Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
ÍNDICE DE CONTENIDO
1. OBJETO.........................................................................................................................5
5. METODOLOGÍA ........................................................................................................... 10
7. CONCLUSIONES........................................................................................................... 17
8. REFERENCIAS .............................................................................................................. 18
8.1. INTERNAS............................................................................................................ 18
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 3 de 18
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holdi ng BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
ÍNDICE DE TABLAS
ÍNDICE DE FIGURAS
Figura 6. Falla Trifásica en los Bujes de 66 kV del Nuevo Transformador de Potencia de 150 MVA
de la Subestación EL Bosque 66 kV ...................................................................................... 14
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 4 de 18
This document is the property of Alstom Grid Holding BV and may not b e reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
1. OBJETO
A continuación se describen las bahías que conforman la subestación El Bosque en sus niveles
de tensión a 220 kV y a 66 kV:
La subestación El Bosque 220 kV tiene una configuración de interruptor y medio y cuenta con
las siguientes bahías:
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 5 de 18
This document is the property of Alstom Grid Holding BV and may not b e reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
La subestación El Bosque 66 kV tiene una configuración de doble barra y cuenta con las
siguientes bahías:
2.2.2. Ampliación 66 kV
Bahía de transformación 66 kV: conexión del buje de 66 – 110 kV del nuevo transformador de
potencia de 150 MVA con relación convertible de 220/110 – 66/13,8 kV al terminal SF6 del
módulo GIS 110 kV, 145/275/650 kV.
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 6 de 18
This document is the property of Alstom Grid Holding BV and may not b e reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 7 de 18
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 8 de 18
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 9 de 18
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
En la Tabla 1 se detallan las características de los transformadores de corriente que hacen parte
del alcance de este estudio según la información recibida por el cliente.
Nivel de
Subestación Tensión del Núcleo Relación de Transformación Capacidad Precisión
Barraje
5. METODOLOGÍA
Por lo tanto, para llegar a ese punto se requiere seguir una metodología que conste de los
siguientes pasos:
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
Parámetro Valor
Relación de Transformación 1600/1 [Aprim/Asec]
Clase de precisión 10P20
Burden Nominal 10 Ω
Resistencia Interna de Devanados 10,119 Ω
Burden Real 0,686 Ω
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
Un vez definido el modelo del transformador de corriente a ser verificado, se procede a simular
un evento de cortocircuito externo mediante el módulo de simulación transitoria EMT
(Electromagnetic Transients) disponible en el programa DIgSILENT Power Factory, con el fin de
validar el desempeño del transformador de corriente ante este tipo de condición.
En la Figura 6, se presenta una falla trifásica en los bujes de 66 kV del nuevo transformador de
potencia de 150 MVA con relación convertible de 220/110 – 66/13,8 kV de la subestación
El Bosque 66 kV, correspondiente a la falla más crítica, en el escenario de operación de demanda
máxima térmica.
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
Figura 6. Falla Trifásica en los Bujes de 66 kV del Nuevo Transformador de Potencia de 150 MVA de la
Subestación EL Bosque 66 kV
De acuerdo con lo anterior, en la Figura 7 se observa que aunque las ondas de corriente
coinciden, se evidencia una pequeña deformación de la onda, lo cual indica que se está
presentando un efecto acumulativo de flujo magnético en el transformador de corriente
llevándolo a operar en la región no lineal de su característica de magnetización y por lo tanto,
se presenta el efecto de saturación (Ver Figura 8) para el transformador de corriente asociado a
la bahía de 66 kV de la subestación El Bosque.
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
DIgSILENT
30,00
[A]
20,00
10,00
0,00
-10,00
-20,00
0,0000 0,0600 0,1199 0,1799 0,2399 [s] 0,2998
Cub_9\CT El Bosque 1600/1 5P20 10 VA Real: Secondary Current A
Cub_9\CT El Bosque 1600/1 5P20 10 VA Ideal: Secondary Current A
60,00
[kV]
30,00
0,00
-30,00
-60,00
-90,00
0,0000 0,0600 0,1199 0,1799 0,2399 [s] 0,2998
Cub_9: Phase Voltage A
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
DIgSILENT
1600,00
[V]
1200,00
800,00
400,00
0,00
-400,00
-2,00 0,00 2,00 4,00 6,00 [A] 8,00
Cub_9\CT El Bosque 1600/1 5P20 10 VA Real: Excitation Current in A / Mag. Flux A in V
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved.
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
7. CONCLUSIONES
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 17 de 18
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.
Subestación El Bosque 220/66 kV
Verificación del Comportamiento Transitorio de los CT’s
SBQ-ID-EE-MC-08
8. REFERENCIAS
8.1. INTERNAS
8.2. EXTERNAS
[10] ANSI-IEEE C37-110. “GUIDE FOR THE APPLICATION OF CURRENT TRANSFORMERS USED
FOR PROTECTIVE RELAYING PURPOSES”.
[12] MERLIN GERIN. COLLECTION TECHNIQUE. CAHIER TECHNIQUE NO. 194. “CURRENT
TRANSFORMERS: HOW TO SPECIFY THEM”. AUTORA: PAOLA FONTI GRUPO SCHNEIDER
ELECTRIC.
©2016 Alstom Grid Holding BV proprietary and confidential information. All Rights Reserved. Página 18 de 18
This document is the property of Alstom Grid Holding BV and may not be reproduced, transmitted, stored, or copied in whole
or in part, or used to furnish information to others, without the prior written permission of Alstom Grid Holding BV.