COMPUTOS - 17 - JULIO - 16 - TUNEL DE INCAHUASnI
COMPUTOS - 17 - JULIO - 16 - TUNEL DE INCAHUASnI
COMPUTOS - 17 - JULIO - 16 - TUNEL DE INCAHUASnI
VOLUMEN
AREA AREA MEDIA VOLUMEN
PROGRESIVA ACUMULADO OBSERVACIONES
(m2) (m2) (m3) (m3)
63+340
0+00.0 0.000 0.000 0.00 0.00 Túnel Principal - Portal Ipati
0+10.0 96.452 48.226 482.26 482.26 Túnel Principal - Portal Ipati
0+20.0 79.325 87.889 878.89 1361.15 Túnel Principal - Portal Ipati
0+30.0 52.989 66.157 661.57 2022.72 Túnel Principal - Portal Ipati
0+35.0 38.256 45.623 228.12 2250.84 Túnel Principal - Portal Ipati
TOTAL ITEM 5.1.2. Excavación Material Suelto (espesor promedio 2 m) = 2250.84 m3.
VOLUMEN
AREA AREA MEDIA VOLUMEN
PROGRESIVA ACUMULADO OBSERVACIONES
(m2) (m2) (m3) (m3)
062+100.00
62+102.00 20.537 10.269 20.54 20.54 Portal Muyupampa
62+104.00 49.300 34.919 69.84 90.38 Portal Muyupampa
62+106.00 47.756 48.528 97.06 187.44 Portal Muyupampa
62+108.00 40.931 44.344 88.69 276.13 Portal Muyupampa
62+110.00 25.907 33.419 66.84 342.97 Portal Muyupampa
62+112.00 26.107 26.007 52.01 394.98 Portal Muyupampa
62+114.00 17.452 21.780 43.56 438.54 Portal Muyupampa
62+115.00 25.999 21.726 21.73 460.27 Portal Muyupampa
TOTAL ITEM 5.1.3. Excavación con escarificación (espesor promedio 4 m) = 460.27 m3.
VOLUMEN
AREA AREA MEDIA VOLUMEN
PROGRESIVA ACUMULADO OBSERVACIONES
(m2) (m2) (m3) (m3)
062+106.00
62+108.00 6.663 3.33 6.66 6.66 Portal Muyupampa
62+110.00 22.138 14.40 28.80 35.46 Portal Muyupampa
62+112.00 22.454 22.30 44.59 80.05 Portal Muyupampa
62+114.00 31.583 27.02 54.04 134.09 Portal Muyupampa
62+115.00 30.337 30.96 30.96 165.05 Portal Muyupampa
72.00
VOLUMEN
AREA LONGITUD VOLUMEN
PROGRESIVA ACUMULADO OBSERVACIONES
(m2) (m) (m3) (m3)
63+340
0+00.0 0.455 62.950 28.64 28.64 Túnel Principal - Portal Ipati
6.00
DE (m2) (m2)
62+120 6.00 54.51 54.51 Talud Tunel Principal Portal Muyupampa
54.51
TOTAL ITEM 5.2.4. Malla Electrosoldada d=8mm, 10cm x 10cm = 54.51 m2.
8.40
Volumen a
PROGRESIVA Area Longitud Espesor Tramo
Certificar
OBSERVACIONES
BANQUINA
62+120 82.40 0.07 5.77 Banquina Portal Muyupampa
10.61
TOTAL ITEM 5.3.1. Revestimiento de hormigón - canales de drenaje (dmax=5cm) 10.61 m3.
SECCION TRAPEZOIDAL
DESCRIPCION a b h AREA
A1 0.92 0.52 0.4 0.288
A2 0.7 0.4 0.3 0.165
0.123
BASE DE BANQUINA
063+229.50 063+207.50 14.990 22.00 329.78 Tunel Portal Ipati Seccion piloto
2,501.39
1,523.97
124.04
VOLUMEN
PROGRESIVA PROGRESIVA AREA MEDIA VOLUMEN
ACUMULADO OBSERVACIONES
INICIAL FINAL
(m2) (m3) (m3)
2,151.00
063+323.00 2.050 1.00 2.05 2.05 Tunel principal Portal Ipati Izq.
063+322.00 2.050 1.00 2.05 4.10 Tunel principal Portal Ipati Izq.
063+321.00 2.050 1.00 2.05 6.15 Tunel principal Portal Ipati Izq.
