2.ppto Ascensor Abril 15 de 2016
2.ppto Ascensor Abril 15 de 2016
2.ppto Ascensor Abril 15 de 2016
Obra: PROYECTO ASCENSOR PARA EL SERVICIO DE SALUD- EDIFICIO 310 EMILIO FECHA: 2-Mar-16
ALJURE
6 VARIOS
VENTANA ALUMINIO TIPO PERSIANA EN VANO DEL 10,275,357 10,994,632
FOSO DE ASCENSOR PARA MANTENIMIENTO. VER
DETALLE ARQUITECTÓNICO EN PLANO. (1.75 X 0.60
6.1 M2 1.2 275,280 330,336 353,460
MTS)
6.4 ESTRUC.MURO BOARD 10mm [CANAL-PARAL] 89MM C20 M2 4 36,980 147,920 158,274
CARTERAS EN BOARD 10MM A=26-50CM [3 CARAS]
6.5 ML 6 49,990 299,940 320,936
6.6 ESTUCO MURO SEMIPLASTICO RELLENO S/CONCR. M2 71 12,820 910,220 973,935
6.7 ESTUCO MURO SEMIPLASTICO (LISTO) M2 71 4,490 318,790 341,105
6.8 VINILO TIPO 1 [3M] M2 20 5,947 118,940 127,266
6.9 SIUMINISTRO E INSTALACION DE DURO PISO M2 3 77,990 233,970 250,348
6.10 SIKA 101 MORTERO M2 20 93,000 1,860,000 1,990,200
DEMOLICIÓN MURO EN PANTALLA FOSO PARA AMPLIAR
6.11 VANO DE VENTANA DE ACCESO PARA MANTENIMIENTO M2 1 65,699 65,699 70,298
CARTERA EN REPELLO VANO VENTANA FOSO
6.12 ML 5 9,087 45,435 48,615
6.13 SIKAFLEX 1CSL A=8-10MM H=10MM ML 10 11,338 113,380 121,317
6.14 ALQUILER DE CONTENEDOR TIPO BODEGA 20¨ MES 3 545,000 1,635,000 1,749,450
MURETE IMPERMEALIBILIZADO SOBRE FACHADA- VER
6.15 ESPECIFICACION Y UBICACIÓN EN PLANO ML 6 28,224 169,344 181,198
MEDIACAÑA EN MORTERO IMPERMEABILIZADO SOBRE
FACHADA- VER ESPECIFICACION Y UBICACIÓN EN
6.16 ML 6 10,786 64,716 69,246
PLANO
SUBTOTAL
74,000,000 100,920,000
ASCENSOR
CIENTO TREINTA Y UN MILLONES NOVECIENTOS SETENTA Y TRES MIL DOSCIENTOS CUARENTA Y NUEVE MILLONES
6 VARIOS
VENTANA ALUMINIO TIPO PERSIANA EN VANO DEL 10,275,357 10,994,632
FOSO DE ASCENSOR PARA MANTENIMIENTO. VER
DETALLE ARQUITECTÓNICO EN PLANO. (1.75 X 0.60
6.1 M2 1.2 275,280 330,336 353,460
MTS)
6.4 ESTRUC.MURO BOARD 10mm [CANAL-PARAL] 89MM C20 M2 4 36,980 147,920 158,274
CARTERAS EN BOARD 10MM A=26-50CM [3 CARAS]
6.5 ML 6 49,990 299,940 320,936
6.6 ESTUCO MURO SEMIPLASTICO RELLENO S/CONCR. M2 71 12,820 910,220 973,935
6.7 ESTUCO MURO SEMIPLASTICO (LISTO) M2 71 4,490 318,790 341,105
6.8 VINILO TIPO 1 [3M] M2 20 5,947 118,940 127,266
6.9 SIUMINISTRO E INSTALACION DE DURO PISO M2 3 77,990 233,970 250,348
6.10 SIKA 101 MORTERO M2 20 93,000 1,860,000 1,990,200
DEMOLICIÓN MURO EN PANTALLA FOSO PARA AMPLIAR
6.11 VANO DE VENTANA DE ACCESO PARA MANTENIMIENTO M2 1 65,699 65,699 70,298
CARTERA EN REPELLO VANO VENTANA FOSO
6.12 ML 5 9,087 45,435 48,615
6.13 SIKAFLEX 1CSL A=8-10MM H=10MM ML 10 11,338 113,380 121,317
6.14 ALQUILER DE CONTENEDOR TIPO BODEGA 20¨ MES 3 545,000 1,635,000 1,749,450
MURETE IMPERMEALIBILIZADO SOBRE FACHADA- VER
6.15 ESPECIFICACION Y UBICACIÓN EN PLANO ML 6 28,224 169,344 181,198
MEDIACAÑA EN MORTERO IMPERMEABILIZADO SOBRE
FACHADA- VER ESPECIFICACION Y UBICACIÓN EN
6.16 ML 6 10,786 64,716 69,246
PLANO
SUBTOTAL
14,800,000 17,420,160
ASCENSOR
VALOR TOTAL COSTOS DIRECTOS
40,807,153
COSTOS INDIRECTOS 40,807,153
TOTAL COSTOS DIRECTOS
ADMINISTRACION 26.5% 10,809,647
IMPREVISTOS 1.0% 408,072
UTILIDAD 4.0% 1,632,286
TOTAL AIU 31.5% 12,850,005
IVA SOBRE LA UTILIDAD 16.0% 261,166
133,726,323
CIENTO TREINTA Y TRES MILLONES SETECIENTOS VEINTISEIS MIL TRESCIENTOS VEINTITRES PESOS MCTE
ADECUACION DEL ESPACIO PARA EL FUNCIONAMIENTO DE LA DIVISION DE RECURSOS HUMANOS EN EL PISO 2 DEL EDIFICIO 301, ADMINISTRACION CENTRAL UNIVERSIDAD
DEL VALLE
ANEXO 11 TÉCNICO FECHA : 7/23/2020
GASTOS ADMINISTRATIVOS
GASTOS VARIOS $ 2,520,000
Elementos de Protección Personal 4 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 6.4 $ 50,000 $ 320,000
equipos de oficina 1 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2.4 $ 25,000 $ 60,000
Mantenimiento de equipos oficina 1 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2.4 $ 25,000 $ 60,000
Enfermeria dotacion 1 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2.4 $ 25,000 $ 60,000
papeleria 1 1 1 1 1 1 1 1 1 8.0 $ 50,000 $ 400,000
comunicaciones 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4.0 $ 50,000 $ 200,000
señalizacion 1 1 1 1 1 1 1 1 1 8.0 $ 35,000 $ 280,000
Transportes Generales 1 1 1 1 1 1 1 1 1 8.0 $ 35,000 $ 280,000
Capacitaciones 1 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2.4 $ 25,000 $ 60,000
Seguridad de Obra 1 1 1 1 1 1 1 1 1 8.0 $ 100,000 $ 800,000
DESCUENTOS SOBRE EL CONTRATO Y POLIZAS
DESCUENTOS SOBRE CONTRATO % Base $ 2,691,603
ESTAMPILLA PROUNIVALLE 2.00% $ 50,994,344 $ 1,019,887
ESTAMPILLA PRODESARROLLO 2.00% $ 55,242,492 $ 1,104,850
ESTAMPILLA PROHOSPITALES 1.00% $ 55,242,492 $ 552,425
ESTAMPILLA PROCULTURA 1.00% $ 321,262 $ 3,213
ESTAMPILLA PROSEGURIDAD 0.20% $ 729,456 $ 1,459
ESTAMPILLA PROUCEVA 0.50% $ 1,954,038 $ 9,770
TOTAL= 6.70%
POLIZAS % Plazo Factor Base $ 232,376
Manejo de anticipo 100% 12 0.03% 0.36% $ 55,242,492 $ 198,873
Cumplimiento 15% 12 0.03% 0.05% $ 55,242,492 $ 29,831
Salarios y prestaciones 5% 44 0.03% 0.07% $ 321,262 $ 212
