 3.44 4.38 15.07 1.72 7.53 50.00% 1.72 7.53 50.00% 1.72 7.53 50.00%
03.04 SUMINISTRO Y COLOCACION DE CAJAS DE PASO

CAJA DE PASE METALICA


03.04.01 und 1.00 30.82 30.82 1.00 30.82 100.00% 1.00 30.82 100.00% 0.00 0.00 0.00%
150MMX150MMX100MM
SUMINISTRO E INSTALACION DE CABLES Y
03.05
TUBERIAS
03.05.01 CABLE 2-1X6MM2 NYY m 150.60 21.62 3,255.97 0.00 0.00 0.00% 0.00 0.00 0.00% 150.60 3,255.97 100.00%
03.05.02 TUBERIA PVC - SAP ELECTRICA DE 35mm m 75.30 11.20 843.36 0.00 0.00 0.00% 0.00 0.00 0.00% 75.30 843.36 100.00%
03.05.03 CABLE THW Nº12 m 150.60 2.37 356.92 0.00 0.00 0.00% 0.00 0.00 0.00% 150.60 356.92 100.00%
03.05.04 CABLE THW Nº14 rll 1.00 196.00 196.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 196.00 100.00%
03.06 SUMINISTRO DE LUMINARIAS
LUMINARIA URBANA - 46.5 W - INC. MONTAJE E
03.06.01 und 10.00 350.00 3,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 3,500.00 100.00%
INSTALACION
LUMINARIA ADOSADA - LED 20W - INC.
03.06.02 und 7.00 60.00 420.00 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 420.00 100.00%
INSTALACION
03.07 POZO A TIERRA
03.07.01 INSTALACION DE POZO A TIERRA und 1.00 329.60 329.60 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 329.60 100.00%
SUMINISTRO E INSTALACION DE TABLERO
03.08
GENERAL
03.08.01 INSTALACION TABLERO GENERAL glb 1.00 156.00 156.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 156.00 100.00%
04 INSTALACIONES SANITARIAS
SISTEMA DE AGUA
04.01 MOVIMIENTO DE TIERRAS
EXCAVACIÓN DE ZANJAS EN TERRENO
04.01.01 m 26.65 9.89 263.57 26.65 263.57 100.00% 26.65 263.57 100.00% 0.00 0.00 0.00%
NORMAL HASTA 0.60M A=0.40M
04.01.02 REFINE Y NIVELACIÓN DE ZANJAS m2 10.66 1.65 17.59 10.66 17.59 100.00% 10.66 17.59 100.00% 0.00 0.00 0.00%
04.01.03 CAMA DE APOYO DE ARENA E=0.05M P/ZANJAS m3 0.53 127.87 67.77 0.53 67.77 100.00% 0.53 67.77 100.00% 0.00 0.00 0.00%
RELLENO CON MATERIAL PROPIO
04.01.04 m3 4.80 43.65 209.52 4.80 209.52 100.00% 4.80 209.52 100.00% 0.00 0.00 0.00%
COMPACTACIÓN CON EQUIPO LIVIANO
ELIMINACIÓN DE MATERIAL EXCEDENTE
04.01.05 m3 7.33 8.24 60.40 7.33 60.40 100.00% 7.33 60.40 100.00% 0.00 0.00 0.00%
C/VOLQUETE DE 6 M3 D<= 5KM
SUMINISTRO E INSTALACION DE AGUA PARA
04.02
RIEGO
04.02.01 SALIDA DE AGUA PARA RIEGO PVC - SAP 1/2" und 2.00 47.10 94.20 2.00 94.20 100.00% 2.00 94.20 100.00% 0.00 0.00 0.00%
04.02.02 REDES DE DISTRIBUCION - TUBERIA PVC 1/2" m 100.00 5.04 504.00 100.00 504.00 100.00% 100.00 504.00 100.00% 0.00 0.00 0.00%
04.02.03 REDES DE DISTRIBUCION - TUBERIA PVC 1" m 30.00 6.01 180.30 30.00 180.30 100.00% 30.00 180.30 100.00% 0.00 0.00 0.00%
04.02.04 ACCESORIOS DE REDES DE AGUA - PVC 1/2" glb 1.00 60.10 60.10 1.00 60.10 100.00% 1.00 60.10 100.00% 0.00 0.00 0.00%
4.02 SISTEMA DE DESAGUE
04.02.01 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA TUBERIA DE
04.02.01.01 m3 7.36 16.48 121.29 7.36 121.29 100.00% 7.36 121.29 100.00% 0.00 0.00 0.00%
DESAGUE
04.02.02 TUBERIA DE DESAGUE
SUMINISTRO E INSTALACION DE TUBERIA DE
04.02.02.01 m 23.00 66.20 1,522.60 15.00 993.00 65.22% 15.00 993.00 65.22% 8.00 529.60 34.78%
DESAGUE DE 8"
04.02.03 INSTALACIONES DOMICILIARIAS
04.02.03.01 INSTALACIONES DOMIMCILIARIAS GLB 1.00 374.59 374.59 0.50 187.30 50.00% 0.50 187.30 50.00% 0.50 187.30 50.00%
05 SEGURIDAD Y SALUD
05.01 EQUIPO DE PROTECCION PERSONAL glb 1.00 304.00 304.00 0.50 152.00 50.00% 0.50 152.00 50.00% 0.50 152.00 50.00%
05.02 EQUIPO DE PROTECCION COLECTIVA glb 1.00 282.00 282.00 0.50 141.00 50.00% 0.50 141.00 50.00% 0.50 141.00 50.00%
ELABORACION, IMPLEMENTACION Y
05.03 glb 1.00 951.50 951.50 1.00 951.50 100.00% 1.00 951.50 100.00% 0.00 0.00 0.00%
ADMINISTRACION DEL PLAN COVID
06 VARIOS
06.01 LIMPIEZA FINAL DE OBRA m2 577.60 0.28 161.73 0.00 0.00 0.00% 0.00 0.00 0.00% 577.60 161.73 100.00%
06.02 FLETE TERRESTRE glb 1.00 9,500.00 9,500.00 1.00 9,500.00 100.00% 1.00 9,500.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO (CD) 83,222.74 57,211.51 57,211.51 26,011.23
GASTOS GENERALES 31,000.00 25,500.00 25,500.00 5,500.00
COSTO TOTAL DE OBRA 114,222.74 82,711.51 82,711.51 31,511.23
AVANCE PORCENTUAL 100.00% 72.41% 72.41% 27.59%
AVANCE PORCENTUAL ACUMULADO
CURVA DE AVANCE DE OBRA - ENERO 2021
PROYECTO:
"MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE
CUTERVO - DEPARTAMENTO DE CAJAMARCA"

