ITEM DESCRIPCIÓN DEL ELEMENTO UNIDAD SUB ESTACION PU S/. P. PARCIAL S/.
01 ESTRUCTURAS
01.01 COLUMNETAS DE CONFINAMIENTO
01.01.01 Concreto Premezclado f´c=210 kg/cm2 M3 5.22 310.43 1,621.77
01.01.02 Encofrado y desencofrado M2 87.92 38.54 3,388.51
01.01.03 Acero Corrugado Fy=4200 kg/cm2 KG 437.48 3.19 1,395.56
01.02 VIGAS
01.02.01 Concreto Premezclado f´c=210 kg/cm2 M3 4.83 310.43 1,500.42
01.02.02 Encofrado y desencofrado M2 46.18 39.48 1,823.08
01.02.03 Acero Corrugado Fy=4200 kg/cm2 KG 384.18 3.19 1,225.54
01.03 MUROS DE CONCRETO
01.03.01 Concreto Premezclado f´c=210 kg/cm2 M3 6.86 310.43 2,128.06
01.03.02 Encofrado y desencofrado M2 68.45 37.85 2,590.74
01.03.03 Acero Corrugado Fy=4200 kg/cm2 KG 376.31 3.19 1,200.42
01.04 LOSAS
01.04.01 Concreto Premezclado f´c=210 kg/cm2 M3 10.63 310.43 3,298.60
01.04.02 Encofrado y desencofrado M2 80.04 39.48 3,160.17
01.04.03 Acero Corrugado Fy=4200 kg/cm2 KG 897.94 3.19 2,864.41
02 ALBAÑILERIA Y ARQUITECTURA
02.01 Muro de ladrillo e=0.25cm M2 210.68 64.44 13,575.91
02.02 Muro de ladrillo e=0.10cm M2 4.19 62.00 259.47
02.03 Muro de ladrillo e=0.15cm M2 5.78 60.00 346.68
02.04 Tarrajeo de muros M2 441.28 20.21 8,918.20
02.05 Puerta de madera P1 (1.50mx2.20m) UND 1.00 1,200.00 1,200.00
02.06 Puerta de madera P2 (1:00mx2.20m) UND 1.00 730.00 730.00
03 ESTRUCTURAS METALICAS
03.01 * Marco de angulo de 2" x 1/4 Kg 215.00 10.28 2,209.34
03.02 * Contramarco de angulo de 1 1/2 x 1/4 Kg 150.00 10.28 1,541.40
03.03 * Tejido de angulo de 1" x 3/16 Kg 585.00 10.28 6,011.46
03.04 * Planchas estrillada de 90cmt. X 2.10 (1/8) Kg 150.00 10.28 1,541.40
03.05 REJILLAS FIJAS 2.15 x 1.45 Kg 685.00 10.28 7,039.06
03.06 REJILLA DE PARED DE 1.00 X .90 glb 1.00 275.80 275.80
03.07 ESCALERA DE GATO S/PLANO GALVANIZADO 65cmt Mt/L 8.65 238.00 2,058.70
03.08 TAPA METALICA 1.00 x 1.00 und 2.00 470.40 940.80
03.09 ASAS DE ESCALERA und 2.00 42.00 84.00
03.10 SUB-ESTACIÓN (ADICIONAL)
03.11 PUERTA METALICA DE 2.10 X 1.50 und 1.00 2,800.00 2,800.00
03.12 TAPAS METALICAS DE 3.00 X 60 und 2.00 1,050.00 2,100.00
03.13 REJA FIJA 1.00 X .90 und 1.00 450.00 450.00
03.14 ASAS DE ESCALERA und 1.00 250.00 250.00
04 PINTURA
04.01 TECHO (Lijado, imprimado, masillado 2 manos de pintura) m2 99.13 6.50 644.35
04.02 PARED (Lijado, imprimado, 2 manos de empaste, sellado, 2 manos de pintura m2 219.50 10.00 2,195.00
PARCIAL
82,609.62 PC
68,071.15 100 82,609.62
12,980.77 130 84,437.83
1,125.00 150 ###
432.69 160 99,395.09
84,437.83 603 79,819.83
34,148.74 607 90,848.08
9,064.34 611 26,686.67
23,291.12 ###
6,933.66
6,251.83
4,748.14
194,383.60
5,220.21
57,009.58
61,884.57
70,269.23
99,395.09
73,082.97
26,312.12
79,819.83
9,046.80
6,904.91
6,764.85
6,651.23
12,292.04
38,160.00
90,848.08
51,386.54
39,461.54
26,686.67
12,115.38
14,571.29
658,180.71
CALCULO DE ADICIONAL POR TRABAJOS EN VECINOS
DIAS 45.00 =
PARCIAL
3,153.83 PC
1,075.05
1,712.15 130 14,673.83
366.62 150 1,077.00
11,520.00 280 1,700.00
11,520.00 200 64,629.19
1,077.00 100 1,400.00
1,077.00 460 8,690.37
1,700.00
1,700.00
359.00
234.00
125.00
1,400.00
1,400.00
1,365.37
1,075.05
107.01
183.31
5,220.00
5,220.00
1,250.00
250.00
100.00
100.00
200.00
600.00
720.00
720.00
135.00
135.00
23,169.82
5,691.46
13,596.51
3,881.85
41,100.38
4,355.00
28,750.00
1,150.00
1,408.75
5,436.63
92,170.39
ADICIONAL 10 TUBERIAS DE ESCAPE PARA MOTOBOMBA CONTRA INCENDIO
OBRA: EDIFICIO BARLOVENTO
UBICACIÓN: REPUBLICA DE PAMANA
FECHA: 3/18/2015 DIAS 20 0.83 MESES
COSTOS
ITEM DESCRIPCION / PARTIDA
UND CUADRILLA CANTIDAD P.U. MONTO
380 TUBERIAS DE ESCALE PARA MOTOBOMBA GLB 1.00 1.00 72,356.40 72,356.40
GASTOS GENERALES
10%
ESTRUCTURAS
35%
ASCENSORES
6%
MURO CORTINA
6%
ARQUITECTURA
13%
ESTATUS ADICIONALES - TORRE BARLOVENTO
Adicionales (A) Deductivos (B)
Nº Descripcion (A-B) SOLES PC
SOLES SOLES
2 INCREMENTO ANCLAJES MURO ANCLADO 8VO ANILLO 0 Nov-13 Ejecutado 107,341.21 107,341.21 Aprobado
5 CAMBIO EETT CRISTALES FACHADA POSTERIOR 0 En Ejecucion 137,267.20 137,267.20 Pendiente Aprobación
10 TUBERIAS DE ESCAPE PARA MOTOBOMBA CONTRA INCENDIO 0 En Ejecucion 104,883.63 104,883.63 Pendiente Aprobación
15 ADICIONAL PLC (SISTEMA DE CONTROL DE BOMBAS DE AGUA) 0 En Ejecucion 5,272.00 5,272.00 Pendiente Aprobación
18 ADICIONAL CAMBIO DE PRECIO UNITARIO ACERO CORRUGADO 0 En Ejecucion 203,067.66 203,067.66 Pendiente Aprobación
19 ADICIONAL INCREMENTO CUANTIA ACERO CORRUGADO 0 En Ejecucion 776,409.29 776,409.29 Pendiente Aprobación
Ya incluido en
20 ADICIONAL CONCRETO PREMEZCLADO CAMBIO PROYECTO VSL 0 Ad, 21 - Pendiente Aprobación
23 COLUMNETAS METALICAS PARA PUERTA-CORTAFUEGO 4"X4"X1/8 0 En Ejecucion 57,810.72 57,810.72 Pendiente Aprobación
24 ADICIONAL POR CAMBIO DE DISIPADORES TADAS A ADAS 0 En Ejecucion 658,180.71 658,180.71 Pendiente Aprobación
26 ADICIONAL GUARDIANIA ANTES DE INICIO DE OBRA 0 En Ejecucion 52,346.65 52,346.65 Pendiente Aprobación
28 ADICIONAL MARCOS INOX. PUERTAS ASCENSORES 0 En Ejecucion 131,325.12 131,325.12 Pendiente Aprobación
32 VIGAS Y COLUMNETAS ADICIONALES SOLICITADOS POR KONE En Ejecucion 36,279.03 36,279.03 Pendiente Aprobación
34 CAMBIO DE RECORRIDO DE DUCTOS DE EXTRACION DE AIRE Pendiente 15,000.00 15,000.00 Pendiente Aprobación
1,094,720.69 660,769.23
PC
611
611
611
611
611
611
611
609
607
607
607
607
607
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
101
101
607
607
611
611
101
607
607
607
611
611
611
611
611
611
611
101
611
611
611
611
611
611
101
611
611
611
611
611
611
607
607
607
607
607
607
607
607
607
607
611
611
611
611
611
611
611
103
607
607
607
607
611
611
611
611
611
608
607
130
130
130
607
103
611
611
611
611
170
103
611
611
611
150
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
610
610
608
607
611
611
611
611
101
170
103
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
611
17,021
18,454
348,923
129,974
DEMOLICION 2012 -
SEMANA 5
ENE 2013
EI ACTIVIDAD
1 603 SUPERVISION (CAPATACES)
2 SUPERVISION (MAESTRO DE OBRA)
3 SUPERVISION (CAPATAZ TOPOGRAFO SILVIO)
4 122 EXCAVACION, PERFILADO Y PAÑETEO
5 110 ACERO
6 ACERO NP
7 110 ENCOFRADO
8 ENCOFRADO NP
9 110 CONCRETO
10 CONCRETO NP
11 101 DEMOLICION (con rotomartillo)
12 204 REPARACIONES DE CONCRETO
13 202 SOLAQUEOS, REVOQUES Y ENLUCIDOS
14 103 TOPOGRAFIA
15 101 ACARREO
16 RIGGER
17 101 OBRAS PROVISIONALES
18 603 IIEE PROVISIONALES
19 603 PDRGA
20 603 ALMACEN / PORTERIA 2,312 1,960.0 82.0
21 APOYO A PALMANOVA
22 Varios (Apoyo social, practicantes, probetero y Tucto)
23 REAJUSTE
SUMA HORAS 2312.0 1960.0 82.0
Horas Administracion 2312.0 1960.0 82.0
Costo de Planilla
SEMANA 10
SEMANA 11
SEMANA 12
SEMANA 13
SEMANA 14
SEMANA 6
SEMANA 7
SEMANA 8
SEMANA 9
96.0 96.0 96.0 96.0 96.0 162.0 122.5 155.0
35.0 40.0 63.0
48.0 48.0 48.0 48.0 48.0 54.0 37.0 52.0
78.0 73.0 161.5
45.0 58.0 114.0
57.0 21.0 16.0
90.0 130.0 292.0
141.5 8.0 -37.5
18.0 48.0 112.0
98.0 -14.5 28.5
46.0 58.0 93.5
0.0
25.5
96.0 96.0 96.0 96.0 96.0 87.5 68.0 108.0
-148.3 39.3 50.5
7 12 12 12 12 15 15 17
49 38 32 43 48 -9 0 1
1,252,776
SEMANA 16
SEMANA 17
SEMANA 18
SEMANA 19
SEMANA 20
SEMANA 21
SEMANA 22
SEMANA 23
SEMANA 24
184.0 210.0 219.0 177.5 187.0 223.0 211.0 186.0 191.0 178.0
56.0 57.0 58.0 53.0 56.0 57.0 57.0 58.0 58.0 48.5
54.0 58.0 57.0 53.0 57.0 55.0 77.0 54.0 55.0 54.0
121.5 174.0 107.0 0.0 77.5 126.5 107.5 91.5 84.0 55.5
66.0 146.5 45.0 0.0 79.5 110.0 53.0 73.0 54.5
56.0 54.5 141.0 144.0 100.5 76.0 183.0 124.0 72.5 119.0
78.0 325.5 294.5 102.0 102.0 335.5 117.5 167.0 100.0
149.5 -8.0 47.5 203.0 161.5 9.5 303.0 163.5 104.5 245.5
19.0 110.0 84.5 43.0 22.0 98.0 29.0 30.5 66.0 46.5
88.5 45.0 100.5 -2.5 131.0 -17.0 -26.0 160.5 98.0 87.0
169.0 114.5 122.0 134.0 178.0 137.0 219.0 201.5 175.5 287.0
40.5 40.0 27.0 170.5 19.5 94.5 105.0 3.0 24.5 0.0
32.5 19.5 27.0 135.5 0.0 70.0 89.0 9.0 46.5 0.0
100.0 126.0 104.0 96.0 120.0 113.5 148.0 106.0 108.0 95.5
-30.5 16.8 -10.5 24.8 198.0 187.8 116.5 0.5 49.5 -119.3
80.0 93.3 59.5 106.3 -100.0 101.3 141.5 197.5 63.0 142.8
64.0 70.0 83.0 68.5 71.0 76.0 87.0 87.0 80.0 73.5
205.0 191.0 184.0 198.5 185.0 199.0 248.5 205.0 165.0 266.5
144.0 122.0 115.0 117.0 113.0 124.0 136.0 111.0 112.0 114.0
208.0 217.0 211.0 204.5 196.0 202.5 227.0 204.5 174.0 165.0
-5.5 -62.0 -1.0 -9.0 46.0 -49.0 10.0 45.0 149.5 175.5
1879.5 2120.5 2075.0 2019.5 2000.5 2330.0 2469.0 2208.5 2116.5 2189.0
1879.5 2120.5 2075.0 2019.5 2000.5 2330.0 2469.0 2208.5 2116.5 2189.0
17 18 18 20 20 21 22 22 22 22
5 5 3 5 -5 5 6 9 3 6
NO DE OBRA
SEM 60 SEM 61 SEM 62 SEM 63 SEM 64 SEM 65 SEM 66 SEM 67 SEM 68 SEM 69
SEMANA 25
SEMANA 26
SEMANA 27
SEMANA 28
SEMANA 29
SEMANA 30
SEMANA 31
SEMANA 32
SEMANA 33
SEMANA 34
232.0 223.0 206.5 265.0 264.0 280.0 154.0 300.0 264.0 242.0
68.0 41.0 66.0 70.0 75.0 71.0 61.5 79.0 73.0 65.0
77.0 64.5 60.0 85.0 69.0 78.0 71.5 65.0 62.0 60.0
110.0 141.5 123.5 162.5 215.5 179.0 148.5 197.5 133.0 159.0
152.0 152.5 106.0 157.5 146.0 105.0 121.5 177.0 92.0 79.5
64.0 41.0 73.0 92.0 125.0 138.0 92.0 118.0 73.5 62.0
171.5 278.5 121.0 348.0 205.5 247.0 300.0 348.5 243.0 190.5
163.5 21.5 136.5 139.0 238.0 228.5 129.5 184.0 161.0 109.0
73.0 147.5 46.5 88.0 89.5 148.0 101.5 150.0 63.0 63.5
87.0 20.5 117.5 115.5 135.5 89.0 80.5 91.5 85.5 92.0
254.5 109.0 108.5 195.5 152.5 189.5 163.0 230.5 154.5 158.5
8.0 15.0 21.5 70.5 46.5 67.5 73.5 80.5 82.5 102.5
40.5 115.5 77.5 46.5 74.0 85.5 64.5 97.0 117.0 46.0
139.0 119.0 122.0 160.0 144.0 143.5 97.5 191.0 176.0 180.5
74.3 185.5 -77.0 -14.3 27.3 117.8 50.0 28.8 -1.5 41.5
144.0 144.0 144.0 143.5 161.0 174.0 136.0 146.0
115.3 76.5 170.0 -44.8 -24.3 98.3 -41.5 24.3 -6.5 34.5
84.0 80.0 89.0 90.0 100.0 89.0 87.5 99.0 71.0 79.0
277.0 312.0 252.0 344.5 409.0 366.0 305.5 338.5 287.5 279.0
120.0 100.0 131.0 120.0 122.0 115.0 96.0 120.0 107.5 120.0
163.0 309.0 368.5 395.0 362.5
190.0 168.5 163.5 232.5 288.5 302.5 249.0 334.0 330.0 352.0
114.0 106.0 136.0 292.5 183.0 -165.0 -156.0 -166.0 -123.0 -165.0
2614.5 2518.5 2394.5 3159.5 3229.5 3279.5 2719.5 3630.5 2976.0 2859.5
2614.5 2518.5 2394.5 3159.5 3229.5 3279.5 2719.5 3630.5 2976.0 2859.5
22 22 23 27 27 27 26 28 28 28
5 3 7 -2 -1 4 -2 1 0 1
2.15
0.222222 2.45
SEM 70 SEM 71 SEM 72 SEM 73 SEM 74 SEM 75 SEM 76 SEM 77 SEM 78
SEMANA 35
SEMANA 36
SEMANA 37
SEMANA 38
SEMANA 39
SEMANA 40
SEMANA 41
SEMANA 42
SEMANA 43
193.5 238.0 246.0 259.0 272.0 272.0 219.5 276.0 221.5
55.5 69.0 68.0 68.0 69.0 65.0 59.5 71.0 54.5
52.5 61.0 81.0 77.0 80.0 65.0 57.5 61.0 48.5
85.0 157.0 140.0 196.0 135.0 111.5 104.0 164.0 166.0
120.5 127.0 306.0 350.0 455.5 635.0 609.5 374.5 265.0
21.0 41.0 144.5 47.0 57.5 -34.5 -224.5 78.0 75.0
202.5 190.0 197.0 229.0 203.5 203.5 218.0 317.0 344.0
93.0 246.0 247.0 200.0 180.0 231.0 348.5 385.5 399.5
1.0 60.5 164.0 132.5 131.0 79.0 247.0 209.0 202.0
1.0 67.5 112.0 63.5 147.0 229.5 209.5 224.5 141.0
1.0 156.0 165.5 170.5 155.5 142.5 145.0 231.5 233.5
1.0 99.0 74.0 57.5 39.5 70.5 27.5 21.0 54.0
69.5 90.5 37.0 0.0 54.0 17.0 0.0 6.0 21.0
142.5 167.0 221.0 208.0 218.0 162.0 193.5 175.0 164.5
28.8 42.8 16.3 49.3 16.3 122.0 196.8 161.5 82.3
114.5 142.0 142.0 158.5 167.0 162.0 125.0 114.5 100.0
54.3 11.8 -15.3 -2.3 18.8 71.5 251.3 40.0 31.8
61.5 82.0 88.5 73.0 89.0 90.5 82.5 78.5 69.5
228.5 294.5 308.5 323.0 316.5 298.0 308.5 360.0 286.5
95.0 107.5 117.0 121.0 134.0 122.0 109.0 120.0 61.0
248.0 301.5 297.0 293.0 286.0 134.0 98.5 92.0 95.5
276.0 336.0 362.0 370.5 375.0 344.0 280.5 318.0 269.5
-121.5 -116.5 -91.0 -118.5 -122.0 -114.5 -356.5 -75.0 4.0
2024.5 2971.0 3428.0 3325.5 3478.0 3478.5 3310.0 3803.5 3390.0
2357.0 2971.0 3428.0 3325.5 3478.0 3478.5 3310.0 3803.5 3390.0
26
8.6
COSTO DE PLANILLA
TOTAL DE HH
INCIDENCIA
a la fecha
7,514 8.27% 103,656
1,946 2.14% 26,838
2,232.5 2.46% 30,797
4,086 4.50% 56,367
5,377 5.92% 74,169 2,995.5 49362.19 469
2,248 2.48% 31,011 143.0 2356.466 275
6,692 7.37% 92,316 985
5,333 5.87% 73,562 547
2,923 3.22% 40,323 278
2,887 3.18% 39,826 270
5,052 5.56% 69,693
1,537 1.69% 21,196
1,514 1.67% 20,879
4,985 5.49% 68,761 103
1,523 1.68% 21,010
2,418 2.66% 33,356
3,895 4.29% 53,725 101
2,775.5 3.06% 38,288
8,358.5 9.20% 115,306
5,947 6.55% 82,032
3,444 3.79% 47,503
8,577 9.44% 118,320
-447 -0.49% -6,159
90813.5 1.0 1,252,775.52 50178.5
91146.0 62001.5
Inicio: MAR 2013
Término: 30/04/2015
INFORME DE COSTOS EDIFICIO BARLOVENTO Avance: 95.43% MAY '14
PRESUPUESTO GG no Inc. en OBVIACIONES OBRAS Presupuesto Gasto Real Gasto Real Avance Según Proyec. Saldo Est. de Pago Resultado Resultado DIF Resultado
ITEMS DE COSTO DIRECTO DE OBRA CD CD PPTO OBRA ADICIONALES TOTAL del Mes Acumulado Est. de Pago Real p/Gastar Por Efectuar MAY 14 ABR 14 MAY - ABR analisis por cta
100 OBRAS PRELIMINARES E INSTALACION DE F 1,485,374 1,485,374 1,372,467 2,701,155 1,669,594 30,453 -184,220 -1,246,235 -375,096 -871,139 - 1,109,878.40
110 DEMOLICION Y SOSTENIMIENTO 1,888,770 154,954 2,043,724 28,910 1,855,205 1,936,383 -24,000 107,341 212,519 245,712 -33,193 212,518.98
