01 Informe Mensual Julio 2022
01 Informe Mensual Julio 2022
01 Informe Mensual Julio 2022
PRESUPUESTO
VALORIZACIÓN DE OBRA Nº 01 MAYORES
PARTIDAS DESCRIPCION UND ANTERIOR ACTUAL ACUMULADO SALDO
METRADO PU PRES METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO PRES. %
METRADOS
==========================================================================================================================
======================================================================================================================================================
01 CANCHA DE GRASS SINTETICO
01.01 OBRAS PROVISIONALES.
01.01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA. GLB 1.00 500.00 500.00 - 0.00% 1.00 500.00 100.00% 1.00 500.00 100.00% - - 0.00%
01.01.02 AGUA PARA LA CONTRUCCION GLB 1.00 80.00 80.00 - 0.00% 0.00 - 0.00% - - 0.00% 1.00 80.00 100.00%
01.01.03 CERCO PROVISIONAL. M 112.50 15.75 1,771.88 - 0.00% 112.50 1,771.88 100.00% 112.50 1,771.88 100.00% - - 0.00%
01.01.04 LIMPIEZA MANUAL DE TERRENO. M2 600.00 0.66 396.00 - 0.00% 600.00 396.00 100.00% 600.00 396.00 100.00% - - 0.00%
01.02 SEGURIDAD Y SALUD. 0.00
01.02.01 CINTA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD EN OBRA.
M 112.5 8.30 933.75 - 0.00% 75.00 622.50 66.67% 75.00 622.50 66.67% 37.50 311.25 33.33%
01.02.02 RECURSOS P/RESP. ANTE EMERGENCIAS DE SEGURIDAD Y SALUD.
UND 1.00 100.00 100.00 - 0.00% 1.00 100.00 100.00% 1.00 100.00 100.00% - - 0.00%
01.03 MOVIMIENTO DE TIERRAS 0.00
01.03.01 EXCAVACIÓN CON MAQUINARIA M3 235.26 6.44 1,515.07 - 0.00% 235.26 1,515.07 100.00% 235.26 1,515.07 100.00% - - 0.00%
01.03.02 ACARREO DE MATERIAL DE EXCAVACION M3 120.00 31.11 3,733.20 - 0.00% 120.00 3,733.20 100.00% 120.00 3,733.20 100.00% - - 0.00%
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE. M3 120.00 13.18 1,581.60 - 0.00% 99.50 1,311.41 82.92% 99.50 1,311.41 82.92% 20.50 270.19 17.08%
01.03.04 NIVELACIÓN INTERIOR Y APISONADO. M2 600.00 2.21 1,326.00 - 0.00% 41.40 91.49 6.90% 41.40 91.49 6.90% 558.60 1,234.51 93.10%
01.04 OBRAS DE CONCRETO SIMPLE. 0.00
01.04.01 GRADERIOS.- CONCRETO F'C=140 KG/CM2 +50% P.G. 8". M3 30.14 213.54 6,436.10 - 0.00% 0.00 - 0.00% - - 0.00% 30.14 6,436.10 100.00%
01.04.02 GRADERIOS.-ENCOF. Y DESENCOFRADO NORMAL. M2 44.54 60.73 2,704.91 - 0.00% 0.00 - 0.00% - - 0.00% 44.54 2,704.91 100.00%
01.04.03 SARDINEL.- CONCRETO F'C=175 KG/CM2. M3 3.00 385.51 1,156.53 - 0.00% 0.00 - 0.00% - - 0.00% 3.00 1,156.53 100.00%
01.04.04 SARDINEL.- ENCOF. Y DESENCOFRADO NORMAL. M2 40.00 39.31 1,572.40 - 0.00% 0.00 - 0.00% - - 0.00% 40.00 1,572.40 100.00%
01.04.05 VEREDAS.- CONCRETO F'C=140 KG/CM2. M2 118 149.9 17,688.20 - 0.00% 0.00 - 0.00% - - 0.00% 118.00 17,688.20 100.00%