CLIENTE:
MUNICIPALIDAD DISTRITAL RESIDENTE ING. DANIEL EMILIANO RODAS
DE SOCOTA OBRA: ALVITES
INSPECTOR ING. BYROL EDUARDO VEGA
DEPARTAMENTO: CAJAMARCA PROVINCIA: CUTERVO
OBRA: SANDOVAL
DISTRITO: SOCOTA MODALIDAD: ADMINISTRACION DIRECTA
PRESUP.
114,222.74
REFERENCIAL:

FECHA: 20/01/2021 AL 31/02/2021 MES: ENERO

80.00%
74.21%

70.00%

60.00%
60.00%

50.00%
50.00%

VALORIZACION PROGRAMADO
40.00%
ACUMULADA(%) REAL
34.21%

30.00%
30.00%

24.00%

20.00%
15.00%

10.00% 10.00%
10.00%
5.00%

0.00%
0.00%
0 1 2 3 4 5 6 7

MES 0 Inicio 22/01/2021 24/01/2021 26/01/2021 28/01/2021 31/01/2021


0.00% VALORIZACION PROGRAMADO 0.00% 5.00% 10.00% 15.00% 30.00% 34.21%
ACUMULADA(%) REAL 0.00% 10.00% 24.00% 50.00% 60.00% 74.21%
RESUMEN DE VALORIZACION 02
PROYECTO: "MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE CUTERVO - DEPARTAMENTO DE CAJAMARCA"
CLIENTE: MUNICIPALIDAD DISTRITAL DE SOCOTA RESIDENTE OBRA: ING. DANIEL EMILIANO RODAS ALVITES

DEPARTAMENTO: CAJAMARCA PROVINCIA: CUTERVO INSPECTOR OBRA: ING. BYROL EDUARDO VEGA SANDOVAL

DISTRITO: SOCOTA MODALIDAD: ADMINISTRACION DIRECTA


PRESUP.
11,422.74
REFERENCIAL:
FECHA: 01/02/2021 AL 20 /02/2021 MES: FEBRERO

AVANCE VALORIZADO SALDO


ITEM Descripción SUB TOTAL PRESUPUESTADO ANTERIOR ACTUAL ACUMULADO

01 PRESUPUESTO 114,222.74 82,711.51 31,511.23 114,222.74 0.00


COSTO DIRECTO S/ 83,222.74 57,211.51 26,011.23 83,222.74 0.00
GASTOS GENERALES S/ 31,000.00 25,500.00 5,500.00 31,000.00 0.00
COSTO TOTAL DE OBRA S/ 114,222.74 82,711.51 31,511.23 31,511.23 0.00

AVANCE FISICO EJECUTADO 72.41% 27.59% 100.00% 0.00%


AVANCE FISICO PROGRAMADO 34.21% 65.79% 100.00% 0.00%
RESUMEN DE VALORIZACION 01
"MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE CUTERVO -
PROYECTO:
DEPARTAMENTO DE CAJAMARCA"
CLIENTE: MUNICIPALIDAD DISTRITAL DE SOCOTA RESIDENTE OBRA: ING. DANIEL EMILIANO RODAS ALVITES

DEPARTAMENTO: CAJAMARCA PROVINCIA: CUTERVO INSPECTOR OBRA: ING. BYROL EDUARDO VEGA SANDOVAL

DISTRITO: SOCOTA MODALIDAD: ADMINISTRACION DIRECTA


PRESUP.
11,422.74
REFERENCIAL:
FECHA: 20/01/2021 AL 31 /01/2021 MES: ENERO

AVANCE VALORIZADO SALDO


ITEM Descripción SUB TOTAL PRESUPUESTADO ANTERIOR ACTUAL ACUMULADO

01 PRESUPUESTO 114,222.74 0.00 82,711.51 82,711.51 31,511.23


COSTO DIRECTO S/ 83,222.74 0.00 57,211.51 57,211.51 26,011.23
GASTOS GENERALES S/ 31,000.00 0.00 25,500.00 25,500.00 5,500.00
COSTO TOTAL DE OBRA S/ 114,222.74 0.00 82,711.51 82,711.51 31,511.23

AVANCE FISICO EJECUTADO 0.00% 72.41% 72.41% 27.59%


AVANCE FISICO PROGRAMADO 0.00% 34.21% 34.21% 65.79%
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA - FEBRERO 2021
PROYECTO: "MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE CUTERVO - DEPARTAMENTO DE CAJAMARCA"
CLIENTE: MUNICIPALIDAD DISTRITAL DE SOCOTA RESIDENTE OBRA: ING. DANIEL EMILIANO RODAS ALVITES
DEPARTAMENTO: CAJAMARCA PROVINCIA: CUTERVO INSPECTOR OBRA: ING. BYROL EDUARDO VEGA SANDOVAL
DISTRITO: SOCOTA MODALIDAD: ADMINISTRACION DIRECTA
PRESUP. REFERENCIAL: 114,222.74
FECHA: 01/02/2021 AL 20 /02/2021 MES: FEBRERO

AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO A EJECUTAR


ITEM Descripción Und. Metrado UNITARIO PARCIAL METRADO PRECIO % METRADO PRECIO % METRADO PRECIO % METRADO PRECIO %

01 ESTRUCTURA
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 577.60 0.21 121.30 577.60 121.30 100.00% 0.00 0.00 0.00% 577.60 121.30 100.00% 0.00 0.00 0.00%
01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 577.60 1.33 768.21 577.60 768.21 100.00% 0.00 0.00 0.00% 577.60 768.21 100.00% 0.00 0.00 0.00%
01.01.03 CORTE DE TERRENO NATURAL C/MAQUINARIA m3 173.28 10.30 1,784.78 173.28 1,784.78 100.00% 0.00 0.00 0.00% 173.28 1,784.78 100.00% 0.00 0.00 0.00%
PERFILADO Y COMPACTADO DE TERRENO
01.01.04 m2 577.60 2.13 1,230.29 577.60 1,230.29 100.00% 0.00 0.00 0.00% 577.60 1,230.29 100.00% 0.00 0.00 0.00%
NATURAL
01.02 MOVIMIENTO DE TIERRAS
EXCAVACIÓN MANUAL PARA SARDINEL H
01.02.01 m3 8.54 13.73 117.25 8.54 117.25 100.00% 0.00 0.00 0.00% 8.54 117.25 100.00% 0.00 0.00 0.00%
Prom=0.35 M
01.02.02 EXCAVACIÓN MANUAL P/CIMIENTO EN BANCAS m3 8.63 16.48 142.22 8.63 142.22 100.00% 0.00 0.00 0.00% 8.63 142.22 100.00% 0.00 0.00 0.00%
01.02.03 EXCAVACIÓN MANUAL P/GRADAS m3 0.81 20.60 16.69 0.81 16.69 100.00% 0.00 0.00 0.00% 0.81 16.69 100.00% 0.00 0.00 0.00%
RELLENO CON MATERIAL PROPIO
01.02.04 m3 112.38 43.65 4,905.39 112.38 4,905.39 100.00% 0.00 0.00 0.00% 112.38 4,905.39 100.00% 0.00 0.00 0.00%
COMPACTACIÓN CON EQUIPO LIVIANO
RELLENO COMPACTADO, MAT. PRESTAMO -
01.02.05 m3 38.40 62.28 2,391.55 38.40 2,391.55 100.00% 0.00 0.00 0.00% 38.40 2,391.55 100.00% 0.00 0.00 0.00%
AFIRMADO 4" - C/EQUIPO LIVIANO
ELIMINACIÓN DE MATERIAL EXCEDENTE
01.02.07 m3 126.70 8.24 1,044.01 126.70 1,044.01 100.00% 0.00 0.00 0.00% 126.70 1,044.01 100.00% 0.00 0.00 0.00%
C/VOLQUETE DE 6 M3 D<= 5KM
01.03 OBRAS DE CONCRETO
01.03.01 SOLADO
SOLADO E=2" MEZCLA 1:12 C:H PREPARACION
01.03.01.01 m2 8.63 8.20 70.77 8.63 70.77 100.00% 0.00 0.00 0.00% 8.63 70.77 100.00% 0.00 0.00 0.00%
C/MEZCLADORA
01.03.02 SARDINEL
01.03.02.01 CONCRETO F'c= 175 KG/CM2 EN SARDINEL m3 12.20 335.74 4,096.03 12.20 4,096.03 100.00% 0.00 0.00 0.00% 12.20 4,096.03 100.00% 0.00 0.00 0.00%
01.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 81.34 16.46 1,338.86 81.34 1,338.86 100.00% 0.00 0.00 0.00% 81.34 1,338.86 100.00% 0.00 0.00 0.00%
01.03.03 CIMIENTO CORRIDO
CONCRETO CICLOPEO C:H 1:8+25% PM
01.03.03.01 m3 4.32 206.02 890.01 4.32 890.01 100.00% 0.00 0.00 0.00% 4.32 890.01 100.00% 0.00 0.00 0.00%
PREPARACION C/MEZCLADORA
01.03.04 PISOS Y VEREDAS
CONCRETO F'c= 175 KG/CM2, E=0.12 M
01.03.04.01 m2 374.60 44.26 16,579.80 337.14 14,921.82 90.00% 37.46 1,657.98 10.00% 374.60 16,579.80 100.00% 0.00 0.00 0.00%
PREPARACION C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO EN PISO Y
01.03.04.02 m2 29.33 6.88 201.79 26.40 181.61 90.00% 2.93 20.18 10.00% 29.33 201.79 100.00% 0.00 0.00 0.00%
VEREDA
ACERO DE REFUERZO FY=4200 kg/cm2 kg 143.89 4.38 630.24 129.50 567.21 90.00% 14.39 63.02 10.00% 143.89 630.24 100.00% 0.00 0.00 0.00%
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 BANCAS DE CONCRETO SEGUN DISEÑO
CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA
01.04.01.01 m3 5.40 360.46 1,946.48 4.86 1,751.84 90.00% 0.54 194.65 10.00% 5.40 1,946.48 100.00% 0.00 0.00 0.00%
P/BANCAS S/DISEÑO
ENCOFRADO Y DESENCOFRADO EN BANCAS -
01.04.01.02 m2 52.87 6.88 363.75 47.58 327.37 90.00% 5.29 36.37 10.00% 52.87 363.75 100.00% 0.00 0.00 0.00%
INC SOPORTE P/COBERTURA
01.04.01.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 188.68 4.38 826.42 169.81 743.78 90.00% 18.87 82.64 10.00% 188.68 826.42 100.00% 0.00 0.00 0.00%
01.04.02 GRADAS DE CONCRETO
01.04.02.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3 4.63 346.86 1,605.96 4.17 1,445.37 90.00% 0.46 160.60 10.00% 4.63 1,605.96 100.00% 0.00 0.00 0.00%
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN GRADAS m2 9.07 6.88 62.40 8.16 56.16 90.00% 0.91 6.24 10.00% 9.07 62.40 100.00% 0.00 0.00 0.00%
01.04.02.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 146.10 4.38 639.92 131.49 575.93 90.00% 14.61 63.99 10.00% 146.10 639.92 100.00% 0.00 0.00 0.00%
01.04.03 SARDINEL REFORZADO 0.00
