Informe Final de Terminacion LSC-X5D
Informe Final de Terminacion LSC-X5D
Informe Final de Terminacion LSC-X5D
Mayo 2016
Santa Cruz de la Sierra – Bolivia
1
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
INDICE
INTRODUCCION ........................................................................................................................................... 1
1 DATOS GENERALES ................................................................................................................................... 2
2 REGISTROS ............................................................................................................................................... 2
3 BALEOS .................................................................................................................................................... 2
4 TAPONES Y PACKERS ................................................................................................................................ 2
5 PRUEBA DE PRODUCCION ........................................................................................................................ 2
6 INCIDENTES (FALLAS) ............................................................................................................................... 3
7 SECUENCIA DE OPERACIONES .................................................................................................................. 3
8 ARREGLOS DE FONDO .............................................................................................................................. 5
9 FLUIDOS ................................................................................................................................................... 6
9.1 FLUIDO DE INTERVENCION Y EMPAQUE .................................................................................................. 6
9.1.1 PROPIEDADES ...................................................................................................................................... 6
9.1.2 CONCENTRACIONES FLUIDO DE EMPAQUE ......................................................................................... 6
9.1.3 BACHES VISCOSOS ............................................................................................................................... 6
9.1.4 VOLUMENES ........................................................................................................................................ 6
9.1.5 MATERIALES ........................................................................................................................................ 6
10 TIEMPOS............................................................................................................................................... 7
10.1 DISTRIBUCION DE TIEMPOS OPERATIVOS................................................................................................ 7
10.2 CLASE DE TIEMPOS .................................................................................................................................. 9
11 COSTOS .............................................................................................................................................. 10
12 CONCLUSIONES Y RECOMENDACIONES .............................................................................................. 11
13 SEGURIDAD Y MEDIO AMBIENTE ........................................................................................................ 12
13.1 MONITOREO AMBIENTAL ...................................................................................................................... 12
13.2 INCIDENTES AMBIENTALES .................................................................................................................... 13
13.3 GESTION DE SEGURIDAD........................................................................................................................ 13
13.4 REUNIÓNES DE SEGURIDAD ................................................................................................................... 14
13.5 PERMISOS DE TRABAJO.......................................................................................................................... 14
13.6 INCIDENTES, EVACUACIÓN DEL PERSONAL Y TARJETAS TOT ................................................................. 15
13.7 CONTROL Y MANEJO DE DESECHOS SÓLIDOS Y CHATARRA ................................................................... 15
13.8 CONTROL Y MANEJO DE AGUAS RESIDUALES ........................................................................................ 15
14 ANEXOS .............................................................................................................................................. 16
1
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
INTRODUCCION
Los resultados de las pruebas de producción para los niveles arenosos de la Formación
Iquiri 1 fueron positivos, motivo por el cual el pozo quedó completado con una instalación
Final simple para la producción del reservorio “Iquiri 1” tramo 3694-3700m, 3702-3705m,
3707-3710m.
1
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
1 DATOS GENERALES
2 REGISTROS
3 BALEOS
4 TAPONES Y PACKERS
5 PRUEBA DE PRODUCCION
2
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
3694-3700
6 INCIDENTES (FALLAS)
Tipo de
Fecha Compañía Resumen Detalle
Servicio
1) RECARGA LA CELDA DE
PRESION DEL MANOMETRO DE
SENSOR DE PRESION
EQUIPO DE LA CONSOLA DEL PERFORADOR
03/05/2016 DLS ARCHER Y CAMBIO DE
PERFORACION 2) CAMBIAR LA BOMBA 1 POR LA
BOMBA
BOMBA 2 DEBIDO A ANOMALIAS
DE PRESION.
7 SECUENCIA DE OPERACIONES
3
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
4
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
Bajó arreglo final hasta 1890m. SL bajó calibre 1.7/8" hasta 435m punto de
resistencia. Sacó arreglo hasta 665m, apartó 65 Pzas. Tub. 2.3/8“CS Hyd por
colapso en conexión pin. SL bajó calibre 1.7/8" y Tapón “XR" a SSD “XO".