01.04.06 VEREDAS.-ENCOF. Y DESENCOFRADO NORMAL. M2 10.80 11.50 124.20 - 0.00% 0.00 - 0.00% - - 0.00% 10.80 124.20 100.00%
01.05 REVOQUES Y REVESTIMIENTOS. 0.00
01.05.01 TARRAJEO EN EXTERIORES C/CEMENTO-ARENA. M2 205.54 16.69 3,430.46 - 0.00% 0.00 - 0.00% - - 0.00% 205.54 3,430.46 100.00%
01.06 PISOS Y PAVIMENTOS. 0.00
01.06.01 CAMA DE ARENA PARA TUBERIA M3 2.59 115.19 298.34 - 0.00% 0.00 - 0.00% - - 0.00% 2.59 298.34 100.00%
01.06.02 CAMPO DEPORTIVO CANTO RODADO M3 12.00 85.12 1,021.44 - 0.00% 0.00 - 0.00% - - 0.00% 12.00 1,021.44 100.00%
01.06.03 CAMPO DEPORTIVO HORMIGON M3 90.00 91.85 8,266.50 - 0.00% 0.00 - 0.00% - - 0.00% 90.00 8,266.50 100.00%
01.06.04 CAMPO DEPORTIVO ARENA GRUESA M3 66.00 109.87 7,251.42 - 0.00% 0.00 - 0.00% - - 0.00% 66.00 7,251.42 100.00%
01.06.05 CAMPO DEPORTIVO MATERIAL SELECCIONADO M3 66.00 117.33 7,743.78 - 0.00% 0.00 - 0.00% - - 0.00% 66.00 7,743.78 100.00%
01.06.06 CESPED SINTETICO SUMINISTRO E INSTALACION. M2 600.00 100.80 60,480.00 - 0.00% 0.00 - 0.00% - - 0.00% 600.00 60,480.00 100.00%
01.07 CARPINTERIA METALICA Y HERRERIA. 0.00
01.07.01 ARCO DE FUTBOL. UND 2.00 1,002.92 2,005.84 - 0.00% 0.00 - 0.00% - - 0.00% 2.00 2,005.84 100.00%
01.08 PINTURA 0.00
01.08.01 PINTURA EN EXTERIORES. M2 20.00 9.55 191.00 - 0.00% 0.00 - 0.00% - - 0.00% 20.00 191.00 100.00%
01.09 SISTEMA DE DRENAJE PLUVIAL. 0.00
01.09.01 TUBERIA CRIBADA DE D=3" SERIE 25. M 102.50 24.25 2,485.63 - 0.00% 0.00 - 0.00% - - 0.00% 102.50 2,485.63 100.00%
01.09.02 TUBERIA DE PVC SAL 4" C-10 M 61.00 53.28 3,250.08 - 0.00% 0.00 - 0.00% - - 0.00% 61.00 3,250.08 100.00%
Páginas 3
VALORIZACIÓN DE OBRA Nº 01
MUNICIPALIDAD CORRESPONDIENTE AL MES DE JULIO DEL 2022
DISTRITAL DE “CREACION DE LOS SERVICIOS DEPORTIVOS EN EL CENTRO POBLADO DE PUMACHANCA DEL DISTRITO DE OLLACHEA - PROVINCIA DE CARABAYA -
DEPARTAMENTO DE PUNO”
OLLACHEA MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA DATOS DE UBICACIÓN
PLAZO DE EJECUCION : 90 dias calendarios Comunidad : Pumachanca
SUB-GERENCIA DE RESIDENTE DE OBRA : ING. ANGEL HUGO SALGUERO LAZA Distrito : Ollachea
INSPECTOR DE OBRA : ING. RUBEN JESUS CONDORI COPARE Provincia : Carabaya
INFRAESTRUCTURA Y
PRESUPUESTO OBRA : S/. 241,508.85 Departamento : Puno
MES DESARROLLO URBANO Y FECHA DE INICIO : 11/07/2022
PRESUPUESTO
VALORIZACIÓN DE OBRA Nº 01 MAYORES
PARTIDAS DESCRIPCION UND ANTERIOR ACTUAL ACUMULADO SALDO
METRADO PU PRES METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO PRES. %
01.09.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" UND 16.00 48.52 776.32 - 0.00% 0.00 - 0.00% - - 0.00% 16.00 776.32 100.00% METRADOS