120 MOVIMIENTO DE TIERRAS 1,385,963 - 1,385,963 - 1,600,081 1,371,955 - 14,008 -214,118 -214,118 - - 214,117.96
130 HORMIGON 4,433,328 4,433,328 2,956,548 5,790,734 4,443,676 -0 -10,348 -1,357,406 -351,849 -1,005,557 - 636,381.31
150 MOLDAJES 2,049,265 2,049,265 2,201,761 3,436,348 2,049,265 75,036 - -1,462,119 -14,673 -1,447,446 - 1,255,696.15
160 ACERO 3,446,852 3,446,852 2,591,635 4,573,953 3,446,852 0 - -1,127,102 207,925 -1,335,027 - 41,543.90
170 ESTRUCTURAS DE ACERO (DISIPADORES) 1,032,395 1,032,395 1,253,767 108,000 103,566 924,395 -324,938 -39,862 -285,076 - 199,920.73
200 ESTUCOS, YESOS, AFINADOS 603,572 603,572 830,954 1,102,212 784,796 19,328 -181,224 -517,968 18,509 -536,477 - 377,315.62
210 TABIQUES Y ALBAÑILERIA 1,448,070 1,448,070 2,039,914 2,113,622 1,448,070 106,399 - -771,951 -25,935 -746,016 - 693,279.41
230 REVESTIMIENTOS 242,843 242,843 354,088 354,088 - 40,380 242,843 -151,625 31,270 -182,895 - 54,809.97
250 CERÁMICA 297,133 297,133 381,200 381,200 557,547 9,881 -260,414 -93,948 - -93,948 - 93,947.74
270 CIELOS 150,186 150,186 167,432 167,432 150,186 1,340 0 -18,586 0 -18,586 - 17,816.00
280 PAVIMENTOS 370,870 370,870 107,662 199,579 111,999 33,421 258,870 137,870 107,273 30,597 180,559.49
290 CERRAJERIA Y PUERTAS DE MADERA 297,579 297,579 231,895 231,895 294,603 720 2,976 64,964 45,244 19,721 76,089.47
300 PINTURAS 675,287 675,287 681,524 681,524 668,534 43,392 6,753 -49,629 187,864 -237,494 - 46,790.14
310 ARTEFACTOS SANITARIOS, GRIFERIA Y MUEB 132,572 132,572 141,084 141,084 112,482 -0 20,090 -8,512 - -8,512 - 8,511.80
320 MUEBLES FIJOS 181,360 181,360 250,663 250,663 180,762 27,263 598 -96,567 - -96,567 - 72,093.56
330 ESTRUCTURAS METALICAS 522,112 522,112 543,612 543,612 1,444,546 25,497 -922,434 -46,997 - -46,997 55,971.55
340 ALUMINIOS Y MURO CORTINA 2,414,806 137,267 2,552,074 2,194,189 2,194,189 1,782,250 1,033,207 769,824 -675,323 -656,142 -19,181 - 675,322.95
350 INSTALACIONES SANITARIAS Y GAS 779,327 779,327 542,764 748,892 779,327 93,182 - -62,748 -61,244 -1,503 - 17,275.76
360 INST. ELECTRICA 2,861,335 595,049 3,456,384 3,153,577 3,220,040 3,918,676 537,887 -462,293 -301,543 300,583 -602,125 251,003.32
370 CORRIENTES DEBILES (CCTV) 212,348 212,348 187,375 187,375 148,643 29,968 63,704 -4,996 -4,996 - - 4,995.65
380 SEG., CONTROL, DET., EXT. Y AUDIOEVACUA 1,669,733 1,669,733 1,377,208 1,377,208 1,607,502 468,850 62,230 -176,326 -22,098 -154,228 - 12,744.45
390 SISTEMA EXTRACCION DE BASURAS 53,200 53,200 39,960 39,960 53,200 13,240 - - - - -
410 ASCENSORES 2,343,808 219,046 2,562,854 2,360,966 2,360,966 1,469,120 704,598 1,093,733 -502,711 -146,600 -356,111 - 261,656.81
420 POSTENSADO 2,427,068 2,427,068 1,695,420 2,433,061 2,427,068 0 - -5,993 22,718 -28,711 - 5,993.09
440 SEÑALETICA 26,975 26,975 14,943 14,943 - 12,032 26,975 - 1,975 -1,975 -
450 CLIMATIZACION, PRESURIZACION Y EXTRAC 2,637,485 2,637,485 1,775,482 1,775,482 2,558,361 484,402 79,125 377,601 403,863 -26,262 564,773.02
460 OBRAS EXTERIORES 17,002 17,002 108,923 108,923 132,165 0 -115,163 -91,920 - -91,920 - 83,229.92
470 VARIOS - - - - - - - - - -
-
-
TOTAL COSTO DIRECTO 36,086,616 - 1,106,316 37,192,931 28,332,155 41,839,191 35,655,562 3,870,045 1,537,369 -8,516,305 -339,678 -8,176,627 - 4,542,405
TOTAL GG inc en CD 4,684,933 3,503,185 - 8,188,118 7,613,222 11,050,524 7,651,185 468,292 536,933 -3,330,699 -267,172 -3,063,527 - 3,124,541.77
TOTAL GG 40,771,548 3,503,185 1,106,316 45,381,049 35,945,378 52,889,716 43,306,747 4,338,337 2,074,302 -11,847,004 -606,850 - 7,666,947.26
UTILIDAD ESTIMADA 3,063,476 3,063,476 3,063,476
REAJUSTE DE CONTRATO -
INGRESOS FINANCIEROS - - -
EMPRESA REAL
PLANILLA DE SUPERVISIÓN
DIRECCIÓN
SAUL YABAR 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0
INGENIERO RESIDENTE 26,100.00 26,100.00 26,100.00 20,300.00 413,250.00 26,100.00 26,100.00 26,100.00 26,100.00 26,100.00 26,100.00 13,050.00 169,650
RAFAEL RUIZ 0.00 1.00 1.00 1.00 1.00 1.00 0
JEFE DE CAMPO 13,775.00 13,775.00 13,775.00 13,775.00 313,200.00 13,775.00 13,775.00 13,775.00 13,775.00 13,775.00 0.00 68,875
SANDRA CHIRINOS (CAP) 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0
ARQUITECTO DE ACABADOS 5,800.00 5,800.00 5,800.00 5,800.00 69,600.00 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 2,900.00 43,500
ALEX VILLAJUAN 0.00 1.00 1.00 1.00 1.00 1.00 0.50 0
INGENIERO DE INSTALACIONES 10,875.00 10,875.00 10,875.00 10,875.00 212,425.00 10,875.00 10,875.00 10,875.00 10,875.00 10,875.00 5,437.50 59,813
GUILLERMO TEMOCHE 0.00 1.00 1.00 1.00 1.00 1.00 0
MAESTRO DE ACABADOS 3,160.79 4,028.57 7,189.36 7,189.36 8,366.93 141,956.21 7,189.36 7,189.36 7,189.36 7,189.36 7,189.36 0.00 35,947
SANCHEZ RAMOS ENMANUEL 0.00 1.00 1.00 1.00 1.00 1.00 0
ASISTENTE DE PRODUCCION 1 3,160.79 1,071.43 4,232.22 4,232.22 6,852.76 114,542.04 4,232.22 4,232.22 4,232.22 4,232.22 4,232.22 0.00 21,161
HURTADO HERNANDEZ PAUL 0.00 1.00 1.00 0
ASISTENTE DE PRODUCCION 2 3,160.79 750.00 3,910.79 3,910.79 5,893.19 87,800.84 3,910.79 3,910.79 0.00 0.00 0.00 0.00 7,822
JORGE ESTRADA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ASISTENTE DE INSTALACIONES 3,160.79 1,500.00 4,660.79 4,660.79 4,647.19 17,218.94 4,660.79 4,660.79 4,660.79 4,660.79 4,660.79 4,660.79 4,660.79 4,660.79 4,660.79 41,947
SUBTOTAL DIRECCIÓN 76,543.16 76,510.07 1,369,993.03 76,543.16 76,543.16 72,632.37 72,632.37 72,632.37 41,998.29 23,510.79 7,560.79 4,660.79 448,714.09
PRODUCCION 0
DIPAZ ALARCON ENRIQUE 1.00 1.00 1.00 1.00 1.00 0
CAPATAZ ACABADOS 3,160.79 1,285.71 4,446.50 4,446.50 6,892.78 47,213.54 4,446.50 4,446.50 4,446.50 4,446.50 4,446.50 0.00 22,233
MOLINA CARRASCO JESUS 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0
CAPATAZ TERMINACIONES 3,160.79 1,285.71 4,446.50 4,446.50 6,892.78 47,213.54 4,446.50 4,446.50 4,446.50 4,446.50 4,446.50 4,446.50 2,223.25 28,902
CHUQUILIN CHUQUILIN RAUL 0.00 1.00 0.50 0
CAPATAZ DRYWALL 3,160.79 2,271.43 5,432.22 5,432.22 3,910.97 4,846.33 5,432.22 2,716.11 0.00 0.00 0.00 0.00 8,148
PERALTA HUAMANI, MATEO GONZALO 0.00 1.00 1.00 1.00 1.00 1.00 0
ELECTRICISTA 1 3,160.79 1,285.71 4,446.50 4,446.50 7,869.35 139,747.12 4,446.50 4,446.50 4,446.50 4,446.50 4,446.50 0.00 22,233
SEBASTIAN CHACON LUIS ENRIQUE (OF) 1.00 1.00 1.00 1.00 1.00 1.00
ELECTRICISTA 2 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 14,962
INGA DONAYRE ROBERTO CARLOS 1.00 1.00 0
RIGGER 1 3,160.79 1,500.00 4,660.79 4,660.79 5,093.40 90,354.92 4,660.79 4,660.79 0.00 0.00 0.00 0.00 9,322
SAENZ COLLAO DANIEL ENRIQUE 1.00 1.00 0
RIGGER 2 3,160.79 642.86 3,803.65 3,803.65 5,507.63 80,604.74 3,803.65 3,803.65 0.00 0.00 0.00 0.00 7,607
HUAYANAY LLIUYACC SILVIO 1.00 0
TOPOGRAFO 1 3,160.79 1,714.29 4,875.08 4,875.08 6,453.77 121,638.47 4,875.08 0.00 0.00 0.00 0.00 0.00 4,875
BECERRA YALAN JORGE LUIS 1.00 1.00 1.00 1.00 1.00 1.00 0
TOPOGRAFO 2 3,160.79 857.14 4,017.93 4,017.93 6,453.77 121,638.47 4,017.93 4,017.93 4,017.93 4,017.93 4,017.93 4,017.93 24,108
MOLINA FLORES EDWIN JOEL 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
TAREADOR 2,387.10 2,387.10 2,387.10 0.00 0.00 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 19,097
SANDOVAL SANTA CRUZ, LUIS SERGIO (OP)
OPERADOR DEL ELEVADOR 1 3,160.79 428.57 3,589.36 3,589.36 4,671.74 12,026.49 0.00 0.00 0.00 0.00 0.00 0.00 0
SALDAÑA BOZA PERCY (AY) 1.00 1.00 1.00 1.00
OPERADOR DEL ELEVADOR 2 2,387.10 2,387.10 2,387.10 0.00 0.00 2,387.10 2,387.10 2,387.10 2,387.10 0.00 0.00 9,548
TEJEDA JUAREZ HUMBERTO RICARDO (OF) 1.00 1.00 1.00 1.00
OPERADOR DEL ELEVADOR 3 2,584.41 428.57 3,012.98 3,012.98 3,725.84 9,485.31 3,012.98 3,012.98 3,012.98 3,012.98 0.00 0.00 12,052
VASQUEZ SILVA, CARLOS ROBERTO 1.00 1.00
BOMBERO 3,160.79 1,714.29 4,875.08 4,875.08 0.00 4,875.08 4,875.08 0.00 0.00 0.00 0.00 9,750
SUBTOTAL PRODUCCION 52,381 57,472 674,769 51,285 43,694 27,638 27,638 22,238 13,345 4,610 2,387 0 192,836.67
OFICINA TECNICA 0
WALTER HUAYNATE 0
K JEFE DE OFICINA TECNICA 12,325.00 12,325.00 12,325.00 12,325.00 239,250.00 0.00 0.00 0.00 0.00 0.00 0.00 0
WENDHELT CAMONES 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 0
K INGENIERO DE COSTOS 8,700.00 8,700.00 8,700.00 6,525.00 121,800.00 6,525.00 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00 4,350.00 63,075
NORIEGA VIERA JIM 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0
K ASISTENTE DE OT 2,387.10 2,387.10 2,387.10 2,609.88 10,080.89 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 2,387.10 16,710
TONY MINAYA / MARCO 0.00 0.50 1.00 1.00 1.00 0
K CADISTA 2,493.70 2,493.70 0.00 1,246.85 2,493.70 2,493.70 2,493.70 8,728
SUBTOTAL OFICINA TECNICA 23,412 21,460 371,131 8,912 11,087 11,087 12,334 13,581 13,581 13,581 4,350 0 0 0 88,512.65
DEPARTAMENTO DE CALIDAD 0
OMAR RAMOS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0
K JEFE DE CALIDAD 9,425.00 9,425.00 9,425.00 8,700.00 178,350.00 9,425.00 9,425.00 9,425.00 9,425.00 9,425.00 9,425.00 9,425.00 65,975
CARRANZA BERMUDEZ FEDERICO (OP) 1.00 0
K TECNICO EN CONTROL DE MATERIALES 3,160.79 3,160.79 3,160.79 8,087.25 88,073.61 3,160.79 0.00 0.00 0.00 0.00 0.00 3,161
0.00 0.00 0
K EN BLANCO 0.00 0.00 0
SUBTOTAL CALIDAD 12,586 16,787 266,424 12,586 9,425 9,425 9,425 9,425 9,425 9,425 0 0 69,135.79
PDRGA 0
VICTOR BARCENA 1.00 1.00 1.00 1.00 1.00 0
K JEFE DE PDR 8,700.00 8,700.00 8,700.00 8,700.00 200,100.00 8,700.00 8,700.00 8,700.00 8,700.00 8,700.00 0.00 43,500
APAZA DE LA CRUZ LUIS (OP) 1.00 1.00 1.00 1.00 1.00 1.00
PDR1 3,160.79 771.43 3,932.22 3,932.22 6,004.59 49,610.10 3,932.22 3,932.22 3,932.22 3,932.22 3,932.22 3,932.22 23,593
ZAPATA OLIVARES, WILMER (OP) 1.00 1.00 1.00 1.00 1.00 1.00
PDR2 3,160.79 514.29 3,675.08 3,675.08 4,677.88 89,486.24 3,675.08 3,675.08 3,675.08 3,675.08 3,675.08 3,675.08 22,050
DIAZ ALIAGA JESUS (OP) 1.00 0.50
PDR 3 3,160.79 514.29 3,675.08 3,675.08 4,015.27 72,184.01 3,675.08 1,837.54 0.00 0.00 0.00 0.00 5,513
BARCENA MUÑANTE JEANETTE MARCELL (OF) 1.00 1.00 1.00 1.00 1.00
PDR 4 2,493.70 2,493.70 2,493.70 2,737.85 30,614.58 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 0.00 12,468
ORMEÑO LEGUA, PEDRO DANIEL (OP) 1.00 1.00 1.00
PDR 5 3,160.79 3,160.79 3,160.79 4,450.87 30,116.57 3,160.79 3,160.79 3,160.79 0.00 0.00 0.00 9,482
RONCAL ALIAGA MILUSKA (AY) 1.00 0.50
PDR 6 2,387.10 2,387.10 2,387.10 2,489.05 3,452.27 2,387.10 1,193.55 0.00 0.00 3,581
SUBTOTAL PDRGA 28,024 33,076 475,564 28,024 24,993 21,962 18,801 18,801 7,607 0 0 0 120,187.90
ADMINISTRACION 0
CESAR YANA 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0
ADMINISTRADOR DE OBRA 5,800.00 5,800.00 5,800.00 5,800.00 133,400.00 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 5,800.00 40,600
YOVERA CASTRO KAREN (OF) 0.00 0.00 1.00 1.00 1.00 0
ASISTENTE ADMINISTRATIVO 2,493.70 128.57 2,622.27 2,622.27 3,222.13 26,533.10 2,622.27 2,622.27 2,622.27 0.00 0.00 0.00 7,867
TUCTO REMUNDO, SOTERO DANTE (OF) 1.00 1.00 1.00 1.00 1.00 0
MENSAJERO 2,493.70 2,493.70 2,493.70 2,538.04 49,084.25 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 0.00 12,468
0.00 0.00 0
K EN BLANCO 0.00 0.00 0
SUBTOTAL ADMINISTRACION 10,916 11,560 209,017 10,916 10,916 10,916 8,294 8,294 5,800 5,800 0 0 60,935.31
LOGISTICA 0
EDGAR SALAZAR 1.00 1.00 1.00 1.00 1.00 0
K JEFE DE LOGISTICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
BALDEON PALACIOS CARLOS (OP) 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0
K JEFE DE ALMACEN 3,160.79 857.14 4,017.93 4,017.93 4,198.39 49,666.67 4,017.93 4,017.93 4,017.93 4,017.93 4,017.93 4,017.93 4,017.93 28,126
ZEGARRA AHUANARI CARLOS (AY) 1.00 1.00 0
K ASISTENTE DE ALMACEN 1 2,387.10 2,387.10 2,387.10 2,489.05 28,402.25 2,387.10 2,387.10 4,774
LOFONCIO MAYON ANTONY (OF) 0.00 1.00 1.00 1.00 1.00 1.00 0
K ASISTENTE DE ALMACEN 2 2,493.70 2,493.70 2,493.70 5,444.78 93,458.83 2,493.70 2,493.70 2,493.70 2,493.70 2,493.70 0.00 12,468
K EN BLANCO 0.00 0
SUBTOTAL LOGISTICA 8,899 12,132 171,528 8,899 8,899 6,512 6,512 6,512 4,018 4,018 0 0 45,368.23
TOTAL 212,761 228,997 3,538,425 197,165 185,557 160,172 155,636 151,483 95,775 60,945 14,298 4,661 1,025,691
RESULTADO OPERATIVO: TORRE BARLOVENTO
PERIODO ANTERIOR : MARZO 2014
PERIODO DE EVALUACION : ABRIL 2014
4,038,486.45
PRESUPUESTO DE OBRA
Total S/. Total S/. Total S/. Total S/. Total S/. Total S/. Total S/.
TOTAL DE
RESULTADO MONTO POR GASTAR - COSTO RESULTADO OPERATIVO
INGRESOS A LA COSTO ACTUAL %
OPERATIVO ACTUAL CPI ACTUAL PROVISION (NO INC FG) PROYECTADO FINAL PROYECTADO FINAL CPI FINAL
FECHA
Total S/. Total S/. AVANCE Total S/. Total S/. Total S/.
GASTOS CONTRATO
Poliza CAR 1 1 S/. 1.00 S/. 57,692.31 S/. 150,000.00
2.- PERSONAL
3.- COMUNICACION
ANDAMIOS 2 3000
Gerenciamiento (Back office) 1 36 S/. 30,000.00 S/. 11,538.46 S/. 1,080,000.00
T O T A L S/. 1,080,000.00
OBRAS COMPLEMENTARIAS
5.- GASTOS EN PERSONAL
T O T A L S/. 226,400.00
T O T A L S/. 157,285.45
OTROS
DESCRIPCION VALOR
RESUMEN CONJUNTA
VALOR S/.
