Trabajo Final Grupo 1 Sec v01
Trabajo Final Grupo 1 Sec v01
Trabajo Final Grupo 1 Sec v01
Grupo 1
Una empresa que manufactura partes para maquinarias industriales, tiene dos plantas de fabricación, la
planta X y la Y. Produce cuatro artículos diferentes, los productos A, B, C y D, para lo que se utilizan tres
materiales, 1, 2 y 3.
GASTOS DE VENTA:
1-NO DE VENDEDORES: 8
2-SUELDO DE VENDEDORES: RD$42,000 AL MES
3-COMISIONES: 10% DE LAS VENTAS
4-VIAJES Y PROMOCION: RD$3,500.00 AL MES POR VENDEDOR
5-PUBLICIDAD:
RADIO: 15 COLOCACIONES AL MES, POR RD$1,000 CADA UNA
TELEVISION: 30 COLOCACIONES AL MES POR RD$4,300 CADA UNA
PUBLICIDAD EXTERIOR: RD$60,000 AL MES
PRENSA: 50 ANUNCIOS POR MES, POR RD$1,000 CADA UNO
6-TELEFONOS Y SUMINISTROS GENERALES: RD$6,200 AL MES
7-DEPRECIACION: RD$3,200 AL MES
8-OTROS GASTOS: RD$2,800 AL MES
ADES)
6to Bimestre TOTAL
35,000.00 170,000.00
40,000.00 200,000.00
8,000.00 51,000.00
12,000.00 71,000.00
95,000.00 492,000.00
ADES)
6to Bimestre TOTAL
40,000.00 210,000.00
20,000.00 99,000.00
9,000.00 54,000.00
40,000.00 182,000.00
109,000.00 545,000.00
TOTAL
PRODUCTO PLANTA X PLANTA Y TOTAL
A 367,400,000.00 462,000,000.00 829,400,000.00
B 300,000,000.00 148,500,000.00 448,500,000.00
C 68,850,000.00 72,900,000.00 141,750,000.00
D 63,900,000.00 161,100,000.00 225,000,000.00
TOTAL 800,150,000.00 844,500,000.00 1,644,650,000.00
1,350.00 900.00
TA X
PRODUCTO C PRODUCTO D
UNIDADES VALOR $ UNIDADES VALOR $ TOTAL
10,000 13,500,000.00 15,000 13,500,000.00 127,000,000.00
9,000 12,150,000.00 10,000 9,000,000.00 128,650,000.00
7,000 9,450,000.00 10,000 9,000,000.00 133,450,000.00
9,000 12,150,000.00 10,000 9,000,000.00 113,650,000.00
8,000 10,800,000.00 14,000 12,600,000.00 145,400,000.00
8,000 10,800,000.00 12,000 10,800,000.00 152,000,000.00
68,850,000.00 63,900,000.00 800,150,000.00
1,350.00 900.00
TA Y
PRODUCTO C PRODUCTO D
UNIDADES VALOR $ UNIDADES VALOR $ TOTAL
7,000 9,450,000.00 30,000 27,000,000.00 106,450,000.00
8,000 10,800,000.00 25,000 22,500,000.00 131,300,000.00
8,000 10,800,000.00 40,000 36,000,000.00 138,800,000.00
12,000 16,200,000.00 12,000 10,800,000.00 141,500,000.00
10,000 13,500,000.00 32,000 28,800,000.00 160,300,000.00
9,000 12,150,000.00 40,000 36,000,000.00 166,150,000.00
72,900,000.00 161,100,000.00 844,500,000.00
2. Presupuesto de materiales en unidades
TOTAL
PRODUCTO PLANTA X PLANTA Y TOTAL
A 7,515,000 9,450,000 ###
B ### 9,405,000 ###
C 3,978,000 4,212,000 8,190,000
D 4,473,000 ### ###
TOTAL ### ### ###