063+323.00 2.050 1.00 2.05 8.20 Tunel principal Portal Ipati Der.
063+322.00 2.050 1.00 2.05 10.25 Tunel principal Portal Ipati Der.
063+321.00 2.050 1.00 2.05 12.30 Tunel principal Portal Ipati Der.
063+332.00 3.250 0.00 3.25 3.25 Tunel principal Portal Ipati Izq.
063+331.00 3.250 1.00 3.25 6.50 Tunel principal Portal Ipati Izq.
063+330.00 3.250 1.00 3.25 9.75 Tunel principal Portal Ipati Izq.
063+329.00 3.250 1.00 3.25 13.00 Tunel principal Portal Ipati Izq.
063+328.00 3.250 1.00 3.25 16.25 Tunel principal Portal Ipati Izq.
063+327.00 3.250 1.00 3.25 19.50 Tunel principal Portal Ipati Izq.
063+326.00 3.250 1.00 3.25 22.75 Tunel principal Portal Ipati Izq.
063+325.00 3.250 1.00 3.25 26.00 Tunel principal Portal Ipati Izq.
063+324.00 3.250 1.00 3.25 29.25 Tunel principal Portal Ipati Izq.
063+332.00 3.250 0.00 3.25 32.50 Tunel principal Portal Ipati Der.
063+331.00 3.250 0.00 3.25 35.75 Tunel principal Portal Ipati Der.
063+330.00 3.250 1.00 3.25 39.00 Tunel principal Portal Ipati Der.
063+329.00 3.250 1.00 3.25 42.25 Tunel principal Portal Ipati Der.
063+328.00 3.250 1.00 3.25 45.50 Tunel principal Portal Ipati Der.
063+327.00 3.250 1.00 3.25 48.75 Tunel principal Portal Ipati Der.
063+326.00 3.250 1.00 3.25 52.00 Tunel principal Portal Ipati Der.
063+325.00 3.250 1.00 3.25 55.25 Tunel principal Portal Ipati Der.
063+324.00 3.250 1.00 3.25 58.50 Tunel principal Portal Ipati Der.
LONGITUD DE AREA DE
VOLUMEN A VOLUMEN
PROGRESIVA PROGRESIVA HORMIGON HORMIGON
CERTIFICAR ACUMULADA OBSERVACIONES
INICIAL FINAL LANZADO LANZADO
(m) M2 m3 (m3)
062+130.20 062+160.20 30.000 3.58 107.40 107.40 Tunel Principal Muyupampa tipo IV
063+307.00 063+286.50 20.500 0.90 18.45 125.85 Tunel Principal Ipati tipo III
063+279.00 063+240.00 39.000 0.90 35.10 160.95 Tunel Principal Ipati tipo III
TOTAL ITEM. 5.8.1. Hormigón lanzado con fibra - calota túnel = 160.95 m3.
063+333.00 063+324.00 9.000 0.490 4.41 4.41 Tunel Principal Portal Ipati Izq.
063+333.00 063+324.00 9.000 0.490 4.41 4.41 Tunel Principal Portal Ipati Der.
063+324.00 063+321.00 3.000 0.490 1.47 1.47 Tunel Principal Portal Ipati Izq.
063+324.00 063+321.00 3.000 0.490 1.47 1.47 Tunel Principal Portal Ipati Der.
TOTAL ITEM. 5.8.2. Hormigón lanzado con fibra - destroza túnel = 11.76 m3.