2.8 PRESUPUESTO CONTRACTUAL
1.2.19 INSTALACION DE ALMACEN EN SOTANO DESPUES DE COTA 0 glb 1.00 28,440.00 28,440.00
###
5.1.3 Acabado Piso cemento (depósitos + cto bombas, máq+ cto m2 1,105.66 4.13 4,566.38
###
insta.)
5.1.4 Acabado de Piso de cemento (estacionamiento) m2 6,699.24 4.84 32,424.32
###
5.1.5 Acabado de Piso de cemento bruñado (rampa) m2 2,785.91 4.13 11,505.81
###
5.1.6 Topellantas und 315.00 54.50 17,167.50
###
5.2.1.5 Piso de cemento impermeabilizado (en cisternas + canaletas) m2 262.28 30.67 8,044.13
###
5.2.1.8 Piso de Marmol imperial (hall de ascensor de ingreso 1er m2 280.00 384.57 107,679.60
###
piso)
5.2.1.9 Piso de Marmol imperial (atrio de ingreso 1e piso) m2 68.70 384.57 26,419.96
###
5.2.1.10 Piso de Marmol imperial bruñado (rampa discapacitados 1er m2 5.45 395.90 2,157.66
###
piso)
5.2.3.3 Cz.de porcelanato pulido modelo city color negro marca ml 1,140.51 48.89 55,759.53
###
alcalagres formato. h = 0.10 m (hall ascensores + terrazas)
5.9.1.1 Puertas Metalicas del cto de bomba (1.84x2.10) 2 hojas und 2.00 1,160.00 2,320.00
###
5.9.1.2 Puertas Metalicas del cto de bomba (1.84x2.10) 2 hojas und 1.00 2,080.00 2,080.00
###
5.9.1.3 Puertas Metalicas Tipo PCF (1.00x2.10) escaleras und 76.00 1,550.00 117,800.00
###
5.9.1.4 P- Puertas Metalicas Doble hoja (1.60x2.10 m.) und 1.00 1,700.00 1,700.00
###
5.9.1.5 P-3 Malla metálica grupo electrógeno (2.05x1.80) und 1.00 800.00 800.00
###
5.9.1.6 V-1 ventana de inspección de cisterna (2.00x0.60m.) und 3.00 560.00 1,680.00
###
5.9.1.7 Ventana de ducto de instalaciones sanitarias (1.80x?) und 1.00 1,076.00 1,076.00
###
5.9.1.8 R-1 Rejilla en escalera 0.60x0.30m. und 63.00 85.00 5,355.00
###
5.9.1.9 Rejilla en escalera 0.50x0.30m. und 9.00 75.00 675.00
###
5.9.1.10 Rejilla en cto de maquina piso 32 (1.00x0.40m.) und 4.00 180.00 720.00
###
5.9.2.3 Baranda de hall de deposito (eje B-2, sótano 1) tubo de Ø 2" ml 3.55 91.00 323.05
###
5.9.2.4 Baranda de acero inoxidable de Ø 2" (en rampa peatonal) ml 3.00 351.00 1,053.00
###
5.9.4.3 Trampa metálica 1.20x1.20m. (cto de máquina piao 22 y 32) und 1.00 720.00 720.00
###
5.9.4.8 Porta bandejas en atención de mensajería - 1er piso long.= und 2.00 300.00 600.00
###
0.60m. A=0.30m.
5.9.4.9 Celosia métalica quiebravista (en el piso 32) h=1.65m. und 28.90 395.20 11,421.28
###
5.9.4.10 Barra de discapacitados en ss.hh und 98.00 205.00 20,090.00
###
5.10.2 Lavatorio de baja encimera maxbell marca trebol o vainsa und 191.00 68.50 13,083.50
###
ocean
5.10.3 Lavatorio manantial c/ pedestal universal und 1.00 69.47 69.47
###
5.10.4 Lavatorio fontana und 49.00 29.04 1,422.96
###
Urinario modelo cadet-color blanco-con valvula flux -trebol o
5.10.5 similar und 97.00 294.38 28,554.86
###
6 INSTALACIONES ###
6.1 INSTALACIONES SANITARIAS glb 1.00 779,326.58 779,326.58
###
6.2 PROTECCION CONTRA INCENDIO glb 1.00 1,167,376.00 1,167,376.00
###
6.3 INSTALACIONES ELECTRICAS glb 1.00 2,361,335.00 2,361,335.00
###
6.4 GRUPO ELECTROGENO glb 1.00 330,000.00 330,000.00
###
6.5 EQUIPOS DE ILUMINACION glb 1.00 170,000.00 170,000.00
###
6.6 MURO CORTINA glb 1.00 1,898,251.03 1,898,251.03
###
6.7 INSTALACIONES MECANICAS glb 1.00 2,637,485.40 2,637,485.40
###
6.8 ASCENSORES glb 1.00 2,343,808.00 2,343,808.00
###
6.9 BASURAS glb 1.00 53,200.00 53,200.00
###
6.10 SEGURIDAD (AUTOMATIZACION ?) glb 1.00 274,500.00 274,500.00
###
6.11 SISTEMA DE CCTV (CORR. DEBILES) glb 1.00 212,347.80 212,347.80
###
6.12 SISTEMA DE ACCESOS glb 1.00 169,406.73 169,406.73
###
Saldo Final
0
ACUM ENERO 15 42036 42064 42095 42125 42156
(2,000,000)
(4,000,000)
(6,000,000)
(6,953,736)
(7,780,092)
(8,000,000)
(7,780,092)
(10,000,000)
(11,972,013)
(12,000,000) (10,974,252)
(12,526,324)
(14,000,000)
TORRE BARLOVENTO
Acumulado de Proyectos - FLUJO ECONOMICO
Expresado en Nuevos Soles
Al 2/18/2015
COSTO DIRECTO (INC ADIC+BRECHAS) 53,204,526 37,775,068 3,086,248 3,803,028 4,623,671 2,282,155 1,667,805
43,622,616 30,256,139 3,086,248 3,363,745 4,623,671 1,164,721 1,161,541
Saldo Final
0
ACUM ENERO 15 42036 42064 42095 42125 42156
(1,000,000)
(2,000,000)
(2,050,166)
(3,000,000)
(4,000,000)
(4,588,578) (4,431,290)
(5,000,000) (4,668,262)
(5,218,906)
(6,000,000)
(6,315,539)
(7,000,000)
PC EI Rubro Partida Und Cant Precio Parcial PU x Rubro Sub - Total
OBRAS PREVIAS ###
SEGUROS Y GARANTIAS 1.00 19,250.00 19,250.00
0601
Mano de Obra 0.00
0601
Equipos 0.00
0601
Materiales 0.00
0601
Subcontratos 19,250.00
0601
Examenes ocupacionales und 550.000 35.00 19,250.00
0601
OBRAS PROVISIONALES 674,049.47
RED PROVISORIA AGUA Y ALCANTARIA glb 1.00 12,300.00 12,300.00
0101
Mano de Obra 0.00
0101
Equipos 0.00
0101
Materiales 12,300.00
0101
Empalme Agua Potable gl 1.00 6,500.00 6,500.00
0101
Empalme Alcantarillado gl 1.00 5,800.00 5,800.00
0101
0101 Subcontratos 0.00
Subcontratos 0.00
0610
MOBILIARIO PARA SALA DE REUNION glb 1.000 3,620.00 3,620.00
0610
0610 Mano de Obra 0.00
CONCRETO 4,891,603.62
CONCRETO PREMEZCLADO F´c= 500 kg/cm2 2,090.000 427.40 893,266.00
Mano de Obra 72,543.90
Operario hh 0.900 16.44 14.80 30,932.00
0133
Oficial hh 0.600 14.11 8.47 17,702.30
0133
Peón hh 0.900 12.71 11.44 23,909.60
0133
Equipos 70,203.10
Bomba de concreto m3 1.050 31.00 32.55 68,029.50
0132
Herramientas hh 0.347 3.00 1.04 2,173.60
0133
Material 750,519.00
Concreto premezclado f´c=500kg/cm2 m3 1.050 342.00 359.10 750,519.00
0131
Subcontratos 0.00
ENCOFRADO 2,150,702.47
Moldajes de Fundaciones 160.000 31.79 5,086.40
Mano de Obra 2,766.40
0153
Operario hh 0.640 16.44 10.52 1,683.20
0153
Peón hh 0.533 12.71 6.77 1,083.20
0153
Equipos 83.20
0153
Herramientas hh 0.173 3.00 0.52 83.20
0153
Material 604.80
0152
Clavos corrientes 2"x12 (caja kg 0.100 2.84 0.28 44.80
0152
Materiales varios gl 3.500 1.00 3.50 560.00
0152
Subcontratos 1,632.00
0151
subc arriendo de moldaje m2 1.000 10.20 10.20 1,632.00
0151
ACERO 3,567,234.00
Acero 1,077,830.000 3.19 3,438,277.70
Mano de Obra 797,594.20
0162
Operario hh 0.030 16.44 0.49 528,136.70
0162
Oficial hh 0.018 14.11 0.25 269,457.50
0162
Equipos 21,556.60
0162
Herramientas hh 0.007 3.00 0.02 21,556.60
0162
Material 2,619,126.90
0161
alambre negro nac #16 kg 0.030 2.80 0.08 86,226.40
0163
Acero corrugado fy=4200kg/cm2 (Grado 60) kg 1.020 2.30 2.35 2,532,900.50
0161
Subcontratos 0.00
TABIQUES 1,348,897.19
Muro de e=10cm 139.880 64.00 8,952.32
0211
Mano de Obra 0.00
0211
Equipos 0.00
0211
Material 3,566.94
0211
Plancha Panel rey RH 1.22*2.44+12.7mm(1/2") m2 1.100 13.80 15.18
0211
Perfil de drywall para muro de 10cm m2 1.100 9.38 10.32
0211
Subcontratos 5,385.38
0211
Subc Tabiques m2 1.000 30.00 30.00
0211
tratamiento de juntas ml 1.000 8.50 8.50
0211
Acabado Piso cemento (depósitos + cto bombas, máq+ cto insta.) 1,105.660 4.13 4,566.38
0282
Mano de Obra 2,996.34
0282
Operario hh 0.160 16.44 2.63
0282
Herramientas hh 0.026 3.00 0.08
0282
Equipos 0.00
0282
Material 1,570.04
0282
Cemento tipo portland Tipo I (42,5kg) bls 0.100 14.21 1.42
0282
Subcontratos 0.00
0282
Piso de Marmol imperial (hall de ascensor de ingreso 1er piso) 280.000 384.57 107,679.60
0231
Mano de Obra 0.00
0231
Equipos 0.00
0231
Material 0.00
0231
Subcontratos 107,679.60
0231
Suministro e instalación marmol imperial m2 1.070 359.41 384.57
0231
Piso de Marmol imperial (atrio de ingreso 1e piso) 68.700 384.57 26,419.96
0231
Mano de Obra 0.00
0231
Equipos 0.00
0231
Material 0.00
0231
Subcontratos 26,419.96
0231
Suministro e instalación marmol imperial m2 1.070 359.41 384.57
0231
Piso de Marmol imperial bruñado (rampa discapacitados 1er piso) 5.450 395.90 2,157.66
0231
Mano de Obra 0.00
0231
Equipos 0.00
0231
Material 2,157.66
0231
Granito cafe imperial m2 1.070 370.00 395.90
0231
Subcontratos 0.00
0231
Zocalos 141,581.93
Ceramico 30x30 america blanco 58.700 43.12 2,531.14
0251
Mano de Obra 0.00
0251
Equipos 0.00
0251
Material 1,533.24
0251
Ceramico 30x30 america blanco m2 1.100 18.27 20.10
0251
Pegamento celima o similar bls 0.250 20.00 5.00
0251
fragua bls 0.200 5.10 1.02
0251
Subcontratos 997.90
0251
Instalación de ceramica m2 1.000 17.00 17.00
0251
Piso de madera marca shaw (En S.U.M 1er piso) 76.750 116.05 8,906.84
0281
Mano de Obra 0.00
0281
Equipos 0.00
0281
Material 0.00
0281
Subcontratos 8,906.84
0281
Piso de madera marca shaw m2 1.100 105.50 116.05
0281
Contrazocalos 66,282.73
Cz. de cerámico h:15cm serie granilla color gris marca celima o similar (cto acopio de 25.580 14.79 378.33
0251 basura)
Mano de Obra 0.00
0251
Equipos 0.00
0251
Material 0.00
0251
Subcontratos 378.33
0251
Cz. de cerámico h:15cm serie granilla color gris(cto acopio de basura) ml 1.020 14.50 14.79
0251
Cz. cerámico 30 x 30 serie granilla color blanco marca celima o similar h:.15 (Cto, 88.930 14.62 1,300.16
0251 vigilante, atención mensajería, of. C
Mano de Obra 0.00
0251
Equipos 0.00
0251
Material 0.00
0251
Subcontratos 1,300.16
0251
Cz. cerámico 30 x 30 serie granilla color blanco h:.15 (Cto, vigilante, atención mensajería) ml 1.000 14.62 14.62
0251
Cz.de porcelanato pulido modelo city color negro marca alcalagres formato. h = 0.10 1,140.510 48.89 55,759.53
0252 m (hall ascensores + terrazas)
Mano de Obra 0.00
0252
Equipos 0.00
0252
Material 44,354.43
0252
Cz porc. pulido modelo city color negro alcagres ml 1.010 38.50 38.89
0252
Subcontratos 11,405.10
0252
Enchape Contrazocalo ml 1.000 10.00 10.00
0252
FRC Baldosas Modelo ULTIMA marca armstrong(hall asc 1-30) 1,286.800 81.63 105,041.48
0271
Mano de Obra 0.00
0271
Equipos 0.00
0271
Material 81,879.08
0271
Baldosas de fibra mineral Modelo Olympia m2 1.010 63.00 63.63
0271
Subcontratos 23,162.40
0271
Instalación de Baldosas m2 1.000 18.00 18.00
0271
PUERTAS 297,579.00
P-1 (1x 2.1m) 5.000 610.00 3,050.00
0291
Mano de Obra 0.00
0291
Equipos 0.00
0291
Material 0.00
0291
Subcontratos 3,050.00
0291
Puerta Madera 1x2.1m und 1.000 610.00 610.00
0291
Ventanas 148,284.34
v-1 (2 x 0.6 m) 3.000 137.90 413.70
0341
Mano de Obra 0.00
0341
Equipos 0.00
0341
Material 0.00
0341
Subcontratos 413.70
0341
v-1 (2 x 0.6 m) und 1.000 137.90 137.90
0341
Baranda de hall de deposito (eje B-2, sótano 1) tubo de Ø 2" 3.550 91.00 323.05
0331
Mano de Obra 0.00
0331
Equipos 0.00
0331
Material 0.00
0331
Subcontratos 323.05
0331
Sum e inst baranda y pasamanosde acero 2" ml 0.700 130.00 91.00
0331
Baranda de acero inoxidable de Ø 2" (en rampa peatonal) 3.000 351.00 1,053.00
0331
Mano de Obra 0.00
0331
Equipos 0.00
0331
Material 0.00
0331
Subcontratos 1,053.00
0331
Sum e inst baranda y pasamanosde acero 2" ml 2.700 130.00 351.00
0331
Varios 155,530.48
Rejillas Metalicas en piso 455.000 164.47 74,833.85
0333
Mano de Obra 0.00
0333
Equipos 0.00
0333
Material 0.00
0333
Subcontratos 74,833.85
0333
Rejillas Metalicas en piso m 1.000 164.47 164.47
0333
Trampa metálica 1.20x1.20m. (cto de máquina piao 22 y 32) 1.000 720.00 720.00
0333
Mano de Obra 0.00
0333
Equipos 0.00
0333
Material 0.00
0333
Subcontratos 720.00
0333
Trampa metálica 1.20x1.20m. (cto de máquina piao 22 y 32) und 1.000 720.00 720.00
0333
Reja metálica en ducto de inyección de aire en piso 3 (2.75x1.65m.) 1.000 1,100.00 1,100.00
0332
Mano de Obra 0.00
0332
Equipos 0.00
0332
Material 0.00
0332
Subcontratos 1,100.00
0332
Reja metálica en ducto de inyección de aire en piso 3 (2.75x1.65m.) und 1.000 1,100.00 1,100.00
0332
Porta bandejas en atención de mensajería - 1er piso long.= 0.60m. A=0.30m. 2.000 300.00 600.00
0334
Mano de Obra 0.00
0334
Equipos 0.00
0334
Material 0.00
0334
Subcontratos 600.00
0334
Porta bandejas en atención de mensajería - 1er piso long.= 0.60m. A=0.30m. und 1.000 300.00 300.00
0334
Celosia métalica quiebravista (en el piso 32) h=1.65m. 28.900 395.20 11,421.28
0334
Mano de Obra 0.00
0334
Equipos 0.00
0334
Material 0.00
0334
Subcontratos 11,421.28
0334
Celosia métalica quiebravista (en el piso 32) h=1.65m. m2 1.000 395.20 395.20
0334
Lavatorio de baja encimera maxbell marca trebol o vainsa ocean 191.000 68.50 13,083.50
0311
Mano de Obra 0.00
0311
Equipos 0.00
0311
Material 13,083.50
0311
Lavatorio ovalin gr.s/j STD blanco und 1.000 68.50 68.50
0311
Subcontratos 0.00
0311
Urinario modelo cadet-color blanco-con valvula flux -trebol o similar 97.000 294.38 28,554.86
0311
Mano de Obra 0.00
0311
Equipos 0.00
0311
Material 28,554.86
0311
Urinario trebol cadet un 1.000 294.38 294.38
0311
Subcontratos 0.00
0311
Llave de bronce de 1/2" con perilla metalica y regulador de chorro. eco trebol 2.000 32.60 65.20
0312
Mano de Obra 0.00
0312
Equipos 0.00
0312
Material 65.20
0312
Llave de 1/2" lavatorio cuerpo grande eco und 1.000 32.60 32.60
0312
Subcontratos 0.00
0312
Llave de lavatorio temporizado con aereador antivandalico Vainsa 238.000 125.05 29,761.90
0312
Mano de Obra 0.00
0312
Equipos 0.00
0312
Material 29,761.90
0312
LLAVE PRESION TEMP 13704000 C/A ANTIB MU und 1.000 125.05 125.05
0312
Subcontratos 0.00
0312
CLOSETS 145,763.37
CL 1.95x2.00m. 1.000 555.75 555.75
0321
Mano de Obra 0.00
0321
Equipos 0.00
0321
Material 0.00
0321
Subcontratos 555.75
0321
Subc. Closet ml 1.950 285.00 555.75
0321
INSTALACIONES ###
INSTALACIONES SANITARIAS 1.00 779,326.58 779,326.58
Mano de Obra 142,500.28
Operario hh 8,667.900 16.44 142,500.28 142,500.28
0351
Equipos 0.00
0351
Material 0.00
0351
Subcontratos 636,826.30
Suministo e instalacion para desague glb 1.000 230,119.00 230,119.00 230,119.00
0351
Suministro e instalacion sistema de agua glb 1.000 175,500.00 175,500.00 175,500.00
0351
Instalacion de aparatos sanitarios glb 1.000 30,000.00 30,000.00 30,000.00
0351
Sistema de bombas de agua y desague glb 1.000 201,207.30 201,207.30 201,207.30
0353
ENSAYOS 53,975.00
Prueba de rotura de probetas 3,400.000 12.50 42,500.00
0612
Mano de Obra 0.00
0612
Equipos 0.00
0612
Material 42,500.00
0612
Ensayo de probetas und 1.000 12.50 12.50
0612
Subcontratos 0.00
0612
DESCRIPCION PARCIAL (S/.) Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15
INGRESOS
COSTO DIRECTO 40,771,547.25 539,916.81 305,817.45 497,632.66 374,696.85 762,862.76 960,934.94 1,048,515.23 1,061,538.06 1,277,013.44 1,168,710.83 960,504.51 1,175,039.54 1,231,253.52 1,393,611.95 1,461,753.41 1,685,885.00 2,116,761.55 2,920,511.63 2,664,903.11 1,976,391.53 1,981,035.47 1,811,041.33 480,299.51 822,330.65 2,378,428.00 2,378,428.00 5,335,729.50
ADICIONALES 5,404,732.10 154,954.04 32,856.84 103,438.22 26,772.26 54,761.40 32,856.84 68,633.60 85,454.07 85,454.07 1,610,722.86 342,292.61 532,972.45 532,972.45 1,740,590.39
GASTOS GENERALES 3,503,185.45 46,390.90 26,276.54 42,757.75 32,194.82 65,546.93 82,565.75 90,090.85 91,209.80 109,723.94 100,418.33 82,528.76 100,962.11 105,792.14 119,742.36 125,597.23 144,681.56 181,877.04 251,304.78 228,974.63 169,816.12 170,215.14 155,608.85 41,268.44 70,656.55 204,360.02 204,360.02 458,264.09
UTILIDAD 3,063,476.00 40,568.05 22,978.39 37,390.92 28,153.82 57,319.67 72,202.34 78,782.91 79,761.42 95,951.72 87,814.12 72,170.00 88,289.64 92,513.43 104,712.65 109,832.64 126,673.34 159,048.37 219,440.22 200,234.41 148,501.31 148,850.24 136,077.29 36,088.55 61,787.95 178,709.36 178,709.36 400,913.88
