Info Tecnica-Cemento Rioclaro UG 2018.
Info Tecnica-Cemento Rioclaro UG 2018.
Info Tecnica-Cemento Rioclaro UG 2018.
ENERO 2018
Cementos Argos-Planta Rioclaro
Cemento USO GENERAL
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-ene
02-ene 2.64 2.34 15.13 4617 4.73 128 250 8.4 16.0 22.8 31.4 36.61 10.23 4.51 6.39
03-ene 2.71 2.72 11.78 5145 3.11 132 220 9.0 15.2 21.2 32.7 35.27 10.59 4.01 6.57
04-ene 2.76 2.43 13.85 5209 4.32 128 220 9.8 17.4 25.5 35.6 35.27 10.59 4.01 6.57
05-ene 2.65 2.77 11.75 5059 3.12 125 220 9.8 17.7 24.1 38.0 39.64 5.57 3.68 6.05
06-ene 2.69 2.33 15.72 4728 3.66 132 220 9.1 18.1 24.3 34.3 38.19 8.22 3.78 6.82
07-ene 12.30 5.09 138 220 9.5 16.3 23.3 36.6 38.75 7.17 3.75 6.77
08-ene 34.52 11.48 4.19 6.64
09-ene 2.60 2.43 14.84 5438 3.20 134 230 8.7 17.4 22.1 30.7 60.12 11.97 5.94 10.95
10-ene 2.76 2.44 14.83 4795 5.01 148 240 7.6 15.9 23.4 33.6 38.12 8.70 4.16 6.89
11-ene 2.66 2.51 14.37 5003 3.66 141 220 9.0 18.1 23.9 35.4 34.29 11.58 4.25 6.67
12-ene 2.70 2.47 14.89 4942 3.85 136 230 8.3 15.9 22.6 33.9 34.52 11.48 4.19 6.64
13-ene 2.61 2.21 14.79 4915 4.39 138 220 7.9 15.8 20.7 31.2 34.67 14.01 4.21 7.17
14-ene 2.45 2.53 11.59 4551 6.11 143 230 10.2 19.1 26.1 32.2 38.53 10.30 3.88 7.31
15-ene 2.38 2.52 13.55 4549 6.28 159 270 7.4 14.9 20.5 30.4 39.36 8.71 3.46 7.56
16-ene 2.28 2.50 13.49 4721 5.75 125 230 8.2 15.6 21.9 33.3 38.13 10.47 3.74 7.37
17-ene 2.56 2.49 14.41 4812 5.51 133 230 7.3 14.3 20.8 32.2 38.71 9.31 5.00 8.84
18-ene 2.46 2.35 14.72 4550 5.22 151 230 7.6 14.1 20.0 30.2 39.55 7.20 3.69 7.76
19-ene 2.40 2.42 13.38 4622 3.89 133 230 9.9 17.1 24.7 34.8 41.06 5.87 3.95 7.68
20-ene 2.58 2.40 13.72 4681 3.68 132 220 8.2 16.1 22.2 31.4 41.12 5.80 4.03 7.23
21-ene 2.64 2.39 14.96 4634 5.04 125 220 8.2 16.1 22.6 33.4 38.95 7.54 6.16 10.95
22-ene 2.53 2.65 14.46 4845 4.05 132 220 7.5 15.8 23.1 30.7 41.90 4.12 4.12 6.12
23-ene 2.75 2.34 15.32 5585 4.16 132 220 8.4 17.9 25.5 33.4 39.51 5.39 3.79 6.40
24-ene 2.68 2.60 12.26 4737 4.11 122 220 9.5 18.6 25.0 30.9 44.30 2.08 3.59 6.38
25-ene 2.78 2.36 14.20 4997 4.26 115 220 9.2 17.9 24.5 32.1 43.20 1.41 3.48 5.58
26-ene 2.77 2.32 15.30 4684 6.42 117 230 6.2 13.1 19.3 26.3 43.30 1.43 3.11 6.40
27-ene 2.77 2.25 15.84 4732 5.21 124 230 6.4 14.0 19.7 27.5 40.72 3.52 3.81 6.16
28-ene 2.84 2.29 15.53 5022 4.80 107 230 6.7 13.1 18.4 24.3 40.54 4.20 3.34 6.91
29-ene 2.77 2.40 13.49 5140 4.96 131 240 8.9 17.1 22.9 30.3 70.59 4.03 5.60 10.66
30-ene 2.67 2.67 12.75 5093 3.88 107 230 6.7 17.1 22.1 29.5 67.39 5.24 6.07 9.82
31-ene 2.64 2.44 12.81 4665 4.23 134 220 8.8 17.7 23.9 33.6 42.60 2.06 3.35 6.55
PROMEDIO 2.63 2.45 14.00 4874 4.54 131 228 8.4 16.3 22.7 32.1 41.65 7.34 4.16 7.33
SD 0.14 0.14 1.26 268 0.92 12 11 1.1 1.6 2.0 2.9 8.82 3.53 0.81 1.45
MAX 2.84 2.77 15.84 5585 6.42 159 270 10.2 19.1 26.1 38.0 70.59 14.01 6.16 10.95
