Informe Financiero 2018-Ccocha
Informe Financiero 2018-Ccocha
Informe Financiero 2018-Ccocha
Página 1de 46
MES : FEBRERO - 2018
DOCUMENTO UNIDAD PRECIO PRECIO
Nº FECHA SIAF NOMBRE / PROVEEDOR DETALLE DEL GASTO CANTIDAD
Nº C/P. Nº P/J-C-S Nº O/C-S PECOSA MEDIDA UNITARIO TOTAL
1 2/28/2018 733 4142 208 PLANILLA ANUALIZADA DE GASTOS EN P PLANILLA DEL PERSONAL DE OBRA (R.C.E.)PERSONAL 1 1,628.38 1628.38
2 2/28/2018 832 4206 229 PLANILLA ANUALIZADA DE GASTOS EN P PLANILLA DEL PERSONAL - SUPERVISION PERSONAL VARIOS 10,397.33 10397.33
3 2/28/2018 865 4238 248 PLANILLA ANUALIZADA DE GASTOS EN P PLANILLA DEL PERSONAL - GESTION DE PROPERSONAL VARIOS 22,606.67 22606.67
4 2/28/2018 897 4378/4379 261 PLANILLA ANUALIZADA DE GASTOS EN P PLANILLA DEL PERSONAL PROFESIONAL PERSONAL VARIOS 7,194.00 7194.00
TOTAL 41826.38
Página 2de 46
ABRIL - 2018 ABRIL - 2018 ABRIL - 2018
Página 3de 46
10 4/25/2018 335 80 341 DISTRIBUIDORA DE MADERA Y FUNERARIA
LISTONES DE MADERA CORRIENTE 2" X 3" X 3 UND. 200 13.00 2600.00
341 TABLAS DE MADERA CORRIENTE DE 1" 1/2 X 8" UND. 150 26.00 3900.00
11 4/30/2018 3131 671 PLANILLA ANUALIZADA DE GASTOS EN P PLANILLA DEL PERSONAL PROFESIONAL PERSONAL VARIOS 7739.00 7739.00
TOTAL 170490.59
Página 4de 46
ENERO - 2018 ENERO - 2018 ENERO - 2018
Página 5de 46
GOBIERNO REGIONAL DE APURIMAC
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
FORMATO FE - 05
EJECUCION PRESUPUESTAL MENSUAL
PROYECTO : MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INICIAL DE LA I.E.I N° 796 CCOCHA DISTRITO CURAHUASI, PROVINCIA ABANCAY, REGION APURIMAC
FUNCION : EDUCACIÓN - EDUCACIÓN BÁSICA - EDUCACIÓN INICIAL MODALIDAD : ADMINISTRACION DIRECTA
META : 118-2018 FTE.FTO : RECURSOS ORDINARIOS
RESPONSABLES :
RESIDENTE : ING SIXTO PEREZ ESTRADA SUPERVISOR : ING. ABRAHAN ALENDEZ SA
MES : MARZO - 2018
DOCUMENTO COMPROBANTE DE GASTO EJECUCION PRESPUPUESTAL POR ESPECIFICAS (mensual) COSTOS PECO
Nº DETALLE DE GASTOS TOTAL
FECHA CLASE Nº IMPORTEFECHA Nº 26.22.23 26.22.24 26.22.25 26.32.12 26.32.21 26.32.22 26.81.41 26.81.4226.81.43 26.71.61 26.23.99.3 Directos Indirectos SA
1 3/1/2018 O/S 255 974.50 4291 SERVICIO DE TELEFONIA 974.50 974.50 974.50
2 3/2/2018 CJ-CH. R.D.R. 5,000.00 4590 HABILITACION DE FONDO PARA CAJA CHICA - BIENES 5,000.00 5,000.00 5,000.00
3 3/2/2018 CJ-CH. R.D.R. 5,000.00 4590 HABILITACION DE FONDO PARA CAJA CHICA - SERVICIOS 5,000.00 5,000.00 5,000.00
4 3/26/2018 Plan. 387 6,104.00 6328 0 6,104.00 6,104.00 6,104.00
5 3/27/2018 Plan. 404 8,720.00 5952 0 8,720.00 8,720.00 8,720.00
6 3/27/2018 Plan. 359 1,802.38 6000 PLANILLA DEL PERSONAL DE OBRA (R.C.E.) 1,802.38 1,802.38 1,802.38
7 3/28/2018 O/C 60 9,400.00 6876 TUBO RECTANGULAR LAC 50 mm X 150 mm X 2,6 mm X 6 m. 9,400.00 9,400.00 74 9,400.00
8 3/28/2018 Plan. 468 2,834.00 6608 PLANILLA DEL PERSONAL PROFESIONAL 2,834.00 2,834.00 2,834.00
TOTAL 39,834.88 4,636.38 14,400.00 5,974.50 0.00 0.00 0.00 6,104.00 0.00 0.00 8,720.00 0.00 19,400.00 20,434.88 39,834.88
Página 6de 46
100.00 TRAPO INDUSTRIAL 100.00 100.00 339 100.00
3 4/19/2018 O/C 62 2,448.00 7554 ALAMBRE DE ACERO NEGRO Nº 8 2,448.00 2,448.00 95 2,448.00
4 4/19/2018 O/C 551 84.00 7514 CAJA OCTAGONAL DE PVC 4 in X 4 in - KOPLAST 84.00 84.00 474 84.00
120.00 CAJA RECTANGULAR DE PVC 2 in X 2 in - KOPLAST 120.00 120.00 474 120.00
129.50 CURVA DE PVC 1" 1/2 - KOPLAST 129.50 129.50 474 129.50
42.00 CURVA DE PVC 1" - KOPLAST 42.00 42.00 474 42.00
140.00 CURVA DE PVC 3/4" - KOPLAST 140.00 140.00 474 140.00
297.50 TUBO DE PVC DE 1" 1/2 X 3 m. - KOPLAST 297.50 297.50 474 297.50