Calidad de los suministros 15% 12 0.03% 0.05% $ 729,456 $ 394
Calidad del Servicio 15% 12 0.03% 0.05% $ 1,954,038 $ 1,055
Estabilidad de obra 15% 36 0.03% 0.16% $ 261,244 $ 423
Responsabilidad Civil extracontractual 100% 8 0.03% 0.24% $ 661,364 $ 1,587
TOTAL= 0.99%
TOTAL PERSONAL TOTAL $ 5,443,979
RESUMEN
VALOR COSTOS DIRECTOS $ 40,807,153
A.I.U. 31.5% $ 12,850,005
ADMINISTRACION 26.5% $ 10,809,647
IMPREVISTOS 1.00% $ 408,071.53
UTILIDAD 4.00% $ 1,632,286.10
IVA SOBRE UTILIDAD 16.00% $ 261,166
$ 53,918,323
$ 79,808,000
CUADRO DE ANALISIS DE INDIRECTOS vs COSTO DE OBRA - ASCENSOR SERVICIO MÉDICO - INTERVENTORIA COD:
GASTOS ADMINISTRATIVOS
GASTOS VARIOS $ 500,000
Elementos de Protección Personal 1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.8 $ 50,000 $ 40,000
equipos de oficina 1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.8 $ 25,000 $ 20,000
papeleria 1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.8 $ 50,000 $ 40,000
comunicaciones 1 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 2.4 $ 50,000 $ 120,000
Transportes Generales 1 1 1 1 1 1 1 1 1 8.0 $ 35,000 $ 280,000
DESCUENTOS SOBRE EL CONTRATO Y POLIZAS
DESCUENTOS SOBRE CONTRATO % Base #VALUE!
ESTAMPILLA PRODESARROLLO 2.00% #VALUE! #VALUE!
ESTAMPILLA PROHOSPITALES 1.00% #VALUE! #VALUE!
ESTAMPILLA PROCULTURA 1.00% #VALUE! #VALUE!
ESTAMPILLA PROSEGURIDAD 0.20% #VALUE! #VALUE!
ESTAMPILLA PROUCEVA 0.50% #VALUE! #VALUE!
TOTAL= 6.70%
POLIZAS % Plazo Factor Base #VALUE!
Cumplimiento 15% 12 0.03% 0.05% #VALUE! #VALUE!
Salarios y prestaciones 5% 44 0.03% 0.07% #VALUE! #VALUE!
Calidad del Servicio 15% 12 0.03% 0.05% #VALUE! #VALUE!
TOTAL= 0.17%
TOTAL PERSONAL TOTAL #VALUE!
TOTAL ADMINISTRACION
RESUMEN
VALOR COSTOS DIRECTOS #VALUE!
A.I.U. #VALUE! #VALUE!
ADMINISTRACION #VALUE! #VALUE!
TOTAL VALOR
$ 3,056,000
$ 3,056,000
$ 1,949,394
$ 1,528,000
$ 421,394
$ 5,005,394
#VALUE!
#VALUE!
#VALUE!
#VALUE!
FIRMA CONSTRUCTORA ANALISIS DE PRECIOS UNITARIOS
PROYECTO ASCENSOR PARA EL SERVICIO DE SALUD -EDIFICIO 310 EMILIO ALJURE FECHA: 2-Mar-16
MATERIALES
AGUA LTS 220 0 16.00 3,520.00
ARENA MEDIANA M3 1.09 0 27,000.00 29,430.00
CEMENTO GRIS KLS 454 0 480.00 217,920.00
SUBTOTAL MATERIALES 250,870.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.5 0 12,248.00 18,372.00
SUBTOTAL MANO DE OBRA 18,372.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1 0 1,400.00 1,400.00
SUBTOTAL EQUIPO 1,400.00
MATERIALES
AGUA LTS 160 0 16.00 2,560.00
ARENA GRUESA M3 0.52 0 27,000.00 14,040.00
GRAVA TRITURADA DE 3/4 M3 0.94 0 35,000.00 32,900.00
GASOLINA CORRIENTE GLN 0.1 0 8,700.00 870.00
CEMENTO GRIS KLS 260 0 480.00 124,800.00
ACEITE MOTOR 4 TIEMPOS GLN 0.006 0 70,000.00 420.00
SUBTOTAL MATERIALES 175,590.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.1 0 12,248.00 13,472.80
SUBTOTAL MANO DE OBRA 13,472.80
EQUIPO Y HERRAMIENTA
MEZCLADORA DE 9 PIES CUBICOS DIA 0.06 0 38,800.00 2,328.00
HERRAMIENTA MENOR GLB 2.4 0 1,400.00 3,360.00
SUBTOTAL EQUIPO 5,688.00
MATERIALES
AGUA LTS 190 0 16.00 3,040.00
ARENA GRUESA M3 0.56 0 27,000.00 15,120.00
GRAVA TRITURADA DE 3/4 M3 0.84 0 35,000.00 29,400.00
GASOLINA CORRIENTE GLN 0.1 0 8,700.00 870.00
CEMENTO GRIS KLS 350 0 480.00 168,000.00
ACEITE MOTOR 4 TIEMPOS GLN 0.006 0 70,000.00 420.00
SUBTOTAL MATERIALES 216,850.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.1 0 12,248.00 13,472.80
SUBTOTAL MANO DE OBRA 13,472.80
EQUIPO Y HERRAMIENTA
MEZCLADORA DE 9 PIES CUBICOS DIA 0.06 0 38,800.00 2,328.00
HERRAMIENTA MENOR GLB 2.7 0 1,400.00 3,780.00
SUBTOTAL EQUIPO 6,108.00
MATERIALES
AGUA LTS 200 0 16.00 3,200.00
ARENA GRUESA M3 0.67 0 27,000.00 18,090.00
GRAVA TRITURADA DE 3/4 M3 0.67 0 35,000.00 23,450.00
GASOLINA CORRIENTE GLN 0.1 0 8,700.00 870.00
CEMENTO GRIS KLS 420 0 480.00 201,600.00
ACEITE MOTOR 4 TIEMPOS GLN 0.006 0 70,000.00 420.00
SUBTOTAL MATERIALES 247,630.00
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 1.1 0 12,248.00 13,472.80
SUBTOTAL MANO DE OBRA 13,472.80
EQUIPO
MEZCLADORA DE 9 PIES CUBICOS DIA 0.06 0 38,800.00 2,328.00
HERRAMIENTA MENOR GLB 3 0 1,400.00 4,200.00
SUBTOTAL EQUIPO 6,528.00
MATERIALES
VALLA PUBLICIDAD OBRA INCLUYE M.O UND 1 0 525,000.00 525,000.00
Estructura Metalica de soporte tubular e impresión de la
información en Panafelx o equivalente de acuerdo a modelo
institucional
SUBTOTAL MATERIALES 525,000.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 12.2469 6,124.00 75,000.01
MATERIALES
CINTA SEGURIDAD PREVENTIVA ROLLO 250MTS-8CM ANC ROL 1 0 25,600.00 25,600.00
HIERR.DE 60000 PSI 420 MPA KLS 12 0 2,330.00 27,960.00
MEZCLA CONCRETO 1:2.5:4« 2500 PSI-17.5MPa M3 0.125 0 194,751.00 24,343.87
SUBTOTAL MATERIALES 77,903.87
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 5.2609 0 6,124.00 32,217.75
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.18 0 16,329.00 2,939.22
SUBTOTAL MANO DE OBRA 35,156.97
