Balance Hidrico

Descargar como xls, pdf o txt
Descargar como xls, pdf o txt
Está en la página 1de 17

CEDULA DE CULTIVO SIN PROYECTO

ÁREA ÁREAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO

ARANDANO 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

TOTAL 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Fuente: Elaboración Propia
CEDULA DE CULTIVO CON PROYECTO
ÁREA ÁREAS (ha)
CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO

ARANDANO 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

TOTAL 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

Fuente: Elaboración Propia


SET OCT NOV DIC

10.00 10.00 10.00 10.00

10.00 10.00 10.00 10.00

SET OCT NOV DIC

10.00 10.00 10.00 10.00

10.00 10.00 10.00 10.00


FACTOR DE EVAPOTRANSPIRACIÓN POTENCIAL MF (mm/mes)

LAT. M E S E S
SUR Ene. Feb. Mar. Abr. May. Jun. Jul. Ago. Set. Oct. Nov.
1.00 2.79 2.12 2.35 2.20 2.14 1.99 2.09 2.22 2.26 2.36 2.23
2.00 2.37 2.14 2.36 2.18 2.11 1.96 2.05 2.19 2.25 2.37 2.26
3.00 2.35 2.15 2.36 2.17 2.08 1.92 2.03 2.17 2.25 2.39 2.29
4.00 2.39 2.17 2.36 2.15 2.05 1.89 1.99 2.15 2.24 2.40 2.32
5.00 2.42 2.19 2.36 2.13 2.02 1.85 1.96 2.13 2.23 2.41 2.35
6.00 2.45 2.21 2.36 2.12 1.98 1.82 1.98 2.10 2.23 2.42 2.37
7.00 2.48 2.22 2.36 2.10 1.96 1.79 1.89 2.08 2.22 2.43 2.40
8.00 2.51 2.24 2.36 2.08 1.93 1.75 1.86 2.05 2.21 2.44 2.42
9.00 2.54 2.25 2.36 2.06 1.90 1.72 1.82 2.03 2.20 2.45 2.45
10.00 2.57 2.27 2.36 2.04 1.86 1.68 1.79 2.00 2.49 2.46 2.47
11.00 2.60 2.28 2.35 2.02 1.83 1.64 1.75 1.98 2.18 2.47 2.50
12.00 2.63 2.29 2.35 2.00 1.80 1.61 1.72 1.95 2.17 2.48 2.52
13.00 2.65 2.31 2.35 1.98 1.77 1.57 1.68 1.92 2.16 2.48 2.54
14.00 2.68 2.32 2.34 1.96 1.73 1.54 1.65 1.90 2.14 2.49 2.57
15.00 2.71 2.33 2.33 2.94 1.70 1.50 1.61 1.87 2.13 2.50 2.59
16.00 2.73 2.34 2.32 1.91 1.67 1.46 1.58 1.84 2.12 2.50 2.61
17.00 2.76 2.35 2.32 1.89 1.63 1.43 1.54 1.81 2.16 2.50 2.63
18.00 2.79 2.36 2.31 1.87 2.60 1.39 1.50 1.78 2.09 2.51 2.65
19.00 2.81 2.37 2.30 1.84 1.56 1.35 1.47 1.75 2.07 2.31 2.67
CÁLCULO DE LA EVAPOTRANSPIRACIÓN POTENCIAL (m
MÉTODO DE HARGREAVES
ESTACIÓN: Chiclayo Lat.: 6º 46' 16.9'' S
Dic.
2.27 Parámetros Ene. Feb. Mar. Abr. May. Jun.
2.30 TMCº 27.20 28.80 28.60 26.70 25.00 23.60
2.34 TMFº 80.96 83.84 83.48 80.06 77.00 74.48
2.37 HR 68.32 70.32 70.02 70.53 67.23 66.25
2.41 CH 0.93 0.90 0.91 0.90 0.95 0.96
2.44 CE 1.00 1.00 1.00 1.00 1.00 1.00
2.48 MF 1/ 2.43 2.20 2.36 2.13 2.00 1.84
2.51 Eto 184.01 166.65 179.38 153.42 146.41 132.01
2.54 Días 31 28 31 30 31 30
2.58 Eto mm/dia 5.94 5.95 5.79 5.11 4.72 4.40
2.61 Prec. Efec mm/día 0.13 0.25 0.29 0.10 0.03 0.00
2.64 Fuente: Estación Chiclayo - Senamhi
2.68
2.71
2.74 1/ Promedio de los valores de 6º y 8º de Latitud Sur de la Tabla "FACTOR DE EVAPOTRANSPIRA
2.77 Fórmulas Empleadas : ETo = MF x TMF x CH X CE; TMF = (9/5)TMC + 32; CE = 1.0 + 0.04(E/
2.80 CH = 0.166 x ( 100 - HR )1/2 , para HR>64%; para HR<64%
2.83 Donde:
2.86 ETo = Evapotranspiración potencial (mm/día) MF = Factor mensual d
TMF = Temperatura media mensual (ºF) CE = Factor de correcc
TMC = Temperatura media mensual (ºC)
HR = Humedad relativa media mensual (%) E = Altitud o elevación d