Bulones Swellex
Cantidad
Cantidad colocada Largo Unitario total
Prog. Inicial Prog. Final Colocada
mes actual (un) (m/Un)
(m)
0+250.00 0+280.00 41 1.8 73.80
73.80
AREA A
ELEMENTO LARGO ANCHO AREA TOTAL %A CERTIFICAR OBSERVACIONES
[m] PROMEDIO [m] [m2] CERTIFICAR
[m2]
BLOQUE 1 9.22 8.57 79.02 100% 79.02 Oficina y vivienda Supervision
PLANTA BAJA
BLOQUE 2 14.76 4.24 62.58 100% 62.58
Oficina y vivienda Supervision
PLANTA BAJA 8.82 8.23 72.59 100% 72.59
RESUMEN
ANCHO AREA A
LARGO AREA TOTAL
ELEMENTO DESCRIPCION PROMEDIO % A CERTIFICAR CERTIFICAR
[m] [m2]
[m] [m2]
Laboratorio de Suelos y
Hormigones 10.2 3.85 39.27 100% 39.27
LABORATORIO
SUPERVISON Oficina 1 5.6 3.6 20.16 100% 20.16
TUNEL
Sala de Curado 4.45 3.6 16.02 100% 16.02
75.45 75.45
AREA A
ANCHO AREA TOTAL %A
ELEMENTO LARGO [m] CERTIFICAR
PROMEDIO [m] [m2] CERTIFICAR
[m2]
8.3 6.10 50.63 100% 50.63
COMEDOR 2.1 3.4 7.14 100% 7.14
TUNEL
0.94 3.68 3.46 100% 3.46
57.77 57.77
CANTIDAD
PERIODO (Dias) CANTIDAD PARCIAL OBSERVACIONES
N° PERIODO VEHICULO PLACA UNIDAD PARCIAL
USO MES V-Mes
Desde Hasta
B C D=B/C A*D
1 Jul-16 CAMIONETA HILUX 4040-DNA 1 7/1/2016 7/31/2016 31 31 1.00 1.00 SUPERVISIÓN
3 Jul-16 CAMIONETA HILUX 4040-DKR 1 7/1/2016 7/31/2016 31 31 1.00 1.00 SUPERVISIÓN
2 Jul-16 CAMIONETA HILUX 4040-DLU 1 7/1/2016 7/31/2016 31 31 1.00 1.00 FISCALIZACIÓN
JULIO
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL
Desayuno 0.30 0.30 0.30 0.90
CARLOS Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
2
NAVARRO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 1.20
ALBERTO Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
4
AMPUERO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.90
JUAN P. Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
6
FLORES Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 1.80
MILTON Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
8
QUINO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
JULIO
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
RIDER Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
9
CUELLAR Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno
LUISA 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
MARIA Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
10
MONTAÑO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
ARRIETA Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 1.80
GABRIELA Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
12
MORALES Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
DOKA Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
13 ABRAHAN
Teé
CARDENAS 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
GAMANIEL Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
14 BARJA
Teé
RODAS 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
FRANZ Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
15 ASISTIRI
Teé
CUSI 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
NORMA Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
16
PINO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
EDGAR Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
17
TORRICO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
CAROLINA Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
18
GONZSALEZ Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
OSCAR
Ing. Juan19A. Fanin Gutierrez.
ACHACOLLO Supervisión A.B.C.
JOSE CARTELLONE CONSTRUCCIONES CIVILES S.A.
PROYECTO: CONSTRUCCION TUNEL DE INCAHUASI
ITEM: 5.16.5. SERVICIO DE ALIMENTACION
MEDICION PERIODO DE: JULIO
JULIO
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL
19
OSCAR Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
ACHACOLLO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1.75
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
20
BENITO Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