330.00 TUBO DE PVC DE 1" X 3 m. - KOPLAST 330.00 330.00 474 330.00
666.00 TUBO DE PVC DE 3/4" X 3 m. - KOPLAST 666.00 666.00 474 666.00
5 4/23/2018 O/C 728 24,600.00 8018 CEMENTO PORLAND TIPO I - SOL ### 24,600.00 568 24,600.00
6 4/23/2018 599 5,450.00 7996 PLANILLA DEL PERSONAL - SUPERVISION 5,450.00 5,450.00 5,450.00
7 4/24/2018 Plan. 563 5,334.36 8232 0 5,334.36 5,334.36 5,334.36
8 4/24/2018 Plan. 561 3,873.28 8243 0 3,873.28 3,873.28 3,873.28
9 4/24/2018 Plan. 562 86,233.55 8253 PLANILLA DEL PERSONAL DE OBRA (R.C.C.) 86,233.55 86,233.55 86,233.55
10 4/25/2018 O/C 80 2,600.00 LISTONES DE MADERA CORRIENTE 2" X 3" X 3 m. 2,600.00 2,600.00 341 2,600.00
3,900.00 TABLAS DE MADERA CORRIENTE DE 1" 1/2 X 8" X 3 m. 3,900.00 3,900.00 341 3,900.00
11 4/30/2018 Plan. 671 7,739.00 PLANILLA DEL PERSONAL PROFESIONAL 7,739.00 7,739.00 7,739.00
TOTAL 170,490.59 103,180.19 61,860.40 0.00 0.00 0.00 0.00 5,450.00 0.00 0.00 0.00 0.00 148,093.95 22,396.64 170,490.59
Página 7de 46
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : PILAS LINTERNA
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
PROVEEDOR
ITEM Fecha UND Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 UND 3 Alm. Obra 3 3
2 4/23/2015 UNID 2 Alm. Obra 1 topografia U. Huamán 2
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : PINCEL DE CERDA BLANCA NATURAL N° 16
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 UND 4 Alm. Obra 4 4
2 4/16/2015 UND 3 Alm. Obra 1 Vigilancia A. Huamán 3
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : CLAVO DE CALAMINA 2 1/2
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 KILO 14 Alm. Obra 14 14
2 4/15/2015 KILO 13 Alm. Obra 1 topografia A. Huamán 13
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : BISAGRA DE 4 in
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 UND 4 Alm. Obra 4 4
2 4/15/2015 UND 2 Alm. Obra 2 campamento Z. Hilares 2
3 4/16/2015 UND 0 Alm. Obra 0 campamento R. Valencia 0
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : FRANELA ROJA (PROTECCIÓN DEL POLVO)
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 M.L 30 Alm. Obra 30 ¿
2 4/4/2015 M.L 28 Alm. Obra 2 limpieza Z. Hilares 28
3 4/4/2015 M.L 27 Alm. Obra 1 limpieza J. Chipana 27
4 4/4/2015 M.L 26 Alm. Obra 1 limpieza R. Valencia 26
5 4/4/2015 M.L 25 Alm. Obra 1 limpieza E. Marquina 25
6 4/4/2015 M.L 23 Alm. Obra 2 limpieza G. Rivas 23
7 046/04/2015 M.L 22 Alm. Obra 1 limpieza I. Espinoza 22
8 4/16/2015 M.L 21 Alm. Obra 1 limpieza J. Villegas 21
9 4/16/2015 M.L 20 Alm. Obra 1 limpieza Z. Hilares 20
10 4/16/2015 M.L 19 Alm. Obra 1 limpieza J. Chipana 19
11 4/16/2015 M.L 18 Alm. Obra 1 limpieza I. Espinoza 18
12 4/20/2015 M.L 17 Alm. Obra 1 limpieza D. Espinoza 17
13 4/20/2015 M.L 16 Alm. Obra 1 limpieza R. Hilares 16
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : GASOLINA DE 90
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
Alm. Obra 60 60
1 4/1/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 55
2 4/5/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 50
3 4/6/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 45
5 4/7/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 40
6 4/8/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 35
7 4/9/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 30
8 4/11/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 25
9 4/14/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 20
11 4/15/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 15
13 4/17/2015 GALONES 10 SERVI CENTRO SAN ANDRÉS Alm. Obra 10 Transporte de Personal D. Espinoza 5
