MATERIALES
FAJILLA DE MADERA DE PINO 3ra. 5 CM. PZA $30.00 0.010000 $0.30 2.92%
CLAVO DE 2 1/2" A 4" KG $21.00 0.011500 $0.24 2.33%
CALHIDRA KG $1.60 0.200000 $0.32 3.11%
ELABORACION DE PLANOS % $4.02 0.350000 $1.41 13.72%
Subtotal: MATERIALES $2.27 22.08%
MANO DE OBRA
TOPOGRAFO JOR $613.37 0.006500 $3.99 38.81%
CADENERO JOR $442.26 0.006500 $2.87 27.92%
Subtotal: MANO DE OBRA $6.86 66.73%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $6.86 0.030000 $0.21 2.04%
EQUIPO DE TOPOGRAFIA HOR $23.49 0.040000 $0.94 9.14%
Subtotal: EQUIPO Y HERRAMIENTA $1.15 11.19%
Costo directo $10.28
INDIRECTOS 15% $1.54
SUBTOTAL $11.82
FINANCIAMIENTO 0% $0.00
SUBTOTAL $11.82
UTILIDAD 10% $1.18
PRECIO UNITARIO $13.00
(* TRECE PESOS 00/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.576581 $223.65 97.09%
Subtotal: MANO DE OBRA $223.65 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $223.65 0.030000 $6.71 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $6.71 2.91%
Costo directo $230.36
INDIRECTOS 15% $34.55
SUBTOTAL $264.91
FINANCIAMIENTO 0% $0.00
SUBTOTAL $264.91
UTILIDAD 10% $26.49
PRECIO UNITARIO $291.40
(* DOSCIENTOS NOVENTA Y UN PESOS 40/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.097296 $37.74 97.09%
Subtotal: MANO DE OBRA $37.74 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $37.74 0.030000 $1.13 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $1.13 2.91%
Costo directo $38.87
INDIRECTOS 15% $5.83
SUBTOTAL $44.70
FINANCIAMIENTO 0% $0.00
SUBTOTAL $44.70
UTILIDAD 10% $4.47
PRECIO UNITARIO $49.17
(* CUARENTA Y NUEVE PESOS 17/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.250000 $96.97 97.09%
Subtotal: MANO DE OBRA $96.97 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $96.97 0.030000 $2.91 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $2.91 2.91%
Costo directo $99.88
INDIRECTOS 15% $14.98
SUBTOTAL $114.86
FINANCIAMIENTO 0% $0.00
SUBTOTAL $114.86
UTILIDAD 10% $11.49
PRECIO UNITARIO $126.35
(* CIENTO VEINTISEIS PESOS 35/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.394235 $152.92 45.62%
AYUDANTE GENERAL JOR $442.28 0.390000 $172.49 51.46%
Subtotal: MANO DE OBRA $325.41 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $325.41 0.030000 $9.76 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $9.76 2.91%
Costo directo $335.17
INDIRECTOS 15% $50.28
SUBTOTAL $385.45
FINANCIAMIENTO 0% $0.00
SUBTOTAL $385.45
UTILIDAD 10% $38.55
PRECIO UNITARIO $424.00
(* CUATROCIENTOS VEINTICUATRO PESOS 00/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.399546 $154.98 18.98%
COMPRESORISTA JOR $613.37 0.400000 $245.35 30.04%