UCTO B PRODUCTO C PRODU
3 1 2 3
35 TOTAL UNIDADES 24 32 22 TOTAL UNIDADES
1,050,000 2,850,000 10,000 240,000 320,000 220,000 780,000 15,000
1,225,000 3,325,000 9,000 216,000 288,000 198,000 702,000 10,000
1,400,000 3,800,000 7,000 168,000 224,000 154,000 546,000 10,000
875,000 2,375,000 9,000 216,000 288,000 198,000 702,000 10,000
1,050,000 2,850,000 8,000 192,000 256,000 176,000 624,000 14,000
1,400,000 3,800,000 8,000 192,000 256,000 176,000 624,000 12,000
7,000,000 19,000,000 1,224,000 1,632,000 1,122,000 3,978,000
PRODUCTO D
1 2 3
18 20 25 TOTAL
540,000 600,000 750,000 1,890,000
450,000 500,000 625,000 1,575,000
720,000 800,000 1,000,000 2,520,000
216,000 240,000 300,000 756,000
576,000 640,000 800,000 2,016,000
720,000 800,000 1,000,000 2,520,000
3,222,000 3,580,000 4,475,000 11,277,000
3. Presupuesto de materiales en costo
PLANTA X PRODUCTO A
MATERIALES 1 2 3
COSTO UNIDAD 3.50 5.00 4.00 TOTAL
1er Bimestre $ 1,137,500.00 $ 2,500,000.00 $ 1,200,000.00 $ 4,837,500.00
2do Bimestre $ 1,137,500.00 $ 2,500,000.00 $ 1,200,000.00 $ 4,837,500.00
3er Bimestre $ 1,137,500.00 $ 2,500,000.00 $ 1,200,000.00 $ 4,837,500.00
4to Bimestre $ 1,137,500.00 $ 2,500,000.00 $ 1,200,000.00 $ 4,837,500.00
5to Bimestre $ 122,500.00 $ 3,500,000.00 $ 1,680,000.00 $ 5,302,500.00
6to Bimestre $ 112,000.00 $ 3,200,000.00 $ 1,536,000.00 $ 4,848,000.00
TOTAL $ 4,784,500.00 $ 16,700,000.00 $ 8,016,000.00 $ 29,500,500.00
PLANTA Y PRODUCTO A
MATERIALES 1 2 3
COSTO UNIDAD 3.50 5.00 4.00 TOTAL
1er Bimestre $ 1,137,500.00 $ 2,500,000.00 $ 1,200,000.00 $ 4,837,500.00
2do Bimestre $ 1,592,500.00 $ 3,500,000.00 $ 1,680,000.00 $ 6,772,500.00
3er Bimestre $ 1,592,500.00 $ 3,500,000.00 $ 1,680,000.00 $ 6,772,500.00
4to Bimestre $ 1,592,500.00 $ 3,500,000.00 $ 1,680,000.00 $ 6,772,500.00
5to Bimestre $ 1,820,000.00 $ 4,000,000.00 $ 1,920,000.00 $ 7,740,000.00
6to Bimestre $ 1,820,000.00 $ 4,000,000.00 $ 1,920,000.00 $ 7,740,000.00
TOTAL $ 9,555,000.00 $ 21,000,000.00 $ 10,080,000.00 $ 40,635,000.00
TOTAL
PRODUCTO PLANTA X PLANTA Y TOTAL
A $ 29,500,500.00 $ 40,635,000.00 $ 70,135,500.00
B $ 82,000,000.00 $ 40,590,000.00 $ 122,590,000.00
C $ 16,932,000.00 $ 17,928,000.00 $ 34,860,000.00
D $ 18,673,000.00 $ 47,077,000.00 $ 65,750,000.00
TOTAL $ 147,105,500.00 $ 146,230,000.00 $ 293,335,500.00
n costo
PRODUCTO B PRODUCTO C
1 2 3 1
3.50 5.00 4.00 TOTAL 3.50
$ 2,100,000.00 $ 6,000,000.00 $ 4,200,000.00 $ 12,300,000.00 $ 840,000.00
$ 2,450,000.00 $ 7,000,000.00 $ 4,900,000.00 $ 14,350,000.00 $ 756,000.00