14 4/17/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza 0
15 4/20/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza prestamo
16 4/22/2015 GALONES 10 SERVI CENTRO SAN ANDRÉS Alm. Obra 10 Transporte de Personal D. Espinoza prestamo
17 4/24/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza prestamo
18 4/25/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza prestamo
19 4/28/2015 GALONES 5 SERVI CENTRO SAN ANDRÉS Alm. Obra 5 Transporte de Personal D. Espinoza prestamo
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : GUANTE DE CUERO
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 PAR 61 Alm. Obra 61 61
2 4/16/2015 PAR 60 Alm. Obra 1 Desquinche R. Valencia 60
3 4/16/2015 PAR 59 Alm. Obra 1 Desquinche U. Fernández 59
4 4/16/2015 PAR 58 Alm. Obra 1 Desquinche I. Espinoza 58
5 4/16/2015 PAR 57 Alm. Obra 1 Desquinche R. Hilares 57
6 4/16/2015 PAR 56 Alm. Obra 1 Desquinche J. Villegas 56
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : CLAVO DE 3 in
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/11/2014 KILO 59 Alm. Obra 59 59
2 4/15/2014 KILO 58 Alm. Obra 1 topografia A. Huamán 58
3 4/16/2014 KILO 57 Alm. Obra 2 topografia Z. Hilares 57
4 4/18/2014 KILO 56 Alm. Obra 1 topografia R. Valencia 56
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : PINTURA ESMALTE CPP COLOR ROJO
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 GLN 2 Alm. Obra 2 2
2 4/15/2015 GLN 1 Alm. Obra 1 topografia A. Huamán 1
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : THINER ACRÍLICO
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 GLN 8 Alm. Obra 8 8
2 4/15/2015 GLN 7 Alm. Obra 1 topografia 7
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : WINCHA CE 8 METROS
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 UND 2 Alm. Obra 2 2
2 4/22/2015 UND 1 Alm. Obra 1 MEDIR J. Villegas 1
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : LIJA DE FIERRO DE N° 100
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 UND 50 Alm. Obra 50 50
2 4/8/2015 UND 49 Alm. Obra 1 equipo Mecanico 49
FORMATO FE - 07
CUADRO DE MOVIMIENTO DIARIO DE ALMACEN POR INSUMO
INSUMO : PETRÓLEO
PROYECTO : MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LA I.E SAN FRANCISCO DE LUCUCHANGA-PICHIRHUA
COMPONENTE : MEJORAMIENTO DEL SERVICO EDUCATIVO
FTE. FTO. : RECURSOS ORDINARIOS
CORRELATIVO : 102-2012
MODALIDAD : ADMINISTRACION DIRECTA
AÑO : 2012
ENTRADA SALIDA
ITEM Fecha UND PROVEEDOR Nombre quien SALDO
Nº de Factura / Nombre quien recepciona Cantidad Actividad o Partida FIRMA
Cantidad Razón Social del Proveedor recibe
Boleta / O/C
1 4/1/2015 GALONES 155 SERVICIO SAN ANDRÉS Alm. Obra 155 155
1 4/1/2015 GALONES 25 SERVICIO SAN ANDRÉS Alm. Obra 25 LIMPIEZA Justino Chip. 130
2 4/6/2015 GALONES 25 SERVICIO SAN ANDRÉS Alm. Obra 25 LIMPIEZA Justino Chip. 105
4 4/7/2015 GALONES 35 SERVICIO SAN ANDRÉS Alm. Obra 35 LIMPIEZA Justino Chip. 70
5 4/8/2015 GALONES 30 SERVICIO SAN ANDRÉS Alm. Obra 30 LIMPIEZA Justino Chip. 40
6 4/9/2015 GALONES 30 SERVICIO SAN ANDRÉS Alm. Obra 30 LIMPIEZA Justino Chip. 10
ALMCEN CENTRAL
1 4/1/2015 GALONES 155 SERVICIO SAN ANDRÉS 65 65
2 4/6/2015 GALONES 24 SERVICIO SAN ANDRÉS Alm. Central 24 Trasl. de Residente de Obra asist.Adm. 41
3 4/9/2015 GALONES 12 SERVICIO SAN ANDRÉS Alm. Central 12 Trasl. de Residente de Obra asist.Adm. 29
4 4/14/2015 GALONES 10 SERVICIO SAN ANDRÉS Alm. Central 10 Trasl. de Residente de Obra asist.Adm. 19
5 4/21/2015 GALONES 12 SERVICIO SAN ANDRÉS Alm.central 12 Trasl. de Residente de Obra asist.Adm. 7
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