PERFORISTA JOR $613.37 0.400000 $245.35 30.04%
Subtotal: MANO DE OBRA $645.68 79.06%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $645.68 0.030000 $19.37 2.37%
COMPRESOR DE AIRE MCA. SULLIVAN HOR $252.72 0.600000 $151.63 18.57%
Subtotal: EQUIPO Y HERRAMIENTA $171.00 20.94%
Costo directo $816.68
INDIRECTOS 15% $122.50
SUBTOTAL $939.18
FINANCIAMIENTO 0% $0.00
SUBTOTAL $939.18
UTILIDAD 10% $93.92
PRECIO UNITARIO $1,033.10
(* UN MIL TREINTA Y TRES PESOS 10/100 M.N. *)
MATERIALES
MATERIAL DE BANCO M3 $120.00 1.300000 $156.00 66.14%
AGUA M3 $35.00 0.170000 $5.95 2.52%
Subtotal: MATERIALES $161.95 68.66%
MANO DE OBRA
PEON JOR $387.89 0.185000 $71.76 30.42%
Subtotal: MANO DE OBRA $71.76 30.42%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $71.76 0.030000 $2.15 0.91%
Subtotal: EQUIPO Y HERRAMIENTA $2.15 0.91%
Costo directo $235.86
INDIRECTOS 15% $35.38
SUBTOTAL $271.24
FINANCIAMIENTO 0% $0.00
SUBTOTAL $271.24
UTILIDAD 10% $27.12
PRECIO UNITARIO $298.36
(* DOSCIENTOS NOVENTA Y OCHO PESOS 36/100 M.N. *)
MATERIALES
AGUA M3 $35.00 0.130000 $4.55 5.65%
Subtotal: MATERIALES $4.55 5.65%
MANO DE OBRA
PEON JOR $387.89 0.190000 $73.70 91.60%
Subtotal: MANO DE OBRA $73.70 91.60%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $73.70 0.030000 $2.21 2.75%
Subtotal: EQUIPO Y HERRAMIENTA $2.21 2.75%
Costo directo $80.46
INDIRECTOS 15% $12.07
SUBTOTAL $92.53
FINANCIAMIENTO 0% $0.00
SUBTOTAL $92.53
UTILIDAD 10% $9.25
PRECIO UNITARIO $101.78
(* CIENTO UN PESOS 78/100 M.N. *)
MATERIALES
AGUA M3 $35.00 0.027714 $0.97 0.75%
Subtotal: MATERIALES $0.97 0.75%
MANO DE OBRA
PEON JOR $387.89 0.038500 $14.93 11.62%
OFICIAL ALBAÑIL JOR $613.37 0.038500 $23.61 18.38%
Subtotal: MANO DE OBRA $38.54 30.00%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $38.54 0.030000 $1.16 0.90%
Subtotal: EQUIPO Y HERRAMIENTA $1.16 0.90%
BASICOS
CONCRETO F'C=100 KG/CM2, RESISTENCIA M3 $1,048.82 0.063000 $66.08 51.43%
NORMAL AGREGADO MAXIMO 3/4", FABRICADO
EN OBRA EN REVOLVEDORA DE 1SACO.
CIMBRA COMUN DE MADERA M2 $217.31 0.100000 $21.73 16.91%
Subtotal: BASICOS $87.81 68.35%
Costo directo $128.48
INDIRECTOS 15% $19.27
SUBTOTAL $147.75
FINANCIAMIENTO 0% $0.00
SUBTOTAL $147.75
UTILIDAD 10% $14.78
PRECIO UNITARIO $162.53
(* CIENTO SESENTA Y DOS PESOS 53/100 M.N. *)
MATERIALES
PIEDRA BRAZA DE LA REGION M3 $350.00 1.500000 $525.00 36.41%
AGUA M3 $35.00 0.170286 $5.96 0.41%
Subtotal: MATERIALES $530.96 36.82%
MANO DE OBRA
PEON JOR $387.89 0.500000 $193.95 13.45%
OFICIAL ALBAÑIL JOR $613.37 0.500000 $306.69 21.27%