$ 2,800,000.00 $ 8,000,000.00 $ 5,600,000.00 $ 16,400,000.00 $ 588,000.00
$ 1,750,000.00 $ 5,000,000.00 $ 3,500,000.00 $ 10,250,000.00 $ 756,000.00
$ 2,100,000.00 $ 6,000,000.00 $ 4,200,000.00 $ 12,300,000.00 $ 672,000.00
$ 2,800,000.00 $ 8,000,000.00 $ 5,600,000.00 $ 16,400,000.00 $ 672,000.00
$ 14,000,000.00 $ 40,000,000.00 $ 28,000,000.00 $ 82,000,000.00 $ 4,284,000.00
PRODUCTO B PRODUCTO C
1 2 3 1
3.50 5.00 4.00 TOTAL 3.50
$ 700,000.00 $ 2,000,000.00 $ 1,400,000.00 $ 4,100,000.00 $ 588,000.00
$ 980,000.00 $ 2,800,000.00 $ 1,960,000.00 $ 5,740,000.00 $ 672,000.00
$ 700,000.00 $ 2,000,000.00 $ 1,400,000.00 $ 4,100,000.00 $ 672,000.00
$ 1,750,000.00 $ 5,000,000.00 $ 3,500,000.00 $ 10,250,000.00 $ 1,008,000.00
$ 1,400,000.00 $ 4,000,000.00 $ 2,800,000.00 $ 8,200,000.00 $ 840,000.00
$ 1,400,000.00 $ 4,000,000.00 $ 2,800,000.00 $ 8,200,000.00 $ 756,000.00
$ 6,930,000.00 $ 19,800,000.00 $ 13,860,000.00 $ 40,590,000.00 $ 4,536,000.00
PRODUCTO C PRODUCTO D
2 3 1 2 3
5.00 4.00 TOTAL 3.50 5.00 4.00
$ 1,600,000.00 $ 880,000.00 $ 3,320,000.00 $ 945,000.00 $ 1,500,000.00 $ 1,500,000.00
$ 1,440,000.00 $ 792,000.00 $ 2,988,000.00 $ 630,000.00 $ 1,000,000.00 $ 1,000,000.00
$ 1,120,000.00 $ 616,000.00 $ 2,324,000.00 $ 630,000.00 $ 1,000,000.00 $ 1,000,000.00
$ 1,440,000.00 $ 792,000.00 $ 2,988,000.00 $ 630,000.00 $ 1,000,000.00 $ 1,000,000.00
$ 1,280,000.00 $ 704,000.00 $ 2,656,000.00 $ 882,000.00 $ 1,400,000.00 $ 1,400,000.00
$ 1,280,000.00 $ 704,000.00 $ 2,656,000.00 $ 756,000.00 $ 1,200,000.00 $ 1,200,000.00
$ 8,160,000.00 $ 4,488,000.00 $ 16,932,000.00 $ 4,473,000.00 $ 7,100,000.00 $ 7,100,000.00
PRODUCTO C PRODUCTO D
2 3 1 2 3
5.00 4.00 TOTAL 3.50 5.00 4.00
$ 1,120,000.00 $ 616,000.00 $ 2,324,000.00 $ 1,890,000.00 $ 3,000,000.00 $ 3,000,000.00
$ 1,280,000.00 $ 704,000.00 $ 2,656,000.00 $ 1,575,000.00 $ 2,500,000.00 $ 2,500,000.00
$ 1,280,000.00 $ 704,000.00 $ 2,656,000.00 $ 2,520,000.00 $ 4,000,000.00 $ 4,000,000.00
$ 1,920,000.00 $ 1,056,000.00 $ 3,984,000.00 $ 756,000.00 $ 1,200,000.00 $ 1,200,000.00
$ 1,600,000.00 $ 880,000.00 $ 3,320,000.00 $ 2,016,000.00 $ 3,200,000.00 $ 3,200,000.00
$ 1,440,000.00 $ 792,000.00 $ 2,988,000.00 $ 2,520,000.00 $ 4,000,000.00 $ 4,000,000.00
$ 8,640,000.00 $ 4,752,000.00 $ 17,928,000.00 $ 11,277,000.00 $ 17,900,000.00 $ 17,900,000.00
TOTAL
$ 3,945,000.00
$ 2,630,000.00
$ 2,630,000.00
$ 2,630,000.00
$ 3,682,000.00
$ 3,156,000.00
$ 18,673,000.00
TOTAL
$ 7,890,000.00
$ 6,575,000.00
$ 10,520,000.00
$ 3,156,000.00