FORMATO FE-06
CUADRO COMPARATIVO DEL PRESUPUESTO ANALITICO APROBADO Y EJECUTADO
PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INICIAL DE LA I.E.I N° 796 CCOCHA DISTRITO CURAHUASI, PROVINCIA ABANCAY, REGION APURIMAC"
FUNCION : EDUCACIÓN - EDUCACIÓN BÁSICA - EDUCACIÓN INICIAL MODALID : ADMINISTRACION DIRECTA
META : 118-2018 FTE.FTO : RECURSOS ORDINARIOS
RESPONSABLES :
RESIDENTE : ING SIXTO PEREZ ESTRADA SUPERVIS : ING. ABRAHAN ALENDEZ SA
MES
ESPECIFI : ABRIL - 2018
EXPEDIENT EXP. TEC. GASTO GASTO AVANCE FINANACIERO A NIVEL DEVENGADO - 2018 GASTO 2018 GASTO SALDO
CA
DETALLE E SUB META 2016 2017 PIM - 2018 ACUMULADO FINANCIERO %
DE ENERO FEBRERO MARZO ABRIL MAYOJUNIOJULIO GASTO (D SALD0 %
TECNICO (A) (B) (C) E = (B+C+D) (A-E)
GASTO
COSTO DIRECTO 5346252.65 985,498.28 0.00 442,249.78 543,628.00 25,813.54 0.00 9,400.00 148,093.95 0.00 0.00 0.00 183,307.49 360,320.51 66.28% 625557.27 359,941.01 36.52%
2.6.2 2.2 3 COSTO DE CONSTRUCCION POR ADMI. DIR 516,939.71 - 109,082.57 250,450.00 ### 86,233.55 ### 138,402.91 55.26% 221,129.66 295,810.05 57.22%
2.6.2 2.2 4 COSTO DE CONSTRUCCION POR ADM. DIREC 432,558.57 - 318,222.21 252,327.00 9,400.00 61,860.40 71,260.40 181,066.60 71.76% 389,482.61 43,075.96 9.96%
2.6.2 2.2 5 COSTO DE CONSTRUCCION POR ADM. DIREC 36,000.00 - 14,945.00 40,851.00 - 40,851.00 100.00% 14,945.00 21,055.00 58.49%
GASTOS GENERALES 773402.69 142,564.72 0.00 67,606.00 61,000.00 15,806.83 8,822.38 15,610.88 16,946.64 0.00 0.00 0.00 57,186.73 3,813.27 6.25% 124792.73 17,771.99 12.47%
2.6.2 2.2 3 COSTO DE CONSTRUCCION POR ADMI. DIR 112,218.51 - 61,408.13 51,000.00 ### 8822.38 4,636.38 16946.64 46,212.23 4,787.77 9.39% 107,620.36 4,598.15 4.10%
2.6.22.2 4 COSTO DE CONSTRUCCION POR ADM. DIREC 16,742.74 - 3,117.04 5,000.00 5,000.00 5,000.00 0.00 0.00% 8,117.04 8,625.70 51.52%
2.6.2 2.2 5 COSTO DE CONSTRUCCION POR ADM. DIREC 13,603.47 - 3,080.83 5,000.00 5,974.50 5,974.50 -974.50 -19.49% 9,055.33 4,548.14 33.43%
GASTOS DE SUPERVISION 432751.76 79,771.04 0.00 36,213.94 39,991.00 0.00 10,397.33 6,104.00 5,450.00 0.00 0.00 0.00 21,951.33 18,039.67 45.11% 58165.27 21,605.77 27.08%
2.6.8 1.4 1 GASTO POR LA CONTRATACION DE PERSO 70,402.76 - 25,942.00 36,991.00 10397.330 6104.00 5450.00 21,951.33 15,039.67 40.66% 47,893.33 22,509.43 31.97%
2.6.8 1.4 2 GASTO POR LA COMPRA DE BIENES 8,782.76 - 1,171.94 3,000.00 - 3,000.00 100.00% 1,171.94 7,610.82 86.66%
2.6.8 1.4 3 GASTO POR LA CONTRATACION DE SERVIC 585.52 - 9,100.00 - 0.00 #DIV/0! 9,100.00 -8,514.48 ###
MAQUINARIAS, EQUIPOS Y MOBILIARIOS
26.32.999 - 1,750.00 #DIV/0! 1,750.00 -1,750.00 #DIV/0!
26.32.22 MOBILIARIO 167717.00 25087.00 - 25,087.00 - 25,087.00 100.00% 0.00 25,087.00 100.00%
26.32.21 EQUIPAMIENTO 238551.36 39758.56 - 39,758.00 - 39,758.00 100.00% 0.00 39,758.56 100.00%
2.3.1.9.1 2 MATERIALES DIDACTICOS 40530.60 6755.10 - - 0.00 #DIV/0! 0.00 6,755.10 100.00%
26.71.53 CAPACITACION 94661.10 15776.85 - 5,776.00 - 5,776.00 100.00% 0.00 15,776.85 100.00%
26.71.61 GESTION DE PROYECTOS 128643.00 23713.33 - 4,000.00 31,327.00 22,606.67 8,720.00 31,326.67 0.33 0.00% 35,326.67 -11,613.34 -48.97%
26.81.31 EXPEDIENTE TECNICO 205003.96 37789.28 37,789.28 - 0.00 #DIV/0! 37,789.28 0.00 0.00%
26.23.99.5 MITIGACION AMBIENTAL 166044.43 26898.04 - - - #DIV/0! 0.00 26,898.04 100.00%
26.81.49.9 LIQUIDACION FINAL DE OBRA 76768.27 14151.03 - - 0.00 #DIV/0! 0.00 14,151.03 100.00%
TOTAL 7,670,326.82 1,397,763.23 37,789.28 551,819.72 746,567.00 41,620.37 41,826.38 39,834.88 170,490.59 0.00 0.00 0.00 293,772.22 452,794.78 #DIV/0! 883,381.22 514,382.01 #DIV/0!
