PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 3,85 23,00 EF-17 4 29/03/2018
SUPERVISOR TALADRO CAMPO TVD PROP MD PROP PROGRESO SPUD DATE POB
JAIME BEDOYA / ANDY VILLASMIL F-18 BOSCAN 8.476,0 8.912,0 29/03/2018 10
TOTAL DIARIO TOTAL ACUM TOTAL APROP AFE No HRS TOTAL ROT TIPO DE POZO POTENCIAL DIFERIDA ELEV ORIG MR ELEV RIG MR
54.596 218.382 4.720.572 HS1031743 INCLINADO 190,00 190,00 32,00
ULTIMO SURVEY: FECHA MD INC AZIM ULT REV SIG REV ULT PRB PRES BOP
(in) @ (ft) (in) @ (ft)
ACT. A LAS 00 Hrs
PERFORO HOYO DE 17 1/2'' CON MECHA PDC DESDE 86' HASTA 290'
RESUMEN 24 Hrs
REALIZO PRUEBAS FUNCIONALES / REALIZO CHECK-LIST PRE-ARRANQUE "OK"+ ARMO BHA CONVENCIONAL 17-1/2" + PERFORO
HOYO DE 17 1/2'' CON MECHA PDC DESDE 86' HASTA 290'
ACT. PROXIMAS 24 Hrs
CORRER + CEMENTAR CASING 13 3/8''
ACT. A LAS 05:00 am
PERFORO HOYO DE 17 1/2'' CON MECHA PDC HASTA 659' + BOMBEO 60 BBLS DE PÍLDORA VISCOSA Y CIRCULO 2 FONDO ARRIBA
+ SACANDO TUBERIA + BHA DESDE 659' DE FORMA CONVENCIONAL SIN PROBLEMAS (EN PROGRESO)
SUMARIO DE OPERACIONES
DESDE HASTA Hrs T TRAB T. OPE ACT CAT SUB CAT DESCRIPCION
00:00 - 12:00 12,00 D&C N 8 38 TRN REALIZO SKIDDING DESDE DESDE POZO BN-1023 HASTA LOC AD-74
100%
12:00 - 20:00 8,00 D&C N 8 39A OTS VISTIO EQUIPOS, LINEAS DE AGUA-AIRE-LODO, LINEAS DE DESCARGA
DE TANQUES / INSTALO Y VISTIO TUBO CONDUCTOR
20:00 - 20:30 0,50 D&C N 8 39A OTS REALIZO PRUEBAS FUNCIONALES / REALIZO CHECK-LIST
PRE-ARRANQUE
20:30 - 21:00 0,50 D&C N 1 62 CDS REALIZO CHARLA DE SEGURIDAD PRE-TRABAJO / ARMADO DE BHA +
PERFORACION DE HOYO 17-1/2"
21:00 - 21:30 0,50 D&C N 1 7A ARMO BHA CONVENCIONAL 17-1/2" DE LA SIGUIENTE MANERA:
- MECHA 17-1/2" PDC / SMITH S/N:JJ1054 / SDI519MHBPX / TFA: 1.104 /
10x10/32 / 1.33'
- BIT SUB - 3.9'
- X-OVER 6-5/8" REG x XT-54 - 2.37'
- 21 HWDPS 5-1/2" XT-54 - 641.71'
TOTAL BHA: 649.31'
TOCO FONDO @ 85'
21:30 - 00:00 2,50 D&C N 1 2 TOD PERFORO HOYO DE 17 1/2'' CON MECHA PDC DESDE 86' HASTA 290'
CAUDAL: 550 GPM
PRESION: 611 PSI
PSM: 4-6 KLBS
RPM EN EL TOP DRIVE: 100 RPM
TORQUE EN SUPERFICIE: 5-7 KLBS/PIE
NOTAS:
--------------------------EQUIPOS-------------------------
SUMARIO DE OPERACIONES
DESDE HASTA Hrs T TRAB T. OPE ACT CAT SUB CAT DESCRIPCION
21:30 - 00:00 2,50 D&C N 1 2 TOD - EQUIPO DE SOLDAR ( OPERATIVO)
- RIG WATCH (OPERATIVO)
- SYSTEMA GAI-TRONICS (OPERATIVO)
- BOMBA DE RIO: DOS (02) EN SITIO (OPERATIVO)
- SILO DE BARITA (OPERATIVO)
- MONTACARGAS (OPERATIVO)
- LLAVE ST-80 (PRESENTA PROBLEMAS CON LOS RODILLOS)
- PIPEHANDLER (OPERATIVO)
- GENIE (OPERATIVO)
- SERVICIO DE TRANSPORTE DE PERSONAL / CAMBIO DE GUARDIA
(OPERATIVO)
- 33 CUADRILLAS NABORS
- 15 PETROBOSCAN
- 48 TOTAL
------------------------------FLUIDOS----------------------------
VOL. SALMUERA EN FRAC TANK @ 10 LPG: 500 BBLS SUCIA + 200 BBLS
LIMPIA
VOL. AGUA INDUSTRIAL EN FRAC TANKS: 3.000 BBLS
Impreso: 30/03/2018 03:41:27 a.m.
Página 3 de 4
PETROBOSCAN
Reporte Diario de Perforación
POZO No. CHEVRON PROY. No. PROYECTO D.E.L. DIAS EST. MD TVD EST. DE FLUJO DIAS PERF REPT NO FECHA
BN_1024 RR5478 0 DRILL & COMPLETE 3,85 23,00 EF-17 4 29/03/2018
SUMARIO DE OPERACIONES
DESDE HASTA Hrs T TRAB T. OPE ACT CAT SUB CAT DESCRIPCION
21:30 - 00:00 2,50 D&C N 1 2 TOD VOL. LODO: 1000 BBLS BARADRILL RECUPERADOS
LECCIONES APRENDIDAS :
SEGURIDAD
TENETS TARJ. STOP CANT. SIMU. ULT. SIM. ULT. VIS. GER. FREC. NETA FREC BRUTA INC. x AÑO LTA x AÑO
0 0 0 0 0 0 0 0 0
DIAS SIN INC. DIAS LTA ULT. INC. LTA ULT. INSP. TALADRO PERM TRABAJO HRS HOMBRE TON. MILLAS PERSONAL (D/N/M)
0 0 0 0 0/0 240 0 0 /0 /0
INCIDENTE
MATERIALES / CONSUMO
ELEM UNIDAD USO DISPONIBLE ELEM UNIDAD USO DISPONIBLE
DATOS DE SURVEY
M.D. INCL. AZIMUTH T.V.D. N/S ACUM E/O ACUM SECCION M.D. INCL. AZIMUTH T.V.D. N/S ACUM E/O ACUM SECCION
TARJETAS STOP
INVENTARIO DE LODO
ELEM UNIDAD USO COSTO DISPONIBLE