24+300 Alc TMC 48
24+300 Alc TMC 48
24+300 Alc TMC 48
SUSTENTO DE METRADOS
0.1 ALCANTARILLA TMC Ø 48 KM 24+303.00 TIPO CR-AL
LONG. = 13.77 ml. N° CUERPOS 17
RESUMEN DE METRADOS
METRADO METRADO MAYOR MENOR
ITEM PARTIDA UND.
REPLANTEO PROYECTO METRADO METRADO
500 DRENAJE
501.E EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 186.92 287.70 - -100.78
502.A RELLENOS PARA ESTRUCTURAS m3 47.34 45.40 1.94 -
503.E CONCRETO CLASE E (F'C = 175 KG/CM2) m3 12.80 14.10 - -1.30
503.I ENCOFRADO Y DESENCOFRADO m2 53.04 55.60 - -2.56
519.A TUBERIA TMC ɸ = 48" ml 13.77 12.90 0.87 -
520.A TUBERIA TMC ɸ = 60" ml - - - -
600 OBRAS COMPLEMENTARIAS
601.B EMBOQUILLADO DE PIEDRA E= 0.15M m2 43.14 26.60 16.54 -
601.C EMBOQUILLADO DE PIEDRA E= 0.20M m2 - -
601.D PIEDRA ASENTADA m3 - -
604.F DEMOLICION DE ESTRUCTURAS EXISTENTES m3 - -
609.A DESMONTAJE Y TRANSPORTE DE ALC. TMC EXISTENTES ml - -
583944895.xlsx Página 1
OBRAS DE ARTE Y DRENAJE
SUSTENTO DE METRADOS
0.1 ALCANTARILLA TMC Ø 48 KM 24+303.00 TIPO CR-AL
LONG. = 13.77 ml. N° CUERPOS 17
METRADOS: EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
VOLUMEN
DESCRIPCION N° veces Largo Ancho Area 1 Area 2 Altura
PARCIAL
DESCUENTO
ISLA CAJARECEPTORA (A-C8) -1.00 2.24 0.30 -0.67
583944895.xlsx Página 2
OBRAS DE ARTE Y DRENAJE
SUSTENTO DE METRADOS
0.1 ALCANTARILLA TMC Ø 48 KM 24+303.00 TIPO CR-AL
LONG. = 13.77 ml. N° CUERPOS 17
METRADOS: CONCRETO CLASE (F'C = 175 KG/CM2)
VOLUMEN
DESCRIPCION N° veces Largo Ancho Area 1 Area 2 Altura
PARCIAL
CAJA RECEPTORA:
ZAPATA (LOSA) 1 2.40 2.20 5.28 0.60 3.17
Deducir Base Losa -1 1.40 1.60 2.24 0.30 -0.67
MUROS LATERALES 2 1.40 2.10 2.94 0.30 1.76
Deducir Ingreso de Cunetas -2 1.20 0.30 0.30 -0.11
MURO FRONTAL (INTERNO) 1 2.55 2.20 0.40 2.24
Deducir Ingreso de Tuberia -1 0.51 -0.51
MURO POSTERIOR (EXTERNO) 1 2.10 2.20 0.40 1.85
Deducir Ingreso de Canal -1 0.90 0.60 0.26 0.32 -0.08
TOTAL ==> 1 m3 7.65
ALERO:
ZAPATA (Area Mayor) 1 4.87 2.20 5.73 0.40 2.29
ZAPATA (Area Mayor) 1 4.87 4.17 1.58 0.40 0.63
Deducir Solado -1 3.10 1.45 1.87 0.25 -0.47