5.57% 5.60% 5.34% 22.84% 0.00% 0.00% 0.00% 39.35%
RESUMEN CUADRO COMPARATIVO DEL PRESUPUESTO ANALITICO
PORCENT
DESCRIPCIÓN PRESUPUESTO GASTO
AJE
PRESUPUESTO TOTAL DE OBRA 1,397,763.23 100%
GASTO FINANCIERO EJECUTADO 2016 - 2017 589,609.00 42.18%
GASTO FINANCIERO EJECUTADO 2018 293,772.22 21.02%
GASTO ACUMULADO 883,381.22 63.20%
SALDO PRESUPUESTAL 514,382.01 36.80%
Página 22de 46
FORMATO FE - 09
PARTE DIARIO DE MAQUINARIA Y EQUIPO PROPIA Y/O ALQUILADA
HORAS TRABAJADAS MES DE JULIO DEL 2015
CUADRO DE HORAS POR MAQUINARÍA PROPIA TRABAJADAS
PROYECTO : CONSTRUCION TROCHA CARRAZABLE PACHACONAS-RAMAL HUANCARAY, DISTRITO DE MAQUINARIA VOLQUETE VOLVO
COMPONENTE : 4000070 CONSTRUCCION CAMINO VECINAL POTENCIA :
FTE. FTO : RECURSOS POR OPERACIÓN OFICIALES DE CREDITO CAPACIDAD : 08 M3
CORRELATIVO : 0018-2015 MODELO : 1WT-1299
FECHA
INICIO FINAL TOTAL HORAS
FECHA
INICIO FINAL TOTAL HORAS
FECHA
INICIO FINAL TOTAL HORAS
FECHA
INICIO FINAL TOTAL HORAS
FECHA
INICIO FINAL TOTAL HORAS
FECHA
INICIO FINAL TOTAL HORAS
FUNCION : 15 TRANSPORTE
COMPONENTE : 4000070 CONSTRUCCION CAMINO VECINAL
CORRELATIVO DE META :0018-2015
PROYECTO :CONSTRUCCION TROCHA CARROZABLE PACHACONAS-RAMAL HUANCARAY, DISTRITO DE PACHACONAS-ANTABAMBA-REGION APURIMAC.
FTE.FTO :RECURSOS POR OPERACIÓN OFICIALES DE CRÉDITO
MODALIDAD : ADMINISTRACION DIRECTA
RESPONSABLES : ING. ABEL C. GUTIERREZ AGUIRRE
MES : AGOSTO - 2015
HORAS / DIA TRABAJADO
NOMBRE DEL PROVEEDOR /PROPIA DESCRIPCION DE LAMAQUINARIA Y/O EQUIPO(capacidad-placa) UNIDAD DE MEDIDA PRECIO UNITARIO COSTO TOTAL
acumulado anterio Actual (AGOSTO) Acumalado total
GOBIERNO REGIONAL VOLQUETE VOLVO REG WT 1299 183.96 20.70 204.66 HM 180.90 37,022.99
GOBIERNO REGIONAL CAMIONETA TOYOTA PGM 955 111.60 3.00 114.60 HM 350.00 40,110.00
TOTAL 77,132.99
FORMATO FE - 11
CONSUMO DE COMBUSTIBLE
LUBRICANTES REPUESTOS Y OTROS DE MAQUINARIA PROPIA MENSUAL
MES DE JULIO DEL 2015
FUNCION : 15 TRANSPORTE MAQUINARIA: VOLQUE VOLVO
CORRELATIVO : 0018-2015 POTENCIA :
PROYECTO : CONSTRUCCION TROCHA CARROZABLE PACHACONAS-RAMAL HUANCARAY, DISTRITO DE PACHACONAS-ANTABAMBA-REGION APURIMAC. CAPACIDAD : 8M3
FTE.FTO : RECURSOS POR OPERACIÓN OFICIAL DE CREDITO PLACA: WT-1299
MODALIDAD : ADMINISTRACION DIRECTA
RESPONSABLES: ING. ABEL C. GUTIERREZ AGUIRRE
MES : MES DE SETIEMBRE DEL 2015
COMBUSTIBLE LUBRICANTE REPUESTOS OTROS
COSTO TOTAL
FECHA
TIPO DE CANTIDAD Tipos de Unidad de (S/.)
P. Unit. Parcial Tipo de insumo Unidad de Medida P.Unit. Parcial P.Unit. Tipo de insumo P.Unit. Parcial
COMBUSTIBLE (Glns) insumo Medida
Cod. 01
FTE.FTO : RECURSOS ORDINARIOS OPERADOR GAVANCHO PATACA, VICTO
META : 118-2018 MAQUINA MEZCLADORA DE CONCRETO
RESPONSABLES : MARCA
RESIDENTE : ING SIXTO PEREZ ESTRADA CAPACIDAD
SUPERVISOR : ING. ABRAHAN ALENDEZ SANCHEZ PLACA
MES : ENERO - 2018 COMBUSTIBLE GASOLINA
HORAS / DÍA TRABAJADO
Nº FECHA TRABAJOS REALIZADOS COMB.
Acum. Ant. ENERO Acum. Act.
- - Horas Acumulado 0:00:00 0:00:00
1 1/15/2018 VACIADO SOBRECIMIENTO BLOQUE 4 PSIC 1 1:00:00 1:00:00
2 1/16/2018 VACIADO SOBRECIMIENTO BLOQUE 4 PSIC 1 1:40:00 2:40:00
3 1/19/2018 VACIADO VIGA COLLARIN BLOQUE-4 PSICO 3 6:00:00 8:40:00
4 1/24/2018 VACIADO DE SOLADOS EN ZAPATA BLOQUE - 1 0:45:00 9:25:00
5 1/25/2018 VACIADO DE CONCRETO EN ZAPATAS BLOQU 1.5 2:00:00 11:25:00
6 1/26/2018 VACIADO DE CONCRETO VIGAS COLLARIN B 1 4:00:00 15:25:00
7 1/27/2018 VACIADO DE CONCRETO VIGAS CIMENTACI 1 3:20:00 18:45:00
8 1/29/2018 VACIADO DE CONCRETO EN COLUMNAS BLOQUE 1 1:00:00 19:45:00
9 1/30/2018 VACIADO DE CONCRETO EN CIMIENTOS COR 1 3:00:00 22:45:00
10 1/31/2018 VACIADO DE COLUMNAS BLOQUE 1 1 3:00:00 25:45:00
TOTALES HORAS TRABAJADAS 25:45:00 25:45:00
PRECIO POR ALQUILER o DEPRECIACION HORARIA (S/.)