Subtotal: MANO DE OBRA $500.64 34.72%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $500.64 0.030000 $15.02 1.04%
Subtotal: EQUIPO Y HERRAMIENTA $15.02 1.04%
BASICOS
MORTERO CEMENTO ARENA 1:3 M3 $1,275.06 0.310000 $395.27 27.41%
Subtotal: BASICOS $395.27 27.41%
Costo directo $1,441.89
INDIRECTOS 15% $216.28
SUBTOTAL $1,658.17
FINANCIAMIENTO 0% $0.00
SUBTOTAL $1,658.17
UTILIDAD 10% $165.82
PRECIO UNITARIO $1,823.99
(* UN MIL OCHOCIENTOS VEINTITRES PESOS 99/100 M.N. *)
MATERIALES
PIEDRA BRAZA DE LA REGION M3 $350.00 0.300000 $105.00 28.81%
AGUA M3 $35.00 0.080000 $2.80 0.77%
Subtotal: MATERIALES $107.80 29.57%
MANO DE OBRA
PEON JOR $387.89 0.150000 $58.18 15.96%
OFICIAL ALBAÑIL JOR $613.37 0.150000 $92.01 25.24%
Subtotal: MANO DE OBRA $150.19 41.20%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $150.19 0.030000 $4.51 1.24%
Subtotal: EQUIPO Y HERRAMIENTA $4.51 1.24%
BASICOS
MORTERO CEMENTO ARENA 1:3 M3 $1,275.06 0.080000 $102.00 27.98%
Subtotal: BASICOS $102.00 27.98%
Costo directo $364.50
INDIRECTOS 15% $54.68
SUBTOTAL $419.18
FINANCIAMIENTO 0% $0.00
SUBTOTAL $419.18
UTILIDAD 10% $41.92
PRECIO UNITARIO $461.10
(* CUATROCIENTOS SESENTA Y UN PESOS 10/100 M.N. *)
MATERIALES
TUBO DE P.V.C. DE 4" REXOLIT ML $49.70 1.100000 $54.67 72.60%
Subtotal: MATERIALES $54.67 72.60%
MANO DE OBRA
PEON JOR $387.89 0.020000 $7.76 10.31%
OFICIAL ALBAÑIL JOR $613.37 0.020000 $12.27 16.29%
Subtotal: MANO DE OBRA $20.03 26.60%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $20.03 0.030000 $0.60 0.80%
Subtotal: EQUIPO Y HERRAMIENTA $0.60 0.80%
Costo directo $75.30
INDIRECTOS 15% $11.30
SUBTOTAL $86.60
FINANCIAMIENTO 0% $0.00
SUBTOTAL $86.60
UTILIDAD 10% $8.66
PRECIO UNITARIO $95.26
(* NOVENTA Y CINCO PESOS 26/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.550027 $213.35 9.14%
OFICIAL ALBAÑIL JOR $613.37 0.550000 $337.35 14.46%
Subtotal: MANO DE OBRA $550.70 23.60%
EQUIPO Y HERRAMIENTA
VIBRADOR HR $54.00 1.050000 $56.70 2.43%
HERRAMIENTA % $550.70 0.030000 $16.52 0.71%
Subtotal: EQUIPO Y HERRAMIENTA $73.22 3.14%
BASICOS
CONCRETO F'C=250 KG/CM2. REST. NORMAL M3 $1,516.38 1.070000 $1,622.53 69.54%
CIMBRA COMUN DE MADERA M2 $217.31 0.400000 $86.92 3.73%
Subtotal: BASICOS $1,709.45 73.26%
Costo directo $2,333.37
INDIRECTOS 15% $350.01
SUBTOTAL $2,683.38
FINANCIAMIENTO 0% $0.00
SUBTOTAL $2,683.38
UTILIDAD 10% $268.34
PRECIO UNITARIO $2,951.72
(* DOS MIL NOVECIENTOS CINCUENTA Y UN PESOS 72/100 M.N. *)
MATERIALES
PIEDRA BRAZA DE LA REGION M3 $350.00 0.105000 $36.75 11.33%
AGUA M3 $35.00 0.050000 $1.75 0.54%
Subtotal: MATERIALES $38.50 11.87%
MANO DE OBRA
PEON JOR $387.89 0.240000 $93.09 28.71%