01.04.03.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3 1.26 346.86 437.04 1.13 393.34 90.00% 0.13 43.70 10.00% 1.26 437.04 100.00% 0.00 0.00 0.00%
01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 16.78 16.46 276.20 15.10 248.58 90.00% 1.68 27.62 10.00% 16.78 276.20 100.00% 0.00 0.00 0.00%
01.04.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 258.96 4.38 1,134.24 233.06 1,020.82 90.00% 25.90 113.42 10.00% 258.96 1,134.24 100.00% 0.00 0.00 0.00%
01.04.04 COLUMNETAS P/SOPORTE DE COBERTURA 0.00
01.04.04.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3 0.81 349.33 282.96 0.50 174.67 61.73% 0.31 108.29 38.27% 0.81 282.96 100.00% 0.00 0.00 0.00%
01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 21.60 16.46 355.54 10.80 177.77 50.00% 10.80 177.77 50.00% 21.60 355.54 100.00% 0.00 0.00 0.00%
01.04.04.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 236.74 4.38 1,036.92 118.37 518.46 50.00% 118.37 518.46 50.00% 236.74 1,036.92 100.00% 0.00 0.00 0.00%
01.05 ESTRUCTURA METALICA Y EN MADERA
01.05.01 COBERTURA
01.05.01.05 COBERTURA DE TEJA ANDINA m2 28.27 72.12 2,038.83 0.00 0.00 0.00% 28.27 2,038.83 100.00% 28.27 2,038.83 100.00% 0.00 0.00 0.00%
02 ARQUITECTURA
02.01 REVOQUES Y ENLUCIDOS
02.01.01 TARRAJEO DE SARDINEL C:A 1:5 m2 105.74 23.48 2,482.78 0.00 0.00 0.00% 105.74 2,482.78 100.00% 105.74 2,482.78 100.00% 0.00 0.00 0.00%
TARRAJEO PRIMARIO EN BANCAS C:A 1:5 - INC.
02.01.02 m2 65.17 23.48 1,530.19 0.00 0.00 0.00% 65.17 1,530.19 100.00% 65.17 1,530.19 100.00% 0.00 0.00 0.00%
SOPORTE P/COBERTURA
02.02 PINTURA 0.00
02.02.01 PINTURA LÁTEX A DOS MANOS m2 89.47 5.10 456.30 0.00 0.00 0.00% 89.47 456.30 100.00% 89.47 456.30 100.00% 0.00 0.00 0.00%
02.03 PISOS Y PAVIMENTOS 0.00
JUNTA DE DILATACIÓN CON TEKNOPORT Y
02.03.02 m 131.78 6.45 849.98 0.00 0.00 0.00% 131.78 849.98 100.00% 131.78 849.98 100.00% 0.00 0.00 0.00%
SELLADO CON ASFALTO E=1", H=0.15M
02.04 TRATAMIENTO DE AREAS VERDES 0.00
SEMBRADO DE GRASS (INCLUYE SUMINISTRO Y
02.04.01 m2 180.76 26.66 4,819.06 0.00 0.00 0.00% 180.76 4,819.06 100.00% 180.76 4,819.06 100.00% 0.00 0.00 0.00%
SELECCIÓN)
03 INSTALACIONES ELECTRICAS 0.00
03.01 MOVIMIENTO DE TIERRAS 0.00
03.01.01 EXCAVACIÓN MANUAL LOCALIZADA m3 24.10 9.89 238.35 24.10 238.35 100.00% 0.00 0.00 0.00% 24.10 238.35 100.00% 0.00 0.00 0.00%
03.01.02 REFINE Y NIVELACIÓN DE ZANJAS m2 30.12 1.65 49.70 30.12 49.70 100.00% 0.00 0.00 0.00% 30.12 49.70 100.00% 0.00 0.00 0.00%
03.01.03 CAMA DE APOYO DE ARENA E=0.05M P/ZANJAS m3 1.51 127.87 193.08 1.51 193.08 100.00% 0.00 0.00 0.00% 1.51 193.08 100.00% 0.00 0.00 0.00%
RELLENO CON MATERIAL PROPIO
03.01.04 m3 22.59 43.65 986.05 22.59 986.05 100.00% 0.00 0.00 0.00% 22.59 986.05 100.00% 0.00 0.00 0.00%
COMPACTACIÓN CON EQUIPO LIVIANO
ELIMINACIÓN DE MATERIAL EXCEDENTE
03.01.05 m3 9.41 16.48 155.08 9.41 155.08 100.00% 0.00 0.00 0.00% 9.41 155.08 100.00% 0.00 0.00 0.00%
C/MANO DE OBRA
03.02 OBRAS DE CONCRETO 0.00
CONCRETO CICLOPEO C:H 1:12+25% PM
03.02.01 m3 0.05 218.78 10.94 0.00 0.00 0.00% 0.05 10.94 100.00% 0.05 10.94 100.00% 0.00 0.00 0.00%
P/CIMIENTO DE MURO - MEDIDOR
CONCRETO f'c=140 kg/cm, PARA CIMIETO DE
03.02.02 m3 0.96 297.80 285.89 0.00 0.00 0.00% 0.96 285.89 100.00% 0.96 285.89 100.00% 0.00 0.00 0.00%
POSTES
03.03 OBRAS DE CONCRETO ARMADO 0.00
03.03.01 CONCRETO f'c=140 kg/cm, PARA MEDIDOR m3 0.13 290.16 37.72 0.07 18.86 50.00% 0.07 18.86 50.00% 0.13 37.72 100.00% 0.00 0.00 0.00%
03.03.02 ENCOFRADO Y DESENCOFRADO DE MURETE m2 1.70 7.57 12.87 0.85 6.43 50.00% 0.85 6.43 50.00% 1.70 12.87 100.00% 0.00 0.00 0.00%
03.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg 3.44 4.38 15.07 1.72 7.53 50.00% 1.72 7.53 50.00% 3.44 15.07 100.00% 0.00 0.00 0.00%
03.04 SUMINISTRO Y COLOCACION DE CAJAS DE PASO
CAJA DE PASE METALICA
03.04.01 und 1.00 30.82 30.82 1.00 30.82 100.00% 0.00 0.00 0.00% 1.00 30.82 100.00% 0.00 0.00 0.00%
150MMX150MMX100MM
SUMINISTRO E INSTALACION DE CABLES Y
03.05
TUBERIAS
03.05.01 CABLE 2-1X6MM2 NYY m 150.60 21.62 3,255.97 0.00 0.00 0.00% 150.60 3,255.97 100.00% 150.60 3,255.97 100.00% 0.00 0.00 0.00%
03.05.02 TUBERIA PVC - SAP ELECTRICA DE 35mm m 75.30 11.20 843.36 0.00 0.00 0.00% 75.30 843.36 100.00% 75.30 843.36 100.00% 0.00 0.00 0.00%