MIN 2.28 2.21 11.59 4549 3.11 107 220 6.2 13.1 18.4 24.3 34.29 1.41 3.11 5.58
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
FEBRERO 2018
Cementos Argos-Planta Rioclaro
Cemento USO GENERAL
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-feb 2.67 2.44 14.25 4501 1.88 134 230 6.9 14.6 19.4 27.7 39.40 3.63 3.20 6.88
02-feb 2.51 2.38 14.60 4671 3.53 132 230 6.3 13.1 18.8 28.0 45.50 1.51 3.43 7.39
03-feb 3.35 2.44 14.93 4713 4.01 139 230 6.5 14.6 17.8 25.3 46.40 1.03 3.40 7.09
04-feb 3.21 2.49 14.27 4524 4.57 145 230 7.7 16.6 21.8 28.4 46.63 1.22 3.30 6.99
05-feb 3.25 2.59 13.47 4685 4.58 148 230 7.4 16.1 19.9 26.7 45.02 2.83 3.62 6.43
06-feb 3.29 2.59 14.64 4646 4.91 134 230 7.6 17.2 21.2 28.5 44.43 3.46 3.44 7.08
07-feb 3.15 2.10 13.77 4252 4.45 137 230 7.0 14.9 19.4 27.1 42.55 4.86 3.41 7.16
08-feb 2.41 2.49 14.59 4412 3.29 133 220 7.6 15.9 20.4 31.0 39.29 8.32 3.46 7.22
09-feb 2.63 2.43 13.83 4370 3.79 140 220 6.1 13.2 18.1 26.8 37.53 9.33 3.47 6.90
10-feb 2.68 2.47 12.49 3905 3.44 110 210 6.6 14.5 19.6 31.5 41.22 5.25 3.41 6.88
11-feb 2.55 2.64 10.26 4261 2.51 150 240 9.3 17.6 22.5 34.5 45.13 2.80 3.54 6.59
12-feb 2.42 2.57 12.99 4446 3.59 164 260 7.2 15.6 20.6 30.2 38.61 10.15 4.20 6.93
13-feb 2.60 2.68 10.99 4301 3.36 157 270 8.7 16.0 22.2 31.3 38.69 9.26 4.64 7.28
14-feb 2.77 2.33 12.89 4384 3.43 133 240 9.9 17.2 23.2 31.6 37.04 7.47 3.66 6.93
15-feb 2.87 2.69 11.76 4516 2.98 134 230 10.6 21.0 27.7 38.2 42.23 2.68 3.33 6.54
16-feb 3.47 2.57 14.24 4775 3.52 132 220 7.8 15.4 18.7 25.7 38.58 5.26 3.50 6.63
17-feb 2.71 2.50 13.08 4848 3.48 124 220 9.8 17.3 23.2 31.0 41.37 3.67 3.66 6.48
18-feb 2.67 2.48 13.94 4745 3.04 132 220 9.3 17.4 22.6 29.8 40.04 4.91 3.85 6.58
19-feb
20-feb 2.65 2.28 15.54 5347 2.89 123 230 9.5 16.1 21.7 29.5 47.56 3.29 3.36 7.32
21-feb 2.44 2.72 10.46 4483 2.74 118 200 13.8 23.0 29.9 40.3 40.43 4.78 3.66 6.61
22-feb 2.55 2.57 11.06 4440 2.08 118 220 10.3 19.9 27.2 35.4
23-feb 2.87 2.38 14.02 4655 3.37 132 220 7.6 15.7 21.0 28.1
24-feb 2.87 2.38 14.02 4655 3.37 132 220 7.6 15.7 21.0 28.1
25-feb 2.87 2.38 14.02 4655 3.37 132 220 7.6 15.7 21.0 28.1
26-feb 3.08 2.36 14.16 4252 4.18 146 230 6.7 14.0 20.0 29.8
27-feb 2.87 2.59 12.19 4503 2.83 153 240 9.3 19.1 24.0 32.4
28-feb 2.82 2.39 13.93 4515 3.37 131 230 8.7 16.7 22.1 30.1 36.95 7.30 3.04 7.03
PROMEDIO 2.82 2.48 13.35 4536 3.43 136 229 8.3 16.5 21.7 30.2 41.65 4.91 3.55 6.90
SD 0.30 0.14 1.41 260 0.72 12 14 1.7 2.2 2.9 3.6 3.41 2.76 0.34 0.29
MAX 3.47 2.72 15.54 5347 4.91 164 270 13.8 23.0 29.9 40.3 47.56 10.15 4.64 7.39
MIN 2.41 2.10 10.26 3905 1.88 110 200 6.1 13.1 17.8 25.3 36.95 1.03 3.04 6.43
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
MARZO 2018
Cementos Argos-Planta Rioclaro
Cemento USO GENERAL
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-mar 2.73 2.95 13.67 4754 4.50 127 230 7.7 16.8 23.2 33.2 37.35 6.73 3.17 6.92