TOTAL ACUMULADO 11.50 25:45:00
02
FTE.FTO : RECURSOS ORDINARIOS OPERADOR JARA RIOS, WILFREDO
META : 118-2018 MAQUINA VIBRADORA DE CONCRETO
RESPONSABLES : MARCA
RESIDENTE : ING SIXTO PEREZ ESTRADA CAPACIDAD
SUPERVISOR : ING. ABRAHAN ALENDEZ SANCHEZ PLACA
MES : ENERO - 2018 COMBUSTIBLE GASOLINA
HORAS / DÍA TRABAJADO
Nº FECHA TRABAJOS REALIZADOS COMB.
Acum. Ant. ENERO Acum. Act.
- - Horas Acumulado 0:00:00 0:00:00
Página 3 de 3
ENERO - 2018 ENERO - 2018
03
FTE.FTO : RECURSOS ORDINARIOS OPERADOR JARA RIOS, WILFREDO
META : 118-2018 MAQUINA CAMION VOLQUETE XI - 3890
RESPONSABLES : MARCA NISSAN
RESIDENTE : ING SIXTO PEREZ ESTRADA CAPACIDAD
SUPERVISOR : ING. ABRAHAN ALENDEZ SANCHEZ PLACA XI - 3890
MES : ENERO - 2018 COMBUSTIBLE : PETROLEO
HORAS / DÍA TRABAJADO
Nº FECHA TRABAJOS REALIZADOS COMB.
Acum. Ant. ENERO Acum. Act.
- - Horas Acumulado 0:00:00 0:00:00
1 1/22/2018 VACIADO VIGA COLLARIN BLOQUE-4 PSICO 40 8:00:00 8:00:00
2 1/25/2018 TRASLADO DE ENMADERAME 10 8:00:00 16:00:00
TOTALES HORAS TRABAJADAS 16:00:00 16:00:00
PRECIO POR ALQUILER o DEPRECIACION HORARIA (S/.)
TOTAL ACUMULADO 50 16:00:00
Página 3 de 3
ENERO - 2018 ENERO - 2018 ENERO - 2018
: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE NIVEL INICIAL DE LA I.E.I. Nº 796 CCOCHA DISTRITO DE CURAHUASI PROVINCIA DE ABANCAY
PROYECTO
REGION APURIMAC"
FTE.FTO : RECURSOS ORDINARIOS
META : 118-2018
RESPONSABLES :
RESIDENTE : ING SIXTO PEREZ ESTRADA
SUPERVISOR : ING. ABRAHAN ALENDEZ SANCHEZ
MES : ENERO - 2018
DESCRIPCION DE LA MAQUINARIA Y/O EQUIPO HORAS / DIAS TRABAJADOS COSTO
Nº PROPIEDAD Und. Med. Pre. Uni.
(Capacidad - Placa) Acum. Ant. ENERO Acum. Act. TOTAL (S/)
1 G.R.A. MEZCLADORA DE CONCRETO 25:45:00 25:45:00 HM
2 G.R.A. VIBRADORA DE CONCRETO 19:20:00 19:20:00 HM -
3 G.R.A. CAMION VOLQUETE XI - 3890 16:00:00 16:00:00 HM -
TOTAL 0:00:00 61:05:00 61:05:00 -
Página 36de 46
PRE LIQUIDACION - 2018 PRE LIQUIDACION - 2018
Página 37de 46
ENERO - 2018 ENERO - 2018 ENERO - 2018
Página 3 de 3
ENERO - 2018 ENERO - 2018 ENERO - 2018
Página 3 de 3
Página 3 de 3
ENERO - 2018 ENERO - 2018 ENERO - 2018
Página 41de 46
PRE LIQUIDACION - 2018 PRE LIQUIDACION - 2018
Página 42de 46
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
FE-06
CUADRO COMPARATIVO DEL PRESUPUESTO ANALITICO APROBADO Y EJECUTADO
FUNCION : SANIAMIENTO
COMPONENTE : 4000070 SANEAMIENTO RURAL
CORRELATIVO DE ME : 0267-2015
PROYECTO : MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, INSTALACION DE SERVICIO DEL ALCANTARILLADO Y DISPOSICION DE EXCRETAS EN LA LOCALIDAD DE PATAN , DISTRITO DE AQUIRA, PROVINCIA DE COTABAMBAS-APURIMAC.
FTE.FTO : RECURSOS ORDINARIOS
MODALIDAD : ADMINISTRACION DIRECTA SALDO POR EJECUTAR
RESPONSABLE : ING. JORGE ZUÑIGA MAMANI S/.