$ 8,416,000.00
$ 10,520,000.00
$ 47,077,000.00
Presupuesto de mano de obra en horas ( Planta X)
UNIDADES SUPERVICION INGENIERO
PRODUCTO A 1 1
1ER BIMESTRE 25,000.00 25,000.00 25,000.00
2DO BIMESTRE 25,000.00 25,000.00 25,000.00
3ER BIMESTRE 25,000.00 25,000.00 25,000.00
4TO BIMESTRE 25,000.00 25,000.00 25,000.00
2TO BIMESTRO 35,000.00 35,000.00 35,000.00
6TO BIMESTRE 32,000.00 32,000.00 32,000.00
TOTAL 167,000.00 167,000.00
SUPERVISOR INGENIERO
PRODUCTO D 0.50 1.00
1ER BIMESTRE 15,000.00 7,500.00 15,000.00
2DO BIMESTRE 10,000.00 5,000.00 10,000.00
3ER BIMESTRE 10,000.00 5,000.00 10,000.00
4TO BIMESTRE 10,000.00 5,000.00 10,000.00
2TO BIMESTRO 14,000.00 7,000.00 14,000.00
6TO BIMESTRE 12,000.00 6,000.00 12,000.00
SUPERVISOR INGENIERO
PRODUCTO C 1.00 1.00
1ER BIMESTRE 7,000.00 7,000.00 7,000.00
2DO BIMESTRE 8,000.00 8,000.00 8,000.00
3ER BIMESTRE 8,000.00 8,000.00 8,000.00
4TO BIMESTRE 12,000.00 12,000.00 12,000.00
2TO BIMESTRO 10,000.00 10,000.00 10,000.00
6TO BIMESTRE 9,000.00 9,000.00 9,000.00
SUPERVISOR INGENIERO
PRODUCTO D 0.50 1.00
1ER BIMESTRE 30,000.00 15,000.00 30,000.00
2DO BIMESTRE 25,000.00 12,500.00 25,000.00
3ER BIMESTRE 40,000.00 20,000.00 40,000.00
4TO BIMESTRE 12,000.00 6,000.00 12,000.00
2TO BIMESTRO 32,000.00 16,000.00 32,000.00
6TO BIMESTRE 40,000.00 20,000.00 40,000.00
ras ( Planta X)
OBRERO TOTAL HORAS
4
100,000.00 150,000.00
100,000.00 150,000.00
100,000.00 150,000.00
100,000.00 150,000.00
140,000.00 210,000.00
128,000.00 192,000.00
668,000.00 1,002,000.00
OBRERO
3.00
45,000.00 67,500.00
30,000.00 45,000.00
30,000.00 45,000.00
30,000.00 45,000.00
42,000.00 63,000.00
18,000.00 36,000.00
2,741,000.00
ras ( Planta Y)
OBRERO TOTAL HORAS
4.00
100,000.00 150,000.00
140,000.00 210,000.00
140,000.00 210,000.00
140,000.00 210,000.00
160,000.00 240,000.00
160,000.00 240,000.00
OBRERO
3.00
21,000.00 35,000.00
24,000.00 40,000.00
24,000.00 40,000.00
36,000.00 60,000.00
30,000.00 50,000.00
27,000.00 45,000.00
OBRERO
3.00
90,000.00 135,000.00
75,000.00 112,500.00
120,000.00 180,000.00
36,000.00 54,000.00
96,000.00 144,000.00
60,000.00 120,000.00
PLANTA X
PRODUCTO A 1 2 3
BIMESTRE 80 72 45
1 2,000,000 1,800,000 4,500,000
2 2,000,000 1,800,000 4,500,000
3 2,000,000 1,800,000 4,500,000
4 2,000,000 1,800,000 4,500,000
5 2,800,000 2,520,000 6,300,000
6 2,800,000 2,520,000 6,300,000
TOTAL 13,600,000 12,240,000 30,600,000
PRODUCTO B 1 2 3
BIMESTRE 80 72 45
1 1,200,000 4,320,000 5,400,000
2 1,400,000 5,040,000 6,300,000
3 1,600,000 5,760,000 7,200,000