02-mar 2.57 3.04 11.73 4661 5.26 126 200 9.9 18.4 24.6 34.5 43.81 1.48 3.16 6.87
03-mar
04-mar 2.71 2.81 12.82 4857 4.78 128 230 9.4 18.7 24.1 31.8 40.43 4.93 3.21 6.88
05-mar
06-mar 2.77 2.61 15.50 4415 5.68 136 240 7.6 16.1 19.8 26.4 43.02 2.07 3.23 6.93
07-mar 2.70 2.70 13.51 4598 5.02 126 210 9.7 19.1 23.1 30.9 42.60 1.00 3.12 7.17
08-mar 2.59 3.16 9.09 4504 2.93 118 200 14.0 30.1 35.9 42.9 71.18 0.69 5.27 11.14
09-mar 2.68 2.96 11.25 4159 3.15 122 190 12.2 20.3 27.5 41.0 66.08 6.19 5.21 11.12
10-mar 2.73 2.38 15.67 4269 4.87 143 220 7.8 16.6 24.0 36.0 71.24 2.98 5.53 11.10
11-mar 2.62 2.07 13.98 4373 4.23 145 220 7.7 16.5 22.3 32.0 72.59 2.17 5.86 10.72
12-mar 2.72 2.24 14.44 4162 6.59 147 230 7.0 15.0 20.1 29.3 73.15 0.14 5.95 11.38
13-mar 2.65 2.41 14.29 4273 5.09 125 220 9.3 16.8 20.2 29.9 72.95 0.97 5.46 11.15
14-mar 2.88 2.35 15.31 4184 4.72 132 220 7.5 15.6 21.3 30.0 45.77 -0.41 3.33 6.86
15-mar 2.74 2.47 14.54 4097 5.22 133 230 8.0 16.6 23.1 30.3 38.69 6.22 3.38 7.04
16-mar 2.86 2.71 12.77 4460 3.85 126 230 9.1 17.9 24.6 31.9 40.61 4.69 3.48 6.86
17-mar 2.86 2.68 14.58 4612 3.54 137 230 8.2 18.2 24.9 34.2 38.66 5.40 3.49 6.71
18-mar 2.35 3.14 10.82 4131 3.68 121 230 15.2 26.5 33.3 46.3 37.76 6.23 3.80 6.57
19-mar
20-mar 2.66 2.47 12.43 4377 3.34 128 220 9.5 17.3 24.4 33.3 38.51 6.54 4.14 6.59
21-mar 2.75 2.26 13.98 4740 3.52 123 220 9.3 17.2 23.5 33.8 72.95 0.97 5.46 11.15
22-mar 2.64 2.23 15.29 5113 2.84 131 230 7.5 14.2 19.5 27.3 42.60 1.00 3.12 7.17
23-mar 2.42 2.10 15.71 4653 2.52 116 220 8.4 14.1 21.3 27.7 40.96 2.65 4.33 6.11
24-mar 2.44 2.12 16.19 4637 3.67 121 220 7.7 14.3 19.4 28.1 65.08 6.87 7.24 9.28
25-mar 2.66 2.11 14.81 4656 3.56 126 230 7.5 15.0 21.5 29.6 64.91 7.40 7.13 9.42
26-mar 2.41 2.23 15.86 4407 4.19 125 230 6.7 13.5 19.2 27.7 41.16 2.45 4.25 6.09
27-mar 2.48 2.27 14.61 4542 4.70 120 210 7.0 14.4 20.1 25.4 41.16 2.45 4.25 6.09
28-mar 2.71 2.26 14.18 4497 4.74 135 220 6.1 13.2 17.2 25.6 43.76 0.11 3.87 5.92
29-mar 2.36 2.63 12.65 4460 2.98 123 230 10.5 18.7 23.0 29.1 41.16 2.45 4.25 6.09
30-mar 2.33 2.76 12.06 4523 2.71 121 220 11.5 21.0 26.0 33.4 40.96 2.65 4.33 6.11
31-mar 2.33 2.76 12.06 4523 2.71 121 220 11.5 21.0 26.0 33.4 41.91 3.40 4.23 5.94
PROMEDIO 2.62 2.53 13.71 4487 4.09 128 221 9.0 17.6 23.3 32.0 50.39 3.23 4.40 7.91
SD 0.17 0.33 1.73 237 1.04 8 11 2.2 3.7 4.0 5.0 14.01 2.42 1.20 2.05
MAX 2.88 3.16 16.19 5113 6.59 147 240 15.2 30.1 35.9 46.3 73.15 7.40 7.24 11.38
MIN 2.33 2.07 9.09 4097 2.52 116 190 6.1 13.2 17.2 25.4 37.35 -0.41 3.12 5.92
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
ABRIL 2018
Cementos Argos-Planta Rioclaro
Cemento UG- Norma NTC121
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-abr
02-abr 2.71 2.37 15.15 4377 5.09 132 220 7.8 15.1 19.9 26.3 40.56 4.66 4.52 5.70