DEDUCTIVOS - 0.00 0.00 0.00
SUB TOTAL 1 52,742,940.80 626,875.76 355,072.38 577,781.33 435,045.49 885,729.36 1,115,703.03 1,217,388.99 1,232,509.28 1,482,689.10 1,356,943.28 1,115,203.27 1,519,245.33 1,429,559.09 1,650,923.80 1,800,621.49 1,984,012.16 2,512,448.36 3,424,113.47 3,094,112.15 2,363,342.56 2,385,554.93 2,188,181.54 2,168,379.35 1,297,067.76 3,294,469.83 3,294,469.83 7,935,497.85
IGV 18.00% 9,493,729.34 112,837.64 63,913.03 104,000.64 78,308.19 159,431.29 200,826.55 219,130.02 221,851.67 266,884.04 244,249.79 200,736.59 273,464.16 257,320.64 297,166.28 324,111.87 357,122.19 452,240.70 616,340.43 556,940.19 425,401.66 429,399.89 393,872.68 390,308.28 233,472.20 593,004.57 593,004.57 1,428,389.61
TOTAL MENSUAL 739,713.40 418,985.41 681,781.97 513,353.68 1,045,160.65 1,316,529.57 1,436,519.01 1,454,360.95 1,749,573.14 1,601,193.07 1,315,939.86 1,792,709.49 1,686,879.73 1,948,090.08 2,124,733.36 2,341,134.35 2,964,689.06 4,040,453.90 3,651,052.33 2,788,744.22 2,814,954.81 2,582,054.22 2,558,687.64 1,530,539.96 3,887,474.40 3,887,474.40 9,363,887.47
AVANCE ACUMULADO 739,713.40 1,158,698.80 1,840,480.77 2,353,834.45 3,398,995.09 4,715,524.67 6,152,043.68 7,606,404.62 9,355,977.76 10,957,170.84 12,273,110.70 14,065,820.19 15,752,699.92 17,700,790.00 19,825,523.36 22,166,657.72 25,131,346.78 29,171,800.68 32,822,853.02 35,611,597.24 38,426,552.05 41,008,606.27 43,567,293.91 45,097,833.87 48,985,308.27 52,872,782.68 62,236,670.14
ACUMULADO -
AMORTIZACION DEL 10% SIN IGV -4,077,154.73 -53,991.68 -30,581.75 -49,763.27 -37,469.69 -76,286.28 -96,093.49 -104,851.52 -106,153.81 -127,701.34 -116,871.08 -96,050.45 -117,503.95 -123,125.35 -139,361.20 -146,175.34 -168,588.50 -211,676.16 -292,051.16 -266,490.31 -197,639.15 -198,103.55 -181,104.13 -48,029.95 -82,233.07 -237,842.80 -237,842.80 -533,572.95
ADELANTO 10% SIN IGV 4,077,154.73 4,077,154.73
TOTAL A PAGAR SIN IGV 52,742,940.80 4,650,038.80 324,490.63 528,018.06 397,575.80 809,443.09 1,019,609.53 1,112,537.47 1,126,355.47 1,354,987.76 1,240,072.20 1,019,152.82 1,401,741.38 1,306,433.74 1,511,562.60 1,654,446.15 1,815,423.66 2,300,772.21 3,132,062.31 2,827,621.84 2,165,703.41 2,187,451.38 2,007,077.41 2,120,349.40 1,214,834.70 3,056,627.03 3,056,627.03 7,401,924.90 0.00 0.00
COSTO DIRECTO (CD)+ BRECHAS 43,622,616.26 241,530.60 506,049.81 709,140.00 384,881.92 634,259.73 817,631.27 788,350.88 1,172,448.77 854,972.36 1,126,754.81 1,240,174.28 1,389,663.16 1,280,010.88 1,269,131.09 1,253,199.24 1,597,754.20 1,571,678.29 2,025,727.47 2,002,146.02 2,148,530.19 2,059,608.27 1,863,589.59 2,142,158.98 1,176,747.18 3,086,248.47 3,363,745.14 4,623,671.01 1,164,720.97 1,161,541.23
CD - ADELANTOS+BRECHAS 8,547,495.30 125,000.00 300,000.00 0.00 602,135.65 0.00 0.00 323,307.24 176,933.89 1,245,153.07 678,294.96 190,533.93 907,358.63 456,189.29 709,237.56 724,845.88 456,189.29 0.00 0.00 0.00 0.00 0.00 623,749.55 0.00 0.00 0.00 439,283.19 0.00 589,283.19 0.00
GASTOS GENERALES 4,190,213.58 80,135.60 127,978.00 121,716.80 121,711.78 145,895.48 152,809.60 154,746.57 156,793.22 153,748.78 162,838.89 160,252.27 178,965.35 172,857.17 174,976.21 180,761.75 179,195.02 177,306.92 1,808,022.59 116,160.73 118,232.49 117,909.81 112,861.05 117,478.00 118,343.13 128,537.79 121,769.37 143,087.14 98,968.45 216,443.98
FONDOS DE GARANTIA 1,034,414.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 528,151.00 506,263.76
SUB TOTAL 1 57,394,739.90 446,666.19 934,027.81 830,856.80 1,108,729.35 780,155.21 970,440.87 1,266,404.69 1,506,175.88 2,253,874.21 1,967,888.66 1,590,960.48 2,475,987.14 1,909,057.35 2,153,344.86 2,158,806.87 2,233,138.51 1,748,985.21 3,833,750.06 2,118,306.74 2,266,762.68 2,177,518.07 2,600,200.19 2,259,636.98 1,295,090.31 3,214,786.26 3,924,797.70 4,766,758.15 2,381,123.61 1,884,248.97
IGV 18.00% 10,331,053.18 80,399.91 168,125.01 149,554.22 199,571.28 140,427.94 174,679.36 227,952.84 271,111.66 405,697.36 354,219.96 286,372.89 445,677.68 343,630.32 387,602.07 388,585.24 401,964.93 314,817.34 690,075.01 381,295.21 408,017.28 391,953.25 468,036.03 406,734.66 233,116.26 578,661.53 706,463.59 858,016.47 428,602.25 339,164.82
TOTAL MENSUAL 67,725,793.09 527,066.11 1,102,152.81 980,411.03 1,308,300.63 920,583.14 1,145,120.23 1,494,357.53 1,777,287.54 2,659,571.56 2,322,108.62 1,877,333.36 2,921,664.82 2,252,687.67 2,540,946.93 2,547,392.11 2,635,103.44 2,063,802.55 4,523,825.07 2,499,601.96 2,674,779.96 2,569,471.33 3,068,236.23 2,666,371.64 1,528,206.56 3,793,447.78 4,631,261.28 5,624,774.62 2,809,725.86 2,223,413.79
AVANCE ACUMULADO 527,066.11 1,629,218.92 2,609,629.95 3,917,930.58 4,838,513.72 5,983,633.95 7,477,991.48 9,255,279.02 11,914,850.58 14,236,959.20 16,114,292.56 19,035,957.38 21,288,645.05 23,829,591.98 26,376,984.09 29,012,087.53 31,075,890.09 35,599,715.16 38,099,317.12 40,774,097.07 43,343,568.40 46,411,804.63 49,078,176.27 50,606,382.83 54,399,830.61 59,031,091.90 64,655,866.51 67,465,592.37 69,689,006.16
ACUMULADO
INGRESO - EGRESO 4,203,372.61 -609,537.17 -302,838.74 -711,153.54 29,287.88 49,168.66 -153,867.22 -379,820.41 -898,886.45 -727,816.46 -571,807.65 -1,074,245.76 -602,623.61 -641,782.26 -504,360.72 -417,714.85 551,786.99 -701,687.75 709,315.09 -101,059.27 9,933.31 -593,122.78 -139,287.58 -80,255.61 -158,159.22 -868,170.66 2,635,166.75 -2,381,123.61 -1,884,248.97
FLUJO DE CAJA 4,203,372.61 3,593,835.44 3,290,996.69 2,579,843.15 2,609,131.03 2,658,299.70 2,504,432.48 2,124,612.07 1,225,725.62 497,909.16 -73,898.50 -1,148,144.25 -1,750,767.86 -2,392,550.11 -2,896,910.83 -3,314,625.68 -2,762,838.69 -3,464,526.44 -2,755,211.35 -2,856,270.61 -2,846,337.31 -3,439,460.09 -3,578,747.67 -3,659,003.28 -3,817,162.51 -4,685,333.17 -2,050,166.41 -4,431,290.02 -6,315,539.00
P.U. 1 P.U. 2 P.U. 3 2,012 2013 2014 2015
ITEM DETALLE SOLES SOLES SOLES NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY
1 CARPINTEROS
2 AYUDANTES S/. 1,477.34 S/. 1,751.36 S/. 3,795.87 1 3 4 3 3 3 5 6 3 1 1 1 1 5 3 3 3 2 1
3 OFICIALES S/. 2,572.73 S/. 1,960.25 S/. 4,227.32 2 3 2 2 2 2 2 2 5 10 12 13 12 12 13 12 16 4 2 2 1 4 1 2 3 3
4 OPERARIOS S/. 3,621.59 S/. 2,315.85 S/. 4,752.52 2 2 3 3 3 4 4 4 6 9 11 12 15 14 15 19 20 9 4 5 3 1 6 5 6 6 6 3
5 CONCRETEROS
6 AYUDANTES S/. 2,438.87 S/. 2,001.55 S/. 3,795.87 1 3 4 4 4 5 5 5 7 7 6 7 7 6 6 5 6 6 5 5 5 4 5 3 1
7 OFICIALES S/. 3,295.42 S/. 2,053.59 S/. 4,227.32 2 4 4 4 4 5 5 4 4 4 3 4 4 3 2 2 2 2 2 2 2 3 2 3 2
8 OPERARIOS S/. 4,450.35 S/. 2,426.13 S/. 4,752.52 1 1 1 1 1 3 1 1 3 3 4 5 6 7 7 7 6 7 4 4
9 FIERREROS
10 AYUDANTES S/. 2,129.51 S/. 1,667.96 1 1 1 1
11 OFICIALES S/. 3,797.98 S/. 1,866.90 0 1 1 1 0
12 OPERARIOS S/. 3,233.63 S/. 2,205.57 1 1 2 2 2 3 3 1
13 ALBAÑILES
14 AYUDANTES S/. 2,588.26 S/. 1,667.96 S/. 2,769.57 1 0 1 3 2 1 2 2 2 3 3 4 6 8 7 7 7 4 2
15 OFICIALES S/. 3,283.51 S/. 1,866.90 S/. 3,078.17 1 1 1 1 1 1 1 3 3 3 3 2 1 3 5 3 2 3 3 3 3 3 2 1
16 OPERARIOS S/. 3,424.25 S/. 2,205.57 S/. 3,651.85 1 2 2 2 2 2 2 3 4 6 9 8 7 6 4 5 7 7 5 7 9 8 8 8 12 6
17 BOMBERO
18 OPERARIO S/. 2,885.23 S/. 2,205.57 S/. 5,774.58 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
19 TUBEROS
20 OFICIALES S/. 2,885.23 S/. 1,866.90 S/. 2,874.47 1 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1
21 OPERARIOS S/. 2,885.23 S/. 2,205.57 S/. 6,036.52 1 1 1 1 1 1 1 1 1 1
22 TOPOGRAFOS
23 AYUDANTES S/. 2,498.59 S/. 1,667.96 S/. 3,795.87 1 1 1 1 1 1 1 1 1 1 1 1 3 3 1 2 2 2 3 3 2 3 3 3 3 3 3 3
24 OFICIALES S/. 2,885.23 S/. 2,205.57 S/. 4,227.32 1 1 1 1 1 1 2 2 2 1 1
25 OPERARIOS S/. 3,198.67 S/. 2,205.57 S/. 4,752.52 1 1 1 1 1 1 2 2 2 2 2 2 1 2 2 2 2 2 1 1 1 1 1
DISIPADORES
AYUDANTES S/. 2,498.59 S/. 1,667.96 S/. 2,328.43
OFICIALES S/. 2,885.23 S/. 2,205.57 S/. 2,584.41 1 1 1 1
OPERARIOS S/. 3,198.67 S/. 2,205.57 S/. 3,046.01 1 2 2 1 1 1 1 1
ENCHAPADORES
AYUDANTES S/. 2,498.59 S/. 1,667.96 S/. 2,769.57
OFICIALES S/. 2,885.23 S/. 2,205.57 S/. 3,078.17 0 1 1 1 1 1 1
OPERARIOS S/. 3,198.67 S/. 2,205.57 S/. 3,651.85 3 4 6 7 7 7 7 3
FIERREROS PROV
AYUDANTES S/. 2,498.59 S/. 1,667.96 S/. 3,795.87 1 0
OFICIALES S/. 2,885.23 S/. 2,205.57 S/. 4,227.32 2 1
OPERARIOS S/. 3,198.67 S/. 2,205.57 S/. 4,752.52 1 2
DRYWALLEROS
AYUDANTES S/. 2,498.59 S/. 1,667.96 S/. 3,795.87 4 4
OFICIALES S/. 2,885.23 S/. 2,205.57 S/. 4,227.32 1 1 1
OPERARIOS S/. 3,198.67 S/. 2,205.57 S/. 4,752.52 1 7 7
EXTERIORES
AYUDANTES S/. 2,498.59 S/. 1,667.96 S/. 3,795.87 1 1 1 1 1
OFICIALES S/. 2,885.23 S/. 2,205.57 S/. 4,227.32 1 3 3 3 3
OPERARIOS S/. 3,198.67 S/. 2,205.57 S/. 4,752.52
Echeverría Izquierdo Ingeniería y Construcción S.A. 3963924.7145283
Obra Edificio BARLOVENTO 8700 4500 4295.2
PROYECCION GG PERSONAL DE DIRECCION 1,648,336.70
TOTAL - NUEVOS SOLES 0 13,050 25,375 71,377 90,294 118,065 122,132 158,018 167,361 169,856 169,856 168,609 170,154 183,537 183,784 183,784 176,950 181,122 182,506 246,888 249,133 252,218 252,218 257,656 257,656 257,656 217,121 199,357 179,460 178,085 172,153 125,218 108,174 76,004 47,434 5,612,261.42 S/. 3,698,187.8 S/. 5,084,655.1 -S/. 1,445,404.8 -S/. 1,807,693.8
0% 0% 1% 2% 2% 2% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 4% 4% 4% 4% 5% 5% 5% 4% 4% 3% 3% 3% 2% 2% 1% 1%
del ro 4194391.099976
dif -1,417,870.32
contingencia 210207.74
ADMIN:
ACTUALIZAR
HN+HE+AU SUMATORIA MES A MES
M
2015+BON
PPTO 2,012 2013 2014 2015 TOTAL HN HN + HE HN+HE+AUMO ALT RO DIF POR GASTAR POR GASTAR GASTADO TOTAL TOTAL - PPTO BRECHA BRECHA
ITEM DETALLE NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP SOLES Por Gastar 1 Por Gastar 2 Por Gastar 3 Por Gastar 4 POR GASTAR GASTADO POR GASTAR PPTO RO vs PPTO CD GG CD GG CD GG CD GG CD GG
1 Maestro OG 133,369.60 0 0 0 0 2,537 6,206 7,505 6,031 9,010 7,162 7,102 6,771 9,175 6,544 8,593 6,874 7,005 8,253 6,519 6,824 8,298 7,120 7,612 7,678 6,559 9,356 7,773 7,784 8,593 8,544 7,509 3,929 0 0 0 S/. 202,865.12 72,504 85,845 89,839 92,982 0 202,865.12 -69,495.52 -155,340.58 0 202,865 202,865 0 133,369.60 -69,495.52 -
2 Capataces OG 338,840.00 0 0 0 5,393 9,282 15,160 19,112 16,559 24,170 20,418 20,431 20,466 26,362 15,239 17,463 11,037 11,223 16,083 13,761 17,795 21,784 18,898 19,319 15,683 9,703 12,081 12,384 15,628 13,360 14,599 12,140 12,515 8,893 0 0 S/. 466,940.95 60,620 67,847 80,844 84,511 8,893 458,047.94 -119,207.94 -187,054.74 8,893 458,048 466,941 0 338,840.00 -128,100.95 -
3 Rigger 120,000.00 0 0 0 0 0 0 4,370 7,728 14,794 10,965 10,660 8,754 14,039 11,633 16,722 10,701 11,707 13,429 12,007 12,268 15,229 14,350 14,379 14,283 9,848 11,854 9,048 7,767 0 0 0 0 0 0 0 S/. 256,534.77 51,632 70,324 71,856 75,523 0 256,534.77 -136,534.77 -206,858.82 0 256,535 256,535 0 120,000.00 -136,534.77 -
4 Electricista 112,043.40 0 0 0 3,396 3,659 5,576 7,754 6,394 9,388 6,288 6,676 6,653 11,264 8,302 11,932 9,678 9,311 11,555 9,429 10,637 12,985 11,946 18,332 16,554 13,922 18,845 15,837 18,820 18,114 19,796 18,339 15,288 8,893 4,447 4,447 S/. 354,455.56 76,058 100,618 105,305 112,902 17,786 336,669.54 -224,626.14 -325,244.08 17,786 336,670 354,456 0 112,043.40 -242,412.16 -
5 Tecnico en control de materiales 63,020.00 0 0 0 0 0 2,267 2,697 2,755 4,036 3,152 3,092 2,754 3,685 2,565 3,819 2,800 2,990 3,571 2,891 6,609 8,063 6,537 10,297 8,576 6,284 9,043 5,340 1,062 0 0 0 0 0 0 0 S/. 104,884.73 18,091 25,953 26,590 29,591 0 104,884.73 -41,864.73 -67,817.73 0 104,885 104,885 0 63,020.00 -41,864.73 -
6 Topografo (Silvio) 168,720.00 0 0 0 3,032 4,068 4,596 6,213 5,334 7,816 5,088 6,347 5,021 6,850 5,566 6,885 5,270 5,447 6,749 5,594 6,097 7,418 6,098 6,842 6,701 5,766 7,217 9,104 4,832 4,836 5,634 4,328 4,548 4,018 0 0 S/. 173,314.17 57,096 70,416 74,431 77,574 4,018 169,296.24 -576.24 -70,992.73 4,018 169,296 173,314 0 168,720.00 -4,594.17 -
7 Jefe de PrR 209,997.20 0 0 0 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 8,700 0 0 0 0 S/. 243,600.00 104,400 104,400 104,400 104,400 0 243,600.00 -33,602.80 -138,002.80 0 243,600 0 243,600 209,997.20 - -33,602.80
8 Prevencionista Operario 351,447.60 0 0 0 0 2,857 10,044 15,019 14,943 25,292 15,447 17,673 18,010 27,289 24,064 31,635 22,959 23,865 29,344 24,325 27,089 34,465 37,658 44,237 37,153 33,594 27,256 21,212 24,604 18,263 15,749 21,528 21,149 11,025 3,675 0 S/. 681,423.73 98,532 133,031 145,061 157,147 14,700 666,723.43 -315,275.83 -448,306.33 14,700 666,723 681,424 0 351,447.60 -329,976.13 -
9 Ingeniero de fachada 112,500.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 3,900 3,900 5,800 2,900 0 S/. 109,300.00 69,600 69,600 69,600 69,600 8,700 100,600.00 11,900.00 -57,700.00 8,700 100,600 0 109,300 112,500.00 - 3,200.00
10 Servicio Guardiania (Morey) 252,000.00 0 0 0 3,826 8,305 4,504 4,364 4,223 8,727 8,727 8,446 8,727 8,446 8,727 8,727 7,883 8,727 4,223 5,271 21,084 10,542 10,542 10,542 10,542 10,542 10,542 10,542 10,542 10,542 10,542 10,542 10,542 5,000 5,000 0 S/. 269,440.96 100,000 100,000 100,000 100,000 10,000 259,440.96 -7,440.96 -107,440.96 10,000 259,441 269,441 0 252,000.00 -17,440.96 -
11 Servicio Policial - 0 0 0 795 1,405 2,445 3,000 2,530 4,085 4,890 5,070 3,640 2,870 2,570 2,935 2,250 2,520 3,015 2,455 2,665 3,160 3,640 3,640 3,640 3,640 3,640 3,640 3,640 1,400 3,640 3,640 3,640 3,640 3,640 0 S/. 97,380.25 25,480 25,480 25,480 25,480 7,280 90,100.25 -90,100.25 -115,580.25 7,280 90,100 97,380 0 - -97,380.25 -
12 Ingeniero Residente 406,000.00 0 13,050 13,050 13,050 13,050 13,050 13,050 13,050 13,050 13,050 13,050 13,050 13,050 13,050 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 25,694 25,694 25,694 25,694 25,694 25,694 13,050 26,100 26,100 S/. 632,664.00 243,600 243,600 243,600 243,600 65,250 567,414.00 -161,414.00 -405,014.00 65,250 567,414 0 632,664 406,000.00 - -226,664.00
13 Jefe de Campo 357,000.00 0 0 12,325 12,325 12,325 12,325 12,325 12,325 12,325 12,325 12,325 12,325 12,325 12,325 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 13,775 0 0 0 0 S/. 382,075.00 165,300 165,300 165,300 165,300 0 382,075.00 -25,075.00 -190,375.00 0 382,075 0 382,075 357,000.00 - -25,075.00
14 Jefe de Campo (2) 191,250.00 0 0 0 0 0 0 0 0 S/. 0.00 0 0 0 0 0 - 191,250.00 191,250.00 0 0 0 0 191,250.00 - 191,250.00
15 Jefe de Oficina Tecnica 294,000.00 0 0 0 0 0 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 11,600 11,600 11,600 11,600 11,600 11,600 11,600 11,600 11,600 12,325 12,325 12,325 8,700 8,700 8,700 8,700 8,700 8,700 8,700 4,350 8,700 S/. 313,200.00 160,225 160,225 160,225 160,225 21,750 291,450.00 2,550.00 -157,675.00 21,750 291,450 0 313,200 294,000.00 - -19,200.00
16 Jefe de Calidad 210,000.00 0 0 0 0 0 0 0 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 9,425 8,700 8,700 0 S/. 253,025.00 113,100 113,100 113,100 113,100 17,400 235,625.00 -25,625.00 -138,725.00 17,400 235,625 0 253,025 210,000.00 - -43,025.00