843.2
SPIRACIÓN POTENCIAL (mm/día)
HARGREAVES
Long.: 79º 50' 27.2'' W Alt.: 34 msnm

Jul. Ago. Set. Oct. Nov. Dic.


22.80 22.50 22.50 22.90 23.90 25.40
73.04 72.50 72.50 73.22 75.02 77.72
60.58 61.33 60.22 63.32 62.14 64.58
1.04 1.03 1.05 1.01 1.02 0.99
1.00 1.00 1.00 1.00 1.00 1.00
1.97 2.11 2.23 2.42 2.36 2.42
149.88 158.32 169.35 177.97 180.77 186.24
31 31 30 31 30 31
4.83 5.11 5.64 5.74 6.03 6.01 5.44
0.00 0.00 0.00 0.03 0.03 0.06 Metodo de FAO

OR DE EVAPOTRANSPIRACIÓN POTENCIAL"
C + 32; CE = 1.0 + 0.04(E/3000)
ara HR>64%; para HR<64%, CH = 1.

MF = Factor mensual de latitud


CE = Factor de corrección para la altura del lugar

E = Altitud o elevación del lugar (msnm)


KC SIN PROYECTO

ÁREA ÁREAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO
ARANDANO 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Kc 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Fuente: Fao M -56

KC CON PROYECTO

ÁREA ÁREAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO
ARANDANO 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Kc 10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Fuente: Fao M -56
) ÁREA CULTIVO DE
SET OCT NOV DIC (ha) ROTACIÓN

1.00 1.00 1.00 1.00


1.00 1.00 1.00 1.00

) ÁREA CULTIVO DE
SET OCT NOV DIC (ha) ROTACIÓN

1.00 1.00 1.00 1.00


1.00 1.00 1.00 1.00
PRECIPITACIÓN PRECIPITACIÓN
Meses MENSUAL EFECTIVA
(mm) (mm)
ENERO 4.00 3.97
FEBRERO 7.00 6.92
MARZO 9.00 8.87
ABRIL 3.00 2.99
MAYO 1.00 1.00
JUNIO 0.00 0.00
JULIO 0.00 0.00
AGOSTO 0.00 0.00
SETIEMBRE 0.00 0.00
OCTUBRE 1.00 1.00
NOVIEMBRE 1.00 1.00
DICIEMBRE 2.00 1.99
TOTAL 28.00 27.74

Pe = Pt (125 – 0.2 Pt/125 ) Para Pt < 250mm


Pe = 125 + 0.1 Pt Para Pt > 250mm
47.80
71.74
85.63
60.95
30.69
16.74
9.80
9.53
13.41
39.42
40.36
44.87
OFERTA DE AGUA G.G.E. PUENTE FIERRRO

1. Dotación según Constancia de Disponibilidad del Recurso


Hidrico-JU Valle Chancay Lambayeque

Caudal (l/s): 10.00 l/s


Frecuencia(dias) : 1.00 dias
Horas de Riego : 24 horas

2. Dotación Población de Palambla


Actualmente el recurso hidrico del proyecto de riego es
compartido con la población de Palambla para uso de agua
potable, por lo que es necesario calcular la demanda de agua de
la población en un horizonte de 10 años, y este valor restarlo de
la dotación del proyecto, a fin de obtener la maxima oferta
aprovechable.