HERRERA Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
FRANZ Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
21 PADILLA
Teé
LIMON 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
22
FERNANDO Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
VILLARTE Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.40
SAUL Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3.20
23 VARGAS
Teé
GUZMAN 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.40
Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00
Desayuno 0.30 0.30 0.60
FERNANDO Almuerzo 0.40 0.40 0.80
24 VELARDE
Teé 0.05 0.05 0.10
VALERIANO
Cena 0.25 0.25 0.50
Desayuno 0.30 0.30 0.30 0.30 0.30 1.50
CARLOS Almuerzo 0.40 0.40 0.40 0.40 1.60
25 MANTIN Teé 0.05 0.05 0.05 0.05 0.05 0.25
RODRIGUEZ
Cena 0.25 0.25 0.25 0.25 0.25 1.25
JULIO
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL
FISCALIZACION
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 3.60
1
WALTER Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 4.00
GALVAN Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.55
Cena 0.25 0.25 0.25 0.25 0.25 0.25 1.50
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 8.10
FREDDY Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 10.80
2 MAURICIO Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 1.10
PIMENTEL Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 6.75
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 7.50
MARIA Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 10.80
3 ELENA CRUZ Teé
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.55
RIOS Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.50
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 7.80
JANETH Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 12.00
4 VERONICA Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.70
CORIA Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 6.50
Desayuno 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 6.90
JUAN Almuerzo 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 8.40
5 CARLOS Teé 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 1.05
PALENQUE Cena 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 5.50
TOTAL ACUMULADO
Nº ACTIVIDADES A CERTIFICAR A CERTIFICAR TOTAL A CERTIFICAR
1 EJECUCIÓN SUSPENSIÓN DE AGUA PILETA PORTAL IPATI 0.009188847 0.009188847 64,973.54
2 EJECUCIÓN SUSPENSIÓN DE AGUA PILETA PORTAL MUYUPAMPA 0.0105676052 0.0197564522 74,722.62
3 EJECUCION OBRA DE TOMA (TURURUMBA) 0.0200220060 0.0397784582 141,573.87
281,270.03 Bs
Para este trabajo se utilizaron los siguientes equipos cuyo costo + porcentaje calculado en los formularios B-2 que de acuerdo a los precios elementales de la propuesta es:
VIBRO APISONADOR 32X28 cm-63kg Bs. 13.36 AYUDANTE 12.20 AGUA POTABLE m3 39.68
RETROEXCAV. - CARGADORA 0,25 m3 Bs. 183.83 MEDIO OFICIAL 15.09 DERECHOS Y VARIOS m3 1.73
CARGADOR FRONTAL S/NEUM. 3,1 m3 Bs. 389.68 OFICIAL 17.77 MEMBRANA DE CURADO kg 53.97
RETROEXCAVADORA S/ORUGAS 1,2 m3 Bs. 374.37 OFICIAL ESPECIALIZADO 20.95 PLASTIFICANTE kg 11.60
CAMION VOLCADOR CAP. 24 T=15m3 Bs. 300.23 PUNTERO DE CUADRILLA 28.49 CEMENTO PORTLAND (granel en obra) Tn 1307.55
CARGADOR FRONTAL S/NEUM. 2,4 m3 Bs. 416.17 OPER. EQUIPO PESADO 1a. 25.78 LISTON TIPO PARA ENCOFRADO m 18.19
CARGADOR FRONTAL S/NEUM. 2,7 m3 Bs. 326.99 OPER. EQUIPO PESADO 1a. ESPECIAL 28.45 FENOLICO ESP.=19mm (3/4") m2 118.14
MOTOCOMPRESOR 7 m3/min-250cfm Bs. 79.11 OPER. EQUIPO PESADO 2a. 20.77 PUNTAL DE MADERA m 40.02
GRUPO ELECTROGENO 113 KVA - 90KW Bs. 51.47 OPERADOR PLANTAS 22.85 HERRAMIENTAS VARIAS MENORES Gl 1.15
GRUPO ELECTROGENO 455 KVA - 364KW Bs. 309.52 CHOFER 20.74 ALAMBRE DE ATAR kg 14.01
TRITUR.SECUND. A CONO 45" C/ZARANDA Bs. 590.54 OFICIAL ELECTRICO 18.66 ACERO CORRUGADO ADN 420 Tn 7551.89