17 Ingeniero de Costos 126,000.00 0 0 0 0 0 0 0 4,350 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 0 0 0 0 0 0 0 0 S/. 128,325.00 104,400 104,400 104,400 104,400 0 128,325.00 -2,325.00 -106,725.00 0 128,325 0 128,325 126,000.00 - -2,325.00
18 Administrador de Obra 105,000.00 0 0 0 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 S/. 185,600.00 69,600 69,600 69,600 69,600 17,400 168,200.00 -63,200.00 -132,800.00 17,400 168,200 0 185,600 105,000.00 - -80,600.00
19 Jefe de Almacen 147,000.00 0 0 0 1,820 3,665 6,223 7,954 5,704 7,576 5,672 6,214 5,530 8,627 8,416 9,940 8,581 8,601 10,291 7,843 9,042 10,234 11,581 12,670 11,394 10,655 13,566 10,475 10,554 9,603 11,310.92 5,477 5,184 4,018 4,018 0 S/. 252,441.07 56,304 45,759 82,892 89,798 8,036 244,405.21 -97,405.21 -143,164.47 8,036 244,405 252,441 0 147,000.00 -105,441.07 -
20 Asistencia Social - 0 0 0 0 0 0 0 0 1,625 1,859 1,912 1,774 2,438 2,156 2,606 2,028 493 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 S/. 16,888.67 0 0 0 0 0 16,888.67 -16,888.67 -16,888.67 0 16,889 16,889 0 - -16,888.67 -
21 Asistente Administrativo - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,386 4,359 2,491 2,333 2,889 2,946 3,261 2,845 2,557 3,603 3,193 3,473 3,087 1,063 0 0 0 0 0 S/. 40,484.26 23,477 23,477 23,477 23,477 0 40,484.26 -40,484.26 -63,961.17 0 40,484 40,484 0 - -40,484.26 -
22 Practicantes - 0 0 0 1,836 2,648 4,661 5,432 3,016 6,130 7,833 9,827 8,370 14,456 12,135 15,163 12,000 13,269 17,573 11,875 12,965 16,354 11,449 14,656 12,193 10,527 14,252 10,083 11,512 5,413 7,727 8,367 0 0 0 0 S/. 281,722.85 118,447 118,447 118,447 118,447 0 281,722.85 -281,722.85 -400,170.05 0 281,723 281,723 0 - -281,722.85 -
23 Mensajero - 0 0 0 2,055 1,873 2,397 3,255 2,826 2,854 2,177 2,422 2,211 3,153 2,607 3,125 2,326 2,205 3,148 2,065 2,566 3,050 2,700 3,034 2,838 2,086 3,376 3,127 3,902 4,268 4,837 3,571 3,679 2,494 2,494 0 S/. 88,719.51 27,941 25,984 40,954 45,550 4,987 83,732.11 -83,732.11 -109,716.54 4,987 83,732 88,720 0 - -88,719.51 -
24 Ing. Instalaciones - 0 0 0 0 0 0 12,325 12,325 12,325 12,325 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 10,875 0 0 S/. 288,550.00 130,500 130,500 130,500 130,500 10,875 277,675.00 -277,675.00 -408,175.00 10,875 277,675 0 288,550 - 0 - -288,550.00
24 Asistente de oficina tecnica - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,206 2,571 2,569 2,008 2,918 2,773 3,784 3,501 3,904 3,649 3,514 2,387 2,387 2,387 S/. 39,559.15 7,161 32,397.85 -32,397.85 -32,397.85 7,161 32,398 39,559 0 - -39,559.15 -
25 Tareador - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,897 4,048 4,368 5,918 5,155 4,325 2,387 0 0 S/. 28,098.47 2,387 25,711.37 -25,711.37 -25,711.37 2,387 25,711 28,098 0 - -28,098.47 -
26 Elevador de fachada - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8,281 6,383 9,390 7,241 9,779 9,221 8,685 0 0 0 0 0 S/. 58,980.63 0 58,980.63 -58,980.63 -58,980.63 0 58,981 58,981 0 - -58,980.63 -
27 Cadista 2,447 2,732 3,608 2,494 2,494 0 S/. 13,774.94 4,987 8,787.54 -8,787.54 -8,787.54 4,987 8,788 13,775 0 - -13,774.94 -
TOTAL - NUEVOS SOLES 0 13,050 25,375 62,028 80,174 114,830 137,424 154,892 204,529 178,704 184,897 176,256 216,228 188,099 232,344 197,185 202,549 224,392 199,325 230,773 247,272 239,471 264,192 254,455 227,599 250,464 228,964 230,499 203,339 213,165 193,848 156,315 108,174 76,004 47,434 5,964,248.79 1,946,908 2,053,907 2,145,902 2,193,708 231,611 5,732,637 -2,034,450 -4,088,356.32 90,236.33 141,375.00 3,337,673.47 2,394,964.00 3,427,909.79 2,536,339.00 1,686,440.60 2,011,747.20 ### -524,591.80
0 9,350 10,120 3,235 -15,293 3,126 -37,168 -8,848 -15,040 -7,647 -46,074 -4,562 -48,560 -13,402 -25,599 -43,270 -16,819 16,115 1,861 12,747 -11,974 3,201 30,057 7,192 -11,843 -31,142 -23,879 -35,080 -21,695 -31,097 0 0 0
-3,981,358 -4,088,356 -4,180,352 -4,228,158 SUMA DE AZUL 3,211,796.08 -625,970.15 NO CONSIDERADO EN PPTO VENTA
CD 0 0 20,317 37,651 59,419 81,242 75,026 117,749 89,987 94,133 88,536 121,760 96,234 121,775 90,358 93,602 109,660 92,160 122,675 135,229 131,070 150,903 143,323 118,983 136,166 117,621 122,961 102,570 111,702 94,962 88,408 52,862 25,767 4,447 3,049,255
GG 13,050 25,375 41,711 42,523 55,411 56,182 79,866 86,780 88,717 90,764 87,719 94,468 91,865 110,568 106,828 108,947 114,732 107,166 108,098 112,043 108,401 113,289 111,132 108,617 114,299 111,343 107,538 100,769 101,462 98,886 67,908 55,312 50,237 42,987 2,914,994 -106,998.71
Maestro OG 0 0 0 0 2537.227 6205.814 7505.01 6030.891 9010.305 7162.008 7102.208 6771.265 9174.753 6544.245 8592.79493 6873.786 7004.861 8253.237 6518.759 6823.573 8298.209 7119.882 7611.779 7677.946 6559.33 9355.795 7773.05 7783.785 8592.695 8543.9321
Capataces OG 0 0 0 5393.126 9281.623 15160.11 19112.25 16558.64 24170 20417.68 20430.7 20465.67 26362.06 15239.12 17462.7567 11036.78 11223.42 16083.15 13761.32 17795.19 21783.8 18898.22 19319 15683.3 9703.216 12080.62 12383.76 15627.6 13360.32 14599.049
Rigger 0 0 0 0 0 0 4370.335 7727.919 14794 10965.41 10659.67 8753.855 14039.5 11633.09 16721.5758 10701.39 11707.27 13428.55 12006.67 12268 15229 14350.13 14378.65 14283.25 9847.62 11853.94 9048.261 7766.655 0 0
Electricista 0 0 0 3395.88 3658.694 5575.927 7753.67 6393.688 9388.031 6288.079 6676.477 6652.937 11264.5 8302.318 11932.2532 9677.637 9311.134 11554.68 9428.794 10637.11 12985.28 11945.81 18332.11 16553.64 13921.85 18844.51 15837.41 18819.55 18113.84 19796.434
Tecnico en control de materiales 0 0 0 0 0 2267.342 2696.52 2755.087 4035.597 3151.848 3092.034 2753.962 3685.088 2565.154 3819.30264 2800.026 2990.292 3571.259 2890.787 6608.684 8063.218 6537.07 10296.82 8575.763 6283.905 9043.068 5339.966 1061.938 0 0
Topografo (Silvio) 0 0 0 3032.019 4068.425 4596.479 6212.571 5334.456 7816.422 5088.049 6347.031 5021.134 6849.696 5566.082 6884.81081 5269.723 5447.066 6748.546 5593.922 6096.864 7417.854 6098.067 6841.813 6700.645 5766.442 7216.522 9104.248 4831.746 4836.475 5633.7609
Jefe de PrR
Prevencionista Operario 0 0 0 0 2857.261 10043.77 15019.35 14943.18 25292.29 15447.48 17672.89 18010.06 27289.22 24063.5 31634.7923 22958.82 23864.72 29343.82 24324.64 27088.61 34464.61 37658.39 44236.51 37153.06 33594.29 27256.39 21211.66 24604.39 18263.33 15749.256
Ingeniero de fachada
Servicio Guardiania (Morey)
Servicio Policial
Ingeniero Residente
Jefe de Campo
Jefe de Campo (2)
Jefe de Oficina Tecnica
Jefe de Calidad
Ingeniero de Costos
Administrador de Obra
Jefe de Almacen 0 0 0 1820.43 3665.436 6223.103 7953.94 5703.706 7576.393 5672.067 6213.636 5529.546 8626.595 8415.747 9939.93296 8580.565 8601.228 10291.25 7843.498 9042.094 10234.45 11580.91 12670.23 11394.27 10655.08 13566.09 10475.14 10554 9603.39 11310.919
Asistencia Social 0 0 0 0 0 0 0 0 1624.879 1858.825 1911.551 1774.199 2437.728 2155.595 2605.66171 2027.71 492.5256 0 0 0 0 0 0 0 0 0 0 0 0 0
Asistente Administrativo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2385.696 4359.211 2490.989 2332.629 2889.153 2945.567 3261.436 2844.796 2556.568 3602.945 3193.125 3472.669 3086.731 1062.7482
Practicantes 0 0 0 1835.595 2648.141 4661.389 5432.366 3016.066 6130.312 7833.338 9827.254 8370.173 14455.76 12134.65 15162.7076 12000.05 13268.58 17573.13 11874.62 12964.88 16354 11449.45 14656.49 12193.28 10527.13 14252.36 10082.58 11512 5412.572 7726.6432
Mensajero 0 0 0 2054.536 1872.624 2396.803 3254.844 2825.68 2853.708 2177.497 2422.473 2210.613 3152.597 2607.209 3125.04745 2326.278 2205.086 3147.577 2065.166 2565.815 3050.322 2699.813 3033.706 2838.007 2085.729 3376.489 3126.735 3901.794 4268.227 4837.2552
Ing. Instalaciones
Asistente de oficina tecnica 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1205.714 2571.21 2568.805 2008.263 2918.337 2773.426 3784.086 3501.066 3903.9874
Tareador 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1897.412 4048.398 4368.072 5917.7999
Elevador de fachada 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8281.171 6383 9390.063 7241.273 9779.293 9221.249 8684.5855
RESP. INMOBILIARIA
INFORME DE COSTOS EDIFICIO BARLOVENTO RESP. EQUIPO OBRA
PROB PROYECTO (Inc. Planos y PPTO)
OBRAS BRECHA Resultado SUSTENTOS GESTION DE OBRA
COSTO DIRECTO ADICIONALES FEB 2015 C/R al ppto
Reparaciones de Alquiler Oficinas frente a Consumos Trazados y Horas extra
Guardian previo a obra Grua por Disipadores carp. Metalica coril obra Arriendo Coril provisionales niveles Servicios Grua
100 OBRAS PRELIMINARES E INSTALACION DE FAENAS -136,356.26 -1,109,878.40 -1,246,234.67 -52,346.65 -82,609.62 -1,400.00 -30,000.00 -323,450.14 -471,692.58 -17,812.07 -159,665.55 -107,258.05
100% 25% 50% 50% 50% 25% 25% 25% 25%
0% 25% 0% 25% 50% 25% 25%
0% 50% 50% 50% 50% 50% 25% 50% 50%
elementos
varios
Diferencia Cubicacion Complejidad (alambre,
Cambio PU Acero Estructura vs Constructiva Obras civiles Sub prensa
corrugado vs Ppto Presupuesto Disipadores Estación Acero corrugado Mano de Obra hidraulica, etc)
160 ACERO -1,085,557.97 -41,543.90 -1,127,101.87 -203,067.66 -776,409.29 -99,395.09 -6,685.93 117,946.56 -115,389.63 -44,100.83
25% 25% 25% 25% 50% 50% 50%
25% 25% 25% 25% 50% 50% 50%
50% 50% 50% 50%
TAPAJUNTAS ENTRE
BARLOVENTO Y Nacionalizacion de
Tapa Metalica Disipadores CHOCAVENTO ESTRUCTURA DE ACERO Disipadores
170 ESTRUCTURAS DE ACERO (DISIPADORES) -125,017.48 -199,920.73 -324,938.21 -44,949.60 -80,067.88 26,505.68 -226,426.41
50% 0% 0% 100% 100% 0% 0%
0% 0% 0% 0% 0% 0% 0%
50% 100%
IMPERMEABILIZACIO
REPARACIONES DE TUBERIAS DE ESCAPE N NO CONIDERADA
VECINOS DE MOTOBOMBA EN EL PROYECTO Solaqueos y Tarrajeos
200 ESTUCOS, YESOS, AFINADOS -140,652.07 -377,315.62 -517,967.68 -64,629.19 DESMONTAJE -18,580.79
, -57,442.09 -377,315.63
25% MONTAJE DE 0% 0% 40% 0% 0% 0%
PERFILERIA DE
50% DRYWALL Y 0% 0% 60% 0% 0% 0%
25% REFUERZOS PARA 100% 100%
BOTONES DE CRISTAL
REFLEJANTE EN EL
Albañileria Sub Estacion HALL DE ASCENSORES Tabiqueria Drywall
210 TABIQUES Y ALBAÑILERIA -78,671.50 -693,279.41 -771,950.91 -25,030.26 -53,641.24 -693,279.41
0% 0% 0% 25% 0% 0% 0%
0% 0% 0% 25% 0% 0% 0%
REVESTIMIENTO DE
100% ACERO INOXIDABLE 100% 50%
HALL DE ASCENSORES
PISO 1 Y CRISTAL ENCHAPES
ADICIONAL DINTELES INOX TEMPLADO INCOLORO ESPECIALES EN
DE ASCENSORES CON IMAGEN EN VINIL Marmoles y granitos ACERO INOXIDABLE MADERA
230 REVESTIMIENTOS -96,814.69 -54,809.97 -151,624.66 -38,972.66 -57,842.03 -11,180.18 -61,441.75 -21,160.68
0% 0% 0% 25% 25% 25% 0%
0% 0% 0% 25% 25% 25% 0%
100% 100% 50% 50% 50%
Ceramicos
250 CERÁMICA 0.00 -93,947.74 -93,947.74 -93,947.74
0%
0%
100%
FCR
270 CIELOS -770.00 -17,816.00 -18,586.00 -18,586.00
25%
75%
Artefactos sanitraios
310 ARTEFACTOS SANITARIOS, GRIFERIA Y MUEBLES 0.00 -8,511.80 -8,511.80 -8,511.80
100%
0%
ADICIONAL DE TAPAS DE
BAÑOS Y GABINETES
DEBAJO DE MANGUERA
CONTRA INCENDIOS Contrato Closets
320 MUEBLES FIJOS -24,472.98 -72,093.56 -96,566.54 -4,980.00 -91,586.54
0% 25%
0% 25%
100% 50%
BASE DE TABLEROS
Estructuras Met. Sub METALICOS PARA
Columneta Metalica PCI Estacion BAÑOS Carpinteria Metalica
330 ESTRUCTURAS METALICAS -102,968.98 55,971.55 -46,997.43 -57,810.72 -27,301.96 -17,856.30 55,971.55
0% 0% 0% 0% 0% 0%
0% 0% 0% 100% 0% 0%
100% 100% 100%
Cambio EETT cristales VENTANAS PUERTAS Y
posteriores MAMPARAS MURO CORTINA
340 ALUMINIOS Y MURO CORTINA -137,267.20 -675,322.95 -812,590.15 -137,267.20 -185,109.95 -490,213.00
0% 25% 25%
0% 25% 25%
100% 50% 50%
CAMBIO SISTEMA DE
Punto agua urinarios Tuberia Colgadas AGUA DEL PISO 26 Contrato IISS - SAUL SAC
350 INSTALACIONES SANITARIAS Y GAS -45,471.79 -17,275.76 -62,747.55 -7,049.17 -37,723.70 -698.93 -17,275.76
0% 0% 0% 25%
0% 0% 0% 25%
100% 100% 100% MODIFICACIONE 50%
S ELECTRICAS
POR
CAMBIO DE UBICACIÓN
DEL GRUPO NUEVO PROYECTO COORDINACION
Ducteria ELECTROGENO / bombeo ELECTRICO DE CON
Media Tension Automatizacion de petroleo EMERGENCIA ARQUITECTURA Contrato IIEE - DIAR LUMINARIAS
360 INST. ELECTRICA -1,147,594.92 251,003.32 -896,591.60 0.00 -237,168.02 211,006.18 -537,970.04 -30,916.92 -301,542.80 0.00
0% 0% 50% 50% 25% 25% 50%
0% 0% 50% 50% 25% 0% 0%
100% 100% 0% 0% 50% 75% 50%
Sistema de Basuras
390 SISTEMA EXTRACCION DE BASURAS 0.00 0.00 0.00 0.00
0%
0%
100%
Adicional Vigas Metalicas Contrato Ascensores -
Ascensores Marcos Acero Inox. HPD
410 ASCENSORES -460,099.35 -261,656.81 -721,756.16 -328,774.23 -131,325.12 -261,656.81
0% 50% 100%
0% 0% 0%
100% 50% 0%
Contrato VSL
420 POSTENSADO 0.00 -5,993.09 -5,993.09 -5,993.09
0% 0% 0% 0%
0% 0% 0% 100%
Señaleticas
440 SEÑALETICA 0.00 0.00 0.00 0.00
0%
100%
CAMBIO DE
RECORRIDO DE
SISTEMA DE EXTRACCION DUCTOS DE Contrato HVAC -
EN BAÑOS EXTRACION DE AIRE Refricorp
450 CLIMATIZACION, PRESURIZACION Y EXTRACCION -187,172.00 564,773.02 377,601.02 -172,172.00 -15,000.00 564,773.02
50% 50% 50%
0% 0% 50%
50% 50%
REPARACIONES EN
VEREDA CORIL Obras exteriores
460 OBRAS EXTERIORES -8,690.37 -83,229.92 -91,920.30 -8,690.37 -83,229.92
0% 0%
0% 0%
100% 100%
REPARACIONES DEL
SELLOS CORTAFUEGO BANCO CITIBANK Varios
470 VARIOS -118,359.94 0.00 -118,359.94 -79,127.04 -39,232.90 0.00
0% 0%
0% 0%
100% 100%
Examenes Pre
Ocupacionales
601 Seguros y Garantias 0.00 0.00 0.00 0.00
0% 0% 0% 25%
0% 0% 0% 25%
50%
Andamios
609 Carreras y Andamios 0.00 100,083.46 100,083.46 100,083.46
0% 0% 0% 0%
0% 0% 0% 50%
50%
Caja Chica GG Caja Chica CD
610 Caja chica y varios 0.00 -27,233.04 -27,233.04 -27,233.04
0% 0% 0% 0% 0%
0% 0% 0% 100% 0%
0% 100%
TOTAL 40,771,548
INFORME DE COSTOS EDIFICIO BARLOVENTO
PRESUPUESTO GG no Inc. en OBVIACIONES OBRAS
ITEMS DE COSTO DIRECTO DE OBRA CD CD PPTO OBRA ADICIONALES
EMANA ADMINISTRATIVA
TOTAL DE TOTAL DE COSTO COSTO JUNIO
SEMANA DE CAMPO HORAS MAYO HORAS JUNIO MAYOHH/MES HH/MES MAYO
ACTIVIDADES
PICADO 240.00 0.00 15.04 20.13 1.0 3,608.47
RESANE 417.50 278.00 15.04 20.13 1.5 6,277.23
CANTONERAS 170.00 10.00 15.04 20.13 1.0 2,556.00
SIKAFLEX BAÑOS 17.00 17.00 15.04 20.13 0.2 255.60
FRAGUA DE ENCHAPE 47.50 132.50 15.04 20.13 0.8 714.18
ENCHAPE 135.00 302.00 15.04 20.13 1.0 2,029.76
ACARREO DE MATERIAL 1,053.50 957.50 15.04 20.13 5.0 15,839.68
LIMPIEZA DE OBRA 586.00 1,316.50 15.04 20.13 3.0 8,810.68
LIMPIEZA FINA 230.50 20.13
APOYO A PDR 196.50 166.50 15.04 20.13 1.0 2,954.43
TOPOGRAFIA 214.00 192.00 15.04 20.13 1.0 3,217.55
ANDAMIOS Y PLATAFORMAS 147.00 138.00 15.04 20.13 1.0 2,210.19
LINEAS DE VIDA 31.00 0.00 15.04 20.13 1.0 466.09
OBRAS EXTERIORES 1,070.00 206.50 15.04 20.13 6.0 16,087.76
EXTERIORES CORIL 0.00 153.50 15.04 20.13 0.0 0.00
PROTECCION DE ENTREGABLES 103.00 23.50 15.04 20.13 1.0 1,548.63
CERCO PERIMETRICO 163.00 23.50 15.04 20.13 1.0 2,450.75
APOYO A CONTRATISTAS 54.00 61.50 15.04 20.13 0.5 811.91
TRABAJOS EN ASCENSORES 79.00 0.00 15.04 20.13 1.0 1,187.79
APOYO A PINTURA POSTERIOR 140.00 0.00 15.04 20.13 1.0 2,104.94
LLAVERO 129.50 20.13
DEMOLICION HPD 177.00 20.13
4,864.00 4,209.00 28.0 73,131.65
PPTO CTA COSTO
DESCRIPCION
S.C.T.R.