OFICIAL ALBAÑIL JOR $613.37 0.240000 $147.21 45.40%
Subtotal: MANO DE OBRA $240.30 74.11%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $240.30 0.030000 $7.21 2.22%
Subtotal: EQUIPO Y HERRAMIENTA $7.21 2.22%
BASICOS
MORTERO CEMENTO ARENA 1:3 M3 $1,275.06 0.030000 $38.25 11.80%
Subtotal: BASICOS $38.25 11.80%
Costo directo $324.26
INDIRECTOS 15% $48.64
SUBTOTAL $372.90
FINANCIAMIENTO 0% $0.00
SUBTOTAL $372.90
UTILIDAD 10% $37.29
PRECIO UNITARIO $410.19
(* CUATROCIENTOS DIEZ PESOS 19/100 M.N. *)
MATERIALES
AGUA M3 $35.00 0.033429 $1.17 0.60%
CONCRETO F'C=150 KG/CM2, RESIST. NORMAL M3 $1,213.44 0.094000 $114.06 58.89%
Subtotal: MATERIALES $115.23 59.50%
MANO DE OBRA
PEON JOR $387.89 0.055000 $21.33 11.01%
OFICIAL ALBAÑIL JOR $613.37 0.055000 $33.74 17.42%
Subtotal: MANO DE OBRA $55.07 28.43%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $55.07 0.030000 $1.65 0.85%
Subtotal: EQUIPO Y HERRAMIENTA $1.65 0.85%
BASICOS
CIMBRA COMUN DE MADERA M2 $217.31 0.100000 $21.73 11.22%
Subtotal: BASICOS $21.73 11.22%
Costo directo $193.68
INDIRECTOS 15% $29.05
SUBTOTAL $222.73
FINANCIAMIENTO 0% $0.00
SUBTOTAL $222.73
UTILIDAD 10% $22.27
PRECIO UNITARIO $245.00
(* DOSCIENTOS CUARENTA Y CINCO PESOS 00/100 M.N. *)
MATERIALES
ARENA DE RIO M3 $200.00 1.000000 $200.00 66.69%
Subtotal: MATERIALES $200.00 66.69%
MANO DE OBRA
PEON JOR $387.89 0.250000 $96.97 32.34%
Subtotal: MANO DE OBRA $96.97 32.34%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $96.97 0.030000 $2.91 0.97%
Subtotal: EQUIPO Y HERRAMIENTA $2.91 0.97%
Costo directo $299.88
INDIRECTOS 15% $44.98
SUBTOTAL $344.86
FINANCIAMIENTO 0% $0.00
SUBTOTAL $344.86
UTILIDAD 10% $34.49
PRECIO UNITARIO $379.35
(* TRESCIENTOS SETENTA Y NUEVE PESOS 35/100 M.N. *)
MATERIALES
TUBO PVC CORRUGADO DE 315 MM. DIAMETRO ML $261.00 1.100000 $287.10 86.78%
GRASA VEGETAL KG $40.00 0.219000 $8.76 2.65%
Subtotal: MATERIALES $295.86 89.43%
MANO DE OBRA
AYUDANTE GENERAL JOR $442.28 0.035000 $15.48 4.68%
OFICIAL PLOMERO JOR $527.83 0.035000 $18.47 5.58%
Subtotal: MANO DE OBRA $33.95 10.26%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $33.95 0.030000 $1.02 0.31%
Subtotal: EQUIPO Y HERRAMIENTA $1.02 0.31%
Costo directo $330.83
INDIRECTOS 15% $49.62
SUBTOTAL $380.45
FINANCIAMIENTO 0% $0.00
SUBTOTAL $380.45
UTILIDAD 10% $38.05
PRECIO UNITARIO $418.50
(* CUATROCIENTOS DIECIOCHO PESOS 50/100 M.N. *)
MATERIALES
TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. PZA $3.20 621.000000 $1,987.20 33.89%
AGUA M3 $35.00 0.180857 $6.33 0.11%
CONCRETO F'C=200 KG/CM2, RESISTENCIA M3 $1,226.78 0.085000 $104.28 1.78%
NORMAL AGREGADO MAXIMO 3/4", FABRICADO