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.2339 1,400.00 327.46
SUBTOTAL EQUIPO 327.46
MATERIALES
CHAZO PLASTICO 1/4 UND 3 0 90.00 270.00
PERFIL PARAL 89 2.44M C.20 L=2.44M A=89MM LAMINA GA UND 0.77 1 23,500.00 18,275.95
PERFIL CANAL 89 2.44M C20 L=2.44M A=89MM LAMINA GA UND 0.34 1 17,100.00 5,872.14
TORN P/LAM 1.1/2x 8 UND 3 0 35.00 105.00
TORN PAMPH 1 x 8 PAM PHILLIPS UND 23 0 33.00 759.00
SUBTOTAL MATERIALES 25,282.09
MANO DE OBRA
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.4 17,349.00 6,939.60
SUBCONTRATO CARPINTERIA PANELERIA GLB 0.3362 10,000.00 3,362.00
SUBTOTAL MANO DE OBRA 10,301.60
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.9973 1,400.00 1,396.22
SUBTOTAL EQUIPO 1,396.22
MATERIALES
PLACA YESO 12.7MM-GYPLAC 244X122 CIELO-PARED UND 0.335 1 15,900.00 5,379.76
CINTA SELLO 2"(PANEL-YESO) CINTA DE 150 PIES 45.72MT ROL 0.008 0 13,500.00 108.00
MASILLA PLASTICA INTERIORES CUム 0.055 1 37,500.00 2,083.12
TORN PAMPH 1 x 8 PAM PHILLIPS UND 12 0 33.00 396.00
SUBTOTAL MATERIALES 7,966.88
MANO DE OBRA
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.55 17,349.00 9,541.95
SUBCONTRATO CARPINTERIA PANELERIA GLB 0.1827 10,000.00 1,827.00
SUBTOTAL MANO DE OBRA 11,368.95
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.4958 1,400.00 694.12
SUBTOTAL EQUIPO 694.12
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.9 0 6,124.00 5,511.60
SUBTOTAL MANO DE OBRA 5,511.60
EQUIPO Y HERRAMIENTA
VOLQUETA 5 M3 VJE 0.04 0 43,500.00 1,740.00
HERRAMIENTA MENOR GLB 0.06 0 1,400.00 84.00
SUBTOTAL EQUIPO 1,824.00
MATERIALES
BISAGRA 3x1.1/4" COBRIZ PAR 3 0 4,900.00 14,700.00
HOJ.TIPO FORTEC RES. UND 1 0 59,900.00 59,900.00
SUBTOTAL MATERIALES 74,600.00
MANO DE OBRA
M.O. CARP.MADERA 1 AYUDANTE-1 OFI HC 1 0 18,369.00 18,369.00
SUBTOTAL MANO DE OBRA 18,369.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1.0007 0 1,400.00 1,400.98
SUBTOTAL EQUIPO 1,400.98
MATERIALES
PUNTILLA 3.1/2" LBS 0.5 0 2,000.00 1,000.00
SUBTOTAL MATERIALES 1,000.00
MANO DE OBRA
M.O. CARP.MADERA 1 AYUDANTE-1 OFI HC 2 0 18,369.00 36,738.00
SUBTOTAL MANO DE OBRA 36,738.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1 0 1,400.00 1,400.00
SUBTOTAL EQUIPO 1,400.00
MATERIALES
CADENA GALVANIZADA 3/16" HIERRO GALVANIZADO ML 1 0 2,400.00 2,400.00
SUBTOTAL MATERIALES 2,400.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.17 16,329.00 2,775.93
SUBTOTAL MANO DE OBRA 2,775.93
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.2173 1,400.00 304.22
SUBTOTAL EQUIPO 304.22
MATERIALES
CANDADO YALE 110-30 UND 1 0 18,328.00 18,328.00
SUBTOTAL MATERIALES 18,328.00
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 0.45 0 6,124.00 2,755.80
SUBTOTAL MANO DE OBRA 2,755.80
EQUIPO Y HERRAMIENTA
VOLQUETA 5 M3 VJE 0.28 0 43,500.00 12,180.00
HERRAMIENTA MENOR GLB 0.403 0 1,400.00 564.20
SUBTOTAL EQUIPO 12,744.20
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 3 0 6,124.00 18,372.00
SUBTOTAL MANO DE OBRA 18,372.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.996 0 1,400.00 1,394.40
SUBTOTAL EQUIPO 1,394.40
ALIMENTADOR ELECTRICO PARA ASCENSOR 3#8 + 1#8 + 1#8T Ø1 1/2"" EMT Unidad: ML
ITEM: 2,1
DESCRIPCION UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MATERIALES
CABLE COBRE THW # 8 ML 4 5 6,184.00 25,972.80
UNION 2" COLMENA UND 0.333 0 3,187.00 1,061.27
CURVA 2" EMT COLMENA UND 0.17 0 10,526.00 1,789.42
TUBO 2" EMT COLMENA UND 0.333 5 56,292.00 19,682.49
SUBTOTAL MATERIALES 48,505.98
MANO DE OBRA
M.O. ELECTRICAS 2 AYUDANTE-1 OFI HC 0.4012 31,127.00 12,488.15
SUBTOTAL MANO DE OBRA 12,488.15
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0993 1,400.00 139.02
SUBTOTAL EQUIPO 139.02
MATERIALES
CAJA DE PASO METALICA DE 8"X8"X4" UND 1 0 35,000.00 35,000.00
SUBTOTAL MATERIALES 35,000.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.2051 22,860.00 4,688.58
SUBTOTAL- MANO DE OBRA 4,688.58
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.7136 1,400.00 999.04
SUBTOTAL- EQUIPO 999.04
MATERIALES
TOTALIZADOR LG 50 AMP GOLD STAR UND 1 0 93,004.00 93,004.00
SUBTOTAL MATERIALES 93,004.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 1.6341 22,860.00 37,355.52
SUBTOTAL MANO DE OBRA 37,355.52
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.1 1,400.00 140.00
SUBTOTAL EQUIPO 140.00
MATERIALES
CABLE COBRE THW # 8 ML 4 5 6,184.00 25,972.80
LIMPIADOR PVC 760-G 1/4 GL UND 0.006 2 28,925.00 177.02
SOLDADURA PVC 1/ 4 GLN UND 0.006 2 56,900.00 348.22
TUBO PVC 2" X 3 MTS UND 0.333 5 13,601.00 4,755.58
SUBTOTAL MATERIALES 31,253.62
MANO DE OBRA
M.O. ELECTRICAS 2 AYUDANTE-1 OFI HC 0.1713 0 31,127.00 5,332.05
SUBTOTAL MANO DE OBRA 5,332.05
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0969 0 1,400.00 135.66
SUBTOTAL EQUIPO 135.66
DEMOLICION DE PISO, CONTRAPISO 0.40 X 0.40 Y EXCAVACION PARA EMPALME DE Unidad: UND
TUBERIA DE ACOMETIDA A CAJA EXISTENTE INCLUYE ROTURA DE PASE EN LA CAJA.