03-abr 2.70 2.53 12.64 4250 3.46 123 230 11.7 22.6 29.3 28.6 40.59 3.28 4.44 5.57
04-abr 2.79 2.47 14.54 4706 4.59 134 240 9.9 17.3 23.4 30.2 62.45 9.50 7.17 9.49
05-abr 2.78 2.34 13.81 4503 3.51 128 260 10.4 20.8 27.4 34.7 62.29 9.70 7.02 9.82
06-abr 2.63 2.66 10.38 4532 2.89 124 250 11.9 21.8 29.1 36.9 65.08 6.87 7.24 9.28
07-abr 2.59 2.67 9.30 4686 2.27 103 220 15.5 26.5 35.4 42.4 64.91 7.40 7.13 9.42
08-abr 2.73 2.34 14.18 4785 4.62 143 240 8.2 16.6 23.9 29.3 65.29 8.65 7.09 9.88
09-abr 2.73 2.34 14.18 4785 4.62 143 240 8.2 16.6 23.9 29.3 65.29 8.65 7.09 9.88
10-abr 2.62 2.23 14.47 4468 5.85 135 240 7.0 16.0 21.3 32.7 65.10 7.00 6.97 9.59
11-abr 2.63 2.39 14.47 4291 6.95 143 230 7.2 14.5 20.7 26.1 39.40 5.52 4.18 6.13
12-abr 2.56 2.80 12.85 4558 4.98 134 230 9.4 16.9 23.0 31.2 43.96 0.85 3.90 6.27
13-abr 2.48 2.84 12.68 4672 4.03 113 240 13.5 24.3 31.0 40.5 69.17 2.78 6.25 10.06
14-abr 2.50 2.79 13.81 4646 3.12 123 240 10.2 19.0 25.2 33.9 68.23 4.24 6.17 9.72
15-abr 2.55 2.94 10.09 4669 3.86 112 240 11.5 22.3 29.1 37.7 66.97 5.27 5.99 10.17
16-abr 2.55 2.94 10.09 4669 3.86 112 240 11.5 22.3 29.1 37.7 66.97 5.27 5.99 10.17
17-abr 2.45 2.98 9.67 5104 3.04 123 230 16.1 26.7 36.2 41.3 66.14 4.97 6.69 10.32
18-abr 2.41 2.68 15.02 5781 2.88 123 230 8.2 15.3 19.2 26.9 69.25 3.51 6.72 10.18
19-abr 2.41 2.52 14.53 5372 3.66 130 240 9.0 16.2 20.7 26.5 65.38 8.76 6.63 10.13
20-abr 2.84 2.30 14.85 5072 5.03 128 240 7.6 15.5 21.1 30.0 65.95 8.05 6.34 10.44
21-abr 2.61 2.34 11.70 4476 4.09 137 240 10.0 19.8 27.4 34.9 65.84 7.07 5.40 10.48
22-abr 2.57 2.41 13.79 4767 4.51 137 260 8.6 15.4 20.3 27.9 65.46 8.31 6.18 10.43
23-abr 2.85 2.32 14.12 4530 6.13 157 250 7.0 14.9 20.2 26.2 68.52 5.68 6.46 10.14
24-abr 2.73 2.23 14.46 4380 5.84 7.8 14.6 19.9 24.3 68.82 5.26 6.39 9.78
25-abr 2.59 2.47 11.70 4453 4.86 142 230 10.8 20.8 29.1 34.4 68.82 5.26 6.39 9.78
26-abr 2.66 3.01 13.16 4454 6.14 146 230 7.9 17.1 22.5 30.5 66.61 7.08 6.44 9.70
27-abr 2.65 2.60 12.88 4847 2.64 123 220 9.5 17.1 21.8 30.1 69.73 5.80 4.95 9.30
28-abr 2.78 2.32 14.77 4350 5.31 138 230 7.5 15.0 19.7 28.4 62.20 10.25 6.54 9.64
29-abr 2.69 2.10 16.51 4734 4.81 134 230 7.0 14.4 17.6 24.8 62.40 11.95 6.56 9.79
30-abr 2.79 1.85 15.85 4771 5.00 132 230 7.0 13.9 18.8 26.3 55.95 17.41 7.14 9.84
PROMEDIO 2.64 2.51 13.30 4679 4.40 130 236 9.6 18.3 24.3 31.4 62.32 6.86 6.21 9.35
SD 0.12 0.28 1.91 327 1.17 12 10 2.5 3.8 5.0 5.1 9.10 3.19 0.95 1.44
MAX 2.85 3.01 16.51 5781 6.95 157 260 16.1 26.7 36.2 42.4 69.73 17.41 7.24 10.48
MIN 2.41 1.85 9.30 4250 2.27 103 220 7.0 13.9 17.6 24.3 39.40 0.85 3.90 5.57
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
MAYO 2018
Cementos Argos-Planta Rioclaro
Cemento UG- Norma NTC 121
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-may 2.76 2.01 15.16 4502 4.56 142 240 7.5 14.6 19.7 26.2 30.06 12.57 4.26 5.87