EN OBRA EN REVOLVEDORA DE 1 SACO
PIEDRA BRAZA DE LA REGION M3 $350.00 1.050000 $367.50 6.27%
VARILLA No. 4 KG $14.25 2.800000 $39.90 0.68%
Subtotal: MATERIALES $2,505.21 42.73%
MANO DE OBRA
OFICIAL ALBAÑIL JOR $613.37 3.000000 $1,840.11 31.38%
PEON JOR $387.89 3.000000 $1,163.67 19.85%
Subtotal: MANO DE OBRA $3,003.78 51.23%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $3,003.78 0.030000 $90.11 1.54%
Subtotal: EQUIPO Y HERRAMIENTA $90.11 1.54%
BASICOS
MORTERO CEMENTO ARENA 1:3 M3 $1,275.06 0.207000 $263.94 4.50%
Subtotal: BASICOS $263.94 4.50%
Costo directo $5,863.04
INDIRECTOS 15% $879.46
SUBTOTAL $6,742.50
FINANCIAMIENTO 0% $0.00
SUBTOTAL $6,742.50
UTILIDAD 10% $674.25
PRECIO UNITARIO $7,416.75
(* SIETE MIL CUATROCIENTOS DIECISEIS PESOS 75/100 M.N. *)
MATERIALES
TABIQUE COMUN BARRO R.R. DE 7X14X28 CM. PZA $3.20 83.000000 $265.60 21.75%
AGUA M3 $35.00 0.075143 $2.63 0.22%
CONCRETO F'C=200 KG/CM2, RESISTENCIA M3 $1,226.78 0.094000 $115.32 9.44%
NORMAL AGREGADO MAXIMO 3/4", FABRICADO
EN OBRA EN REVOLVEDORA DE 1 SACO
Subtotal: MATERIALES $383.55 31.41%
MANO DE OBRA
OFICIAL ALBAÑIL JOR $613.37 0.670000 $410.96 33.65%
PEON JOR $387.89 0.670000 $259.89 21.28%
Subtotal: MANO DE OBRA $670.85 54.94%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $670.85 0.030000 $20.13 1.65%
Subtotal: EQUIPO Y HERRAMIENTA $20.13 1.65%
BASICOS
MORTERO CEMENTO ARENA 1:3 M3 $1,275.06 0.115000 $146.63 12.01%
Subtotal: BASICOS $146.63 12.01%
Costo directo $1,221.16
INDIRECTOS 15% $183.17
SUBTOTAL $1,404.33
FINANCIAMIENTO 0% $0.00
SUBTOTAL $1,404.33
UTILIDAD 10% $140.43
PRECIO UNITARIO $1,544.76
(* UN MIL QUINIENTOS CUARENTA Y CUATRO PESOS 76/100 M.N. *)
MATERIALES
ARENA DE RIO M3 $200.00 1.000000 $200.00 70.67%
Subtotal: MATERIALES $200.00 70.67%
MANO DE OBRA
PEON JOR $387.89 0.207739 $80.58 28.47%
Subtotal: MANO DE OBRA $80.58 28.47%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $80.58 0.030000 $2.42 0.86%
Subtotal: EQUIPO Y HERRAMIENTA $2.42 0.86%
Costo directo $283.00
INDIRECTOS 15% $42.45
SUBTOTAL $325.45
FINANCIAMIENTO 0% $0.00
SUBTOTAL $325.45
UTILIDAD 10% $32.55
PRECIO UNITARIO $358.00
(* TRESCIENTOS CINCUENTA Y OCHO PESOS 00/100 M.N. *)
MATERIALES
TUBO DE PVC SANITARIO DE 6" DIAMETRO ML $79.60 4.300000 $342.28 29.66%
COODO DE PVC SANITARIO DE 90X6" DIAMETR PZA $75.98 2.000000 $151.96 13.17%
Subtotal: MATERIALES $494.24 42.82%
MANO DE OBRA
AYUDANTE GENERAL JOR $442.28 0.500000 $221.14 19.16%
OFICIAL PLOMERO JOR $527.83 0.500000 $263.92 22.87%
PEON JOR $387.89 0.401222 $155.63 13.48%