2.1 Datos:
Población: 700.00 hab Año 1,993
Coef Crecimiento anual 30
Dotacion 80 l/hab/dia

2.2 Calculo de la población en un horizonte de 10 años


Poblacion futura: 1330.00 hab Año 2,023

2.3 Calculo de demanda de agua para uso poblacional:


- Consumo promedio diario anual (Qm)
Qm= 1.23 l/s
- Consumo maximo diario (Qmd)
Qmd= 1.60 l/s
- Consumo maximo horario (Qmh)
Qmh= 1.85 l/s

3. Maxima Oferta Aprovechable por el G.G.E. Puente Fierro


Caudal Disponible : 10.00 l/s
Caudal demandado por población : 1.85 l/s
Caudal aprovechable por G.G.E. : 8.15 l/s
OFERTA DE AGUA SIN PROYECTO
Caudal (l/s) : 8
Nº Beneficiarios: 4
Tiempo de riego: (hr/mes) 18.00
Dotación de riego: 1

DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC

l/s 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Caudal
m3/hr 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80
Tiempo de riego (horas/riego/mes) 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
Dotación de riego (riegos/mes) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Número de días al mes dias 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
Número de dotación al mes Numero 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
Volumen promedio m3/mes 16,070.40 14,515.20 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40
Área ha 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Volumen Ofertado m3/ha-mes 1,607.04 1,451.52 1,607.04 1,555.20 1,607.04 1,555.20 1,607.04 1,607.04 1,555.20 1,607.04 1,555.20 1,607.04
Fuente: Elaboración Propia
OFERTA DE AGUA CON PROYECTO
Caudal (l/s) : 8
Nº Beneficiarios: 4
Tiempo de riego: 18.00
Dotación de riego: 1

DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC

l/s 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Caudal
m3/hr 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80 28.80
Tiempo de riego (horas/riego/mes) 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
Dotación de riego (riegos/mes) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Número de días al mes dias 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
Número de dotación al mes Numero 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
Volumen promedio m3/mes 16,070.40 14,515.20 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40
Área ha 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Volumen Ofertado m3/ha-mes 1,607.04 1,451.52 1,607.04 1,555.20 1,607.04 1,555.20 1,607.04 1,607.04 1,555.20 1,607.04 1,555.20 1,607.04
Fuente: Elaboración Propia
DEMANDA SIN PROYECTO
PARAMETRO UNIDAD ENE FEB MAR ABR MAY

1 Evapotranspiración Potencial (mm/dia) 5.94 5.95 5.79 5.11 4.72


2 Kc 1.00 1.00 1.00 1.00 1.00
3 Evatrans. Real o Uso consuntivo (1x2) (mm/dia) 5.94 5.95 5.79 5.11 4.72
4 Precipitación efectiva (mm/dia) 0.13 0.25 0.29 0.10 0.03
5 Deficit de humedad (3-4) (mm/dia) 5.81 5.70 5.50 5.01 4.69
6 Eficiencia de riego (%) 0.30 0.30 0.30 0.30 0.30
7 Nº dias del mes (dias) 31.00 28.00 31.00 30.00 31.00
(mm/dia) 19.36 19.02 18.33 16.71 15.64
8 Requerimiento de agua (5/6) (m3/ha/dia) 193.59 190.16 183.34 167.15 156.35
(m3/ha/mes) 6,001.20 5,324.44 5,683.56 5,014.36 4,846.98
9 Área Total (ha) 10.00 10.00 10.00 10.00 10.00
10 Volumen demandado (m3/mes) 60,011.99 53,244.45 56,835.55 50,143.59 48,469.76
Fuente: Elaboración Propia

DEMANDA CON PROYECTO


PARAMETRO UNIDAD ENE FEB MAR ABR MAY

1 Evapotranspiración Potencial (mm/dia) 5.94 5.95 5.79 5.11 4.72


2 Kc 1.00 1.00 1.00 1.00 1.00

3 Evatrans. Real o Uso consuntivo (1x2) (mm/dia) 5.94 5.95 5.79 5.11 4.72
4 Precipitación efectiva (mm/dia) 0.13 0.25 0.29 0.10 0.03
5 Deficit de humedad (3-4) (mm/dia) 5.81 5.70 5.50 5.01 4.69
6 Eficiencia de riego (%) 0.75 0.75 0.75 0.75 0.75
7 Nº dias del mes (dias) 31.00 28.00 31.00 30.00 31.00
(mm/dia) 7.74 7.61 7.33 6.69 6.25
8 Requerimiento de agua (5/6) (m3/ha/dia) 77.43 76.06 73.34 66.86 62.54
(m3/ha/mes) 2,400.48 2,129.78 2,273.42 2,005.74 1,938.79
9 Área Total (ha) 10.00 10.00 10.00 10.00 10.00
10 Volumen demandado (m3/mes) 24,004.80 21,297.78 22,734.22 20,057.44 19,387.90
Fuente: Elaboración Propia
JUN JUL AGO SET OCT NOV DIC