03.05.03 CABLE THW Nº12 m 150.60 2.37 356.92 0.00 0.00 0.00% 150.60 356.92 100.00% 150.60 356.92 100.00% 0.00 0.00 0.00%
03.05.04 CABLE THW Nº14 rll 1.00 196.00 196.00 0.00 0.00 0.00% 1.00 196.00 100.00% 1.00 196.00 100.00% 0.00 0.00 0.00%
03.06 SUMINISTRO DE LUMINARIAS
LUMINARIA URBANA - 46.5 W - INC. MONTAJE E
03.06.01 und 10.00 350.00 3,500.00 0.00 0.00 0.00% 10.00 3,500.00 100.00% 10.00 3,500.00 100.00% 0.00 0.00 0.00%
INSTALACION
LUMINARIA ADOSADA - LED 20W - INC.
03.06.02 und 7.00 60.00 420.00 0.00 0.00 0.00% 7.00 420.00 100.00% 7.00 420.00 100.00% 0.00 0.00 0.00%
INSTALACION
03.07 POZO A TIERRA
03.07.01 INSTALACION DE POZO A TIERRA und 1.00 329.60 329.60 0.00 0.00 0.00% 1.00 329.60 100.00% 1.00 329.60 100.00% 0.00 0.00 0.00%
SUMINISTRO E INSTALACION DE TABLERO
hy89
GENERAL
03.08.01 INSTALACION TABLERO GENERAL glb 1.00 156.00 156.00 0.00 0.00 0.00% 1.00 156.00 100.00% 1.00 156.00 100.00% 0.00 0.00 0.00%
04 INSTALACIONES SANITARIAS
SISTEMA DE AGUA
04.01 MOVIMIENTO DE TIERRAS
EXCAVACIÓN DE ZANJAS EN TERRENO
04.01.01 m 26.65 9.89 263.57 26.65 263.57 100.00% 0.00 0.00 0.00% 26.65 263.57 100.00% 0.00 0.00 0.00%
NORMAL HASTA 0.60M A=0.40M
04.01.02 REFINE Y NIVELACIÓN DE ZANJAS m2 10.66 1.65 17.59 10.66 17.59 100.00% 0.00 0.00 0.00% 10.66 17.59 100.00% 0.00 0.00 0.00%
04.01.03 CAMA DE APOYO DE ARENA E=0.05M P/ZANJAS m3 0.53 127.87 67.77 0.53 67.77 100.00% 0.00 0.00 0.00% 0.53 67.77 100.00% 0.00 0.00 0.00%
RELLENO CON MATERIAL PROPIO
04.01.04 m3 4.80 43.65 209.52 4.80 209.52 100.00% 0.00 0.00 0.00% 4.80 209.52 100.00% 0.00 0.00 0.00%
COMPACTACIÓN CON EQUIPO LIVIANO
ELIMINACIÓN DE MATERIAL EXCEDENTE
04.01.05 m3 7.33 8.24 60.40 7.33 60.40 100.00% 0.00 0.00 0.00% 7.33 60.40 100.00% 0.00 0.00 0.00%
C/VOLQUETE DE 6 M3 D<= 5KM
SUMINISTRO E INSTALACION DE AGUA PARA
04.02 0.00
RIEGO
04.02.01 SALIDA DE AGUA PARA RIEGO PVC - SAP 1/2" und 2.00 47.10 94.20 2.00 94.20 100.00% 0.00 0.00 0.00% 2.00 94.20 100.00% 0.00 0.00 0.00%
04.02.02 REDES DE DISTRIBUCION - TUBERIA PVC 1/2" m 100.00 5.04 504.00 100.00 504.00 100.00% 0.00 0.00 0.00% 100.00 504.00 100.00% 0.00 0.00 0.00%
04.02.03 REDES DE DISTRIBUCION - TUBERIA PVC 1" m 30.00 6.01 180.30 30.00 180.30 100.00% 0.00 0.00 0.00% 30.00 180.30 100.00% 0.00 0.00 0.00%
04.02.04 ACCESORIOS DE REDES DE AGUA - PVC 1/2" glb 1.00 60.10 60.10 1.00 60.10 100.00% 0.00 0.00 0.00% 1.00 60.10 100.00% 0.00 0.00 0.00%
4.02 SISTEMA DE DESAGUE
04.02.01 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA TUBERIA DE
04.02.01.01 m3 7.36 16.48 121.29 7.36 121.29 100.00% 0.00 0.00 0.00% 7.36 121.29 100.00% 0.00 0.00 0.00%
DESAGUE
04.02.02 TUBERIA DE DESAGUE 0.00
SUMINISTRO E INSTALACION DE TUBERIA DE
04.02.02.01 m 23.00 66.20 1,522.60 15.00 993.00 65.22% 8.00 529.60 34.78% 23.00 1,522.60 100.00% 0.00 0.00 0.00%
DESAGUE DE 8"
04.02.03 INSTALACIONES DOMICILIARIAS 0.00
04.02.03.01 INSTALACIONES DOMIMCILIARIAS GLB 1.00 374.59 374.59 0.50 187.30 50.00% 0.50 187.30 50.00% 1.00 374.59 100.00% 0.00 0.00 0.00%
05 SEGURIDAD Y SALUD 0.00
05.01 EQUIPO DE PROTECCION PERSONAL glb 1.00 304.00 304.00 0.50 152.00 50.00% 0.50 152.00 50.00% 1.00 304.00 100.00% 0.00 0.00 0.00%
05.02 EQUIPO DE PROTECCION COLECTIVA glb 1.00 282.00 282.00 0.50 141.00 50.00% 0.50 141.00 50.00% 1.00 282.00 100.00% 0.00 0.00 0.00%
ELABORACION, IMPLEMENTACION Y
05.03 glb 1.00 951.50 951.50 1.00 951.50 100.00% 0.00 0.00 0.00% 1.00 951.50 100.00% 0.00 0.00 0.00%
ADMINISTRACION DEL PLAN COVID
06 VARIOS
06.01 LIMPIEZA FINAL DE OBRA m2 577.60 0.28 161.73 0.00 0.00 0.00% 577.60 161.73 100.00% 577.60 161.73 100.00% 0.00 0.00 0.00%
06.02 FLETE TERRESTRE glb 1.00 9,500.00 9,500.00 1.00 9,500.00 100.00% 0.00 0.00 0.00% 1.00 9,500.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO (CD) 83,222.74 57,211.51 26,011.23 83,222.74 0.00
GASTOS GENERALES 31,000.00 25,500.00 5,500.00 31,000.00 0.00
COSTO TOTAL DE OBRA 114,222.74 82,711.51 31,511.23 114,222.74 0.00
AVANCE PORCENTUAL 100.00% 72.41% 27.59% 100.00% 0.00%
AVANCE PORCENTUAL ACUMULADO
CURVA DE AVANCE DE OBRA - FEBRERO 2021
PROYECTO:
"MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE CUTERVO
- DEPARTAMENTO DE CAJAMARCA"
MUNICIPALIDAD DISTRITAL
CLIENTE: RESIDENTE OBRA: ING. DANIEL EMILIANO RODAS ALVITES
DE SOCOTA