ITEM: 2,5
MATERIALES
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.2 0 236,431.00 47,286.20
MANO DE OBRA
M.O. ELECTRICAS. 2 AYUDANTE - 1 OFIC. HC 1.6443 0 23,983.00 39,435.24
SUBTOTAL MANO DE OBRA 39,435.24
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.4038 0 1,400.00 565.32
SUBTOTAL EQUIPO 565.32
MATERIALES
ACCESORIOS EMT PARA TUBERÍA 3/4 UND 1 0 500.00 500.00
TUBO EMT 3/4 UND 1 0 4,505.00 4,505.00
SUBTOTAL MATERIALES 5,005.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.1 22,860.00 2,286.00
MATERIALES
CURVA EMT 3/4" UND 1 0 1,426.00 1,426.00
SUBTOTAL MATERIALES 1,426.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.05 0 22,860.00 1,143.00
SUBTOTAL MANO DE OBRA 1,143.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.3 0 1,400.00 420.00
SUBTOTAL EQUIPO 420.00
MATERIALES
CONECTOR EMT 3/4" UND 1 0 629.00 629.00
SUBTOTAL MATERIALES 629.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.02 22,860.00 457.20
MATERIALES
CAJA DE 2X4 FS UND 1 0 8,000.00 8,000.00
SUBTOTAL MATERIALES 8,000.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.08 22,860.00 1,828.80
SUBTOTAL MANO DE OBRA 1,828.80
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.3 1,400.00 420.00
SUBTOTAL EQUIPO 420.00
MATERIALES
ACCESORIOS UND 1 0 1,000.00 1,000.00
CAJA FS 4X4 UND 1 0 11,000.00 11,000.00
SUBTOTAL MATERIALES 12,000.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.85 0 22,860.00 19,431.00
SUBTOTAL MANO DE OBRA 19,431.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.1 0 1,400.00 140.00
SUBTOTAL EQUIPO 140.00
MATERIALES
FACE PPLATE UND 1 0 11,000.00 11,000.00
TOMA DOBLE RJ45-5E UND 1 0 38,000.00 38,000.00
SUBTOTAL MATERIALES 49,000.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.3 0 22,860.00 6,858.00
SUBTOTAL MANO DE OBRA 6,858.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.1 0 1,400.00 140.00
SUBTOTAL EQUIPO 140.00
MATERIALES
CABLE UTP CATEGORIA 5E ML 1 5 1,885.00 1,979.25
SUBTOTAL MATERIALES 1,979.25
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.04 0 22,860.00 914.40
SUBTOTAL MANO DE OBRA 914.40
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0102 0 1,400.00 14.28
SUBTOTAL EQUIPO 14.28
MATERIALES
CITOFONO UND 1 0 35,000.00 35,000.00
MATERIALES
BREAKER 1x 15 AMP UND 1 0 21,000.00 21,000.00
SUBTOTAL MATERIALES 21,000.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.5 0 22,860.00 11,430.00
SUBTOTAL MANO DE OBRA 11,430.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.097 0 1,400.00 135.80
SUBTOTAL EQUIPO 135.80
MATERIALES
CABLE COBRE THW # 12 ML 1 5 2,966.00 3,114.30
SUBTOTAL MATERIALES 3,114.30
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.02 0 22,860.00 457.20
SUBTOTAL MANO DE OBRA 457.20
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0996 0 1,400.00 139.44
SUBTOTAL EQUIPO 139.44
MATERIALES
ACCESORIOS EMT PARA TUBERÍA 1/2 UND 1 0 1,000.00 1,000.00
TUBO EMT 1/2 UND 0.167 0 35,089.00 5,859.86
SUBTOTAL MATERIALES 6,859.86
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.0101 22,860.00 230.88
MATERIALES
CAJA 2x4 PVC UND 1 0 7,656.00 7,656.00
TOMA DOBLE UND 1 0 8,468.00 8,468.00
SUBTOTAL MATERIALES 16,124.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.7651 0 22,860.00 17,490.18
SUBTOTAL MANO DE OBRA 17,490.18
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1 0 1,400.00 1,400.00
SUBTOTAL EQUIPO 1,400.00
MATERIALES
SWITCHE SENCILLO AMBIA LUMINEX UND 1 0 6,148.00 6,148.00
SUBTOTAL MATERIALES 6,148.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.9051 0 22,860.00 20,690.58
SUBTOTAL MANO DE OBRA 20,690.58
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.1 0 1,400.00 140.00
SUBTOTAL EQUIPO 140.00
MATERIALES
LAMPARA AHORRADORA COMPACTA 1X26W UND 1 0 19,500.00 19,500.00
SUBTOTAL MATERIALES 19,500.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.0407 0 22,860.00 930.40
SUBTOTAL MANO DE OBRA 930.40
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0982 0 1,400.00 137.48
SUBTOTAL EQUIPO 137.48
MATERIALES
CAJA OCTOGONAL UND 1 0 609.00 609.00
PLAJON LOSA UND 1 0 2,000.00 2,000.00
MATERIALES
ACCESORIOS UND 1 0 1,000.00 1,000.00
CAJA FS 4X4 UND 1 0 11,000.00 11,000.00
SUBTOTAL MATERIALES 12,000.00
MANO DE OBRA
M.O. ELECTRICAS 1 AYUDANTE-1 OFI HC 0.8439 0 22,860.00 19,291.55
SUBTOTAL MANO DE OBRA 19,291.55
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.1993 0 1,400.00 279.02
SUBTOTAL EQUIPO 279.02
OTROS
SUBTOTAL OTROS -
MATERIALES
SUMINISTRO E INSTALACIÓN DE PERFIL TIPO HEA 160 UND 0.083 1 1,622,144.00 135,984.33
THINER DISOLVENTE GLN 0.1 0 18,000.00 1,800.00
ANTICORROSIVO ROJO BASE PINTURA GLN 0.05 0 20,400.00 1,020.00