Poliza CAR glb 1.00 150,000.00
Examenes ocupacionales und 550.00 35.00
Costo Mensual
Costo Acumulado
GASTOS A LA FECHA
168,095.00
150,000.00 SEGUROS
19,250.00 Examenes medicos
GASTOS A LA FECHA POR GASTAR
162,711.79
-
118,014.96 118,014.96 PPTO
44,696.83 44,696.83 GASTOS A LA FECHA
-
-
POR GASTAR TOTAL BRECHA
FINAL S/.
PU S/.
5,383.21 168,095.00 -
DESCRIPCION S/.
Peón 97,867.00
Operario 90,420.00
Ayudante Topografo 93,748.75
Herramientas 5,648.61
GASTOS A LA FECHA
Sedapal 26,737.85
Luz del Sur 210,807.70
Telefono + Internet 2,210.00
2,642,679.09 49,546.06
POR GASTAR
1,314,100.95 7,387.89
38,713.05
524.00 GASTADO A ENERO 1,231,488.84
31,523.77 PROY. (MARZ - JUL 15) 90,000.00
246,951.40
43,067.79 GASTO A LA FECHA -1,314,100.95
30,800.08
17,469.41
16,957.14
91,179.78
50,124.98
29,924.87
10,976.69
13,044.51
4,440.98
1,359.71
2,660.53
27,499.52
7,056.21
3,362.49
11,608.08
7,600.00
16,773.17
30,000.00
52,699.70
2,470.40
20,637.00 VENTA
- POZO PROBETAS 0.50
27,644.09 ESCUADRAS METALICAS 0.50
7,800.00 Caja metalica insumos quimicos 0.50
45,100.00 Contenedor Marino y escalera metalica 0.50
8,957.02 Canastilla metalica 0.50
600.00 Venta reflectores 0.30
19,139.94 Ventiladores sotanos 0.30
15,300.00 Canastillas metalicas 0.50
5,500.00 Cajon metalico 0.50
48,210.00 Venta T. Metalicas 0.50
2,791.43 Reventa Activos -17,021.35
183.05
-
323,450.14
327,370.90 3,865.53
315,995.08 MO 3,865.53
3,465.26
-
-
-
411.94
253.30 REVENTA EQUIPOS -18,454.13
3,751.01
3,494.31
248,685.55 19,200.00
810,997.75 -
43,250.00
183,680.56
30,062.78
30,657.46
26,632.99 VALORIZACION 22 58,373.03
30,221.44 GASTO DE LA VALO 22 DE ETAC -43,020.00
31,439.74 DESCUENTO FINAL A ETAC -15,353.03
29,185.88
31,672.57 NOTA DE CREDITO POR PARAS DE ETAC1 -13,423.42
27,313.62 NOTA DE CREDITO POR PARAS DE ETAC2 -28,000.00
9,580.00
33,302.33
39,728.95
56,388.75
51,008.65
54,113.75
46,314.90
43,020.00
-
13,423.42
-
FINAL S/.
#REF!
331,236.43 -17,812.07 61,656.00 -79,468.08
2,731,608.58 -1,109,878.40
-1,109,878.40
TORRE GRUA HE HN
JUN 49.50 22,980.00
JUL 136.00 22,980.00
AGO 109.00 22,980.00
SEP 99.00 22,980.00
OCT 56.50 22,980.00
NOV 54.00 22,980.00
DIC 53.50 22,980.00
ENE 62.00 22,980.00
FEB 29.50 22,980.00
MAR 42.50 22,980.00
ABR 54.50 22,980.00
MAY 36.00 22,980.00
JUN 55.50 22,980.00
JUL 14.00 22,980.00
AGO 12.50 22,980.00
SEP 41.50 22,980.00
OCT 50.00 22,980.00
NOV 50.00 22,980.00
DIC 50.00 22,980.00
ENE 50.00 22,980.00
1,105.50
6,191.50
136,894.07
Fono
210.00
250.00
250.00
130.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
750.00
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 110 DEMOLICIONES Y SOSTENIMIE
112 FIERRO
113 ENCOFRADO
114 CONCRETO
115 DEMOLICIONES
TOTAL
DIFERENCIA A FAVOR EIICSA
EMOLICIONES Y SOSTENIMIENTO
986,893.70 107,341.21
921,693.40
5,200.30
60,000.00
ADELANTO
107,341.21 ADELANTO
Valorizaciones
Valorización Nº01
Valorización Nº02
Valorización Nº03
Valorización Nº04
Valorización Nº05
Valorización Nº06
Valorización Nº07
varios (ACELERANTE SIKA 3)
izaje con grua de equipos
120,382.50
17,713.94 HH - Acero
10,122.25
141,937.20
23,424.80 HH - Encofrado
20,078.40
38,910.80 Alquiler UNISPAN, muros anclados
Plancha de teknoport
2,492.00 Clavos
Mat. Varios (SOLERAS, TRIPLAY)
4,058.40
40,512.80
12,460.00
585,556.40
14,857.70 HH - Concreto
12,755.60
22,894.30
Varios
57,629.00 Bomba de concreto
1,515.80 Recargo minimo Bomba
Recargo minimo Concreto
Materiales varios
475,904.00 Concreto f´c´420 PD 67 SuperPlast
Concreto f´c´350 PD 57 Plast
Concreto f´c´100 PD 57
54,000.00 47,612.83
HH DEMOLEDORES
VALORIZACION DE PICADORES
1,888,769.79 154,954.04
2043723.83
GASTOS A LA FECHA
PROVEEDOR Acum. Anterior Mes Actual Provisión Acum. A la fecha
900,556.50
40,938.98 40,938.98
286,575.29 286,575.29
131,630.71
31,992.54 31,992.54
6,687.68 6,687.68
3,427.10 3,427.10
56,994.00 56,994.00
32,503.38 32,503.38
26.01 26.01
159,795.97
115,829.38 115,829.38
28,282.80 28,282.80
5,097.02 5,097.02
1,820.86 1,820.86
8,765.91 8,765.91
536,968.11
89,528.49 89,528.49
2,215.00 2,215.00
44,736.00 44,736.00
9,232.00 9,232.00
245.00 245.00
3,167.12 3,167.12
62,985.75 62,985.75
323,077.50 323,077.50
1,781.25 1,781.25
126,253.56
54,000.00 54,000.00
OMARTILLO 31,785.41 31,785.41
PATA GRUA 21,166.00 21,166.00
0.00
12,164.14 12,164.14
7,138.01 7,138.01
0.00 900,556.51
Contrato PT 0.00
0.00 131,630.71
-24,000.00 135,795.97
0.00 126,253.56
-24,000.00 1,831,204.86
212,518.98
-
BRECHA
S/.
TOTAL 92993
AGO 87705
SEPT 5288
Acero kg 87705 2.56
MO hh 4318 16.18
Alambre
ENCOFRADO 3,790.40
-11,248.22
-193,134.78 CONCRETO 1,442.36
125385.58665 268332.4134385
-24,640.73
kg
kg
kg
224244.1
69844.2
10,114.78
304203.1 87705 AGOSTO
18341.33 5288 SEPT POR GASTAR 100% MA
125385.6 36150 MA ORIGINAL
178817.5 51555
m2
m3
Adicionales
Carta Fianza PALMANOVA
Fondo de garantia
Desquinche y Pañeteo
Operario hh 2,660.46 16.44
Herramientas glb 1.00 1,330.00
COMPACTACION P/SOLADOS
Operario hh 204.38 16.44
Herramientas glb 1.00 100.24
SOLADOS EN CIMENTACIÓN
Operario hh 420.07 16.44
Herramientas glb 1.00 210.00
Solado m2 660.00 5.20
TOTAL
DIFERENCIA A FAVOR EIICSA
.C.
GASTOS A LA
1,291,021.51 -
45,068.00
6,615.00
2,637.47
3,005.03
170.00
802.50
29,250.00
29,250.00
14,008.20
3,360.01
100.24
6,905.95
210.00
3,432.00
1,385,962.71 -
1,385,962.71
1,385,962.71
-
#REF!
GASTOS A LA FECHA POR GASTAR
Acum. Anterior Mes Actual Provisión Acum. A la fecha CANT
1,543,714.15
712,461.00 712,461.00
- 45,771.89 - 45,771.89
- 54,000.00 - 54,000.00 Excavadoras
429,678 429,678.00 Eliminacion
225,810 225,810.00 MO
158,550 158,550.00 Carta Fianza PALMANOVA
28,500 28,500.00 Fondo de garantia
47,335 47,335.04
30,024 30,024.00
11,128 11,128.00
56,366.52
56,366.52 56,366.52
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,600,081 - - 1,600,080.67
POR GASTAR TOTAL BRECHA
- 1,543,714.15 - 252,692.64
-
-
-
anza PALMANOVA
- 56,366.52 - 11,298.52
- - 6,615.00
- - 29,250.00
- 14,008.20
- -
- 1,600,080.67
- 214,117.96
-
Obras provisionales
Excav. y pañeteo
Demolicion
38,574.68
Acarreo
SEM 12 78 46 9
SEM 13 73 58 46.5
151 104 46.5 9
SEM 14 162 93.5 54 23.5
SEM 15 122 169 116.5 227
SEM 16
SEM 17
283 263 170.5 251
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA
DESCRIPCION
UND
AD SUBESTACION
AD 30 REPARACIONES VECINOS
Operario hh
Oficial hh
Peón hh
Herramientas glb
AD 30 REPARACIONES VECINOS
134.00 CONCRETO DE LOSA, CONTRAPISOS Y RELLENOS
138.00 VARIOS
CURADO DE CONCRETO m2
Peon hh
TOTAL
DIFERENCIA A FAVOR EIICSA
130.00
11,980.00
3,179,793.14
387,938.47
8,548.84
11,520.00
5,143.82
371,316.36
397,355.57
84,437.83
3,153.83
3,628.08
351,007.56
130,226.91
53,205.26
4,269.82 12.71 54,269.41
4,433,327.62 721,025.04
5,154,352.66
647,216.76
3,931,784.35 302.28
13,007.06
GASTOS A LA FECHA
DESCRIPCION Acum. Anterior
Reajuste
ABRAZADERAS 35,770.32
ACOPLE T/ MANGUITO SK-H125/5,5 ND 1,437.86
BOLA DE ESPONJA 1,388.04
CODOS DE TUBERIA 7,973.67
Empaquetadura para Abrazaderas 5 ½ 615.81
Grasa Amarilla Vistony (450gr) 1,801.84
JUNTO-A DN125/5,5
MANGUERA DN100 (4 NB½")4 MALLAS ACERO 84.06
x7MT 5,510.09
PIN de seguridad para Abrazadera DN125. 811.82
Rep. Filtro para Aceite y aire primario 4,246.42
RETEN - O RING PARA MAQ 139.30
RIMULA R4 15W/40 1,947.98
SEGUROS PARA ABRAZADERA F° 334.32
TAPA P/Manguera DN125 C/abraz.# 7018 inc 379.35
TECLE DE CADENA 1 TN X 10 MTS DE IZAJE 1,070.00
TELLUS S2 M 46 4,682.13
TUBERIAS DE LA TK 33,667.92
Concreto f´c´280 PD 57
Concreto f´c´280 PD 67
Concreto f´c´350 PD 57 Normal
Concreto f´c´350 PD 57 Plast
Concreto f´c´500 PD 67 SuperPlastificado
5,797,127.38
A FECHA
Mes Actual Provisión Acum. A la fecha
4,005,873.75
13,292.50
18,559.00
149,896.00
444,967.25
451,739.00
6,448.00
4,488.75
286,747.50
1,292,007.00
8,400.00
69,088.00
411,579.00
1,704.00
185,463.75
449,111.00
1,218.75
9,348.25
2,362.50
193,153.50
6,300.00
-
940,293.81
-
94,250.24
129,372.97
87,263.00
3,388.00
248,371.20
275,787.48
35,770.32
1,437.86
1,388.04
7,973.67
615.81
1,801.84
84.06
5,510.09
811.82
4,246.42
139.30
1,947.98
334.32
379.35
1,070.00
4,682.13
33,667.92
744,782.42
-14,810.15
33,841.11
36,509.61
46,607.85
34,287.77
51,665.81
33,239.17
37,364.21
39,669.39
32,770.14
44,526.15
65,627.49
56,449.76
54,095.34
56,930.56
42,090.80
52,745.66
27,604.30
11,389.71
2,177.73
- -
-
-
-
-
-
4,604.87
-
-
-
-
-
4,604.87
95,179.13
19.67
1,162.71
35.83
1,250.00
48.98
27,643.22
12,581.60
3,952.90
21,058.53
25,739.59
1,686.10
- - 5,790,733.98
5,790,733.98
POR GASTAR
CANT PU
2013
REAJUSTE
AY
OF
OP
Provision por gastar
varios 1,000.00 21.00
SELLADO JUNTAS
TOPELLANTAS POR GASTAR
Gasto a la fecha
185,463.75
256,386.25
320,951.00
-
13,325.00
449,111.00
781,696.00
1,779,832.00
1,218.75
205,269.00
13,760.00
6,055.00
-7,194.00
-4,005,873.75
- 940,293.81 -568,977.45
-
-
-
-348,923.27
- 744,782.42 -259,835.19
-
-
-
- - 3,628.08
- 4,604.87 346,402.69
40,169.53
21,000.00
30,900.00
19,200.00
-95,179.13
-16,090.40
-0.00 5,790,733.97
-636,381.31
Inf. en C. Costos
-0.00
-348,923.27
348,923.26
SEP 13 - AGO 14 10,669.50 31.00 330,754.50
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO MES ACTUAL 10
RESULTADO CUENTA 150 ENCOFRADOS MES FALTANTES 11
52,300 m2 aprox.