DEPARTAMENTO: CAJAMARCA PROVINCIA: CUTERVO INSPECTOR OBRA: ING. BYROL EDUARDO VEGA SANDOVAL
DISTRITO: SOCOTA MODALIDAD: ADMINISTRACION DIRECTA
PRESUP.
114,222.74
REFERENCIAL:

FECHA: 01/02/2021 AL 20/02/2021 MES: FEBRERO

120.00%

100.00%
100.00% 98.00%

89.00%
85.00%
80.00% 80.00%
80.00%
74.21%

65.00%
60.00% VALORIZACION PROGRAMADO
60.00%
55.00% ACUMULADA(%) REAL
50.00%

40.00%
40.00%
34.21%
30.00%
24.00%

20.00%
15.00%
10.00% 10.00%
5.00%
0.00%
0.00%
0 2 4 6 8 10 12

MES 0 Inicio 22/01/2021 24/01/2021 26/01/2021 28/01/2021 31/01/2021 05/02/2021 08/02/2021 12/02/2021 17/02/2021 20/02/2021
0.00% VALORIZACION PROGRAMADO 0.00% 5.00% 10.00% 15.00% 30.00% 34.21% 40.00% 55.00% 65.00% 80.00% 100.00%
ACUMULADA(%) REAL 0.00% 10.00% 24.00% 50.00% 60.00% 74.21% 80.00% 85.00% 89.00% 98.00% 100.00%
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
PROYECTO:
"MEJORAMIENTO DEL PARQUE RECREATIVO DEL CENTRO POBLADO CHISIGLE,
DEPARTAMENTO DE CAJAMARC
ITEM Descripción Und.
01 ESTRUCTURA
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2
01.01.02 TRAZO, NIVELACION Y REPLANTEO m2
01.01.03 CORTE DE TERRENO NATURAL C/MAQUINARIA m3
01.01.04 PERFILADO Y COMPACTADO DE TERRENO NATURAL m2
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACIÓN MANUAL PARA SARDINEL H Prom=0.35 M m3
01.02.02 EXCAVACIÓN MANUAL P/CIMIENTO EN BANCAS m3
01.02.03 EXCAVACIÓN MANUAL P/GRADAS m3
01.02.04 RELLENO CON MATERIAL PROPIO COMPACTACIÓN CON EQUIPO LIVIANO m3
01.02.05 RELLENO COMPACTADO, MAT. PRESTAMO - AFIRMADO 4" - C/EQUIPO LIVIANO m3
01.02.06 RELLENO CON TIERRA NEGRA O VEGETAL E=10CM m3
01.02.07 ELIMINACIÓN DE MATERIAL EXCEDENTE C/VOLQUETE DE 6 M3 D<= 5KM m3
01.03 OBRAS DE CONCRETO
01.03.01 SOLADO
01.03.01.01 SOLADO E=2" MEZCLA 1:12 C:H PREPARACION C/MEZCLADORA m2
01.03.02 SARDINEL
01.03.02.01 CONCRETO F'c= 175 KG/CM2 EN SARDINEL m3
01.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2
01.03.03 CIMIENTO CORRIDO
01.03.03.01 CONCRETO CICLOPEO C:H 1:8+25% PM PREPARACION C/MEZCLADORA m3
01.03.04 PISOS Y VEREDAS
01.03.04.01 CONCRETO F'c= 175 KG/CM2, E=0.12 M PREPARACION C/MEZCLADORA m2
01.03.04.02 ENCOFRADO Y DESENCOFRADO EN PISO Y VEREDA m2
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 BANCAS DE CONCRETO SEGUN DISEÑO
01.04.01.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA P/BANCAS S/DISEÑO m3
01.04.01.02 ENCOFRADO Y DESENCOFRADO EN BANCAS - INC SOPORTE P/COBERTURA m2
01.04.01.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
01.04.02 GRADAS DE CONCRETO
01.04.02.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN GRADAS m2
01.04.02.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
01.04.03 SARDINEL REFORZADO
01.04.03.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3
01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2
01.04.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
01.04.04 COLUMNETAS P/SOPORTE DE COBERTURA
01.04.04.01 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m3
01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2
01.04.04.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
01.05 ESTRUCTURA METALICA Y EN MADERA
01.05.01 COBERTURA
01.05.01.01 ACERO DE SOPORTE PARA COBERTURA und