Subtotal: MANO DE OBRA $640.69 55.51%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $640.69 0.030000 $19.22 1.67%
Subtotal: EQUIPO Y HERRAMIENTA $19.22 1.67%
Costo directo $1,154.15
INDIRECTOS 15% $173.12
SUBTOTAL $1,327.27
FINANCIAMIENTO 0% $0.00
SUBTOTAL $1,327.27
UTILIDAD 10% $132.73
PRECIO UNITARIO $1,460.00
(* UN MIL CUATROCIENTOS SESENTA PESOS 00/100 M.N. *)
EQUIPO Y HERRAMIENTA
CAMION DE VOLTEO DE 7 M3 HOR $234.69 0.349951 $82.13 79.92%
RETROEXCAVADORA CAT. 416 B HOR $325.71 0.063339 $20.63 20.08%
Subtotal: EQUIPO Y HERRAMIENTA $102.76 100.00%
Costo directo $102.76
INDIRECTOS 15% $15.41
SUBTOTAL $118.17
FINANCIAMIENTO 0% $0.00
SUBTOTAL $118.17
UTILIDAD 10% $11.82
PRECIO UNITARIO $129.99
(* CIENTO VEINTINUEVE PESOS 99/100 M.N. *)
MATERIALES
AGUA M3 $35.00 0.025714 $0.90 16.98%
Subtotal: MATERIALES $0.90 16.98%
MANO DE OBRA
PEON JOR $387.89 0.011000 $4.27 80.57%
Subtotal: MANO DE OBRA $4.27 80.57%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $4.27 0.030000 $0.13 2.45%
Subtotal: EQUIPO Y HERRAMIENTA $0.13 2.45%
Costo directo $5.30
INDIRECTOS 15% $0.80
SUBTOTAL $6.10
FINANCIAMIENTO 0% $0.00
SUBTOTAL $6.10
UTILIDAD 10% $0.61
PRECIO UNITARIO $6.71
(* SEIS PESOS 71/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.288303 $111.83 97.09%
Subtotal: MANO DE OBRA $111.83 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $111.83 0.030000 $3.35 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $3.35 2.91%
Costo directo $115.18
INDIRECTOS 15% $17.28
SUBTOTAL $132.46
FINANCIAMIENTO 0% $0.00
SUBTOTAL $132.46
UTILIDAD 10% $13.25
PRECIO UNITARIO $145.71
(* CIENTO CUARENTA Y CINCO PESOS 71/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.084070 $32.61 97.08%
Subtotal: MANO DE OBRA $32.61 97.08%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $32.61 0.030000 $0.98 2.92%
Subtotal: EQUIPO Y HERRAMIENTA $0.98 2.92%
Costo directo $33.59
INDIRECTOS 15% $5.04
SUBTOTAL $38.63
FINANCIAMIENTO 0% $0.00
SUBTOTAL $38.63
UTILIDAD 10% $3.86
PRECIO UNITARIO $42.49
(* CUARENTA Y DOS PESOS 49/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.252236 $97.84 97.08%
Subtotal: MANO DE OBRA $97.84 97.08%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $97.84 0.030000 $2.94 2.92%
Subtotal: EQUIPO Y HERRAMIENTA $2.94 2.92%
Costo directo $100.78
INDIRECTOS 15% $15.12
SUBTOTAL $115.90
FINANCIAMIENTO 0% $0.00
SUBTOTAL $115.90
UTILIDAD 10% $11.59
PRECIO UNITARIO $127.49
(* CIENTO VEINTISIETE PESOS 49/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.093197 $36.15 89.68%
Subtotal: MANO DE OBRA $36.15 89.68%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $36.15 0.115000 $4.16 10.32%