Moldajes de Fundaciones m2 160.00 10.20 1,632.00 ARRIENDO UNISPAN 594,160.92 594,160.92 GASTO ALQUILER A LA FECHA - 594,160.92 ###
Moldaje de Muros m2 15,478.00 10.91 168,864.98 PROY ALQUILER A ABRIL 587,470.83
Moldajes de Losas m2 28,117.00 10.20 286,793.40 REPOSISCION ENCOF. IRREPARABLE 104,618.67 104,618.67 REPOSISCION ENCOF. IRREPARABLE 116,570.21
Moldaje Frisos m2 1,600.00 4.08 6,528.00 9.96 LIMPIEZA Y REPARACION ENCOFRADO 100,241.25 100,241.25 GASTO IRREPARRABLES - 104,618.67
Moldajes Pilares m2 2,103.20 13.10 27,551.92 PUNTALES 59,532.20 59,532.20 LIMPIEZA Y REPARACION ENCOFRAD 99,411.58 ###
Moldaje Estanque m2 622.00 15.30 9,516.60 GASTO LIMPIEZA Y REPARACION - 100,241.25
Moldaje muro posterior m2 880.00 10.91 9,600.80 SALDO DE ALQ DE MA 14,425.93 14,425.93 ###
Moldaje pilares circulares m2 668.80 15.28 10,219.26 SUPUESTAS PERDIDAS 70,604.48 ###
Moldajes de Escaleras (madera tornillo) m2 2,670.00 9.31
1080460 kg aprox
UF proyección:
DESCRIPCION PPTO CTA COSTO OOEE GASTOS A LA FECHA POR GASTAR TOTAL
UND CANT PU S/. UNID Acum. Anterior Mes Actual Provisión Acum. A la fecha CANT P. UNIT. TOTAL FINAL
Acero corrugado fy=4200kg/cm2 (Grado 60) kg 1077830 2.35 2,532,900.50 Kg Acero Reajuste -
Acero Muro posterior kg 2630 2.42 6,364.60 985,000.00 2.4780 2,440,830.00
Acero dimensionado - SIDER 2,453,438.44 2,453,438.44 374,331.52 2.4780 927,593.51
Acero corrugado fy=4200kg/cm2 (Grado 60) - ADICIONAL kg 450000 2.48 BARRA DE CONSTRUCCION 8MM 268,327.72 268,327.72
BARRA DE CONSTRUCCION 1/2" 200,528.11 200,528.11
BARRA DE CONSTRUCCION 3/8" 157,849.78 157,849.78 GASTO A LA FECHA - 3,400,795.49
AD. 18 CAMBIO DE PRECIO UNITARIO ACERO CORRUGADO 203,067.66 BARRA DE CONSTRUCCION 3/4" 24,918.98 24,918.98 reajuste PU - 23,991.62
AD. 19 INCREMENTO CUANTIA ACERO CORRUGADO 776,409.29 BARRA DE CONSTRUCCION 1" 135,019.49 135,019.49
BARRA DE CONSTRUCCION 5/8" 63,430.19 63,430.19
ACERO OBRAS EXT
Conector mecanico 61,589.78 61,589.78 600.0 2.4780 1,486.80
-
NOTA DE CREDITO - 19,183.79 - 19,183.79
REAJUSTE CONTABLE 54,876.80 REAJUTE CONTABLE 54,876.80
-
162 MANO DE OBRA 821,149.60 1,042,620.25 0.00 1,042,620.25
CASCO
Operario hh 32125.1 16.44 528,136.64 HH - Acero (SALDO MA) 36,072.43 36,072.43 985,000.00 0.733 722,005.00
Oficial hh 19096.92 14.11 269,457.54 HH - Acero (SEP) 21,824.99 21,824.99 404,473.00 0.733 296,478.71
Herramientas glb 1 21,556.60 21,556.60 HH - Acero (OCT) 25,207.38 25,207.38
HH - Acero (NOV) 36,781.88 36,781.88 Avance MO Casa - 199,066.74
HH - Acero (DIC) 37,688.05 37,688.05
Muro posterior HH - Acero (ENE) 23,749.05 23,749.05 Avance Val Aburto - 828,357.12
HH - Acero (SEP 14) 7,519.97 7,519.97
Operario hh 78.39 16.44 1,288.73 HH - Acero (OCT 14) 8,740.98 8,740.98 REAJUSTE 6780.15
HH - Acero (NOV 14) 1,482.00 1,482.00
Oficial hh 46.6 14.11 657.53 -
Herramientas glb 1 52.60 52.60 SC ABURTO VAL 01- 04 68,141.06 68,141.06 HH EXTERIROES 144 2,160.00
SC ABURTO VAL 05-06 52,463.24 52,463.24
SC ABURTO VAL 07-08 69,233.45 69,233.45
AD. 24 DISIPADORES 99,395.09 SC ABURTO VAL 09-11 60,622.76 60,622.76
AD. MO SUB ESTACION 6,685.93 SC ABURTO VAL 12-14 100,868.33 100,868.33
SC ABURTO VAL 15-16 89,253.75 89,253.75
SC ABURTO VAL 17-18 80,048.52 80,048.52
SC ABURTO VAL 19-20 82,986.33 82,986.33
SC ABURTO VAL 21-22 84,980.80 84,980.80
SC ABURTO VAL 23-24 65,112.31 65,112.31
SC ABURTO VAL 25-26 40,957.84 40,957.84
SC ABURTO VAL 27-28 23,300.60 23,300.60
SC ABURTO VAL 29 10,388.13 10,388.13
-
GASTO DE EPPS PARA ABURTO 15,196.39 15,196.39
Alambre # 16 kg 30870.28 2.8 86,436.78 alambre negro nac #16 70,917.99 70,917.99
alambre negro nac #8 38,482.19 38,482.19 24,353.37 2.82 96,091.33
- Gasto a la Fecha - 130,537.63
PRENSA HIDRAULICAP/ TERM.DE 10M2 A 508.47 508.47 Adicional Proyeccion 34,446.30
-
ANCLAJE ADHESIVO 20,540.00 20,540.00
ALAMBRE GALVANIZADO N18 88.98 88.98
-
Inf. En C. Costos -
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 170 ESTRUCTURAS DE ACERO
528039.15
UF proyección:
DESCRIPCION PPTO CTA COSTO OO.EE GASTOS A LA FECHA POR GASTAR TOTAL
UND CANT PU S/. UNID Acum. Anterior Mes Actual Provisión Acum. A la fecha CANT P. UNIT. TOTAL FINAL
Disipador de energia ADAS de 16 Tonf und 120 4,603.50 552,420.00 Contrato DISIPA 1,056,078.30 1,056,078.30 DISIPA 969,008.32
Disipador de energia ADAS de 24 Tonf und 36 5,300.10 190,803.60 - - 87,069.98
Sistema de anclaje completo 156 550.80 85,924.80 - -
Prototipo disipador de energia para ensayo 1 3,628.80 3,628.80 - -
Ensayo de prototipo en DICTUC 1 4,158.00 4,158.00 SERV. DE COLOC. DE DISIPADORES SISMICOS 25,200.00 25,200.00 PROYECCION DE INSTALACION 94,743.15
Montaje de Disipadores 156 560.64 87,459.84 PERSONAL DE DISIPADORES 43,977.89 43,977.89 Gasto a la fecha - 1,150,821.45
CONECTOR MECANICO DE 1" MODELO LOCK 5,316.84 5,316.84
SERVICIO DE ROSCADO DE BARRA DE ACERO 20,206.47 20,206.47
soldadura 41.95 41.95
DESCRIPCION
UND CANT PU
AD 30 REPARACIONES DE VECINOS
AD 10 TUBERIAS DE ESCAPE PARA MOTOBOMBA CONTRA INCENDIO
TOTAL
PPTO
S/. UNID
200,823.08
14,349.10
120,928.21
24,835.26
10,020.51 IMPERMEABILIZACION DE CISTERNA T/COSTO
30,690.00
359,461.60
48,175.40
2,403.04 Mano de Obra
98,257.90
190,507.65 Arena fina
3,887.82 Arena gruesa
2,916.09 cal
13,313.70 CEMENTO
LADRILLO "PANDERETA" 10 X 12 X 24 CM
LADRILLO P/TECHO 12 X 30 X 30 CM, 4 H.
LADRILLO "KK" 18 HUECOS 9 X 13 X 24 xMil
LADRILLO PASTELERO 20 x 20 x 3 cm.
BATEA PARA TARRAJEO
CAMPANA ANTIPOLVO
yeso
sikaboom
confitillo
Aplicador de silicona
Esponja plancha 2.40x1.20mt x 3"
PIEDRA CHANCADA EN BOLSA
Lija
PER-GROUT 100 (BL x 30KG)
SIKADUR 31
SIKADUR 32
SIKADUR 52
11,287.19
8,098.65
3,188.54
32,000.00 140,652.07
64,629.19
18,580.79
603,571.86 140,652.07
482,644
321,762
201,191
UF proyección:
19,733.00
-
-
-
19733 19,733.00
- Proyectado Gastar
Gasto a la fecha
-
968,050.85
850,353.45 850,353.45
114,428.06
- -
1,102,211.91
182.61%
56,285,890
4,412,227
POR GASTAR TOTAL
P. UNIT. TOTAL FINAL
- 19,733.00 181,090.08
- 968,050.85 - 608,589.25
- -
19,327.65 1,121,539.55
- -
- 377,315.63
Inf. En C. Costos
19,328
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA
DESCRIPCION
UND CANT PU
TOTAL
PPTO
S/. Descripcion
1,448,070.05
(MO) DRYWALL
CONTRATA WILLSAN
CONTRATA TIR
GASTO DE EPPS PARA GG DRYWALL
1,448,070.05 78,671.50
UF proyección:
2,113,621.71
53,641.24 53,641.24
MO DRYWALL CASA
861.32 861.32
4,293.65 4,293.65
- -
36,223.23 175.37 36,398.60
989.89 989.89
25,024.25
121.19 121.19
15,500.00 15,500.00 GASTO VARIOS
542.37 542.37
1,398.31 1,398.31 GASTO A junio 15
6,943.69 6,943.69 Avance Gastos varios
287.00 287.00
67.63 67.63
118.31 118.31
45.76 45.76
-
0
0
2,113,621.71
-
24,637
TRATA TIR 227,076.22
echa CONTRATA 3 -138,598.22
25,024
astos varios - 25,024.25
106,399.25 2,220,020.96
- 693,279.41
Inf. En C. Costos -
- 42,548
650,732
106,399
-
#REF! #REF! #REF! #REF!
#REF! #REF!
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA
DESCRIPCION
UND CANT PU
TOTAL
PPTO
S/. Descripcion
204,856.36
6,716.22 57,842.03
31,270.07
211,572.58 57,842.03
GASTOS A LA FECHA
Acum. Anterior Mes Actual Provisión TOTAL
198,567.52
107,405.42
59,413.95 59,413.95
18,809.85 18,809.85
13,964.86 13,964.86
15,216.77 15,216.77
48,114.75
31458.45 31,458.45
7464.61 7,464.61
6,691.69 6,691.69
2,500.00 2,500.00
-
-
354,087.69
-
354,087.69
- 354,088
4,412,227
UF proyección: 21,065
POR GASTAR
CANT P. UNIT. TOTAL
17,469.02
18,594.58
PAC 141,461.79
DESCUENTO COMERCIAL - 15,461.79
GASTO A LA FECHA - 107,405.42
4,316.00
40,379.60
-
Inf. En C. Costos
-
TOTAL
FINAL
7,073
52,430.75 - 21,160.68
394,467.29 129,630.04
-
- 125,052.68
-
40,380
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 250
DÓLAR = S
2.8
87
DESCRIPCION PPTO
CTA COSTO
Ceramicas y Porcelanatos
GASTOS A
UNID Acum. Anterior Mes Actual
11,906.43
GASTOS A LA FECHA
Provisión TOTAL
226,924.40
141,396.87
2,083.71
2,676.67
985.10
3,731.14
72,035.58
35.59
3,555.61
266.95
157.17
-
154,275.23
58,733.10
977.69
46,458.81
25,696.39
1,512.38
2,718.81
9,030.54
197.79
150.45
2,410.48
47.96
-
-
3,315.00
1,740.68
12.48
77.59
1,011.47
13.56
0.64
169.41
-
-
-
381,199.63
-
381,199.63
- 381,200
4,412,227
UF proyección:
POR GASTAR
CANT
FRAGUA 627.2
PEGAMENTO DE 25kG 2,090.5
REAJUSTE
Avance MO
Avance Materiales
ENCHAPE
HH SIKAFLEX BAÑOS
HH FRAGUA DE ENCHAPE
HH ENCHAPE
21,065
TOTAL
P. UNIT. TOTAL FINAL
30.90 2,624
-
5.10 3,199
28.00 58,535
160,000.00
- 141,396.87
- 239,802.75
-
2,706
6,958
Inf. En C. Costos -
9,881
-
221,417
177133.5864
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 270
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
TOTAL 150,186.32
Cielos
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual
167,432.12
37,503
56,548 PROY DEL 2 AL 30 PISO
9,641 GASTO A LA FECHA
19,977 PROY DEL 1MER PISO
- GASTO A LA FECHA 1mer piso
43,763
-
167,432.12
-
167,432.12
56,285,890
4,412,227
GASTAR TOTAL
TOTAL FINAL
125,009.13 6,250
- 123,668.93
43,763.19 2,188
- 43,763.19
- - -
- -
- -
- -
1,340.20 168,772.32
- -
- 18,586.00
Inf. En C. Costos -
1,340
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 280
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual Provisión
MO - SC BAUTICH 12,221.47
VAL - SC BAUTICH 1 2 3 y 4 21,261.00
VAL - SC BAUTICH (5 y 6) 10,832.17
VAL - SC BAUTICH 7 y 8 12,162.00
VAL - SC BAUTICH 9 6,346.49
VAL - SC BAUTICH 10 7,734.87
VAL - SC BAUTICH 11-12 11,511.03
VAL - SC BAUTICH 13-14 13,567.90
VAL - SC BAUTICH 15-16 12,086.24
VAL - SC BAUTICH 17-18 10400.396
VAL - SC BAUTICH 19-20 8936.22
VAL - SC BAUTICH 21-23 15436.21
VAL - SC BAUTICH 24-25 6159.49
VAL - SC BAUTICH 26 2079.4875
VAL - SC BAUTICH 27 5320.83679999989
230,043.71 3,561.60 -
UF proyección:
- 20,000.00
Alfombra 20,000
157,618.86 -
12,221.47 SC - ACABADO PISOS BAUTICH 160,560.27
21,261.00 Avance - 157,618.86
10,832.17 Reajuste sc acabados - 2,941.41
12,162.00 proyeccion de gastos de albañileria 7,143.43
6,346.49 gastos de albañileria - 7,143.43
7,734.87 ADICIONAL REPARACION FISURA DE LOSAS 40,989.61
11,511.03 REPARACIONES DE VECINOS 1,700.00
13,567.90 reajuste del adicional reparacion de fisuras de lo - 15,806.31
12,086.24 GASTO ADICIONAL REPARACION DE LOSA - 25,183.31
10,400.40 GASTO ADIC VECINOS - 1,700.00
8,936.22
15,436.21
6,159.49
2,079.49
5,320.84
-
1,563.05
25,183.31
1,700.00
3,829.00
529.66
156.01
2,546.26
50.85
6.23
25.42
-
-
-
-
-
41,959.72 13,421.08
41,959.72 PPPTO TABLEROS MARMOLES 55,380.80
- GASTO A LA FECHA - 41,959.72
-
-
-
199,578.58 33,421.08
- -
199,578.58
56,285,890 -
4,412,227
TOTAL
FINAL
20,000.00 - 11,093.16
157,618.86 156,148.84
55,380.80 - 28,380.80
- 21,195.00
232,999.66
-
180,559.49
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 290
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual
1,072.49
169
166
1,005
UF proyección: 21,065
217,374.02
50,904.11
37,579.87 SC PUERTAS NELSON SILVA
12,123.29 SOBRECOSTO DE PUERTAS
11,493.06 GASTO EN PUERTAS
11,343.66
22,257
17,619 AUMENTO DE PUERTAS Y CARPI
15,047 Gasto del aumento de puertas
-
11,125
2,109
-
-
14,050
3,115
-
214
459
119
38
346
172
68
6
226
1,119
548
61
1,518
1,189
158
2,343
23
-
14,520.51
-
10,695.65 CERRAJERIA - LA SIRENA
55.93 AVANCE CERRAJERIA
635.59 REAJUSTE
1,930.70
428.90
51.10
588.99
133.64
231,894.53
-
231,894.53
- 231,895
371,000
56,285,890
4,412,227
34.14 5,768.82
30.60 5,079.60
2.03 2,040.15
12,889
GASTAR TOTAL
TOTAL FINAL
205,217.00
1,752.02
- 206,249.02
11,125.00
- 11,125.00
0.00 14,520.51 137,588.49
14,204.88
- 14,520.51
315.63
720.00 232,614.53
- -
76,089.47
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 300
DESCRIPCION PPTO
CTA COSTO
TOTAL 675,286.65
GAST
UNID Acum. Anterior
681,524.30
83,096.03 681,524.30
-
681,524.30
- 681,524
371,000
56,285,890
4,412,227
21,065
GALINDO 392,693.32
PINTURA NUEVOS ALZANCES 88,434.06
- 681,524.30
43,391.83 724,916.13
- -
- 46,790.13
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 310
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
TOTAL 132,571.89
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual
139,102.17 1,307.66
UF proyección:
111,329.57
673.86
28,213.20 Inodoro italgrif cancun 190.00
20,457.50 Inodoro para discapacitados 48.00
498.31 Ovalin vainsa acapulco 190.00
111.53 Lav. Nuevo cancun 48.00
1,416.30 Urinario vainsa bavaro 97.00
1,300.30
7,352.71 Gasto de aparatos sanitarios
8,005.18 REAJUSTE DE APARATOS SANITARIOS
-
-
1,355.22
-
397.95 REAJUSTE DE Accesorios aparatos y griferias
27,936.72 Gasto de ACCESORIOS sanitarios
1,843.23
850.83
2,041.52
2,966.28
2,437.77
10.60
301.11
50.51
1,927.51
26.95
33.56
11.69
139.77
336.91
6.20
596.31
15.59
14.45
-
-
-
9,681.65
9,637.92
43.73 Llave urinario Temporizado 97.00
- Llave lav. Temporizado 239.00
- GASTO DE GRIFERIA
- REAJUSTE DE GRIFERIA
20,072.47
141,083.69
-
141,083.69
21,065
174.32 33,120.80
409.15 19,639.32
45.43 8,631.70
34.11 1,637.28
97.38 9,445.86
- 67,355.03
- 5,119.94
y griferias 43,300.68
- 43,301
- 9,681.65 20,145
117.24 11,372.28
136.79 32,692.81
- 9,681.65
- 34,383.44
- 0.00 20,072.47 18
CITADOS 20,000.00
- 20,072.47
72.47
- 0.00 141,083.69
- -
- 8,511.80
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 320
DÓLAR = S/.2.8
DESCRIPCION PPTO
CTA COSTO
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual Provisión
250,663.48 - -
UF proyección: 21,065
137,368.78 3,402.70
64,150
10,013 Contrato Closets - ISG 128,300
29,270 ADICIONAL 1 DE PUERTAS CAMBIADAS 5,418.95
13,492 ADICIONAL 2 DE PUERTAS CAMBIADAS 4,800
9,069 ADICIONAL 3 DE PUERTAS CAMBIADAS 2,253
11,375
- GASTO A LA FECHA ISG - 137,369
21,127.43
PROYECCION DE MUEBLE CONUTER 7,053.40
PROYECCION DE TAPAJUNTAS ENTRE 14,074
113,294.70 2,733.30
250,663.48 27,263.43
- -
250,663.48
Inf. En C. Costos
- 250,663
371,000
56,285,890 -
4,412,227
TOTAL
FINAL
140,771.48 - 4,485.11
21,127.43 14,469.57
116,028.00 - 101,571.00
277,926.91
-
- 77,512.51
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 330
DESCRIPCION PPTO
CTA COSTO
TOTAL 522,111.51
GAST
UNID Acum. Anterior
102,968.98 485,232.41
625,080.49
UF proyección:
350,189.90
62,456 SC GEMA HNOS
29,040 AD. BASE TABLERO BAÑOS
24,983 AD. COLUMNETAS PCI
7,917 AD. SUBESTACION
80,366 AD. PASAMANOS
21,702 AD. PUERTAS CAMBIO DE ESPECIFICACIONES T
35,705 AD. ELEMENTO DE CARPINTERIA METALICA EN
5,600 AD. ELEMENTOS DE CARPINTERIA METALICA EN
26,356
12,841 DEDUCTIVOS DE GEMA
8,570
11,925 Gasto GEMA - CARP. METALICA
14,249
8,091.54 8,092
-
389
193,422.05
22,670 Puertas Metalicas PCF 90min (GEMA)
- 8,570 DEDUCTIVO PUERTAS CONTRA INCENDIO GEMA
33,441 Puertas Metalicas PCF 180min (REGEYSER)
95,593 AD Puertas Metalicas PCF 180min (REGEYSER) 2U
2,240.00 2,240 PUERTAS ENROLLABLES
- CELOSIA
-
48,048.00 48,048 Gasto GEMA - PCI
- GASTO REGEISER PCI
Gasto puerta Enrollable
Provision Rejillas + adicionales
-
543,611.95
543,611.95
- 543,612
371,000
56,285,890
4,412,227
21,065
- 33,313.35
METALICA - 350,190
23,535.75 216,957.80 -
90min (GEMA) 22,670
S CONTRA INCENDIO GEMA- 8,570
180min (REGEYSER) 129,034
CF 180min (REGEYSER) 2U 2,240