Probó hermeticidad con 500-3500psi. Bajó arreglo hasta 1054m. SL bajó calibre
23/05/2016 1.7/8" hasta SSD “XO” sin resistencia.
Bajó arreglo final de 1054m hasta 3660m (Tope PCK 7"), enchufó unidad de
sellos, asentó 5Klbs. Probó hermeticidad unidad de sellos por EA con 500-
24/05/2016 1000psi.
Sacó arreglo final hasta 3547m. Instaló y probó válvula SSSV, realizó
dimensionamiento. Bajó hasta 3653m, probó hermeticidad arreglo
dimensionado con 500-3500psi. Enchufó unidad de sellos, asentó colgador en
25/05/2016 Sección “C". SL bajó y ancló tapón “PXN" en NA “XN".
Probó arreglo final por directa con 500-2000psi. SL abrió SSD “XO". Cambió FT
x FE 9.2ppg. SL cerró SSD “XO", probó por EA con 500-1000psi. Desmontó
BOP's. Instaló y probó arbolito de producción simple 11" x 2.91/16" x 2.1/16".
26/05/2016 Probó apertura válvula SSSV.
Desarmó tiros Tub. 2.7/8" PJD + DP 5" + DC 4.3/4" estibados en peine. Finalizó
27/05/2016 operaciones de terminación a Hrs. 23:59.
8 ARREGLOS DE FONDO
N° Componentes Observación
1 TREP TRICONO 8 1/2" SMITH TIPO: FDS+PS, S/N: 6009702, Rotar cemento por
BOQ: 3x24 + BIT SUB (c/ Válvula Flot) + XO + SCD 9.5/8" + XO encima de boca liner
+ 6 DC 6.1/2" + XO. 7”.
2 TREP. TRICONO 6" TIPO XR+PS, S/N: RD8840 + BIT SUB Calibración y
(c/FV) + SCD 7" + CEPILLO 6" + MAGNETO 6" + 6 DC 4.3/4" + Limpieza Liner 7” y
XO + 115pzas tub 2 7/8” PJD + 2 XO + SCD 9.5/8" + 1 PZA DP Cañ 9 5/8”.
5".
3 Pata de mula 2 7/8"PJD + XO 2 7/8" PJD (P) x 2 3/8" Hyd (B) + Prueba semiseca a
1 Pza 2.3/8” Hyd + XO 2.3/8” Hyd (P) x 3.1/2 8rd (B) + Liner 7”
PACKER 9 5/8" (IZQ) MOD. M6 + XO 3.1/2” 8rd (P) x 2 7/8”
PJD (B) +XO 2.7/8” PJD (P) x 3 ½” IF (B).
4 PATA MULA 2,7/8 8RD + 1 PZA 2 7/8" 8RD + PACKER 7" Prueba de Producción
RETRIEVAMATIC (DER) + XO (2 7/8" 8RD x 2 3/8"HYD) + NA Fm. Iquiri 1 Tr.: 3707-
"XN" + 1 PJ 2 3/8" HYD + SSD "XO" + XO (2 3/8"HYD x 2 3710m.
7/8"PJD) + 1 PJ 2 7/8" PJD.
5 OVERSHOT 5 3/4 (AGARRE 3 1/16", MILL CONTROL 3 1/8") + Para pesca de BHA#4
TIJERA HIDRAULICA + 6PM 4 3/4" + XO (NC38 x 2 7/8" PJD).
6 PATA MULA 2 7/8 8RD + 1 PZA 2 7/8" 8RD + PACKER 7" Prueba de Producción
RETRIEVAMATIC (DER) + XO (27/8" 8RD x 2 3/8"HYD) + NA Fm. Iquiri 1 Tr.: 3694-
"XN" + 1 PJ 2 3/8" HYD + SSD "XO" + XO (2 3/8"HYD x 2 3700m, 3702-3705m,
7/8"PJD) + 1 PJ 2 7/8" PJD. 3707-3710m.