02-may 2.68 2.17 13.34 4571 3.72 115 210 9.7 18.1 24.5 32.5 37.94 5.77 4.17 5.48
03-may 2.67 1.99 14.02 4010 5.36 128 210 8.2 16.5 22.0 30.4 38.69 4.83 4.20 5.52
04-may 2.54 2.25 11.33 4101 4.94 128 210 10.5 19.4 26.9 33.7 38.89 4.57 4.31 5.55
05-may 2.73 2.00 14.62 4688 5.06 116 230 7.6 15.7 21.6 30.2 39.66 3.69 4.13 5.54
06-may 2.69 2.18 13.86 4381 5.17 135 230 7.8 15.6 21.2 31.3 39.12 4.41 4.10 5.49
07-may 2.56 2.49 13.14 4107 4.51 124 210 9.4 18.1 24.2 31.0 39.53 4.00 4.14 5.46
08-may 2.77 2.29 14.93 4468 4.83 118 210 9.2 16.8 23.4 28.4 39.75 3.83 4.04 5.40
09-may 2.97 2.33 13.55 3668 4.88 134 240 8.7 16.9 21.8 27.5 40.11 3.29 4.05 5.42
10-may 2.90 2.51 15.13 4343 4.23 149 240 6.5 15.1 19.3 27.5 38.24 5.16 4.22 5.49
11-may 2.95 2.61 15.52 4517 3.82 136 240 7.1 16.2 23.1 28.1 38.72 4.62 4.02 5.54
12-may 3.00 2.10 15.08 4347 4.74 149 250 7.1 15.3 21.6 27.1 39.93 3.60 3.91 5.41
13-may 3.02 2.22 15.15 4296 5.02 143 250 7.1 16.0 23.4 28.9 39.77 3.64 3.92 5.59
14-may
15-may 2.77 2.67 10.48 4205 5.03 138 250 11.0 21.9 29.0 38.1 66.03 6.18 6.45 9.62
16-may 2.75 2.87 11.72 4575 2.95 145 230 10.3 27.2 31.9 2.17 -1.21 0.05 0.09
17-may 3.01 2.33 14.20 4606 6.08 138 270 6.4 14.1 21.0 26.1 38.34 4.95 4.02 5.85
18-may 2.90 2.63 11.53 4269 4.59 157 250 9.6 19.9 27.3 33.0 38.68 4.68 4.05 5.75
19-may 3.11 2.79 14.00 4561 5.26 166 280 7.3 15.1 21.6 28.2 37.80 5.25 4.01 6.22
20-may 2.68 2.48 14.34 4374 7.45 168 280 6.2 14.4 19.2 26.8 39.15 4.17 3.90 5.87
21-may 2.68 2.46 14.43 4238 6.16 157 270 6.5 14.6 20.2 26.3 38.10 5.12 4.00 6.03
22-may 2.91 2.26 15.22 4163 7.43 153 270 6.4 14.0 20.2 25.0 38.19 4.96 4.00 6.05
23-may 2.80 2.68 10.42 4302 3.83 137 250 10.3 19.7 28.6 37.2 41.27 1.68 3.72 5.94
24-may 2.84 2.68 14.60 4039 6.22 145 260 5.6 13.5 18.3 24.7 38.55 4.80 3.93 5.81
25-may 2.82 2.63 14.44 4419 5.69 145 250 6.5 14.9 21.6 27.7 39.12 4.08 3.85 5.99
26-may 2.57 2.77 7.86 4049 3.59 134 250 7.5 16.0 23.5 28.1 65.75 5.69 6.48 10.06
27-may 2.82 2.33 13.63 4284 6.03 142 250 5.7 13.9 18.3 24.9 64.13 7.48 6.50 10.27
28-may 64.04 7.55 6.39 10.13
29-may 2.47 2.93 11.05 4924 1.75 136 250 12.8 24.8 33.0 37.4 63.60 7.77 6.39 10.63
30-may 2.47 2.90 11.01 4801 1.93 135 230 12.4 22.8 31.0 33.7 61.92 10.11 6.66 10.15
31-may 2.39 2.83 13.23 4729 4.05 120 230 8.8 18.0 25.5 31.8 62.64 9.39 6.47 10.37
PROMEDIO 2.77 2.46 13.34 4363 4.79 139 243 8.3 16.8 23.4 29.8 43.33 5.22 4.48 6.55
SD 0.18 0.29 1.89 270 1.33 14 21 1.9 2.9 3.8 3.8 13.50 2.54 1.34 2.29
MAX 3.11 2.93 15.52 4924 7.45 168 280 12.8 24.8 33.0 38.1 66.03 12.57 6.66 10.63
MIN 2.39 1.99 7.86 3668 1.75 115 210 5.6 13.5 18.3 24.7 2.17 -1.21 0.05 0.09
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
JUNIO 2018
Cementos Argos-Planta Rioclaro
Cemento UG- Norma NTC 121