PANTALLA (Exterior) 1 1.87 1.62 0.26 1.52 0.40
PANTALLA (Interior) 1 2.03 1.62 0.46 1.52 0.69
Deducir Tuberia -1 0.49 -0.49
ALAS 2 0.30 0.09 1.80 1.41
PARAPETO 1 1.87 1.62 0.52 0.30 0.16
TOTAL ==> 1 m3 4.62
ALERO:
ZAPATA (LOSA) 1 11.57 0.40 4.63
PANTALLA EXTERIOR 1 1.62 1.52 2.46
PANTALLA INTERIOR 1 2.03 1.87 1.95 1.52 2.96
Deducir Tuberia -2 1.17 -2.34
ALA INTERIOR 2 1.80 1.11 4.00
ALA EXTERIOR 2 1.98 1.11 4.38
TAPAS ALA 2 0.25 0.70 0.35
PARAPETO 2 1.87 1.62 0.30 1.24
TOTAL ==> 1 m2 17.69
583944895.xlsx Página 3
OBRAS DE ARTE Y DRENAJE
SUSTENTO DE METRADOS
0.1 ALCANTARILLA TMC Ø 48 KM 24+303.00 TIPO CR-AL
LONG. = 13.77 ml. N° CUERPOS 17
583944895.xlsx Página 4
SUSTENTO DE METRADOS - CAJA RECEPTORA Ø 48''
MUROS LATERALES ( 1.40 X 2.10 X 0.30 X 2.00 ) - ( 1.20 X 0.30 ) X 0.30 X 2.00 = 1.66 m3
2.00
MURO FRONTAL (INTERNO) ( 0.30 + 0.50 ) X 2.55 X 2.20 - (π X 1.22² ) X 0.44 = 1.73 m3
2.00 4.00
MURO POSTERIOR (EXTERNO) ( 0.30 + 0.50 ) X 2.10 X 2.20 - ( 0.90 + 0.60 ) X 0.35 X 0.32 = 1.77 m3
2.00 2.00
TOTAL = 7.65 m3
PANTALLA CARA INTERIOR (π X 1.22² ) - 0.90 + 0.60 X 0.35 + 0.35 X 2.20 = 11.58 m2
4.00 2.00
PANTALLA CARA EXTERIOR 0.30 + 0.33 X 0.35 X 2.00 - 0.90 + 0.60 X 0.35 - (π X 1.22 = 18.26 m2
2.00 2.00 4.00
4
TOTAL = 35.36 m2
14
0.30 0.35 0.90 0.35 0.30
24 0.30 1.40 0.30
0.30 0.35 0.90
5
2 0.60 0.30
7 0.35
1.80 2.70
0.60 0.90
0.30 0.35
0.30 0.30
1.40 0.30
0.45 0.30
dsdsd 0.30 0.20 0.30 0.90
0.30
0.35
0.33
2.55 1.70
0.44 3.15
1.75
0.10
0.30 0.30
0.60
0.30 0.30
ZAPATA (LOSA) ( 2.20 + 4.87 ) 16.00 1.62 + ( 4.87 + 4.17 ) X 0.35 X 0.40 -
2.00 2.00
ALAS ( 0.30 + 0.50 ) x 1.52 + ( 0.20 + 0.30 ) x 0.70 / 2.00 X 1.80 X 2.00 = 1.41 m3
2.00 2.00
TOTAL = 4.62 m3
ZAPATA (LOSA) ( 4.17 + 2.20 ) + ( 2.10 X 2.00 ) + ( 0.50 X 2.00 ) X 0.40 = 4.63 m2
PANTALLA CARA INTERIOR 1.62 X 1.52 + ( 1.87 + 2.03 ) X 1.52 - (π X 1.22² ) X 2.00 = 3.09 m2
2.00 4.00
5 TOTAL = 17.69 m2
2
0.30
7 4.87
2.20 0.30
0.30
2.03
0.34
1.52
0.32 0.42
0.70
1.87 2.10 0.50
8 2.02 1.62 1.62
1.45 0.15 0.40
1.93 0.25
1.80 0.82 0.90 0.82 0.25
0.35
0.20 1.97
0.30 3.10 0.50
0.20
4.17