Subtotal: EQUIPO Y HERRAMIENTA $4.16 10.32%
Costo directo $40.31
INDIRECTOS 15% $6.05
SUBTOTAL $46.36
FINANCIAMIENTO 0% $0.00
SUBTOTAL $46.36
UTILIDAD 10% $4.64
PRECIO UNITARIO $51.00
(* CINCUENTA Y UN PESOS 00/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.776174 $301.07 97.09%
Subtotal: MANO DE OBRA $301.07 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $301.07 0.030000 $9.03 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $9.03 2.91%
Costo directo $310.10
INDIRECTOS 15% $46.52
SUBTOTAL $356.62
FINANCIAMIENTO 0% $0.00
SUBTOTAL $356.62
UTILIDAD 10% $35.66
PRECIO UNITARIO $392.28
(* TRESCIENTOS NOVENTA Y DOS PESOS 28/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.288278 $111.82 97.09%
Subtotal: MANO DE OBRA $111.82 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $111.82 0.030000 $3.35 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $3.35 2.91%
Costo directo $115.17
INDIRECTOS 15% $17.28
SUBTOTAL $132.45
FINANCIAMIENTO 0% $0.00
SUBTOTAL $132.45
UTILIDAD 10% $13.25
PRECIO UNITARIO $145.70
(* CIENTO CUARENTA Y CINCO PESOS 70/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.335714 $130.22 97.08%
Subtotal: MANO DE OBRA $130.22 97.08%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $130.22 0.030000 $3.91 2.92%
Subtotal: EQUIPO Y HERRAMIENTA $3.91 2.92%
Costo directo $134.13
INDIRECTOS 15% $20.12
SUBTOTAL $154.25
FINANCIAMIENTO 0% $0.00
SUBTOTAL $154.25
UTILIDAD 10% $15.43
PRECIO UNITARIO $169.68
(* CIENTO SESENTA Y NUEVE PESOS 68/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.168166 $65.23 97.08%
Subtotal: MANO DE OBRA $65.23 97.08%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $65.23 0.030000 $1.96 2.92%
Subtotal: EQUIPO Y HERRAMIENTA $1.96 2.92%
Costo directo $67.19
INDIRECTOS 15% $10.08
SUBTOTAL $77.27
FINANCIAMIENTO 0% $0.00
SUBTOTAL $77.27
UTILIDAD 10% $7.73
PRECIO UNITARIO $85.00
(* OCHENTA Y CINCO PESOS 00/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.403568 $156.54 97.09%
Subtotal: MANO DE OBRA $156.54 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $156.54 0.030000 $4.70 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $4.70 2.91%
Costo directo $161.24
INDIRECTOS 15% $24.19
SUBTOTAL $185.43
FINANCIAMIENTO 0% $0.00
SUBTOTAL $185.43
UTILIDAD 10% $18.54
PRECIO UNITARIO $203.97
(* DOSCIENTOS TRES PESOS 97/100 M.N. *)
MANO DE OBRA
PEON JOR $387.89 0.161438 $62.62 97.09%
Subtotal: MANO DE OBRA $62.62 97.09%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $62.62 0.030000 $1.88 2.91%
Subtotal: EQUIPO Y HERRAMIENTA $1.88 2.91%
Costo directo $64.50
INDIRECTOS 15% $9.68
SUBTOTAL $74.18