01.05.01.02 ESTRUCTURA EN MADERA P/COBERTURA INC. PINTURA und
01.05.01.03 VIGA DE MADERA 3"X2" m
01.05.01.04 VIGA DE MADERA 2"X1" m
01.05.01.05 COBERTURA DE TEJA ANDINA m2
02 ARQUITECTURA
02.01 REVOQUES Y ENLUCIDOS
02.01.01 TARRAJEO DE SARDINEL C:A 1:5 m2
02.01.02 TARRAJEO PRIMARIO EN BANCAS C:A 1:5 - INC. SOPORTE P/COBERTURA m2
02.02 PINTURA
02.02.01 PINTURA LÁTEX A DOS MANOS m2
02.03 PISOS Y PAVIMENTOS
02.03.01 PISO DE CONCRETO ESTAMPADO E=0.05M. TIPO ADOQUIN - COLOR ROJO S/DISEÑOm2
02.03.02 JUNTA DE DILATACIÓN CON TEKNOPORT Y SELLADO CON ASFALTO E=1", H=0.15M m
02.04 TRATAMIENTO DE AREAS VERDES
02.04.01 SEMBRADO DE GRASS (INCLUYE SUMINISTRO Y SELECCIÓN) m2
02.04.02 SEMBRADO Y SUMINISTRO DE ARBUSTOS und
02.04.03 SEMBRADO Y SUMINISTRO DE ARBOLES und
03 INSTALACIONES ELECTRICAS
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACIÓN MANUAL LOCALIZADA m3
03.01.02 REFINE Y NIVELACIÓN DE ZANJAS m2
03.01.03 CAMA DE APOYO DE ARENA E=0.05M P/ZANJAS m3
03.01.04 RELLENO CON MATERIAL PROPIO COMPACTACIÓN CON EQUIPO LIVIANO m3
03.01.05 ELIMINACIÓN DE MATERIAL EXCEDENTE C/VOLQUETE DE 15 M3 D<= 5KM m3
03.02 OBRAS DE CONCRETO
03.02.01 CONCRETO CICLOPEO C:H 1:12+25% PM P/CIMIENTO DE MURO - MEDIDOR m3
03.02.02 CONCRETO f'c=140 kg/cm, PARA CIMIETO DE POSTES m3
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 CONCRETO f'c=140 kg/cm, PARA MEDIDOR m3
03.03.02 ENCOFRADO Y DESENCOFRADO DE MURETE m2
03.03.03 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
03.04 SUMINISTRO Y COLOCACION DE CAJAS DE PASO
03.04.01 CAJA DE PASE METALICA 150MMX150MMX100MM und
03.05 SUMINISTRO E INSTALACION DE CABLES Y TUBERIAS
03.05.01 CABLE 2-1X6MM2 NYY m
03.05.02 TUBERIA PVC - SAP ELECTRICA DE 35mm m
03.06 SUMINISTRO DE LUMINARIAS
03.06.01 LUMINARIA URBANA - 46.5 W - INC. MONTAJE E INSTALACION und
03.06.02 LUMINARIA ADOSADA - LED 20W - INC. INSTALACION und
03.07 POZO A TIERRA
03.07.01 INSTALACION DE POZO A TIERRA und
03.08 SUMINISTRO E INSTALACION DE TABLERO GENERAL
03.08.01 INSTALACION TABLERO GENERAL glb
04 INSTALACIONES SANITARIAS
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACIÓN DE ZANJAS EN TERRENO NORMAL HASTA 0.60M A=0.40M m
04.01.02 REFINE Y NIVELACIÓN DE ZANJAS m2
04.01.03 CAMA DE APOYO DE ARENA E=0.05M P/ZANJAS m3
04.01.04 RELLENO CON MATERIAL PROPIO COMPACTACIÓN CON EQUIPO LIVIANO m3
04.01.05 ELIMINACIÓN DE MATERIAL EXCEDENTE C/VOLQUETE DE 6 M3 D<= 5KM m3
04.02 SUMINISTRO E INSTALACION DE AGUA PARA RIEGO
04.02.01 CAJA DE CONCRETO 12"X12"X4" und
04.02.02 SALIDA DE AGUA PARA RIEGO PVC - SAP 1/2" und
04.02.03 REDES DE DISTRIBUCION - TUBERIA PVC 1/2" m
04.02.04 ACCESORIOS DE REDES DE AGUA - PVC 1/2" glb
05 SEGURIDAD Y SALUD
05.01 EQUIPO DE PROTECCION PERSONAL glb
05.02 EQUIPO DE PROTECCION COLECTIVA glb
05.03 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN COVID glb
06 VARIOS
06.01 LIMPIEZA FINAL DE OBRA m2
06.02 FLETE TERRESTRE glb
COSTO DIRECTO (CD)
GASTOS GENERALES
COSTO TOTAL DE OBRA
AVANCE PORCENTUAL
AVANCE PORCENTUAL ACUMULADO
A VALORIZADO DE AVANCE DE OBRA
CENTRO POBLADO CHISIGLE, DISTRITO DE SOCOTA, PROVINCIA DE CUTERVO -
EPARTAMENTO DE CAJAMARCA"
Metrado UNITARIO PARCIAL 1ERA QUINC. 2DA QUINC. TOTAL