4 1,000,000 3,600,000 4,500,000
5 1,200,000 4,320,000 5,400,000
6 1,600,000 5,760,000 7,200,000
TOTAL 8,000,000 28,800,000 36,000,000
PRODUCTO C 1 2 3
BIMESTRE 80 72 45
1 400,000 720,000 1,350,000
2 360,000 648,000 1,215,000
3 280,000 504,000 945,000
4 360,000 648,000 1,215,000
5 320,000 576,000 1,080,000
6 320,000 576,000 1,080,000
TOTAL 2,040,000 3,672,000 6,885,000
PRODUCTO D 1 2 3
BIMESTRE 80 72 45
1 600,000 1,080,000 2,025,000
2 400,000 720,000 1,350,000
3 400,000 720,000 1,350,000
4 400,000 720,000 1,350,000
5 560,000 1,008,000 1,890,000
6 480,000 864,000 1,620,000
TOTAL 2,840,000 5,112,000 9,585,000
1 2 3
Planta X 26,480,000 49,824,000 83,070,000
Planta Y 30,200,000 46,368,000 87,480,000
Totales 56,680,000.00 96,192,000.00 170,550,000.00
PLANTA Y
PRODUCTO A 1 2 3
BIMESTRE 80 72 45
1 2,000,000 1,800,000 4,500,000
2 2,800,000 2,520,000 6,300,000
3 2,800,000 2,520,000 6,300,000
4 2,800,000 2,520,000 6,300,000
5 3,200,000 2,880,000 7,200,000
6 3,200,000 2,880,000 7,200,000
TOTAL 16,800,000 15,120,000 37,800,000
PRODUCTO B 1 2 3
BIMESTRE 80 72 45
1 400,000 1,440,000 1,800,000
2 560,000 2,016,000 2,520,000
3 400,000 1,440,000 1,800,000
4 1,000,000 3,600,000 4,500,000
5 800,000 2,880,000 3,600,000
6 800,000 2,880,000 3,600,000
TOTAL 3,960,000 14,256,000 17,820,000
PRODUCTO C 1 2 3
BIMESTRE 80 72 45
1 280,000 504,000 945,000
2 320,000 576,000 1,080,000
3 320,000 576,000 1,080,000
4 480,000 864,000 1,620,000
5 400,000 720,000 1,350,000
6 360,000 648,000 1,215,000
TOTAL 2,160,000 3,888,000 7,290,000
PRODUCTO D 1 2 3
BIMESTRE 80 72 45
1 1,200,000 2,160,000 4,050,000
2 1,000,000 1,800,000 3,375,000
3 1,600,000 2,880,000 5,400,000
4 480,000 864,000 1,620,000
5 1,400,000 2,520,000 4,725,000
6 1,600,000 2,880,000 5,400,000
TOTAL 7,280,000 13,104,000 24,570,000
Totales
159,374,000
164,048,000
323,422,000
Presupuesto de mano de obra en costos
SUPERVICION INGENIERO OBRERO
PRODUCTO A 80 72 45
1ER BIMESTRE 0 $ 2,000,000.00 $ 1,800,000.00 $ 4,500,000.00
2DO BIMESTRE 0 $ 2,000,000.00 $ 1,800,000.00 $ 4,500,000.00
3ER BIMESTRE 0 $ 2,000,000.00 $ 1,800,000.00 $ 4,500,000.00
4TO BIMESTRE 0 $ 2,800,000.00 $ 3,600,000.00 $ 4,500,000.00
2TO BIMESTRO 0 $ 2,800,000.00 $ 4,320,000.00 $ 6,300,000.00
6TO BIMESTRE 0 $ 2,560,000.00 $ 2,304,000.00 $ 5,760,000.00
MO TOTAL
SUPERVICION INGENIERO OBRERO
$ 8,300,000.00
$ 8,300,000.00
$ 8,300,000.00
$ 10,900,000.00
$ 13,420,000.00
$ 10,624,000.00
$ 59,844,000.00
Total de costo
$ 10,020,000.00
$ 12,740,000.00