01.10 CONEXION A RED EXTERNA. 0.00
01.10.01 PINTURA EN CARPINTERIA METALICA. M2 12.50 10.95 136.88 - 0.00% 0.00 - 0.00% - - 0.00% 12.50 136.88 100.00%
01.10.02 CONEXION A RED EXTERNA. M 15.00 7.78 116.70 - 0.00% 0.00 - 0.00% - - 0.00% 15.00 116.70 100.00%
01.10.03 TABLERO DE DISTRIBUCION 18 POLOS. UND 1.00 220.40 220.40 - 0.00% 0.00 - 0.00% - - 0.00% 1.00 220.40 100.00%
01.10.04 POSTE FIERRO NEGRO UND 4.00 942.62 3,770.48 - 0.00% 0.00 - 0.00% - - 0.00% 4.00 3,770.48 100.00%
01.10.05 CONDUCTOR NYY. M 110.00 8.81 969.10 - 0.00% 0.00 - 0.00% - - 0.00% 110.00 969.10 100.00%
01.10.06 TUBERIA P.V.C. SAP DE 50 MM. M 90.00 6.87 618.30 - 0.00% 0.00 - 0.00% - - 0.00% 90.00 618.30 100.00%
01.11 ARTEFACTOS. 0.00
01.11.01 REFLECTOR FHILIPS HALOGERURO. UND 4.00 166.50 666.00 - 0.00% 0.00 - 0.00% - - 0.00% 4.00 666.00 100.00%
02 CONSTRUCCION DE CERCO PERIMETRICO 0.00
02.01 OBRAS PRELIMINARES 0.00 0.00
02.01.01 LIMPIEZA MANUAL DE TERRENO. M2 56.25 0.66 37.13 - 0.00% 56.25 37.13 100.00% 56.25 37.13 100.00% - - 0.00%
02.01.02 TRAZO Y REPLANTEO PRELIMINAR M2 56.25 3.62 203.63 - 0.00% 56.25 203.63 100.00% 56.25 203.63 100.00% - - 0.00%
02.02 MOVIMIENTO DE TIERRAS 0.00
02.02.01 EXCAVACIÓN CON MAQUINARIA M3 9.54 6.44 61.44 - 0.00% 9.54 61.44 100.00% 9.54 61.44 100.00% - - 0.00%
02.02.02 ACARREO DE MATERIAL DE EXCAVACION M3 11.45 31.11 356.21 - 0.00% 3.80 118.22 33.19% 3.80 118.22 33.19% 7.65 237.99 66.81%
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE. M3 11.45 13.18 150.91 - 0.00% 0.00 - 0.00% - - 0.00% 11.45 150.91 100.00%
02.02.04 NIVELACIÓN INTERIOR Y APISONADO. M2 22.5 2.21 49.73 - 0.00% 0.00 - 0.00% - - 0.00% 22.50 49.73 100.00%
02.03 OBRAS DE CONCRETO SIMPLE. 0.00
02.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO: HORMIGON +30% 5.83
M3 DE PIEDRA GRANDE 243.78 1,421.24 - 0.00% 0.00 - 0.00% - - 0.00% 5.83 1,421.24 100.00%
02.03.02 CONCRETO 1:8 +25% PM P/SOBRECIMIENTO CORRIDO M3 9.72 417.11 4,054.31 - 0.00% 0.00 - 0.00% - - 0.00% 9.72 4,054.31 100.00%
02.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO.M2 65.97 55.63 3,669.91 - 0.00% 0.00 - 0.00% - - 0.00% 65.97 3,669.91 100.00%
02.04 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00
02.04.01 TARRAJEO EN EXTERIORES C/CEMENTO-ARENA. M2 87.22 16.69 1,455.70 - 0.00% 0.00 - 0.00% - - 0.00% 87.22 1,455.70 100.00%
02.04.02 BRUÑAS EN INTERIORES Y EXTERIORES. M 36.50 8.45 308.43 - 0.00% 0.00 - 0.00% - - 0.00% 36.50 308.43 100.00%
02.05 CARPINTERIA METALICA. 0.00
02.05.01 PUERTA C/MALLA GALVANIZADA. M2 5.00 300.00 1,500.00 - 0.00% 0.00 - 0.00% - - 0.00% 5.00 1,500.00 100.00%