SOLDADURA 7018 x 1/8" KLS 0.5 0 7,200.00 3,600.00
SUBTOTAL MATERIALES 142,404.33
MANO DE OBRA
M.O. ALBANILERIA 2 AYUDANTE HC 0.15 0 12,248.00 1,837.20
M.O. CARP.TALLER 2 AYUDANTE-1 OFI HRS 2.7572 0 28,573.00 78,781.47
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.1 0 17,349.00 1,734.90
SUBTOTAL MANO DE OBRA 82,353.57
EQUIPO Y HERRAMIENTA
PULIDORA CON PIEDRA O DISCO DIA 0.1 0 26,000.00 2,600.00
HERRAMIENTA MENOR GLB 1.4981 0 1,400.00 2,097.34
OXICORTE (OXIGENO-ACETILENO) DIA 0.15 0 27,500.00 4,125.00
ANDAMIO METALICO TUBULAR U/D 0.4 0 1,050.00 420.00
SUBTOTAL EQUIPO 9,242.34
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 21.2097 0 6,124.00 129,888.20
SUBTOTAL MANO DE OBRA 129,888.20
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0798 0 1,400.00 111.72
SUBTOTAL EQUIPO 111.72
MATERIALES
PLATINA EN LAMINA COL ROLLED DE 1/4" DE CALIBRE, UND 1 2 106,256.00 108,381.12
SUBTOTAL MATERIALES 108,381.12
MANO DE OBRA
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 4.0186 0 17,349.00 69,718.69
SUBTOTAL MANO DE OBRA 69,718.69
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.9999 0 1,400.00 1,399.86
OXICORTE (OXIGENO-ACETILENO) DIA 0.2 0 27,500.00 5,500.00
SUBTOTAL EQUIPO 6,899.86
MATERIALES
GANCHO EN ACERO DE 5/8" DE 60.000 PSI, INCLUYE AS UND 1 0 174,000.00 174,000.00
MEZCLA CONCRETO 1:2:2 3500 PSI-24.5MPa M3 0.06 0 267,631.00 16,057.86
SUBTOTAL MATERIALES 190,057.86
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.0822 0 18,369.00 19,878.93
SUBTOTAL MANO DE OBRA 19,878.93
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.045 0 1,400.00 63.00
SUBTOTAL EQUIPO 63.00
"VENTANA ALUMINIO TIPO PERSIANA EN VANO DEL FOSO DE ASCENSOR PARA Unidad: M2
MANTENIMIENTO. VER DETALLE ARQUITECTÓNICO EN PLANO. (1.75 X 0.60 MTS)
" ITEM: 6.1
MATERIALES
CHAZO PLASTICO 1/4 UND 6 0 90.00 540.00
ALACENA ALUMINIO-ACRILICO MODELO 42-15 M2 3.5 0 38,644.00 135,254.00
PERFIL U 3 x1.1/2x6 SP UND 0.7 0 63,800.00 44,660.00
UNION 8CMX1/8" UND 4 0 3,300.00 13,200.00
REMACHE POT 4*4 UND 76 0 18.00 1,368.00
TORN.AVELLAN 2.1/2"x 8 GOLOSO UND 6 0 99.00 594.00
SUBTOTAL MATERIALES 195,616.00
MANO DE OBRA
M.O. CARP.ALUMINIO 1 AYUDANTE-1 OFI HC 2.5 16,329.00 40,822.50
SUBCONTRATO CARPINTERIA ALUMINIO GLB 3.6259 0 10,000.00 36,259.00
SUBTOTAL MANO DE OBRA 77,081.50
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1.8446 0 1,400.00 2,582.44
SUBTOTAL EQUIPO 2,582.44
MATERIALES
CHAZO PLASTICO 1/4 UND 4 0 90.00 360.00
SILICONA TRANSPARENT.11 OZ UND 1 0 8,950.00 8,950.00
ALFAGIA ALUM.21-40 CM ANCHO ML 0.2 0 37,477.00 7,495.40
TORN.AVELLANADO 2" x 8 UND 4 0 51.00 204.00
SUBTOTAL MATERIALES 17,009.40
MANO DE OBRA
M.O. CARP.ALUMINIO 1 AYUDANTE-1 OFI HC 0.4 16,329.00 6,531.60
SUBTOTAL MANO DE OBRA 6,531.60
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1.5995 0 1,400.00 2,239.30
SUBTOTAL EQUIPO 2,239.30
MATERIALES
BISAGRA 3x3" COBRIZ PAR 3 0 3,480.00 10,440.00
LIJA 320 AGUA PLI 1.5 0 1,000.00 1,500.00
SOLDADURA 6011 1/8" VARILLA KLS 0.1 0 7,200.00 720.00
ACERO PARA PUERTAS UND 1 0 70,000.00 70,000.00
MASILLA PLASTICA INTERIORES CUム 0.015 0 37,500.00 562.50
ANTICORROSIVO WASH-PRIMER GLN 0.03 0 90,800.00 2,724.00
SUBTOTAL MATERIALES 85,946.50
MANO DE OBRA
M.O. METALISTERIA 1 AYUDANTE-1 OFI HC 4.1455 0 19,594.00 81,226.92
SUBTOTAL MANO DE OBRA 81,226.92
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 9.9973 0 1,400.00 13,996.22
SUBTOTAL EQUIPO 13,996.22
MATERIALES
CHAZO PLASTICO 1/4 UND 3 0 90.00 270.00
PERFIL PARAL 89 2.44M C.20 L=2.44M A=89MM LAMINA GA UND 0.77 1 23,500.00 18,275.95
PERFIL CANAL 89 2.44M C20 L=2.44M A=89MM LAMINA GA UND 0.34 1 17,100.00 5,872.14
TORN P/LAM 1.1/2x 8 UND 3 0 35.00 105.00
TORN PAMPH 1 x 8 PAM PHILLIPS UND 23 0 33.00 759.00
SUBTOTAL MATERIALES 25,282.09
MANO DE OBRA
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.4 17,349.00 6,939.60
SUBCONTRATO CARPINTERIA PANELERIA GLB 0.3362 10,000.00 3,362.00
SUBTOTAL MANO DE OBRA 10,301.60
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.9973 1,400.00 1,396.22
SUBTOTAL EQUIPO 1,396.22
OTROS
SUBTOTAL OTROS -
MATERIALES
LIJA 240 MADE PLI 1 0 950.00 950.00
PLACA SUPERBOARD 10MM 2440x1220 UND 0.5 0 51,600.00 25,800.00
CINTA QUICK TAPE 75MTS FIBRA DE VIDRIO RLL 0.026 0 19,800.00 514.80
TORN PAMPH 1 x 8 PAM PHILLIPS UND 18 0 33.00 594.00
MASILLA JUNTA INVIS.BOARD JUNTA INVISIBLE ETERCOA CUN 0.024 0 88,900.00 2,133.60
SUBTOTAL MATERIALES 29,992.40
MANO DE OBRA
M.O. CARP.TALLER 1 AYUDANTE-1 OFI HC 0.8 17,349.00 13,879.20
SUBCONTRATO CARPINTERIA ALUMINIO GLB 0.4538 0 10,000.00 4,538.00
SUBTOTAL MANO DE OBRA 18,417.20
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 1.0066 0 1,400.00 1,409.24