MES : NOVIEMBRE-2015 ###
PIM 2015 PROGRAMADO GASTOS EJECUTADOS AÑO 2015 SALDO
ESPECIFICA DE
DETALLE PIM 2015
GASTO OCTUBRE NOVIEMBRE DICIEMBRE TOTAL OCTUBRE NOVIEMBRE DICIEMBRE % ACUMULADO % SALDO %
COSTO DIRECTO 173,060.00 21,722.00 70,000.00 81,300.00 173,022.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 6.2 3.5 3 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 60,000.00 11,306.00 35,000.00 13,700.00 60,006.00 Err:509 Err:509 38896.75 Err:509 Err:509 Err:509 Err:509 Err:509
2 6.2 3.5 4 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA -BIENES 99,158.00 10,416.00 30,000.00 58,700.00 99,116.00 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 6.2 3.5 5 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 13,902.00 0.00 5,000.00 8,900.00 13,900.00 0.00 0.00 0.00% 0.00 0.00% 13,902.00 100.00%
2 6.2 3.5 6 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - OTROS 0.00 0.00 0.00 - 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
GASTOS GENERALES 39,000.00 0.00 24000.00 16000.00 40,000.00 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 6.2 3.5 3 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 25,000.00 0.00 14,000.00 11,000.00 25,000.00 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 6.2 3.5 4 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA -BIENES 8,000.00 0.00 7,000.00 2,000.00 9,000.00 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 6.2 3.5 5 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 6,000.00 0.00 3,000.00 3,000.00 6,000.00 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
GASTOS DE SUPERVISIÓN 12,930.00 0.00 0.00 12930.00 12930.00 0.00 0.00 0.00% 0.00 0.00% 12930.00 100.00%
2 6.8 1.4 1 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
2 6.8 1.4 2 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA -BIENES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
2 6.8 1.4 3 COSTO DE COSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 12,930.00 0.00 0.00 12,930.00 12,930.00 0.00 0.00 0.00% 0.00 0.00% 12,930.00 100.00%
2 6.8 1.4. 99 COSTO DE CONST. POR ADM.DIRECTA-OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
DESARROLLO DE CAPACITACION 10000.00 0.00 0.00 10000.00 10000.00 0.00 0.00 0.00% 0.00 0.00% 10000.00 100.00%
2 6.7 1.5 2 GASTOS POR LA COMPRA DE BIENES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
2 6.7 1.5 3 GASTOS POR LA CONTRATACION DE SERVICIOS 10,000.00 0.00 0.00 10,000.00 10,000.00 0.00 0.00 0.00% 0.00 0.00% 10,000.00 100.00%
OTROS GASTOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
2 6.8 1.3 1 GASTOS DE EXPEDIENTE TECNICO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
2 6.2 3.2 3 CONSTO POR CONSTRUCCION POR CONTRATA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
2 6.8 1.4. 99 GASTOS DE LIQUIDACION DE OBRA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%
TOTAL 234,990.00 21,722.00 94,000.00 120,230.00 235,952.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
###
RESUMEN DEL AÑO 2015 ###
DETALLE MONTO %
PRESUPUESTO TOTAL DE OBRA -
PRESUPUESTO SEGUN PIM 2015 234,990.00 100.00%
TOTAL EJECUTADO 2015 Err:509 Err:509
SALDO Err:509 Err:509 ###
ING.RESIDENTE DE OBRA ASISTENTE ADMINISTRATIVO ING. SUPERVISOR O INSPECTOR
Firma y Sello Firma y Sello Firma y Sello
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
MANIFIESTO DE GASTOS
FUNCION
COMPONEN
CORRELAT 0267-2015
PROYECTO : MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, INSTALACION DE SERVICIO DEL ALCANTARILLADO Y DISPOSICION DE EXCRETAS EN LA
FTE.FTO : RECURSOS ORDINARIOS
MODALIDA : ADMINISTRACION DIRECTA
RESPONSA : ING JORGE ZUÑIGA MAMANI
MES : NOVIEMBRE - 2015
TOTAL
DOCUMENTO UNID. PRECIO DEL
Nº PROVEEDOR DETALLE DEL GASTO CANTIDAD OBSERVACIONES
Nº P/J-C-S Nº O/C-S MEDIDA UNITARIO DOCUMEN
TO
BARNIZ MARNO - PARACAS GALON 2 55.00 110.00
BARNIZ POLIURETANO GALON 2 70.00 140.00