02.05.02 CERCO C/MALLA GALVANIZADA M 110.50 360.00 39,780.00 - 0.00% 0.00 - 0.00% - - 0.00% 110.50 39,780.00 100.00%
02.06 CERRAJERIA 0.00
02.06.01 CERRADURA FORTE DE TRES GOLPES EN PUERTA METALICA UND 1.00 154.60 154.60 - 0.00% 0.00 - 0.00% - - 0.00% 1.00 154.60 100.00%
02.07 PINTURA 0.00
02.07.01 PINTURA EN INTERIORES Y EXTERIORES. M2 87.22 9.55 832.95 - 0.00% 0.00 - 0.00% - - 0.00% 87.22 832.95 100.00%
03 VARIOS. 0.00
03.01 LIMPIEZA FINAL DE OBRA. M2 985.60 0.33 325.25 - 0.00% 0.00 - 0.00% - - 0.00% 985.60 325.25 100.00%
03.02 TRANSPORTE DE MATERIALES. GLB 1 3500 3,500.00 - 0.00% 0.60 2,100.00 60.00% 0.60 2,100.00 60.00% 0.40 1,400.00 40.00%
03.03 PLACA RECORDATORIA. UND 1.00 732.40 732.40 - 0.00% 0.00 - 0.00% - - 0.00% 1.00 732.40 100.00%
=========================================================================================================
======================================================================================================================================================
COSTO DIRECTO S/. 203,912.35 S/. 0.00 0.00% S/. 12,561.97 6.16% S/. 12,561.97 6.16% S/. 191,350.38 93.84%
COSTO INDIRECTO S/. 37,596.50 S/. 0.00 0.00% S/. 1,312.77 3.49% S/. 1,312.77 3.49% S/. 36,283.73 96.51%
GASTOS GENERALES 10.45% S/. 21,309.50 S/. 0.00 0.00% S/. 1,312.77 6.16% S/. 1,312.77 6.16% S/. 19,996.73 93.84%
GASTOS DE SUPERVISION 3.33% S/. 6,787.00 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 6,787.00 100.00%
GASTOS DE LIQUIDACION 1.72% S/. 3,500.00 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 3,500.00 100.00%
Páginas 3
VALORIZACIÓN DE OBRA Nº 01
MUNICIPALIDAD CORRESPONDIENTE AL MES DE JULIO DEL 2022
DISTRITAL DE “CREACION DE LOS SERVICIOS DEPORTIVOS EN EL CENTRO POBLADO DE PUMACHANCA DEL DISTRITO DE OLLACHEA - PROVINCIA DE CARABAYA -
DEPARTAMENTO DE PUNO”
OLLACHEA MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA DATOS DE UBICACIÓN
PLAZO DE EJECUCION : 90 dias calendarios Comunidad : Pumachanca
SUB-GERENCIA DE RESIDENTE DE OBRA : ING. ANGEL HUGO SALGUERO LAZA Distrito : Ollachea
INSPECTOR DE OBRA : ING. RUBEN JESUS CONDORI COPARE Provincia : Carabaya
INFRAESTRUCTURA Y
PRESUPUESTO OBRA : S/. 241,508.85 Departamento : Puno
MES DESARROLLO URBANO Y FECHA DE INICIO : 11/07/2022
PRESUPUESTO
VALORIZACIÓN DE OBRA Nº 01 MAYORES
PARTIDAS DESCRIPCION UND ANTERIOR ACTUAL ACUMULADO SALDO
METRADO PU PRES METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO PRES. %
EXPEDIENTE TECNICO 2.94% S/. 6,000.00 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/. 6,000.00 100.00% METRADOS
S/. 0.00 0.00% S/. 13,874.74 5.75% S/. 13,874.74 5.75% S/. 227,634.11 94.25%
TOTAL PRESUPUESTO S/. 241,508.85
ANTERIOR ACTUAL ACUMULADO SALDO
Páginas 3