FINANCIAMIENTO 0% $0.00
SUBTOTAL $74.18
UTILIDAD 10% $7.42
PRECIO UNITARIO $81.60
(* OCHENTA Y UN PESOS 60/100 M.N. *)
MATERIALES
AGUA M3 $35.00 0.029667 $1.04 7.07%
Subtotal: MATERIALES $1.04 7.07%
MANO DE OBRA
PEON JOR $387.89 0.003800 $1.47 9.99%
Subtotal: MANO DE OBRA $1.47 9.99%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $1.47 0.030000 $0.04 0.27%
CAMION PIPA DE 10 M3 HOR $255.58 0.008000 $2.04 13.87%
MOTOCONFORMADORA HOR $615.41 0.011000 $6.77 46.02%
VIBROCOMPACTADOR HOR $334.77 0.010000 $3.35 22.77%
Subtotal: EQUIPO Y HERRAMIENTA $12.20 82.94%
Costo directo $14.71
INDIRECTOS 15% $2.21
SUBTOTAL $16.92
FINANCIAMIENTO 0% $0.00
SUBTOTAL $16.92
UTILIDAD 10% $1.69
PRECIO UNITARIO $18.61
(* DIECIOCHO PESOS 61/100 M.N. *)
MATERIALES
AGUA M3 $35.00 0.132571 $4.64 1.87%
MATERIAL DE BANCO M3 $120.00 1.300000 $156.00 62.85%
Subtotal: MATERIALES $160.64 64.72%
MANO DE OBRA
PEON JOR $387.89 0.015000 $5.82 2.34%
Subtotal: MANO DE OBRA $5.82 2.34%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $5.82 0.030000 $0.17 0.07%
MOTOCONFORMADORA HOR $615.41 0.060000 $36.92 14.87%
VIBROCOMPACTADOR HOR $334.77 0.080000 $26.78 10.79%
CAMION PIPA DE 10 M3 HOR $255.58 0.070000 $17.89 7.21%
Subtotal: EQUIPO Y HERRAMIENTA $81.76 32.94%
Costo directo $248.22
INDIRECTOS 15% $37.23
SUBTOTAL $285.45
FINANCIAMIENTO 0% $0.00
SUBTOTAL $285.45
UTILIDAD 10% $28.55
PRECIO UNITARIO $314.00
(* TRESCIENTOS CATORCE PESOS 00/100 M.N. *)
MATERIALES
TUBO DE COBRE DE 13 MM. TIPO "M" ML $48.60 6.300000 $306.18 26.75%
VALVULA DE INSERCION DE 13 MM. COBRE PZA $138.00 1.000000 $138.00 12.06%
CODO DE COBRE DE 90 X 13 MM. PZA $8.90 2.000000 $17.80 1.56%
TEE PAREJA DE COBRE DE 13 MM. PZA $12.30 1.000000 $12.30 1.07%
COPLE DE COBRE DE 13 MM. PZA $4.80 1.000000 $4.80 0.42%
LIJA EN ROLLO DE 38 MM. ML $5.60 1.500000 $8.40 0.73%
SOLDADURA 50 X 50 ROLLO $97.00 0.215000 $20.86 1.82%
GASOLINA BLANCA LTS $35.00 0.500000 $17.50 1.53%
PASTA PARA SOLDAR KG $48.00 0.152292 $7.31 0.64%
ABRAZADERA PVC DE 3" PZA $48.00 1.000000 $48.00 4.19%
Subtotal: MATERIALES $581.15 50.77%
MANO DE OBRA
AYUDANTE GENERAL JOR $442.28 0.450000 $199.03 17.39%
OFICIAL PLOMERO JOR $527.83 0.450000 $237.52 20.75%
PEON JOR $387.89 0.285000 $110.55 9.66%
Subtotal: MANO DE OBRA $547.10 47.80%
EQUIPO Y HERRAMIENTA
HERRAMIENTA % $547.10 0.030000 $16.41 1.43%
Subtotal: EQUIPO Y HERRAMIENTA $16.41 1.43%
Costo directo $1,144.66
INDIRECTOS 15% $171.70
SUBTOTAL $1,316.36
FINANCIAMIENTO 0% $0.00
SUBTOTAL $1,316.36
UTILIDAD 10% $131.64
PRECIO UNITARIO $1,448.00
(* UN MIL CUATROCIENTOS CUARENTA Y OCHO PESOS 00/100 M.N. *)