Avance de Obra Oga
Avance de Obra Oga
Avance de Obra Oga
48
PROMOTORA: ZEUKALES GRUPO INMOBILIARIO SAS COSTOS INDIRECTOS 14,295,165,391 26.25% 25.13%
INTERVENTOR: ESTUDIOS Y PROYECTOS CIVILES LTDA COSTOS FINANCIEROS 2,647,525,000 4.86% 4.66%
GERENTE A CARGO POR PARTE DEL BANCO: UTILIDAD 2,424,760,688 4.45% 4.26%
FECHA DE AVANCE PARA ESTE INFORME: 29/09/2021 PREOPERATIVO 2,750,000,000 5.00% 7.00%
NO. DESEMBOLSO (CRÉDITO
PREOPERATIVO) REALIZADO:
1 CONSTRUCTOR * 24,750,000,000 45.00% 59.00%
VENTAS A LA FECHA 125 Unidades Principales Por Desembolsar 29/09/2021 0.00% 0.00% - 25,450,000,000.00
PRELIMINARES
1 $ 168,491,036 0.61% 168,491,035.73 100.00% - 0.0% -
EXCAVACIONES Y RELLENOS
2 $ 650,688,990 2.34% 650,688,990.48 100.00% - 0.0% -
CIMENTACION
3 $ 2,811,098,989 10.10% 2,811,098,988.67 100.00% - 0.0% -
FILTROS Y DESAGUES
4 $ 46,036,389 0.17% 46,036,388.90 100.00% - 0.0% -
ESTRUCTURA
5 $ 6,255,482,412 22.47% 6,255,482,412.07 100.00% - 0.0% -
MAMPOSTERIA
6 $ 2,234,247,585 8.02% 2,234,247,584.96 100.00% - 0.0% -
PAÑETES
7 $ 726,355,812 2.61% 726,355,811.54 100.00% - 0.0% -
INSTALACIONES ELECTRICAS
8 INSTALACIONES HIDROSANITARIAS $ 2,040,566,597 7.33% 2,020,160,931.51 99.00% 20,405,665.97 1.0% -
9 $ 1,242,165,734 4.46% 1,242,165,734.25 100.00% - 0.0% -
RED CONTRAINCENDIO
10 $ 300,900,000 1.08% 300,900,000.00 100.00% - 0.0% -
CIELORASO
11 $ 416,412,412 1.50% 416,412,412.24 100.00% - 0.0% -
12 AFINADO DEE PISOS
CUBIERTA IMPERMEABILIZACIONES $ 373,264,022 1.34% 373,264,022.28 100.00% - 0.0% -
13 $ 274,655,822 0.99% 274,655,822.01 100.00% - 0.0% -
PISOS
14 ENCHAPES, REVESTIMIENTOS Y MESONES $ 613,814,538 2.20% 607,676,392.96 99.00% 6,138,145.38 1.0% -
15 $ 236,577,659 0.85% 236,577,659.33 100.00% - 0.0% -
CARPINTERIA DE ALUMINIO
16 $ 1,712,503,531 6.15% 1,712,503,531.28 100.00% - 0.0% -
CARPINTERIA METALICA
17 $ 48,306,940 0.17% 47,823,870.60 99.00% 483,069.40 1.0% -
CARPINTERIA MADERA
18 $ 1,210,753,170 4.35% 1,198,645,637.81 99.00% 12,107,531.70 1.0% -
APARATOS Y ACCESORIOS
19 EQUIPOS ESPECIALES Y DOTACION $ 1,315,503,667 4.72% 1,302,348,630.58 99.00% 13,155,036.67 1.0% -
20 CERRADURIAS Y NOMENCLATURAS $ 1,421,554,355 5.11% 1,407,338,811.47 99.00% 14,215,543.55 1.0% -
21 $ 36,920,774 0.13% 36,551,565.99 99.00% 369,207.74 1.0% -
PINTURA
22 $ 422,451,755 1.52% 418,227,237.13 99.00% 4,224,517.55 1.0% -
OBRAS EXTERIORES
23 $ 47,265,000 0.17% 46,792,350.00 99.00% 472,650.00 1.0% -
LUMINARIAS
24 $ 104,451,922 0.38% 103,407,402.78 99.00% 1,044,519.22 1.0% -
ASEO Y REMATES
25 HERRAMIENTAS Y EQUIPOS DE OBRA $ 283,546,566 1.02% 226,837,252.60 80.00% 42,531,984.86 15.0% 14,177,328.29
26 GASTOS ADMINISTRATIVOS Y DE OBRA $ 379,165,046 1.36% 375,373,396.03 99.00% 3,791,650.46 1.0% -
27 $ 1,659,892,608 5.96% 1,643,293,682.39 99.00% 16,598,926.08 1.0% -
28 OTROS E IMPREVISTOS $ 811,652,123 2.91% 803,535,601.77 99.00% 8,116,521.23 1.0% -
27,844,725,455 100.00% 27,686,893,157.36 99.43% 143,654,969.81 0.52% 14,177,328.29
CUADRO DE
COMENTARIOS GENERALES ANTICIPOS
APROBADOS
VALOR TOTAL % ANTICIPO A VALOR ANTICIPO A
DESCRIPCION FECHA DE ANTICIPO
ANTICIPO DESEMBOLSAR DESEMBOLSAR
50% -
50% -
50% -
50% -
50% -
50% -
50% -
50% -
50% -
50% -
-
ESTADO ACTUAL DEL PROYECTO
REGISTRO FOTOGRAFICO
SOTANO 3
SOTANO 1
NIVEL 5
NIVEL 6
NIVEL 7
NIVEL 8
NIVEL 10
NIVEL 11
O ACTUAL DEL PROYECTO
CO DESCRIPCION DEL ESTADO DE LA OBRA
Página 10