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-jun 2.64 2.63 13.09 4500 3.68 146 260 8.3 17.6 23.7 30.6 61.06 11.11 6.45 9.93
02-jun 2.70 2.74 9.27 4356 2.96 130 260 11.7 22.8 30.8 37.8 64.07 8.10 6.51 9.85
03-jun 2.89 2.55 12.16 4413 3.47 140 240 10.5 20.8 26.0 35.9 63.18 8.12 6.84 10.45
04-jun 2.91 2.54 12.34 4695 3.79 152 250 10.3 19.9 26.5 33.2 64.99 6.87 6.45 9.72
05-jun 2.88 2.71 13.87 5214 2.61 152 270 10.0 19.0 24.8 30.2 65.48 6.09 6.68 10.22
06-jun 2.74 2.38 13.63 4578 4.52 148 250 8.9 18.8 24.9 32.8 64.84 6.54 6.47 9.99
07-jun 3.11 2.66 7.74 4914 1.78 132 250 9.2 18.1 22.6 28.6 41.23 4.09 3.91 5.23
08-jun 2.83 2.58 14.03 4870 2.48 148 250 10.3 21.2 28.2 35.8 66.06 6.08 6.64 9.11
09-jun 2.62 2.49 12.38 4457 3.16 145 250 10.3 20.8 27.9 34.7 64.75 7.16 7.20 9.21
10-jun 2.54 2..62 12.86 4285 5.34 148 250 9.8 20.5 27.0 36.3 41.00 4.32 4.68 5.77
11-jun 3.09 2.45 12.19 4424 4.63 142 250 8.8 17.6 23.2 31.9 42.10 3.15 3.82 6.14
12-jun 2.90 2.74 8.79 4449 2.79 145 250 12.8 22.6 31.7 37.5 38.32 4.85 3.81 7.00
13-jun 2.97 2.57 13.12 4455 3.92 146 260 8.2 16.5 22.8 27.5 38.15 5.67 4.23 6.14
14-jun 2.87 2.39 12.65 4383 4.29 170 270 9.5 17.1 23.6 29.7 39.45 4.26 3.89 5.52
15-jun 3.16 2.37 14.26 4566 5.19 163 280 6.4 13.4 18.5 25.0 39.55 3.90 3.94 5.66
16-jun 2.77 2.19 11.23 4267 4.66 142 270 10.5 19.9 26.4 30.2 39.52 4.71 3.62 5.76
17-jun 2.84 2.40 13.69 4325 5.81 161 270 7.4 15.2 20.9 25.0 40.75 3.00 3.51 5.95
18-jun 2.26 2.89 15.79 4586 3.88 160 280 6.9 14.9 20.8 26.2 42.28 1.47 3.57 5.62
19-jun 2.68 2.90 11.38 4309 4.17 146 270 10.4 19.2 26.2 33.3 39.22 4.39 3.69 6.21
20-jun 2.72 2.50 13.09 4207 4.59 155 260 7.0 15.1 21.2 30.4 40.98 2.49 3.13 6.15
21-jun 2.52 3.29 7.21 4469 1.22 122 240 13.8 23.3 32.3 38.8 41.58 1.57 3.41 6.40
22-jun 2.92 2.53 8.85 4323 2.52 123 240 12.1 21.5 28.6 40.3 64.15 7.42 6.29 10.77
23-jun 3.03 2.56 10.77 4347 3.73 136 240 8.8 17.0 23.9 29.2 64.48 7.39 6.22 10.53
24-jun 3.03 2.98 10.41 4172 3.31 144 260 9.3 18.8 25.5 34.0 64.38 7.40 6.78 9.86
25-jun 64.58 7.15 6.29 10.30
26-jun 2.84 2.24 11.96 4455 4.23 143 250 9.2 17.9 26.2 29.3 61.73 9.74 6.17 10.90
27-jun 3.14 2.27 13.41 4393 5.55 155 280 7.0 14.4 20.2 26.1 60.09 11.49 6.03 11.33
28-jun 2.94 2.96 12.51 4340 6.21 168 270 6.6 16.6 20.0 26.0 59.15 13.71 6.62 10.58
29-jun 2.94 2.55 15.34 4538 5.48 165 270 8.2 13.8 19.5 27.1 63.35 9.38 6.83 10.22
30-jun 3.24 2.40 14.35 4337 7.16 170 280 6.5 12.5 17.9 27.7 64.19 7.68 6.83 9.85
PROMEDIO 2.85 2.59 12.15 4470 4.04 148 259 9.3 18.2 24.5 31.4 53.49 6.31 5.35 8.35
SD 0.22 0.25 2.15 222 1.35 13 13 1.9 2.9 3.8 4.4 11.84 2.93 1.43 2.18
MAX 3.24 3.29 15.79 5214 7.16 170 280 13.8 23.3 32.3 40.3 66.06 13.71 7.20 11.33
MIN 2.26 2.19 7.21 4172 1.22 122 240 6.4 12.5 17.9 25.0 38.15 1.47 3.13 5.23
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
JULIO 2018
Cementos Argos-Planta Rioclaro
Cemento UG- norma NTC 121