ANDAMIO METALICO TUBULAR U/D 0.1 1,050.00 105.00
TABLONES 3 MTS DIA 0.1 560.00 56.00
CRUCETA ANDAMIO DIA 0.1 100.00 10.00
SUBTOTAL EQUIPO 1,580.24
MATERIALES
ARENA FINA M3 0.045 0 27,000.00 1,215.00
AGUA LTS 1.9 0 16.00 30.40
ESTUCO SEMIPLASTICO(LISTO) BULTO 25K BLANCO-COL KLS 6.25 1 850.00 5,365.62
LIJA 400 AGUA PLI 0.05 0 1,000.00 50.00
SUBTOTAL MATERIALES 6,661.02
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 0.326 0 18,369.00 5,988.29
SUBTOTAL MANO DE OBRA 5,988.29
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.0469 0 1,400.00 65.66
ANDAMIO METALICO TUBULAR U/D 0.1 0 1,050.00 105.00
SUBTOTAL EQUIPO 170.66
MATERIALES
AGUA LTS 0.9 0 16.00 14.40
ESTUCO SEMIPLASTICO(LISTO) BULTO 25K BLANCO-COL KLS 1.8 1 850.00 1,545.30
LIJA 400 AGUA PLI 0.02 0 1,000.00 20.00
SUBTOTAL MATERIALES 1,579.70
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.16 0 17,349.00 2,775.84
SUBTOTAL MANO DE OBRA 2,775.84
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.021 0 1,400.00 29.40
ANDAMIO METALICO TUBULAR U/D 0.1 0 1,050.00 105.00
SUBTOTAL EQUIPO 134.40
MATERIALES
AGUA LTS 0.035 0 16.00 0.56
RODILLO FELPA UND 0.03 0 4,500.00 135.00
CINTA ENMASCARAR ROL 0.01 0 3,500.00 35.00
BROCHA CERDA MONA 4 UND 0.01 0 12,000.00 120.00
VINILO TIPO 1 GLN 0.05 1 47,500.00 2,398.75
SUBTOTAL MATERIALES 2,689.31
MANO DE OBRA
M.O. PINTURA 1 AYUDANTE-1 OFI HC 0.18 0 17,349.00 3,122.82
SUBTOTAL MANO DE OBRA 3,122.82
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.021 0 1,400.00 29.40
ANDAMIO METALICO TUBULAR U/D 0.1 0 1,050.00 105.00
SUBTOTAL EQUIPO 134.40
MATERIALES
AGUA LTS 1 0 16.00 16.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 2.5 0 972.00 2,430.00
LIJA 320 AGUA PLI 0.05 0 1,000.00 50.00
ACIDO OXALICO QUIMICO GLN 0.05 0 4,600.00 230.00
MARMOLINA BLANCA BTO 0.01 0 3,800.00 38.00
DURO PISO M2 1 3 45,600.00 46,968.00
MORTERO 1:3 M3 0.04 0 270,642.00 10,825.68
SUBTOTAL MATERIALES 60,557.68
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 0.2 0 18,369.00 3,673.80
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.8 16,329.00 13,063.20
SUBTOTAL MANO DE OBRA 16,737.00
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.4969 0 1,400.00 695.66
SUBTOTAL EQUIPO 695.66
MATERIALES
SIKA 101 MORTERO 5KG. RECUBRIMIENTO IMPERM. M2 1 0 93,000.00 93,000.00
SUBCONTRATO SUBTOTAL MATERIALES 93,000.00
DEMOLICIÓN MURO EN PANTALLA FOSO PARA AMPLIAR VANO DE VENTANA DE ACCESO Unidad: M2
PARA MANTENIMIENTO ITEM: 6.11
DESCRIPCION UND CANT. DESP.% PRECIO UNIT VALOR TOTAL
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE HC 3 0 6,124.00 18,372.00
SUBTOTAL MANO DE OBRA 18,372.00
EQUIPO Y HERRAMIENTA
COMPRESOR DE DOS MARTILLOS HRS 0.5 0 92,000.00 46,000.00
HERRAMIENTA MENOR GLB 0.948 0 1,400.00 1,327.20
SUBTOTAL EQUIPO 47,327.20
MATERIALES
MORTERO 1:3 M3 0.015 0 270,642.00 4,059.63
SUBTOTAL MATERIALES 4,059.63
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.3 0 16,329.00 4,898.70
SUBTOTAL MANO DE OBRA 4,898.70
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.017 0 1,400.00 23.80
ANDAMIO METALICO TUBULAR U/D 0.1 0 1,050.00 105.00
SUBTOTAL EQUIPO 128.80
MATERIALES
SIKAFLEX 1CSL AUTONIVELANTE UND 0.325 5 24,360.00 8,312.85
SUBTOTAL MATERIALES 8,312.85
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 0.1647 0 18,369.00 3,025.37
SUBTOTAL MANO DE OBRA 3,025.37
MATERIALES
ALQUILER CONTENEDOR TIPO BODEGA UND 1 0 545,000.00 545,000.00
MATERIALES
PLASTO CRETE 169 HE SIKA KLS 0.5 0 4,176.00 2,088.00
AGUA LTS 2 0 16.00 32.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS 0.2 1 972.00 196.34
LISTON 1 x2x3M. UND 0.235 0 3,100.00 728.50
PUNTILLA 2.1/2 104 UND/LB LBS 0.06 1 2,000.00 121.20
TABLA 1x05x3M [1C] UND 0.235 1 4,500.00 1,068.07
VARETA 1"x1"x3M UND 0.2 1 2,400.00 484.80
MEZCLA CONCRETO 1:2:3 3100 PSI 210 MPa M3 0.005 0 236,431.00 1,182.15
SUBTOTAL MATERIALES 5,901.06
MANO DE OBRA
M.O. ALB. ACABADOS 1 AYUDANTE-1 OFI HC 1.2 0 18,369.00 22,042.80
SUBTOTAL MANO DE OBRA 22,042.80
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR GLB 0.2 0 1,400.00 280.00
SUBTOTAL EQUIPO 280.00
MATERIALES
PLASTO CRETE 169 HE SIKA KLS 0.5 0 4,176.00 2,088.00
MORTERO 1:3 M3 0.013 0 270,642.00 3,518.34
SUBTOTAL MATERIALES 5,606.34
MANO DE OBRA
M.O. ALBANILERIA 1 AYUDANTE-1 OFI HC 0.3 0 16,329.00 4,898.70
SUBTOTAL MANO DE OBRA 4,898.70
EQUIPO Y HERRAMIENTA
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 0.014 0 15,000.00 210.00
HERRAMIENTA MENOR GLB 0.051 0 1,400.00 71.40
SUBTOTAL EQUIPO 281.40
MATERIALES
MEZCLA DE CONCRETO 3100 PSI 21 MPA M3 0.04 0 245,888.24 9,835.53
TABLA OTOBO UND 5.5 0 9,000.00 49,500.00