4.40 4.83 5.11 5.64 5.74 6.03 6.01


1.00 1.00 1.00 1.00 1.00 1.00 1.00
4.40 4.83 5.11 5.64 5.74 6.03 6.01
0.00 0.00 0.00 0.00 0.03 0.03 0.06
4.40 4.83 5.11 5.64 5.71 5.99 5.94
0.30 0.30 0.30 0.30 0.30 0.30 0.30
30.00 31.00 31.00 30.00 31.00 30.00 31.00
14.67 16.12 17.02 18.82 19.03 19.97 19.81
146.67 161.16 170.24 188.16 190.29 199.74 198.12
4,400.17 4,996.06 5,277.36 5,644.93 5,898.91 5,992.24 6,141.71
10.00 10.00 10.00 10.00 10.00 10.00 10.00
44,001.69 49,960.62 52,773.57 56,449.35 58,989.07 59,922.44 61,417.07 652,219.15

DEMANDA MAXIMA 199.74


DEMANDA MINIMA 17.05
DEMANDA PROMEDIO 178.75

JUN JUL AGO SET OCT NOV DIC

4.40 4.83 5.11 5.64 5.74 6.03 6.01


1.00 1.00 1.00 1.00 1.00 1.00 1.00
4.40 4.83 5.11 5.64 5.74 6.03 6.01
0.00 0.00 0.00 0.00 0.03 0.03 0.06
4.40 4.83 5.11 5.64 5.71 5.99 5.94
0.75 0.75 0.75 0.75 0.75 0.75 0.75
30.00 31.00 31.00 30.00 31.00 30.00 31.00
5.87 6.45 6.81 7.53 7.61 7.99 7.92
58.67 64.47 68.09 75.27 76.11 79.90 79.25
1,760.07 1,998.42 2,110.94 2,257.97 2,359.56 2,396.90 2,456.68
10.00 10.00 10.00 10.00 10.00 10.00 10.00
17,600.68 19,984.25 21,109.43 22,579.74 23,595.63 23,968.98 24,566.83 260,887.66

DEMANDA MAXIMA 79.90


DEMANDA MINIMA 6.82
DEMANDA PROMEDIO 71.50
BALANCE SIN PROYECTO

DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV

DEMANDA (m3/ha/mes) 60,011.99 53,244.45 56,835.55 50,143.59 48,469.76 44,001.69 49,960.62 52,773.57 56,449.35 58,989.07 59,922.44

OFERTA (m3/ha/mes) 16,070.40 14,515.20 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40 16,070.40 15,552.00 16,070.40 15,552.00

BALANCE (m3/ha/mes) -43,941.59 -38,729.25 -40,765.15 -34,591.59 -32,399.36 -28,449.69 -33,890.22 -36,703.17 -40,897.35 -42,918.67 -44,370.44
Fuente:Elaboración Propia
V olum n de a g ua (m 3/m es)

70,000.00
BALANCE HIDRICO SIN PROYECTO
60,000.00

50,000.00

DEMANDA m3/ha/mes
40,000.00
OFERTA m3/ha/mes

30,000.00

20,000.00

10,000.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
BALANCE CON PROYECTO
DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV

DEMANDA (m3/ha/mes) 24,004.80 21,297.78 22,734.22 20,057.44 19,387.90 17,600.68 19,984.25 21,109.43 22,579.74 23,595.63 23,968.98

OFERTA (m3/ha/mes) 16,070.40 14,515.20 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40 16,070.40 15,552.00 16,070.40 15,552.00

BALANCE (m3/ha/mes) -7,934.40 -6,782.58 -6,663.82 -4,505.44 -3,317.50 -2,048.68 -3,913.85 -5,039.03 -7,027.74 -7,525.23 -8,416.98
Fuente:Elaboración Propia
V olum n de ag ua (m 3/m es)

30,000.00
BALANCE HIDRICO CON PROYECTO
25,000.00

20,000.00
Row 26

15,000.00 OFERTA m3/


has/mes

10,000.00

5,000.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
DIC

61,417.07

16,070.40

-45,346.67
DIC

24,566.83

16,070.40

-8,496.43