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-jul 3.27 2.40 14.30 4236 6.55 168 280 5.0 10.8 15.8 24.8 63.08 8.62 7.56 9.21
02-jul 3.94 1.93 16.47 4380 5.52 180 280 7.4 14.8 20.7 25.2 65.38 6.55 7.38 9.07
03-jul 3.61 2.33 14.97 4632 6.26 155 260 8.5 16.6 23.1 31.7 64.12 7.49 7.34 9.45
04-jul 3.54 2.07 15.42 4358 6.53 141 250 7.3 15.0 20.6 26.6 64.56 6.25 7.53 9.76
05-jul 3.27 2.63 9.76 4223 3.05 132 250 12.7 23.6 32.1 42.3 63.20 8.09 7.42 9.55
06-jul 3.30 2.48 11.62 4651 4.86 135 250 11.8 24.5 31.0 40.3 61.39 9.38 7.67 9.92
07-jul 4.31 2.19 16.21 4385 6.41 145 250 8.0 16.2 22.6 31.0 62.98 8.08 7.42 9.59
08-jul 3.64 2.41 14.70 4559 5.37 133 250 8.5 15.9 22.0 30.7 39.95 4.16 4.61 5.87
09-jul 3.14 3.17 6.93 4318 1.92 131 240 16.7 29.5 39.5 51.2 40.16 3.76 4.69 5.86
10-jul 3.36 2.72 10.79 4335 2.81 136 250 12.1 21.8 31.2 34.9 41.04 2.68 4.28 5.71
11-jul 3.95 2.11 15.17 4314 5.50 164 250 7.5 15.1 21.6 28.0 39.52 4.45 4.40 5.83
12-jul 3.67 2.31 16.18 4771 5.66 170 300 6.3 13.0 17.6 25.1
13-jul 3.48 2.20 13.32 4506 4.97 159 280 8.5 15.5 20.9 24.6
14-jul 3.13 2.86 10.76 4396 4.83 155 270 7.8 17.6 22.1 28.6
15-jul 3.32 2.45 10.17 4399 2.26 152 270 13.5 25.6 30.6 41.3
16-jul 3.36 2.46 14.14 4387 5.28 181 310 7.0 14.7 21.6 27.8
17-jul 3.36 2.45 13.82 4304 5.00 180 315 7.2 15.4 22.4 31.1
18-jul 2.88 2.44 15.21 4510 3.91 148 270 7.9 15.6 20.9 27.4 39.02 3.98 4.00 6.16
19-jul 3.10 2.16 15.50 4480 4.98 146 270 7.3 14.9 22.2 31.2 38.19 4.93 3.93 6.01
20-jul 2.82 2.18 15.65 4465 5.93 146 260 6.5 13.5 19.2 26.7 33.53 9.53 4.03 6.27
21-jul 2.71 2.14 15.78 4498 5.32 153 260 6.4 15.0 21.5 30.1 51.21 20.00 7.16 10.75
22-jul 3.13 2.23 15.01 4556 4.36 132 230 6.8 15.0 21.1 29.0 57.50 13.83 7.31 10.27
23-jul 2.57 2.22 14.42 3963 7.61 140 260 5.1 11.7 17.4 26.6 63.23 8.00 7.23 9.92
24-jul 2.49 2.95 8.22 4502 2.73 137 260 12.5 23.0 32.4 41.5 63.08 8.17 6.67 10.78
25-jul 2.76 2.55 13.82 4398 4.32 145 280 8.6 16.1 23.2 32.8 63.53 7.94 6.88 10.65
26-jul 2.72 2.39 12.72 4298 5.36 173 310 7.0 16.1 22.6 31.4 66.19 5.58 6.67 10.03
27-jul 2.80 2.38 15.17 4387 5.35 160 280 7.6 14.9 20.5 26.3 63.09 8.78 7.22 9.95
28-jul 2.65 2.86 11.24 4444 3.93 137 260 10.5 19.6 27.2 36.8 64.62 7.28 6.95 9.82
29-jul 2.80 2.37 15.34 4457 4.66 152 290 8.3 14.9 22.0 30.1 65.07 6.93 6.78 10.29
30-jul 2.71 2.57 12.55 4246 4.71 143 270 9.3 18.4 23.6 37.2 61.94 10.02 6.70 10.22
31-jul 2.90 2.52 15.78 4322 5.72 170 280 5.2 13.3 16.9 27.5
PROMEDIO 3.18 2.42 13.59 4409 4.89 152 269 8.5 17.0 23.4 31.6 55.65 7.69 6.33 8.79
SD 0.45 0.28 2.50 151 1.32 15 21 2.7 4.3 5.3 6.3 11.51 3.59 1.38 1.91
MAX 4.31 3.17 16.47 4771 7.61 181 315 16.7 29.5 39.5 51.2 66.19 20.00 7.67 10.78
MIN 2.49 1.93 6.93 3963 1.92 131 230 5.0 10.8 15.8 24.6 33.53 2.68 3.93 5.71
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad
REPORTE DIARIO DE RESULTADOS