64,496 -
7,088
- 14,100
- 131,274
- 48,048
- - -
25,496.99 569,108.94
55,971.55
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 340
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO OOEE
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual
1,815,579.42
T/C 3
UF proyección: 21,065
314,940.67
1,879,248.76
-
2,194,189.43
-
371,000
56,285,890
4,412,227
GASTAR TOTAL
TOTAL FINAL
653,776.26
12,973.47
- 314,941
2,541,044.59
- 1,879,248.76
38,115.67
- 18,513.35
1,033,207.21 3,227,396.64
-
- 675,322.95
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 350
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual Provisión
-
VAL 1 ADICIONAL SAUL 39,397.01
OTROS
BOMBA TRASEGADORA RO 503.39
788,289.06 -
UF proyección: 21,065
748,388.66 93,182.08
-
39,397.01
-
-
-
503.39
503
-
748,892.05 93,182.08
- -
748,892.05
Inf. En C. Costos
- 748,892
371,000
56,285,890 -
4,412,227
TOTAL
FINAL
841,570.74 - 217,979.67
503.39 200,703.91
-
842,074.13
-
- 17,275.76
93,182
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 360
DÓLAR = S
2.8
DOWNLUX E 1X26W
SYL LIGHTER LED 1
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual Provisión
2,902,163.40 317,876.31
UF proyección: 21,065
A POR GASTAR
TOTAL CANT P. UNIT. TOTAL
3,140,309.67 447,616.93
47,794.81 CONTRATO DIAR (BT + MT) 2,992,195.42
36,531.36 VALORIZ. (BT + MT) - 2,708,676.26
20,970.95 DCTO MO (01 Op desde 14/10/13) - 55,288.08
20,544.01
24,137.18
51,105.46
67,516.73
60,785.65 AD. DUCTERIA DE CORRIENTES 177,807.06
228,889.28 NUEVO PROYECTO ELECTRICO 537,970.04
221,409.96 ENERGETIZACION EQUIPOS AUT 59,360.96
65,124.39 MODIFICACIONES VARIAS 30,916.92
411,662.71 SISTEMA DE BOMBEO DE PETR - 211,006.18
300,620.89 GASTO A LA FECHA DE LOS ADI- 412,501.64
205,809.44
158,600.21 GASTOS GENERALES POR SUMINI 32,830.23
577,633.74 ENERGIZACION DE PUERTA ENR 4,008.46
209,539.49
-
412,501.64
74,077.06
-
- 55,288.08
-
291.79
51.00
-
-
-
- -
-
-
-
-
79,730.04 90,269.96
-
15,346.50
32,319.00 PPTO 170,000.00
3,319.68 GASTO A LA FECHA - 79,730.04
235.40
208.40
1,658.00
2,566.26
24,076.80
-
Inc. 361
-
3,220,039.71 537,886.88
- -
3,220,039.71
Inf. En C. Costos
98,440
116,159
56,285,890 -
4,412,227
TOTAL
FINAL
3,587,926.60 - 301,542.80
-
170,000.00 -
- 76,410.36
- -
3,757,926.60
-
- 301,542.80
537,887
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 370
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
TOTAL 212,347.80
CORRIENTES DEBILES
GASTOS A LA FECHA
DESCRIPCION Acum. Anterior Mes Actual Provisión
POR GASTAR
Acum. a la fecha CANT P. UNIT. TOTAL
187,375.16 29,968.29
187,375.16
Inf. En C. Costos
56,285,890 -
4,412,227
TOTAL
FINAL
217,343.45 - 4,995.65
37,992.35
217,343.45
-
- 4,995.65
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 380
DÓLAR = S/2.8
DESCRIPCION PPTO
CTA COSTO
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual
1,377,208.05 -
T/C 2.80
UF proyección: 21,065
1,040,662.17
473,780 Extincion + Bombas (TELEFONICA)
87,945 Avance SC TELEFONICA
109,388
62,340
63,312 CODOS TUBERIAS CONTRA INCENDIO
43,451 TUBERIAS DE ESCAPE PARA MOTOB
AUTOMATIZACION DE TABLEROS NOR
1,377,208.05
56,285,890
4,412,227
STAR TOTAL
TOTAL FINAL
-
72,356
52,269
52,269
5,272
326,399.39 116,571.21
- 269,900.37
468,850.40 1,846,058.45
- -
- 12,744.45
Inf. En C. Costos -
4,689
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 390
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
TOTAL 53,200.00
EXTRACCION DE BASURAS
GASTOS A LA FEC
UNID Acum. Anterior Mes Actual
39,960.00
39,960.00
- 39,960
371,000
56,285,890
4,412,227
GASTAR TOTAL
TOTAL FINAL
13,240.00 53,200.00 -
53,200
- 39,960
13,240.00 53,200.00
- -
-
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 410
DÓLAR = S
2.8
GASTOS A LA FECHA
UNID Acum. Anterior Mes Actual Provisión
2,360,965.80 -
508566.71
T/C: 2.70
2,360,965.80 704,598.36
1,852,399.09 ASC. KONE 2,428,608
AVANCE PAGO KONE - 1,852,399
VIG. PRIMARIAS 126,236.10
27,400.44 VIG. SECUNDARIAS 266,259.10
71,384.21
12,249.58 AVANCE PAGO MELCONSI - 428,774
87,258.68
28,007.90
35,841.00
24,113.35
20,170.74
44,613.00
21,898.53
19,557.77
30,574.03
5,705.00
2,360,965.80 704,598.36
- -
2,360,965.80
Inf. En C. Costos
392,495
- 2,360,966
349,359
223,123
371,000
56,285,890 -
4,412,227
TOTAL
FINAL
3,065,564.16 - 222,684.15
2,428,608
3,065,564.16
-
- 222,684.15
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 420
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
TOTAL 2,427,067.50
Postensado
GASTOS A LA FECHA
2,433,060.59 -
UF proyección: 21,065
POR GASTAR
Provisión Acum. a la fecha
CANT P. UNIT.
2,433,060.59
236,617.50 Contrato VSL
240,620.52 Avance VSL
248,666.86 Deductivo Sanciones
113,860.13
110,683.70 REAJUSTE
157,494.33
215,480.58
212,140.90
237,481.33
132,135.77
189,487.41
124,167.54
8,454.26
64,593.05
141,176.69
-
-
-
-
- 2,433,060.59
-
2,433,060.59
371,000
56,285,890
4,412,227
GASTAR TOTAL
TOTAL FINAL
28,711
0.00 2,433,060.59
- -
- 5,993.09
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 440
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
TOTAL 26,975.00
GASTOS A LA FECHA
DESCRIPCION Acum. Anterior
POR GASTAR
Mes Actual Provisión Acum. a la fecha CANT
14,942.88
señaletica
2,739 esquineros
- resguardo
188.14
50 Gastos a la fecha
11,882
20
33.90 34
4.24 4
25.42 25
-
14,942.88
-
14,942.88
- 14,943
371,000
56,285,890
4,412,227
21,065
12,032.12 26,975.00 -
19,525
3,116
4,335
s a la fecha - 14,942.88
12,032.12 26,975.00
- -
-
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 450
DÓLAR = S
2.8
DESCRIPCION PPTO
CTA COSTO
GASTOS A LA FECHA
DESCRIPCION Acum. Anterior Mes Actual Provisión
DESCUENTOS - 13,624.52
UF proyección: 21,065
POR GASTAR
Acum. a la fecha CANT P. UNIT. TOTAL
1,775,482.38 484,402.00
52,332.35 Contrato SC REFRICORP 2,233,622.38
337,075.00
26,837.10 Avance SC REFRICORP - 1,775,482
134,830.00
82,066.22
41,585.35
498,211 AMORITGUADORES 26,262
616,170
- 13,625
1,775,482.38 484,402.00
- -
1,775,482.38
Inf. En C. Costos
- 1,775,482
371,000
56,285,890 -
4,412,227
TOTAL
FINAL
2,259,884.38 564,773.02
2,259,884.38
-
3,202,258.42
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 460
.
DÓLAR = S/. 2.8
DESCRIPCION PPTO
CTA COSTO
AD 30 REPARACIONES DE VECINOS
TOTAL 17,002.30
GASTOS A LA FECHA
Acum.
DESCRIPCION
Anterior
8,690.37
UF proyección:
108,922.59
213.56 1,351.78
513.16 PRESUPUESTO
88.55 GASTO A LA FECHA
400.00 400.00
148.30 1,334.73 REAJUSTE
560.00
600.00 600.00
2,640.00 2,640.00
1,500.00 7,480.00
2,250.00 2,250.00
504.80
139.74
28.81
1,319.50 1,319.50
1,522.50 1,522.50
3,870.00 3,870.00
2,150.00 2,150.00
1,505.00 1,505.00
1,397.50 1,397.50
284.74
50.87 329.17
32.20
1,652.53
165.25
1,220.00
457.46
600.00 600.00
813.56 813.56
166.50
364.40
194.67
942.00
4.23
-
4,157.46 20,245.22 HH OBRAS EXTERIORES
3,090.41 3,090.41 HH EXTERIORES CORIL
473.12 2,923.88 HH CERCO PERIMETRICO
-
16,307.96
29,472.34
108,922.59
-
108,922.59
- 108,923
371,000
56,285,890
4,412,227
21,065
UPUESTO 17,002.30
O A LA FECHA - 108,923
91,147
0.00 108,922.60
- -
- 91,920.30
Inf. En C. Costos -
-
CONSTRUCTORA CyJ ECHEVERRIA IZQUIERDO S.A.C.
EDIFICIO BARLOVENTO
RESULTADO CUENTA 470
DESCRIPCION PPTO
CTA COSTO
471 Varios
TOTAL - 118,359.94
GASTOS A LA FECHA
DESCRIPCION Acum. Anterior Mes Actual Provisión
UF proyección: 21,065
POR GASTAR
Acum. a la fecha CANT P. UNIT. TOTAL
- 118,359.94
- 118,359.94
- -
Inf. En C. Costos
-
371,000.00
56,285,890 -
4,412,227
TOTAL
FINAL
118,359.94 -
-
-
-
118,359.94
-
- 118,359.94
118,359.94
Partida EI Descripción MONTO (S/.)
0100 Obras Preliminares e Instalaciones provisorias 1,485,373.91
0101 Construcciones Provisorias 442,599.47
0102 Instalaciones provisorias (en 0101) 0.00
0103 Trazados 313,424.36
0104 Consumos provisorios 108,220.00
0105 Permisos municipales 0.00
0106 Retiro de escombros 0.00
0107 Grúa 621,130.08
0110 Demoliciones y Sostenimiento 1,888,769.80
0111 Sistema de Estabilizacion - anclajes 986,893.70
0112 Acero 120,382.50
0113 Encofrado 141,937.20
0114 Concreto 585,556.40
0115 Demoliciones 54,000.00
0116 Maquinarias 0.00
0120 Movimiento de Tierras 1,385,962.70
0121 Excavación Masiva 1,291,021.51
0122 Excavación Manual 45,068.00
0123 Rellenos estabilizados compactados 6,615.00
0124 Retiro de excedentes 29,250.00
0125 Ripio y base Radier 14,008.20
0126 Drenes 0.00
0127 Agotamiento 0.00
0130 Concreto 4,455,378.45
0131 Concreto Armado 3,179,793.14
0132 Servicio de bombeo 371,316.36
0133 Mano de Obra 397,355.76
0134 Concreto en obra 25,678.78
0135 Maquinarias 0.00
0136 Cimientos y Sobrecimientos 351,007.56
0137 Probetas 0.00
0138 Varios 130,226.87
0140 Carpintería en madera 0.00
0141 Carpintería en madera 0.00
0150 Encofrado 2,049,265.27
0151 Alquiler de encofrado 520,706.96
0152 Encofrado materiales varios 458,094.23
0153 Mano de Obra 1,029,964.08
0154 Varios 40,500.00
0160 Acero 3,446,851.50
0161 Acero 2,539,265.10
0162 Mano de Obra 821,149.60
0163 Alambre 86,436.80
0170 Estructuras de acero 1,032,395.04
0171 Estructuras de acero 108,000.00
0172 Sistema de Disipadores de Energia 924,395.04
0180 Aislación y protección 0.00
0181 Aislación termica 0.00
0182 Aislación acustica 0.00
0190 Impermeabilización y Hojalatería 0.00
0191 Impermeabilización Subte, estanques y juntas frías 0.00
0192 Impermeabilización Baños , Cocinas y salas 0.00
0193 Impermeabilización losas expuestas primer piso y otras 0.00
0194 Impermabilización Fachada 0.00
0195 Estructura de Cubierta 0.00
0196 Hojalatería y cubierta 0.00
0197 Sombreretes y ventilaciones 0.00
0200 Estucos y yesos 603,571.87
0201 Tarrajeo 200,823.08
0202 Solaqueo 359,461.60
0203 Vestiduras y forjados 11,287.19
0204 Reparaciones Concreto 32,000.00
0210 Tabiques y Albañilerías 1,448,070.05
0211 Albañileria de Drywall 1,448,070.05
0212 Albañileria de ladrillo 0.00
0213 Varios 0.00
0220 Enchapes 0.00
0221 Suministro e instalación de enchapes 0.00
0230 Revestimientos 242,842.64
0231 Granito y marmol 204,856.35
0232 Acero inoxidable 6,716.22
0233 Papel Mural 0.00
0234 Enchapes y otros revestimientos 31,270.07
0240 Obras húmedas 0.00
0241 Obras humedas 0.00
0250 Cerámica 297,133.07
0251 Ceramico 134,351.41
0252 Porcelanato 162,781.66
0253 Otras cerámicas 0.00
0260 Techumbre 0.00
0261 Estructura de techumbre 0.00
0261 Cubierta 0.00
0270 Cielos 150,186.32
0271 Cielos y cenefas de volcanita 150,186.32
0272 Otros cielos 0.00
0273 Cornisas 0.00
0280 Pavimentos 370,869.53
0281 Alfombra - maderas 8,906.84
0282 Pisos de cemento 313,767.70
0283 Granitos 27,000.00
0284 Baldosas y pastelones 21,195.00
0285 Pavimentos de acera y exteriores 0.00
0286 Asfalto 0.00
0290 Cerrajeria y Puertas 297,579.00
0291 Puertas de madera 145,470.00
0292 Puertas metalicas 0.00
0293 Cerrajeria 152,109.00
0300 Pinturas y barnices 675,286.65
0301 Pinturas 654,064.63
0302 Demarcación y numeración estacionamientos 21,222.02
0310 Artefactos Sanitarios y grifería 162,571.89
0311 Artefactos Sanitarios 112,654.79
0312 Griferías 29,827.10
0313 Accesorios de baño 20,090.00
0315 Artefactos especiales 0.00
0320 Muebles Fijos 181,360.37
0321 Muebles de closet 136,286.37
0322 Muebles de correspondencia 35,597.00
0323 Muebles varios 9,477.00
0324 Muebles comunes 0.00
0330 Estructuras Metálicas 500,060.81
0331 Barandas 61,594.65
0332 Puertas, rejas y portones 125,800.00
0333 Marcos Metálicos y rejillas 82,903.85
0334 Celosias, parrillas y protección de equipos 12,021.28
0335 Pasamanos 51,042.68
0336 Otras estructuras metalicas 166,698.35
0337 Elementos de acerdo inoxidable 0.00
0340 Aluminios, Muro Cortina y Ventanas 2,414,806.49
0341 Ventanas, puertas y mamparas 481,639.78
0342 Baranda vidriada 0.00
0343 Muro Cortina 1,933,166.71
0344 Espejos 0.00
0350 Instalaciones sanitarias y gas 749,326.58
0351 Instalaciones Sanitarias 548,119.28
0352 Obras Civiles 0.00
0353 Equipos (Presurizacion, impulsión) 201,207.30
0354 Varios 0.00
0360 Instalación Eléctrica 2,861,335.00
0361 Instalación electrica 2,361,335.00
0362 Obras Civiles 0.00
0363 Grupo Electrógeno 330,000.00
0364 Luminarias 170,000.00
0370 Corrientes débiles 212,347.80
0371 Subcontrato de corrientes débiles 212,347.80
0372 Obras Civiles 0.00
0380 Seguridad , control, detección, extinción y audioevacuación 1,669,732.73
0381 Deteccion y extincion 1,167,376.00
0382 Control centralizado - BMS 192,406.73
0383 Seguridad y audioevacuacion 309,950.00
0390 Sistema Extracción de Basuras 53,200.00
0391 Subcontrato extracción de basura 53,200.00
0392 Obras Civiles 0.00
0400 Sistema de limpieza de fachadas 0.00
0401 Limpiafachadas 0.00
0402 Obras Civiles 0.00
0410 Ascensores 2,343,808.00
0411 Subcontrato Ascensores 2,343,808.00
0412 Obras Civiles 0.00
0420 Postensado 2,427,067.50
0421 Subcontrato Postensado 2,427,067.50
0430 Aseo, y entrega final 0.00
0431 Subcontrato de aseo 0.00
0432 Mano de obra 0.00
0433 Materiales de aseo 0.00
0440 Señáletica 26,975.00
0441 Señáletica 26,975.00
0450 Climatización Presurización y Extracción 2,637,485.40
0451 Climatizacion, presurizacion y Extraccion 2,637,485.40
0452 Presurizacion y Extraccion (en 0451) 0.00
0453 Obras Civiles 0.00
0460 Obras Exteriores y Complementarias 17,002.30
0461 Veredas 17,002.30
0462 Paisajismo 0.00
0463 Otros obras exteriores 0.00
0470 Varios 0.00
0471 Varios 0.00
0480 Sala de Venta y Piloto 0.00
0480-100 Sala de Venta y Piloto 1 0.00
0480-150 Sala de Venta y Piloto 2 0.00
0490 Urbanización 0.00
0490-100 Urbanización 0.00
0500 Valores Proforma 1 0.00
0500-001 Valores Proforma 2 0.00
0500-002 Valores Proforma 3 0.00
0510 Obras extras 0.00
0511 Obras extras 1 0.00
0520 Gastos Inmobiliaria 0.00
0520-001 0.00
0530 Facturas no codificadas 0.00
0530-001 0.00
0540 Presupuestos Inmobiliaria 0.00
0540-001 0.00
0550 Otros Cargos 0.00
0551 Cargos BIM 0.00
0552 Informática oficina central 0.00
0553 Marketing 0.00
0554 Actividades de capacitación 0.00
0555 Beneficios 0.00
0556 Cargos seguridad 0.00
0600 Gastos Generales (incluidos en CD) 4,684,932.53 Gastos Generales (no incluidos en CD)
601 GG Seguros y Garantías 168,095.00 168,095.00
602 GG Vehículos 0.00 0.00
603 GG Personal Administrativo 1,861,937.80 1,836,250.00 3,698,187.80
604 GG Pensiones 0.00 0.00
605 GG Herramientas 0.00 0.00
606 GG Fletes - Movilización y Tra 60,000.00 60,000.00
607 GG Elementos de Seguridad 311,946.00 311,946.00
608 GG Comunicación 15,500.00 102,250.00 117,750.00
609 GG Carreras y Andamios 202,400.00 202,400.00
610 GG Caja Chica y Varios 23,230.00 101000 124,230.00
611 GG Arriendo Maquinaria y Combu 588,683.54 588,683.54
612 GG Ensayos 53,975.00 53,975.00
613 GG Aseo General 301,272.85 301,272.85
614 GG Trazado y niveles 0.00 0.00
615 GG Ajuste Mano de Obra 0.00 0.00
616 GG Instalación y Consumos Prov 0.00 0.00
617 GG Mano de Obra Indirecta 0.00 0.00
618 GG Gastos Financieros, Oficina 755,192.34 1306400 2,061,592.34
619 GG Post Venta (en 621) 0.00 157285.45 157,285.45
620 GG Varios 0.00 0.00
621 GG Cuadrilla de Entrega 342,700.00 342,700.00
TOTAL CD SOLES 40,771,548.22 3,503,185.45