5
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
9 FLUIDOS
9.1.4 VOLUMENES
9.1.5 MATERIALES
Producto Cantidad Unidad Recibido Consumo Actual
ALDACIDE G 5 gal/bid 58 25 33
Soda Ash 25 kg/sc 178 121 57
Bicarbonato de sodio 25,00 kg/sc 93 10 83
Cloruro de Potasio 50,00 kg/sc 360 246 114
Formiato De Sodio 25,00 kg/sc 3000 1490 1510
BARASCAV L 55 gal/tb 2 1 1
SU COR 656 200 l/tb 4 3 1
Petrocide 5 gal 1
Carbonate De Calcio
40 kg/sc 340 40 300
Densificante
Barita 50 kg/sc 1527 195 1332
CON DET 55 gal/tb 1 1
Cal Hidratada 23 kg/sc 42 1 41
Soda Caustica 25 kg/sc 78 5 73
BARAZAN D PLUS 25 kg/sc 46 6 40
6
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
10 TIEMPOS
7
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
EJECUTADO PROGRAMADO
OPERACIÓN INICIO DURACION (dias) FIN DURACION (dias) DIFERENCIA
TERMINACION LSC-X4D 01/05/2016 26,75 27/05/2016 13 13,75
8
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
9
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
11 COSTOS
10
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
12 CONCLUSIONES Y RECOMENDACIONES
11
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
Todas las actividades realizadas durante la etapa de terminación del Pozo LCS-X5D,
atreves de sus contratistas y subcontratistas estuvieron estrictamente basadas en las
políticas y procedimiento de Medio Ambiente, Seguridad, Salud y Calidad de YPFB-Andina
S.A., así también en las regulaciones, normativas y leyes medio ambientales vigentes en el
estado, velando principalmente por la Salud y Seguridad de todo el personal contribuyente a
que este proyecto se desarrolle y culmine sin ocurrencia de daños a propios o terceros, ni
daños al Medio Ambiente.
La empresa Biota estuvo encargada del monitoreo ambiental, verificando que las actividades
estén basadas en las regulaciones y procedimientos de YPFB-Andina S.A, así también en
las principales leyes y regulaciones bolivianas; como la ley de Medio Ambiente, Reglamento
de prevención y control ambiental, reglamento ambiental para el sector de Hidrocarburos,
etc.
12
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
13
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
14
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
La compañía ARCHER, estuvo a cargo del control y manejo de desechos sólidos y chatarra
generado en campamento y pozo. Control que se vino realizando diariamente con la
selección de las diferentes clases de residuos como: inorgánicos, orgánicos, industriales,
especiales y otros. Los mismos que se detallan en el siguiente cuadro:
Responsable de su Disposición
Tipo de Desechos Cantidad Generada
Final
Inorgánicos 500 Kg Húmus (envio a Santa Cruz)
Orgánicos 2.850 Kg Dispuesto en fosa sanitaria
Industriales 322 Kg Húmus (envio a Santa Cruz)
Especiales 34 Kg Húmus (envio a Santa Cruz)
Patológicos 0 Kg Cuando es necesario Húmus
Personal de Lapacho, contratados por la contratista ARCHER fueron los encargados del
tratamiento de aguas residuales generadas en los campamentos, además se realizaron
toma de muestras periódicas de estas aguas para su análisis por un laboratorio.
15
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
14 ANEXOS
A) ESTADO SUPERFICIAL
16
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
B) ESTADO SUBSUPERFICIAL
17
Declaratoria de Comercialidad
Campo Los Sauces Sur
Reservorio Iquiri 1
Interval Name Interval Depth Interval Depth Completion Fluid BHP BHT Notes
[m-MD] [m-TVD] [ppg] [psi] [ºF]
3694-3700 [6m]
Ar. Iquiri 1 3702-3705 [3m] 9,2
3707-3710 [3m]
Top Bottom Lenght Min ID Max OD Jts Description Part Number Supplier No.