CERRADURA MECANICA DE DOS GOLPES UND 6 65.00 390.00
LIJA PARA PULIR FIERRO Nro 150 UND 20 2.00 40.00
1 001-1145 3064 CHUTA BONIFACIO ABRAHAM
LIJA PARA PULIR MADERA Nro 150 UND 10 2.00 20.00
MASILLA KLG 5 4.00 20.00
TAPA DE CONCRETO PARA DESAGUE DE UND 8 20.00 160.00
YESO X 28 KG KLG 16 12.00 192.00
BARNIZ-LASER GALON 3 40.00 120.00
IMPRIMANTE PARA PARED-CPP GALON 16 25.00 400.00
2 001-1146 3101 CHUTA BONIFACIO ABRAHAM PINTURA ANTICORROSIVA - LASER GALON 4 40.00 160.00
PINTURA ESMALTE COLOR AMARILLO- GALON 6 40.00 240.00
PINTURA LATEX COLOR AMARILLO - CP GALON 16 30.00 480.00
3 199, 211.ADM.MEMO.17 HABILITO DE FONDOS (CAJA CHICA) GLOB 10000.00 10000.00
LENTES PROTECTOR DE POLICARBONA PAR 15 2.50 37.50
GUANTE DE CUERO CON CROMO REFOR PAR 25 8.90 222.50
4 001-3260 3260 RIVERA CHAVEZ GABRIELA CASCO DE SEGURIDAD DE PLASTICO (ME UND 15 6.90 103.50
BOTA DE JEBE PAR 15 19.90 298.50
CHALECO DRILL UNISEX TALLA COLOR UND 15 35.90 538.50
5 001-3040 3289 FERRETERIA EL PORVENIR Y CO CEMENTO PORTLAN TIPO 1 X 42.50 KG - BLS 120 32.00 3,840.00
6 001-3241 3241 REPRESENTACIONES COMERCIAL GEOTEXTIL NO TEJIDO DE POLIPROPILEN METRS 200 8.70 1,740.00
CABLE ELECTRICO Nro 14 TW X 100 M - UND 3 93.70 281.10
CAJA OCTOGONAL GALBANIZADA 4 in x UND 4 1.30 5.20
CAJA RECTANGULAR GALVANIZADA 4 in x UND 6 1.20 7.20
CINTA AISLANTE DE 18MM X 20M -3M UND 6 3.20 19.20
7 001-019065
REPRESENTACIONES
3242 EQUIPO
COMERCIALES Y MULTISERVICIOS DE FLUORESCENTE CIRCULAR 1X UND
.E.I.R.LTDA 12 29.00 348.00
INTERRUPTOR 2 X 30 AMP - BTICINO UND 6 43.00 258.00
INTERRUPTOR DE CONMUTACION - BTI UND 6 7.90 47.40
SOQUETE PARA FUORESCENTE CIRCUL UND 12 1.90 22.80
TABLERO DE METAL PARA EMPOTRAR D UND 2 37.00 74.00
8 0001-00202 3280 CAMARGO RIVAS ROSARIO ALAMBRE DE ACERO DE PUAS N° 16 METRS 1700 0.24 408.00
9 001-00065 S.R.L.DE FIERRO GALVANIZADO DE 2 in UND
INVERSIONES Y DISTRIBUIDORA A Y BTUBO
3290 58 75.00 4,350.00
CARRETILLA PARA CONSTRUCCION TIPO UND 8 165.00 1,320.00
11 3476 PORTOCARRERO QUINO JOSEFINA
PALA TIPO CUCHARA-TRAMONTINA UND 10 25.00 250.00
PICO CON MANGO UND 10 31.00 310.00
ALAMBRE DE ACERO GALVANIZADO N° UND 25 6.5 162.50
ALAMBRE DE ACERO RECOSIDO N° 8 UND 20 3.5 70.00
12 3110 INFESUR
CLAVO DE FIERRO DE 3 PULGADAS UND 15 3.5 52.50
CLAVO DE FIERRO DE 4 PULGADAS UND 15 3.5 52.50
CINTA TEFLON DE 1/2 PULGADA UND 10 0.9 9.00
GRIFO DE BRONCE DE 1/2 PULGADA UND 18 12 216.00
INODORO COMPLETO UND 12 165 1,980.00
13 3073 INFESUR
PEGAMENTO PARA PVC GLN 1 90 90.00
REGISTRO DE BRONCE DE 4 PULGADAS UND 6 9 54.00
SUMIDERO DE BRONCE DE 4 PULGADAS UND 9 9 81.00
LLAVE CROMADA PARA LAVATORIO UND 12 32 384.00
LLAVE DE PASO DE BRONCE DE 1 PULG UND 3 26 78.00
14 INFESUR
TUBO DE PVC DE 2 PULGADAS UND 15 11 165.00
TUBO DE 4 PULGADAS UND 20 22 440.00
15 3290 AYB TUBO DE FIERRO GALVANIZADO DE 2 in UND 58 75 4,350.00
FRAGUA DE COLOR VERDE PARA MAYO KLG 20 4.1 82.00
MAYOLICA 20 X 30 CM UND 20 26 520.00
16 COORPORACION LIA
CERAMICO 30 X 30 CM UND 33 25 825.00
PEGAMENTO PARA CERAMICA BLS 15 14 210.00
17 PUERTA METAL UND 1 2500 2,500.00
18 GAVIONES UND 1 36000 36,000.00
TUBO DE PVC PARA DESAGUE DE 8 X5M UND 15 167 2,505.00
SALINAS TUMBA
TUBO DE PVC PARA DESAGUE DE 6X 6M UND 7 112.8 789.60
19 3293 SANTA MARTA PETROLEO GLN 400 9.76 3,904.00
20 MULTISERVICIOS LEO SERVICIO DE MANO DE OBRA EN GNRL UND 1 10000 10,000.00
21 COMUNIDAD DE PATAN AQUILER DE CAMION VOLQUETE UND 1 5250 5,250.00
22 VALENTIN ROQUE AQUILER DE CAMION RETROEXCABAD UND 1 6000 6,000.00
PLANILLA UNICA DE HABERES GG GLB 1 13953.33 13,953.33 PAG DE RESIDENTE Y ASISTENT
PLANILLA UNICA DE HABERES NOVIEM GLB 1 32146.33 32,146.33 PLANILLA R.COMUN ESPECIAL
PLANILLA OCTUBRE REGIMEN COMUN E GLB 1 11325.16 11,325.16
SUPERVICION GLB 1 12930.08 12930.08
PLANILLA DICIEMBRE GLB 1 30000 30000
PLANILLA DICIEMBRE GG 8000 8000
CACITACITACION GLB 1 10000 10000
TOTAL 222,078.40