$ 14,560,000.00
$ 9,100,000.00
$ 10,920,000.00
$ 10,960,000.00
$ 68,300,000.00
Total de costo
$ 2,470,000.00
$ 2,223,000.00
$ 1,729,000.00
$ 2,223,000.00
$ 1,976,000.00
$ 1,436,000.00
$ 12,057,000.00
Total de costo
$ 3,705,000.00
$ 2,470,000.00
$ 2,470,000.00
$ 2,470,000.00
$ 3,458,000.00
$ 2,154,000.00
$ 16,727,000.00
Total de costo
$ 24,495,000.00
$ 25,733,000.00
$ 27,059,000.00
$ 24,693,000.00
$ 29,774,000.00
$ 25,174,000.00
$ 156,928,000.00
6. Presupuesto de gastos indirectos de fabricación
Planta X
Producto A Producto B Producto
Unidades Costo Unidades Costo Unidades
Bimestre 68 50
Bimestre 1 25,000 1,700,000 30,000 1,500,000 10,000
Bmestre 2 25,000 1,700,000 35,000 1,750,000 9,000
Bimestre 3 25,000 1,700,000 40,000 2,000,000 7,000
Bimestre 4 25,000 1,700,000 25,000 1,250,000 9,000
Bimestre 5 35,000 2,380,000 30,000 1,500,000 8,000
Bimestre 6 35,000 2,380,000 40,000 2,000,000 8,000
Total 170,000 11,560,000 200,000 10,000,000 51,000
Planta Y
Productos A Producto B Producto
Unidades Costo Unidades Costo Unidades
Bimestre 68 50
Bimestre 1 25,000 1,700,000 10,000 500,000 7,000
Bimestre 2 35,000 2,380,000 14,000 700,000 8,000
Bimestre 3 35,000 2,380,000 10,000 500,000 8,000
Bimestre 4 35,000 2,380,000 25,000 1,250,000 12,000
Bimestre 5 40,000 2,720,000 20,000 1,000,000 10,000
Bimestre 6 40,000 2,720,000 20,000 1,000,000 9,000
Total 210,000 14,280,000 99,000 4,950,000 54,000
A B C D Totales
Planta X 11,560,000 10,000,000 1,734,000 1,065,000 24,359,000
Planta Y 14,280,000 4,950,000 1,836,000 2,730,000 23,796,000
Totales 25,840,000 14,950,000 3,570,000 3,795,000 48,155,000
bricación
C Producto D Total
Costo Unidades Costo
34 15
340,000 15,000 225,000 3,765,000
306,000 10,000 150,000 3,906,000
238,000 10,000 150,000 4,088,000
306,000 10,000 150,000 3,406,000
272,000 14,000 210,000 4,362,000
272,000 12,000 180,000 4,832,000
1,734,000 71,000 1,065,000 24,359,000
C Producto D Totales
Costo Unidades Costo
34 15
238,000 30,000 450,000 2,888,000
272,000 25,000 375,000 3,727,000
272,000 40,000 600,000 3,752,000
408,000 12,000 180,000 4,218,000
340,000 35,000 525,000 4,585,000
306,000 40,000 600,000 4,626,000
1,836,000 182,000 2,730,000 23,796,000
BIMESTRE1 BIMESTRE2
GASTOS FIJOS X MES $ 233,450,000.00 $ 259,950,000.00
SALARIOS 336,000.00 672,000.00 672,000.00
COMISIONES 165,395,000.00 23,345,000.00 25,995,000.00
VIAJE Y PROMOCION 28,000.00 56,000.00 56,000.00
RADIO 15,000.00 30,000.00 30,000.00
TELEVISION 129,000.00 258,000.00 258,000.00