VARETA DE OTOBO UND 1.2 0 2,400.00 2,880.00
PUNTILLA 2" LBS 1.00 0 2,000.00 2,000.00
MANO DE OBRA ALBAÑILERIA 1 AYUD- 1 OFICIAL HC 2.5 0 24,024.71 60,061.78
VOLQUETA TRANSPORTE MATERIALE PETREOS 1 -10 K M3 0.04 0 7,000.00 280.00
ALABRE NEGRO # 18 KLS 0.04 0 3,100.00 124.00
SEGUETA SIN MARCO UND 0.04 0 2,600.00 104.00
HIERRO DE 60,000 PSI 420 MPA KLS 1.00 0 2,423.20 2,423.20
MANO DE OBRA ALBAÑILERIA 1 AYUD HC 0.05 0 6,124.00 306.20
SUBTOTAL MATERIALES 127,514.70
OTROS
MATERIALES
SUBTOTAL OTROS -
MATERIALES 68,020,392
DESCRIPCION UND CANT. VR. UNIT. VR.TOTAL
ACCESORIOS EMT PARA TUBERÍA 3/4 UND AC 25 500.00 12,500.00
PLAJON LOSA UND P 5 2,000.00 10,000.00
ACEITE MOTOR 4 TIEMPOS GLN A 0.00924 70,000.00 646.80
FACE PPLATE UND FA 1 11,000.00 11,000.00
ACCESORIOS UND A 1 1,000.00 1,000.00
AGUA LTS A 530.26 16.00 8,484.16
ACCESORIOS EMT PARA TUBERÍA 1/2 UND AC 40 1,000.00 40,000.00
ALACENA ALUMINIO-ACRILICO MODELO 42-15 M2 A 4.2 38,644.00 162,304.80
ALFAGIA ALUM.21-40 CM ANCHO ML A 0.4 37,477.00 14,990.80
ANTICORROSIVO ROJO BASE PINTURA GLN A 0.3 20,400.00 6,120.00
ANTICORROSIVO WASH-PRIMER GLN A 0.24 90,800.00 21,792.00
ARENA FINA M3 A 3.195 27,000.00 86,265.00
ARENA GRUESA M3 A 0.819 27,000.00 22,113.00
ARENA MEDIANA M3 A 0.29757 27,000.00 8,034.39
DURO PISO M2 D 3.09 45,600.00 140,904.00
BISAGRA 3x1.1/4" COBRIZ PAR B 9 4,900.00 44,100.00
BISAGRA 3x3" COBRIZ PAR B 24 3,480.00 83,520.00
BREAKER 1x 15 AMP UND B 1 21,000.00 21,000.00
CABLE COBRE THW # 8 ML C 218.4 6,184.00 1,350,585.60
CABLE COBRE THW # 12 ML C 210 2,966.00 622,860.00
CABLE UTP CATEGORIA 5E ML CA 44.1 1,885.00 83,128.50
CAJA FS 4X4 UND CA 2 11,000.00 22,000.00
CAJA 2x4 PVC UND C 5 7,656.00 38,280.00
CAJA DE 2X4 FS UND CA 1 8,000.00 8,000.00
CANDADO YALE 110-30 UND C 3 18,328.00 54,984.00
CEMENTO BLANCO NARE SACO DE 25 KILOS KLS C 8.712 972.00 8,468.06
CEMENTO GRIS KLS C 554.642 480.00 266,228.16
CHAZO PLASTICO 1/4 UND C 105.2 90.00 9,468.00
CINTA ENMASCARAR ROL C 0.2 3,500.00 700.00
CINTA QUICK TAPE 75MTS FIBRA DE VIDRIO RLL C 0.156 19,800.00 3,088.80
CINTA SELLO 2"(PANEL-YESO) CINTA DE 150 PIES ROL C 0.208 13,500.00 2,808.00
CURVA EMT 3/4" UND C 5 1,426.00 7,130.00
ESTUCO SEMIPLASTICO(LISTO) BULTO 25K BLAN KLS E 577.2655 850.00 490,675.68
GASOLINA CORRIENTE GLN G 0.154 8,700.00 1,339.80
GRAVA TRITURADA DE 3/4 M3 G 1.4084 35,000.00 49,294.00
HIERR.DE 60000 PSI 420 MPA KLS H 120 2,330.00 279,600.00
HOJ.TIPO FORTEC RES. (.71) UND H 3 59,900.00 179,700.00
PLATINA EN LAMINA COL ROLLED DE 1/4" DE CAL UND P 1.02 106,256.00 108,381.12
LAMPARA AHORRADORA COMPACTA 1X26W UND L 5 19,500.00 97,500.00
LIJA 320 AGUA PLI LI 12.15 1,000.00 12,150.00
LIJA 400 AGUA PLI LI 4.97 1,000.00 4,970.00
LIMPIADOR PVC 760-G 1/4 GL UND L 0.10404 28,925.00 3,009.36
LISTON 1 x2x3M. UND L 1.41 3,100.00 4,371.00
MARMOLINA BLANCA BTO M 0.03 3,800.00 114.00
MASILLA PLASTICA INTERIORES CUム MASILLA PLASTICA INTERIORESCU
1.5643 37,500.00 58,661.25
PERFIL U 3 x1.1/2x6 SP UND PE 0.84 63,800.00 53,592.00
PLACA YESO 12.7MM-GYPLAC 244X122 CIELO-PA UND P 8.7971 15,900.00 139,873.89
PUNTILLA 2.1/2 104 UND/LB LBS PU 0.3636 2,000.00 727.20
PUNTILLA 3.1/2" LBS PU 1.5 2,000.00 3,000.00
REMACHE POT 4*4 UND R 91.2 18.00 1,641.60
SILICONA TRANSPARENT.11 OZ UND S 2 8,950.00 17,900.00
SOLDADURA 6011 1/8" VARILLA KLS S 0.8 7,200.00 5,760.00
SOLDADURA 7018 x 1/8" KLS S 3 7,200.00 21,600.00
SOLDADURA PVC 1/ 4 GLN UND S 0.10404 56,900.00 5,919.88
TOMA DOBLE RJ45-5E UND TO 1 38,000.00 38,000.00
SWITCHE SENCILLO AMBIA LUMINEX UND S 5 6,148.00 30,740.00
TABLA 1x05x3M [1C] UND T 1.4241 4,500.00 6,408.45
THINER DISOLVENTE GLN T 0.6 18,000.00 10,800.00
TORN P/LAM 1.1/2x 8 UND T 90 35.00 3,150.00
TORN.AVELLAN 2.1/2"x 8 GOLOSO UND T 7.2 99.00 712.80
TORN.AVELLANADO 2" x 8 UND T 8 51.00 408.00
TORN PAMPH 1 x 8 PAM PHILLIPS UND T 1110 33.00 36,630.00
TOTALIZADOR LG 50 AMP GOLD STAR UND T 1 93,004.00 93,004.00
TUBO EMT 3/4 UND TU 25 4,505.00 112,625.00
TUBO PVC 2" X 3 MTS UND T 5.94405 13,601.00 80,845.02
UNION 8CMX1/8" UND U 4.8 3,300.00 15,840.00
CONECTOR EMT 3/4" UND C 6 629.00 3,774.00
VARETA 1"x1"x3M UND V 1.212 2,400.00 2,908.80
CITOFONO UND C 1 35,000.00 35,000.00
VINILO TIPO 1 GLN V 1.01 47,500.00 47,975.00
CADENA GALVANIZADA 3/16" HIERRO GALVANIZ ML C 2 2,400.00 4,800.00
ACCESORIOS UND A 1 1,000.00 1,000.00
CINTA SEGURIDAD PREVENTIVA ROLLO 250MTS- ROL C 10 25,600.00 256,000.00
GANCHO EN ACERO DE 5/8" DE 60.000 PSI, INC UND G 1 174,000.00 174,000.00
PLASTO CRETE 169 HE SIKA KLS P 6 4,176.00 25,056.00
SIKA 101 MORTERO 5KG. RECUBRIMIENTO IMPE KLS S 20 3,871.00 77,420.00
TOMA DOBLE UND TO 5 8,468.00 42,340.00