577.60 0.34 196.38 196.38 196.38


577.60 4.64 2,680.06 2,680.06 2,680.06
173.28 9.98 1,729.33 1,729.33 1,729.33
577.60 2.33 1,345.81 1,345.81 1,345.81

8.54 13.73 117.25 117.25 117.25


8.63 16.48 142.22 142.22 142.22
0.81 20.60 16.69 16.69 16.69
112.38 18.91 2,125.11 2,125.11 2,125.11
37.46 19.25 721.11 721.11 721.11
18.08 23.36 422.35 422.35 422.35
126.70 6.61 837.49 837.49 837.49

8.63 9.03 77.93 77.93 77.93

12.20 338.59 4,130.80 4,130.80 4,130.80


81.34 21.93 1,783.79 1,783.79 1,783.79

4.32 197.47 853.07 853.07 853.07

374.60 42.09 15,766.91 5,200.00 10,566.91 15,766.91


29.33 21.93 643.21 243.11 400.10 643.21

5.40 338.59 1,828.39 1,828.39 1,828.39


52.87 21.93 1,159.44 1,032.20 127.24 1,159.44
188.68 4.35 820.76 820.76 820.76

4.63 338.59 1,567.67 1,567.67 1,567.67


9.07 21.93 198.91 196.34 2.57 198.91
137.52 4.35 598.21 598.21 598.21

1.26 338.59 426.62 426.62 426.62


16.78 21.93 367.99 363.24 4.75 367.99
44.69 4.35 194.40 194.40 194.40

0.81 338.59 274.26 274.26 274.26


21.60 21.93 473.69 473.69 473.69
236.74 4.35 1,029.82 1,029.82 1,029.82

8.00 500.00 4,000.00 4,000.00 4,000.00


2.00 3,000.00 6,000.00 6,000.00 6,000.00
26.04 27.73 722.09 722.09 722.09
26.55 19.27 511.62 511.62 511.62
28.27 90.24 2,551.08 2,551.08 2,551.08

105.74 15.63 1,652.72 1,652.72 1,652.72


65.17 15.63 1,018.61 1,018.61 1,018.61

89.47 4.78 427.67 427.67 427.67

80.82 80.00 6,465.60 6,465.60 6,465.60


131.78 6.45 849.98 849.98 849.98

180.76 28.56 5,162.51 5,162.51 5,162.51


15.00 21.62 324.30 324.30 324.30
10.00 40.62 406.20 406.20 406.20

24.10 9.89 238.35 238.35 238.35


30.12 1.65 49.70 49.70 49.70
1.51 127.87 193.08 193.08 193.08
22.59 18.91 427.18 427.18 427.18
9.41 6.61 62.20 62.20 62.20

0.05 197.47 9.87 9.87 9.87


0.96 324.29 311.32 311.32 311.32

0.13 324.29 42.16 42.16 42.16


1.70 22.62 38.45 38.45 38.45
3.44 4.35 14.96 14.96 14.96

3.00 20.82 62.46 62.46 62.46

150.60 22.94 3,454.76 3,454.76 3,454.76


75.30 11.20 843.36 843.36 843.36

10.00 385.43 3,854.30 3,854.30 3,854.30


7.00 60.71 424.97 424.97 424.97

1.00 488.70 488.70 488.70 488.70

1.00 256.00 256.00 256.00 256.00

26.65 9.89 263.57 263.57 263.57


10.66 1.65 17.59 17.59 17.59
0.53 127.87 67.77 67.77 67.77
4.80 18.91 90.77 90.77 90.77
7.33 6.61 48.45 48.45 48.45

3.00 78.44 235.32 235.32 235.32


2.00 47.10 94.20 94.20 94.20
26.65 32.85 875.45 875.45 875.45
1.00 3.60 3.60 3.60 3.60

1.00 304.00 304.00 304.00 304.00


1.00 282.00 282.00 282.00 282.00
1.00 2,266.83 2,266.83 915.65 1,351.18 2,266.83

577.60 0.28 161.73 161.73 161.73


1.00 5,000.00 5,000.00 2,019.69 2,980.31 5,000.00
93,105.15 30,807.65 62,297.50 93,105.15
6,600.00 3,300.00 3,300.00 6,600.00
99,705.15 34,107.65 65,597.50 99,705.15
100.00% 34.21% 65.79% 100.00%
34.21% 100.00%

También podría gustarte