AGOSTO 2018
Cementos Argos-Planta Rioclaro
Cemento UG- Norma NTC121
PARÁMETROS FÍSICOS FRAGUADO RESISTENCIA A LA COMPRESIÓN (Mpa) FASES CALCULADAS BOGUE
PARÁMETROS QUÍMICOS
Fecha
despacho Blaine % Retenido R3 días R7 días R28 días
MgO % SO3 % PI % Inicial (min) Final (min) R1 días %C3S %C2S %C3A %C4AF
cm2/g M325 Mpa Mpa Mpa
01-ago 2.93 2.18 14.44 4047 5.75 148 270 7.0 15.0 20.7 29.5 40.80 3.59 4.02 6.52
02-ago 2.78 2.29 14.73 4363 3.25 144 260 6.7 14.1 20.0 26.4 41.09 3.61 3.81 6.43
03-ago 2.43 2.33 9.28 4371 2.08 145 260 8.4 17.1 23.1 30.3 41.08 4.02 4.20 5.59
04-ago 2.66 2.25 15.32 4202 4.75 148 270 7.7 15.4 22.7 30.1 40.90 3.44 4.37 6.11
05-ago 2.55 2.21 12.78 4233 4.28 144 270 8.1 18.4 26.6 34.2 41.41 2.98 4.27 6.22
06-ago 2.42 2.25 15.54 4428 4.09 148 270 9.2 17.7 25.5 40.52 3.80 4.16 6.48
07-ago 2.46 2.69 11.42 40.93 3.30 4.15 6.44
08-ago 5171 3.78 173 280 8.5 18.0 24.1
09-ago 2.45 2.25 15.69 4461 6.18 160 280 6.5 13.9 19.9 40.00 4.37 4.58 6.18
10-ago 2.52 2.23 15.71 4468 7.26 154 270 7.2 14.9 21.2
11-ago 2.44 2.58 12.85 4761 3.78 153 270 10.0 20.5 27.6
12-ago 2.41 2.74 12.65 5440 2.71 170 300 10.1 20.0 27.9
13-ago 5.12 2.54 16.27 4585 4.45 190 300 6.3 15.5 21.3
14-ago 4.67 2.75 15.43 4472 5.53 175 310 6.3 14.5 19.9
15-ago 3.81 2.60 15.08 4450 5.32 137 280 7.3 17.6 23.4 40.10 1.15 3.68 5.93
16-ago 3.47 2.53 15.19 4734 4.52 139 280 7.7 15.8 18.3 38.64 4.13 3.99 6.36
17-ago 3.88 2.27 16.36 4607 3.76 158 280 7.4 16.0 21.7 36.82 5.88 4.08 6.57
18-ago 3.17 2.13 16.62 4663 5.93 106 220 6.1 13.0 18.7 36.08 6.63 4.11 6.53
19-ago 38.01 6.25 4.25 6.57
20-ago 3.46 2.49 13.24 4516 4.57 148 280 8.2 16.2 22.5 34.69 8.24 4.44 6.74
21-ago
22-ago 3.37 2.41 14.20 4435 5.75 165 280 7.9 15.3 20.3 40.80 3.64 4.10 6.40
23-ago 3.23 2.68 13.72 4448 5.25 145 270 8.0 15.6 20.3 40.18 3.80 4.46 6.60
24-ago 3.24 2.76 15.27 5101 3.85 158 290 7.2 14.3 19.3 39.83 4.58 4.34 6.39
25-ago 3.12 2.57 13.00 4502 4.38 151 280 7.8 16.2 20.9 39.41 5.25 4.37 6.19
26-ago 2.66 3.04 14.63 4200 5.96 160 290 5.4 13.4 17.5 38.28 6.19 4.45 6.33
27-ago 2.77 2.77 14.28 4504 5.06 161 280 6.4 14.7 36.97 5.97 4.23 6.14
28-ago 2.98 2.59 15.56 4484 5.95 168 290 5.7 13.9 36.29 5.42 4.05 5.83
29-ago 3.01 2.68 14.64 4466 4.06 146 250 7.9 16.7 63.40 8.38 7.09 9.88
30-ago 2.82 2.80 15.60 4488 4.47 153 260 7.4 16.5 35.92 7.48 4.37 5.93
31-ago 2.86 2.87 12.34 4236 4.05 163 270 9.0 36.00 7.02 4.24 6.41
PROMEDIO 3.06 2.52 14.35 4530 4.67 154 275 7.5 15.9 21.9 30.1 39.92 4.96 4.33 6.45
SD 0.67 0.25 1.67 299 1.14 15 17 1.2 1.9 2.9 2.8 5.41 1.80 0.63 0.78
MAX 5.12 3.04 16.62 5440 7.26 190 310 10.1 20.5 27.9 34.2 63.40 8.38 7.09 9.88
MIN 2.41 2.13 9.28 4047 2.08 106 220 5.4 13.0 17.5 26.4 34.69 1.15 3.68 5.59
CONTROL max 6.0 max 3.5 -- min 2800 -- min 45 max 480 -- min 8 min 15 min 24 Cálculo según ASTM C150
RESPONSABLE Andrea Rueda
Jefe de Calidad