ACERO PARA PUERTAS UND A 8 70,000.00 560,000.00
ACIDO OXALICO QUIMICO GLN A 0.15 4,600.00 690.00
PLACA SUPERBOARD 10MM 2440x1220 UND P 3 51,600.00 154,800.00
SIKAFLEX 1CSL AUTONIVELANTE UND S 3.4125 24,360.00 83,128.50
CAJA OCTOGONAL UND C 5 609.00 3,045.00
LIJA 240 MADE PLI LI 6 950.00 5,700.00
MASILLA JUNTA INVIS.BOARD JUNTA INVISIBLE E CUN M 0.144 88,900.00 12,801.60
PERFIL CANAL 89 2.44M C20 L=2.44M A=89MM UND P 10.302 17,100.00 176,164.20
SUMINISTRO E INSTALACIÓN DE PERLIN TIPO IPE UND S 0.50298 1,622,144.00 815,905.99
PERFIL PARAL 89 2.44M C.20 L=2.44M A=89MM UND P 23.331 23,500.00 548,278.50
ASCENSOR, SIN CUARTO DE MAQUINAS , 630 KILO UND A 1 55,680,000.00 55,680,000.00
CURVA 2" EMT COLMENA UND C 5.95 10,526.00 62,629.70
TUBO 2" EMT COLMENA UND T 12.23775 56,292.00 688,887.42
UNION 2" COLMENA UND U 11.655 3,187.00 37,144.49
TUBO EMT 1/2 UND TU 6.68 35,089.00 234,394.52
BROCHA CERDA MONA 4 UND B 0.2 12,000.00 2,400.00
RODILLO FELPA UND R 0.6 4,500.00 2,700.00
CAJA DE PASO METALICA DE 8"X8"X4" UND C 2 35,000.00 70,000.00
VALLA PUBLICIDAD OBRA INCLUYE M.O UND V 1 525,000.00 525,000.00
ALQUILER CONTENEDOR TIPO BODEGA UND A 3 545,000.00 1,635,000.00
CONTRAPESO UND C 13 70,000.00 910,000.00
EQUIPO 722,294
DESCRIPCION UND CANT. VR. UNIT. VR.TOTAL
ANDAMIO METALICO TUBULAR U/D A 19.7 1,050.00 20,685.00
COMPRESOR DE DOS MARTILLOS HRS C 0.5 92,000.00 46,000.00
CRUCETA ANDAMIO DIA C 0.6 100.00 60.00
HERRAMIENTA MENOR GLB H 251.91292 1,400.00 352,678.09
OXICORTE (OXIGENO-ACETILENO) DIA O 1.1 27,500.00 30,250.00
PULIDORA CON PIEDRA O DISCO DIA P 0.6 26,000.00 15,600.00
TABLONES 3 MTS DIA T 0.6 560.00 336.00
VOLQUETA 5 M3 VJE V 4.64 43,500.00 201,840.00
TALADRO PERCUTOR TIPO HILTI DIA T 1 50,000.00 50,000.00
VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMS M3 V 0.084 15,000.00 1,260.00
MEZCLADORA DE 9 PIES CUBICOS DIA M 0.0924 38,800.00 3,585.12
Concepto %
SALARIO
TOTAL SALARIOS
AUXILIO DE TRANSPORTE LEGAL
CESANTIAS
INTERESES SOBRE CESANTIAS
PRIMA DE SERVICIOS
VACACIONES
DOTACIONES Y SUMINISTROS
APORTES ARP
APORTES EPS
APORTES AFP
APORTES CAJA DE COMPENSACION
APORTES ICBF
APORTES SENA
Suma
HH / mes
Vr HH
TOTAL MES
Vr HH
Valor Mes Valor Mes Valor Mes Valor Mes Valor Mes
ASCENSOR PARA EL SERVICIO DE SALUD EDIF
ANEXO 11 TÉCNICO
CÁLCULO DE PRESTACIONES SOCIA
DESCRIPCIÓN
Jornal Básico
Subsidio de transporte
Horas mes trabajadas
BASICO
Meses al año
Subsidio de transporte anual
HORAS EX
Horas Extras Diurnas mensuales
Horas Extras Nocturnas mensuales
Horas Festiva Diurna (por mes)
Horas Festivas Nocturna (por mes)
PRESTACI
Cesantia
Intereses de Cesantia
Prima
Vacaciones
SEGURIDAD
Seguridad Social (salud)
Seguridad Social (pensión)
Riesgos Profesionales
APORTES PAR
Caja de compensación
DOTAC
Dotación
Recargo por prestaciones sociales sin horas extras
Recargo por prestaciones sociales incluyendo horas extras
LICITACIÓN PÚBLICA XXX
IO DE SALUD EDIFICIO 310-EMILIO ALJURE NASSER UNIVERSIDAD DEL VALLE
FP 1.681 FP 1.528
LICITACIÓN PÚBLICA XXX
ANEXO TÉCNICO XX FECHA : 14/04/2016
CÁLCULO DE PRESTACIONES SOCIALES COD:
Prestaciones personal Prestaciones personal
DESCRIPCIÓN con ingresos inferiores con ingresos superiores
o iguales a dos SMMLV a dos SMMLV
Salario Jornal Meses % Meses %
Jornal Básico689.454 22.981,8
Subsidio de transporte
77.700 2.590,0
Horas mes trabajadas
240 8,0
BASICOS
Meses al año A 8.273.448,0 100,000% 16.546.908,0 100,000%
Subsidio de transporteBanual 932.400,0 11,27%
HORAS EXTRAS
Horas Extras Diurnas
3,00 mensuales1,25 3,75 1,56% 3,75 1,56%
Horas Extras Nocturnas
2,00 mensuales1,75 3,50 1,46% 3,50 1,46%
Horas Festiva Diurna
2,00 (por mes)2,00 4,00 1,67% 4,00 1,67%
Horas Festivas Nocturna
1,00 (por2,50
mes) 2,50 1,04% 2,50 1,04%
PRESTACIONES
Cesantia C=8.33%*(A+B) 766.847,1 9,27% 1.378.357,4 8,33%
D=1%C
Intereses de Cesantia 7.668,5 0,1% 13.783,6 0,08%
Prima E=8.33%*(A+B) 766.847,1 9,27% 1.378.357,4 8,33%
Vacaciones F=4.55%*A 376.441,9 4,55% 752.884,3 4,55%
SEGURIDAD SOCIAL
H=8,50%A
Seguridad Social (salud) 703.243,08 8,50% 1.406.487,18 8,50%
I=12%A
Seguridad Social (pensión) 992.813,76 12,00% 1.985.628,96 12,00%
J=6,96%A
Riesgos Profesionales 575.831,98 6,96% 1.151.664,80 6,96%
APORTES PARAFISCALES
K=4.00%A
Caja de compensación 330.937,92 4,00% 661.876,32 4,00%
DOTACION
Dotación G=GBL 185.000,00 2,24% 0,00%
Recargo por prestaciones sociales5.638.031
sin horas extras
68,1% 8.729.040 52,8%
Recargo por prestaciones sociales6.112.031
incluyendo horas
73,9%extras 9.677.040 58,5%
FP 1,681 FP 1,528
14/04/2016
personal
uperiores
MLV
%
100,000%
1,56%
1,46%
1,67%
1,04%
8,33%
0,08%
8,33%
4,55%
8,50%
12,00%
6,96%
4,00%
0,00%
52,8%
58,5%
1,528