(ANEXO N°01)
J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
TOPOGRAFIA
ELIMINACION
SUBRASANTE
CUNETA TRIANGULAR
BADEN
BUZONES
REP. TMC
CARPETA ASFALTICA
SEÑALIZACION VIAL
PROTEC. AMBIENTAL
LINEA CONDUCCION
DIAS
MES MAYO JUNIO JULIO
ITEM
MAQUINARIA
DE HM
SEM. 1 SEM. 2 SEM. 3 SEM. 4 SEM. 1 SEM. 2 SEM. 3 SEM. 4 SEM. 1 TRABAJO
EXCAVADORA SOBRE ORUGA CON MARTILLO NEUMATICO
01 CAT (INCLUYE OPERADOR Y MANTENIMIETO DE LA 2 13 104.00
MAQUINA)
02 VOLQUETES DE 15 M3 4 6 1 18
03 MOTONONIVELADORA 1 18
06 RETROEXCAVADORA 2 1 25
07 CAMIONETA 1 67
02
VOLQUETES DE 15 M3 560 840 60 18
04
RODILLO VIBRATORIO NEUMATICO 96 168 168 18
05
CISTERNA DE 3000 GLN PARA AGUA 80 140 140 18
07
CAMIONETA 84 84 84 84 84 84 84 84 63 67
08
MINICARGADOR INCLUIDO RODILLO 112 112 48 17
COMBUSTIBLE POR SEMANA 1764 2332 868 648 204 204 164 84 231 6,499
PRESUPUESTO MANO DE OBRA
ESTACION TOTAL -
TRABAJOS
NIVEL DE INGENIERO - -
PRELIMINARES
GPS -
EXCAVADORA 330 5 1 245.00 8.00 9,800.00
CORTE,
EXPLANACIONES Y RETROEXCAVADORA 5 1 120.00 8.00 4,800.00 33,480.00
LIMPIEZA
VOQUETES 5 4 118.00 8.00 18,880.00
EXCAVADORA 336 7 1 265.00 8.00 14,840.00
MOTONIVELADORA 7 1 290.00 8.00 16,240.00
RODILLO 7 1 118.00 8.00 6,608.00
SUB BASE 68,904.00
CAMION CISTERNA 7 1 50.00 8.00 2,800.00
VOLQUETES 4 6 118.00 8.00 22,656.00
RETROEXCAVADORA 6 1 120.00 8.00 5,760.00
EXCAVADORA 336 10 1 265.00 8.00 21,200.00
MOTONIVELADORA 10 1 290.00 8.00 23,200.00
RODILLO 10 1 118.00 8.00 9,440.00
BASE 101,424.00
CAMION CISTERNA 10 1 50.00 8.00 4,000.00
VOLQUETES 6 6 118.00 8.00 33,984.00
RETROEXCAVADORA 10 1 120.00 8.00 9,600.00
CARPETA ASFALTICA EQUIPOS Y MAQUINARIAS - - - - -
RETROEXCAVADORA 10 1 120.00 8.00 9,600.00
CUNETA 28,080.00
MIXER - - - - 18,480.00
RETROEXCAVADORA 1 1 120.00 8.00 960.00
ENCIMADO DE BUZONES 2,310.00
MINICARGADOR 3 1 90.00 5.00 1,350.00
ALCANTARILLA TMC DE
RETROEXCAVADORA 1 1 120.00 5.00 600.00 600.00
24" - REUBICACION
EXCAVADORA 330 5 1 245.00 8.00 9,800.00
BADEN 11,560.00
MIXER - - - - 1,760.00
UNIDAD DE
PARTIDAS REQUERIMIENTO CANTIDAD PRECIO SUBTOTAL TOTAL
MEDIDA
SUB-BASE
ESPARCIDO Y COMPATADO
FALTANTE PROGR. 0+000 HASTA 1+700 1.7 KM
CULMINADO PROGR. 1+700 HASTA 3+002 1.3002 KM
*
GASTO EN VOLQUETES 144.00 HM 118.00 16,992.00
COMBUSTIBLE (GL) 360.00 GL 13.50 4,860.00
21,852.00