PUBLICIDAD EXTERIOR 60,000.00 120,000.00 120,000.00
PRENSA 50,000.00 100,000.00 100,000.00
TELEFONOS Y SUMINISTROS GENERALES 6,200.00 12,400.00 12,400.00
DEPRECIACION 3,200.00 6,400.00 6,400.00
OTROS GASTOS 2,800.00 5,600.00 5,600.00
Totales $ 24,605,400.00 $ 27,255,400.00
BIMESTRE3 BIMESTRE4 BIMESTRE5 BIMESTRE6
$ 272,250,000.00 $ 255,150,000.00 $ 308,400,000.00 $ 324,750,000.00
672,000.00 672,000.00 672,000.00 672,000.00 $ 4,032,000.00
27,225,000.00 25,515,000.00 30,840,000.00 32,475,000.00 $ 165,395,000.00
56,000.00 56,000.00 56,000.00 56,000.00 $ 336,000.00
30,000.00 30,000.00 30,000.00 30,000.00 $ 180,000.00
258,000.00 258,000.00 258,000.00 258,000.00 $ 1,548,000.00
120,000.00 120,000.00 120,000.00 120,000.00 $ 720,000.00
100,000.00 100,000.00 100,000.00 100,000.00 $ 600,000.00
12,400.00 12,400.00 12,400.00 12,400.00 $ 74,400.00
6,400.00 6,400.00 6,400.00 6,400.00 $ 38,400.00
5,600.00 5,600.00 5,600.00 5,600.00 $ 33,600.00
$ 28,485,400.00 $ 26,775,400.00 $ 32,100,400.00 $ 33,735,400.00 $ 172,957,400.00
Presupuesto Anual D
Flujo por Mes Costo Variable
SUELDOS 550,000
MATERIAL GASTABLE 8,500
MANTENIMIENTO Y VIGILANCIA 18,000
SEGUROS 3500
TELEFONO E INTERNET 6,200
PROVISION CUENTAS INCOBRABLES 0.50%
OTROS GASTOS 3,500
Totales $ 589,700.00
Presupuesto Anual De Gastos Administrativos
Bimestrre 1 Bimestrre 2 Bimestrre 3 Bimestrre 4 Bimestrre 5
$ 233,450,000.00 $ 259,950,000.00 $ 272,250,000.00 $ 255,150,000.00 $ 308,400,000.00
$ 1,100,000.00 $ 1,100,000.00 $ 1,100,000.00 $ 1,100,000.00 $ 1,100,000.00
$ 17,000.00 $ 17,000.00 $ 17,000.00 $ 17,000.00 $ 17,000.00
$ 36,000.00 $ 36,000.00 $ 36,000.00 $ 36,000.00 $ 36,000.00
$ 7,000.00 $ 7,000.00 $ 7,000.00 $ 7,000.00 $ 7,000.00
$ 12,400.00 $ 12,400.00 $ 12,400.00 $ 12,400.00 $ 12,400.00
$ 1,167,250.00 $ 1,299,750.00 $ 1,361,250.00 $ 1,275,750.00 $ 1,542,000.00
$ 7,000.00 $ 7,000.00 $ 7,000.00 $ 7,000.00 $ 7,000.00
$ 2,346,650.00 $ 2,479,150.00 $ 2,540,650.00 $ 2,455,150.00 $ 2,721,400.00
Bimestrre 6 Totales
$ 324,750,000.00
$ 1,100,000.00 $ 6,600,000.00
$ 17,000.00 $ 102,000.00
$ 36,000.00 $ 216,000.00
$ 7,000.00 $ 42,000.00
$ 12,400.00 $ 74,400.00
$ 1,623,750.00 $ 8,269,750.00
$ 7,000.00 $ 42,000.00
$ 2,803,150.00 $ 15,346,150.00
9. Estado de resultado del año
ventas $ 1,644,650,000.00
Costos y Gastos
Materiales directos $ 293,335,500.00
Mo directa $ 323,206,000.00
Gasto idirecto de fab. $ 48,155,000.00
Gasto de adm. $ 15,346,150.00
Gastos de ventas $ 172,957,400.00
Total $ 853,000,050.00
Utilidad $ 791,649,950.00