Val Enero 2022
Val Enero 2022
Val Enero 2022
PRESUPUESTO AVANCES
SALDO
COSTO DIRECTO ANTERIOR ACUM ACTUAL ACUMULADO
ITEM DESCRIPCION
Valorizado Valorizado Valorizado Valorizado
S/. % % % %
S/. S/. S/. S/.
PROGRAMADO 7,504,853.70 6,219,215.22 82.87% - 0.00% 6,219,215.22 82.87% 1,285,638.49 17.13%
1 OBRAS PROVISIONALES 24,556.20 24,556.20 100.00% - 0.00% 24,556.20 100.00% - 0.00%
2 TRABAJOS PRELIMINARES 125,162.35 125,162.35 100.00% - 0.00% 125,162.35 100.00% - 0.00%
3 CAPTACION PRINCIPAL PUMANOTA (01) 58,608.43 58,608.43 100.00% - 0.00% 58,608.43 100.00% - 0.00%
4 SEDIMENTADOR + CANAL DE DERIVACION CAPTACION PRINCIPAL (01 UNID) 13,091.57 13,091.57 100.00% - 0.00% 13,091.57 100.00% - 0.00%
5 CAMARA DE CARGA CAPTACION PRINCIPAL (O1 UND) 17,677.55 17,677.55 100.00% - 0.00% 17,677.55 100.00% - 0.00%
6 CAMARA ROMPEPRESION TIPO 1 Y 2 LINEA DE CONDUCCION (04 UNIDADES) 40,208.53 40,208.53 100.00% - 0.00% 40,208.53 100.00% - 0.00%
7 LINEA DE CONDUCCION IRRIGACION PUMANOTA 4,530,612.97 3,529,209.47 77.90% - 0.00% 3,529,209.47 77.90% 1,001,403.50 22.10%
8 VALVULAS CONTROL LINEA DE CONDUCCION 315 mm (04) 29,274.20 29,274.20 100.00% - 0.00% 29,274.20 100.00% - 0.00%
9 VALVULA DE CONTROL 250 mm LINEA DE CONDUCCION (01 UND) 5,796.73 5,796.73 100.00% - 0.00% 5,796.73 100.00% - 0.00%
10 VALVULA DE CONTROL LINEA DE CONDUCCION 200 mm (02 UND) 5,469.69 5,469.69 100.00% - 0.00% 5,469.69 100.00% - 0.00%
11 VALVULAS DE PURGA 110mm LINEA DE CONDUCCION (01 UND) 1,238.99 1,238.99 100.00% - 0.00% 1,238.99 100.00% - 0.00%
12 CAMARAS ROMPEPRESION TIPO 1, 2, 3 y 4 SECTORES DE RIEGO (12 UNIDADES) 42,831.56 42,831.56 100.00% - 0.00% 42,831.56 100.00% - 0.00%
13 LINEA DE DISTRIBUCION SECTORES DE RIEGO 2,157,926.61 1,909,292.74 88.48% - 0.00% 1,909,292.74 88.48% 248,633.87 11.52%
14 CANOAS (07 UNIDADES) 26,201.71 12,835.89 48.99% - 0.00% 12,835.89 48.99% 13,365.82 51.01%
15 ACUEDUCTO (05 UNIDADES) 89,730.69 89,730.69 100.00% - 0.00% 89,730.69 100.00% - 0.00%
16 VALVULAS DE CONTROL 200 mm SECTORES DE RIEGO (04 UND) 10,939.66 10,939.66 100.00% - 0.00% 10,939.66 100.00% - 0.00%
17 VALVULAS CONTROL SECTORES DE RIEGO 160 mm (24 UND) 42,575.76 42,575.76 100.00% - 0.00% 42,575.76 100.00% - 0.00%
18 VALVULA DE CONTROL 110 mm SECTORES DE RIEGO (22) 27,244.32 27,244.32 100.00% - 0.00% 27,244.32 100.00% - 0.00%
19 VALVULAS CONTROL 90 mm SECTORES DE RIEGO (39) 42,780.53 42,780.53 100.00% - 0.00% 42,780.53 100.00% - 0.00%
20 VALVULA DE CONTROL (11 UND) Y PURGA 63 mm (51 UND) SECTORES DE RIEGO 54,194.72 54,194.72 100.00% - 0.00% 54,194.72 100.00% - 0.00%
21 VALVULAS DE AIRE (10 und) 5,908.87 4,259.12 72.08% - 0.00% 4,259.12 72.08% 1,649.75 27.92%
22 HIDRANTES TIPO1 (471) 94,765.70 94,529.42 99.75% - 0.00% 94,529.42 99.75% 236.28 0.25%
23 HIDRANTE TIPO 2 PARA CAÑON (124 UND) 17,842.37 12,010.12 67.31% - 0.00% 12,010.12 67.31% 5,832.25 32.69%
24 PASE AEREO (03 UNIDADES) 13,501.43 - 0.00% - 0.00% - 0.00% 13,501.43 100.00%
25 PASE VEHICULAR (01 UND) 3,050.35 3,050.35 100.00% - 0.00% 3,050.35 100.00% - 0.00%
26 VALVULAS PURGA DE COMPUERTA DE 2" PARA EL SIFON (01 UNIDAD) 574.97 - 0.00% - 0.00% - 0.00% 574.97 100.00%
27 IMPACTO AMBIENTAL (ACCIONES DE MITIGACION) 23,087.24 22,646.62 98.09% - 0.00% 22,646.62 98.09% 440.62 1.91%
C.D. MAYORES METRADO 01 152,851.82 152,851.82 100.00% - 0.00% 152,851.82 100.00% - 0.00%
C.D. PARTIDAS NUEVAS 01 324,554.59 324,554.59 100.00% - 0.00% 324,554.59 100.00% - 0.00%
C.D. MAYORES METRADOS 02 163,456.36 149,530.00 91.48% - 0.00% 149,530.00 91.48% 13,926.36 8.52%
C.D. PARTIDAS NUEVAS 02 381,924.71 365,019.04 95.57% - 0.00% 365,019.04 95.57% 16,905.67 4.43%
C.D. MAYORES METRADO 03 346,215.31 231,275.33 66.80% - 0.00% 231,275.33 66.80% 114,939.99 33.20%
C.D. PARTIDAS NUEVAS 03 779,290.21 626,699.78 80.42% - 0.00% 626,699.78 80.42% 152,590.42 19.58%
C.D. DEDUCTIVOS I (1,107,911.00) (1,107,911.00)
PLAN DE DESARROLLO AGRICOLA 228,434.73 124,732.23 54.60% - 0.00% 124,732.23 54.60% 103,702.50 45.40%
TOTAL COSTO DIRECTO (INCLUYE MAYORES METRADOS 02 Y PARTIDAS NUEVAS 02) 8,773,670.42 8,193,877.99 93.39% - 0.00% 8,193,877.99 93.39% 579,792.44 6.61%
NOTA: SE TIENE UN AVANCE FISICO A COSTO DIRECTO DEL MES DE ENERO 202222 DE 0.00 (0.00 %) , LA OBRA SE ENCUENTRA PARALIZADO POR CAMBIO DE AÑO FISCAL