ZARANDA VIBRAT. 3 PISOS 8'X20' Bs. 119.74 LADRILLOS UNIDAD 1.00
GRILLA FIJA (2800KG) Bs. 35.09 CAÑO PVC D=90mm m 20.70
ALIMENT. VIBRAT. C/GR. CAP. 250T/H Bs. 21.27 MORTERO CEMENTICIO IMPERMEABILIZANTE kg 42.00
CINTA TRANSPORTADORA 0,75mx18m Bs. 24.72
HORMIGONERA DE 350 LITROS (EL) Bs. 18.73
PLANTA ELAB. HORMIGON (12-20m3/h Bs. 129.68
CAMION MOTOHORMIGONERO CAP. 7m3 Bs. 262.66
BOMBA DE H° REMOLC. 50m3/h Bs. 323.83
VIBRADOR DE INMERSION d=57mm (NE) Bs. 6.72
HIDROGRUA MONTADA S/CAMION 6T Bs. 228.03
CORTADORA Y DOBLADORA Fe 1T/h Bs. 537.00 (*) Material de Monteagudo. El Costo incluye el transporte
(**) Costo s/ factura + flete al lugar
A continuación se tiene una tabla resumen de los equipos y mano de obra comprometidos en dichos trabajos en distintas fechas:
DESCRIPCION TRABAJO EJECUTADO Ejecución de pileta para suspensión de sedimento Portal Ipati
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA) (55% al 71,18%) 55.00% Bs. 4,436.563
IMPUESTOS IVA MANO DE OBRA = (% DE LA SUMA DEL SUBTOTAL DE MANO DE
OBRA + CARGAS SOCIALES) 14.94% Bs. 1,867.954
TOTAL MANO DE OBRA Bs. 14,370.995
3. EQUIPOS, MAQUINARIA Y HERRAMIENTAS
CÓDIGO DESCRIPCIÓN UNIDAD CANTIDAD PRECIO PRODUCTIVO COSTO TOTAL
E-I80W6000 VIBRO APISONADOR 32x28 cm-63 Kg hs 57.52500000 Bs. 13.360 Bs. 768.534
E-E00C4162 RETROEXC.- CARGADORA 0,25 m3 hs 0.76700000 Bs. 183.830 Bs. 140.998
E-B10K3801 CARGADOR FRONTAL S/NEUM. 3,1 m3 hs 0.93325380 Bs. 389.680 Bs. 363.670
E-E10K2205 RETROEXCAVADORA S/ORUGAS 1,2 m3 hs 1.24247381 Bs. 374.370 Bs. 465.145
E-F00I3806 CAMION VOLCADOR CAP. 24 T=15 m3 hs 3.92716554 Bs. 300.230 Bs. 1,179.053
E-B10C5000 CARGADOR FRONTAL S/NEUM. 2,4 m3 hs 0.17086545 Bs. 416.170 Bs. 71.109
E-B10K3201 CARGADOR FRONTAL S/NEUM. 2,7 m3 hs 1.15500000 Bs. 326.990 Bs. 377.673
E-K00I0701 MOTOCOMPRESOR 7 m3/min-250 cfm hs 3.08000007 Bs. 79.110 Bs. 243.659
E-L00C0900 GRUPO ELECTROGENO 113 KVA-90 KW hs 1.15500000 Bs. 51.470 Bs. 59.448
E-L00C3600 GRUPO ELECTROGENO 455 KVA-364 KW hs 0.48615294 Bs. 309.520 Bs. 150.474
E-O10C4502 TRITUR.SECUND. A CONO 45" C/ZARANDA hs 0.35800380 Bs. 590.540 Bs. 211.416
E-O20E0670 ZARANDA VIBRAT. 3 PISOS 8'x20' hs 0.52886925 Bs. 119.740 Bs. 63.327
E-O20M0500 GRILLA FIJA (2.800 Kg) hs 0.52886925 Bs. 35.090 Bs. 18.558
E-O40T0075 ALIMENT. VIBRAT. C/GR. CAP. 250 T/h hs 0.52886925 Bs. 21.270 Bs. 11.249
E-O55P1875 CINTA TRANSPORTADORA 0,75 m x 18 m hs 2.83148460 Bs. 24.720 Bs. 69.994
E-P00D0310 HORMIGONERA DE 350 LITROS (EL) hs 1.15500000 Bs. 18.730 Bs. 21.633
E-P05B0200 PLANTA ELAB. HORMIGON (12-20 m3/h) hs 0.98868000 Bs. 129.680 Bs. 128.212
E-P20F9000 CAMION MOTOHORMIGONERO CAP. 7 m3 hs 5.77500000 Bs. 262.660 Bs. 1,516.862
E-P30P5000 BOMBA DE Hº REMOLC. 50 m3/h hs 3.08000007 Bs. 323.830 Bs. 997.396
E-P62W5700 VIBRADOR DE INMERSION d=57 mm (NE) hs 12.32000007 Bs. 6.720 Bs. 82.790
E-M50H0600 HIDROGRUA MONTADA S/CAMION 6 T hs 0.72800755 Bs. 228.030 Bs. 166.008
E-X00T1000 CORTADORA Y DOBLADORA Fe 1 T/h hs 0.60667296 Bs. 53.700 Bs. 32.578
(*) HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% Bs. 431.130
TOTAL EQUIPO, MARINARIA Y HERRAMIENTAS Bs. 6,802.382
TOTAL PRECIO UNITARIO ADOPTADO (Con dos (2) decimales) Bs. 74,722.62
(*) El proponente deberán señalar los porcentajes pertinentes a cada rubro
NOTA.- El proponente declara que el presente Formulario ha sido llenado de acuerdo con las especificaciones técnicas, aplicando las
leyes sociales y tributarias vigentes y es consistente con el Formulario B-3.
Observaciones
Comunicación y Difusión del proyecto Revista ECOS 6,160.00 6,160.00 PERIODICO CORREO DEL SUR
Comunicación y Difusión del proyecto Revista ECOS 7,560.00 13,720.00 PERIODICO CORREO DEL SUR
Comunicación y Difusión del proyecto Revista ECOS 6,160.00 19,880.00 PERIODICO CORREO DEL SUR
19,880.00