[mts] [mts] [mts] [in] [in]
12,46 12,66 0,20 1,945 3,250 1 ADAPTER 2 7/8"TSH CS X 2 3/8" CS HYDRIL PIN X PIN - ANDINA 30
12,66 116,14 103,48 1,945 2,750 11 TUBING 2 3/8" CS HYDRIL BOX-PIN - ANDINA 29
116,14 117,00 0,860 1,945 2,750 1 FLOW COUPLING, 3 FT X 2 3/8" CS HYDRIL BOX-PIN 02.02.3238B.01 EQUIPETROL 28
TUBING RETRIEVABLE SUB-SURFACE SAFETY VALVE, 2
117,00 118,45 1,450 1,875 3,625 1 - BAKER 27
3/8" CS HYDRIL BOX - PIN
118,45 119,31 0,860 1,945 2,750 1 FLOW COUPLING, 3 FT X 2 3/8" CS HYDRIL BOX-PIN 02.02.3238B.01 EQUIPETROL 26
119,31 3647,94 3528,63 1,945 2,750 376 TUBING 2 3/8" CS HYDRIL BOX-PIN - ANDINA 25
3647,94 3648,81 0,87 1,945 2,750 1 FLOW COUPLING, 3 FT X 2 3/8" CS HYDRIL BOX-PIN 02.02.3238B.01 EQUIPETROL 24
SLINDING SIDE DOOR, MODEL XO, 1.875" X 2 3/8" CS
3648,81 3649,67 0,86 1,875 3,063 1 02.02.1C238C EQUIPETROL 23
HYDRIL BOX-PIN
3649,67 3658,50 8,83 1,900 2,625 1 TUBING 2 3/8" CS HYDRIL BOX-PIN - ANDINA 22
3658,50 3659,38 0,88 1,945 2,750 1 FLOW COUPLING, 3 FT X 2 3/8" CS HYDRIL BOX-PIN 02.02.3238B.01 EQUIPETROL 21
3660,80 3662,63 1,83 2,410 2,875 1 SPACER, 7 PLG. X 3.250" X 6FT LONG. 02.01.2700X EQUIPETROL 16
3662,63 3663,54 0,91 2,410 3,250 3 SEAL UNIT, BONDED SEALS, 3.250" SEAL-BORE 02.01.2700X.123 EQUIPETROL 15
3663,54 3663,65 0,11 2,410 3,188 1 HALF MULE SHOE GUIDE, 3.250" SEAL-BORE 02.01.2700X.124 EQUIPETROL 14
13
Sub-Assy - Completacion Inferior - Ar. Iquiri-1 12
Permanent Seal-Bore Packer, Model PermaPak 7" 23-
3660,00 3660,45 0,45 3,250 5,813 1 02.01.2700LL EQUIPETROL 11
32# - CGS
Permanent Seal-Bore Packer, Model PermaPak 7" 23-
3660,45 3660,69 0,24 3,250 5,813 - - EQUIPETROL 10
32# - CGI
THREADED BOTTOM GUIDE F/SEAL BORE EXTENSION
3660,69 3660,85 0,16 3,250 5,750 1 02.01.2700X EQUIPETROL 9
3.250" X SEAL BORE PACKER
3660,85 3663,73 2,88 3,250 4,187 1 SEAL BORE EXTENSION, 7" X 3.250" X 10 FT. LONG. 02.01.2700X EQUIPETROL 8
CROSSOVER ,SEAL BORE EXTENSION 3.250" X 2-7/8"
3663,73 3663,98 0,25 2,440 5,000 1 02.01.2700X EQUIPETROL 7
CS HYDRIL PIN
CROSSOVER DE 2 7/8 " CS HYDRIL BO X 2 3/8" CS
3663,98 3664,25 0,27 1,945 3,187 1 02.04.3278 EQUIPETROL 6
HYDRIL PIN
3664,25 3666,01 1,76 1,945 2,750 1 PUP JOINT, 6 FT 2 3/8" CS HYDRIL BOX-PIN 02.04.2D238B EQUIPETROL 5
3666,01 3666,89 0,88 1,945 2,750 1 FLOW COUPLING, 3 FT X 2 3/8" CS HYDRIL BOX-PIN 02.02.3238B.01 EQUIPETROL 4
NOGO LANDING NIPPLE, TYPE "XN", 1.875" x 2-3/8" CS
3666,89 3667,18 0,29 1,791 3,063 1 02.02.2B238A EQUIPETROL 3
HYDRIL BOX-PIN
3667,18 3667,35 0,17 1,945 2,938 1 WIRE LINE RE-ENTRY GUIDE, 2 3/8" CS HYDRIL BOX-PIN 02.01.2700X.35 EQUIPETROL 2
1
18