Plantilla Civil Tacna
Plantilla Civil Tacna
Plantilla Civil Tacna
PRESUPUESTO
PRESUPUESTO PRESUPUESTO
ITEM DESCRIPCIÓN
S/. US$/.
001 OBRAS PROVISIONALES S/. 0.00 $0.00
002 ESTRUCTURA S/. 0.00 $0.00
003 ARQUITECTURA S/. 0.00 $0.00
004 Obras complementarias S/. 0.00 $0.00
COSTO DIRECTO S/. 0.00 $0.00
GASTOS GENERALES x%?? 1% S/. 0.00 $0.00
UTILIDAD x%?? 1% S/. 0.00 $0.00
TOTAL EN NUEVOS SOLES S/. 0.00 $0.00
Tipo de cambio
NOTAS: 3.26
1 EL PRESUPUESTO NO INCLUYE IGV
2 EL PRESUPUESTO ES LLAVE EN MANO
3 NO INCLUYE MOBILIARIO
5 EL AGUA Y LA ENERGIA ELECTRICA CORRE POR CUENTA DE EXSA
6 PLAZO DE ENTREGA : 50 DIAS
PRESUPUESTO BASE
72,964.56
91,515.56
DESCRIPCION CANT. ALTURA ANCHO LARGO METRADO TOTAL
SOLADOS 39.39 m2
VERTICAL
EJE 1-1 /E-H CV1(0.40*2.00) 1 0.40 7.30 2.92
EJE 3-3 /E-H CV1(0.40*2.00) 1 0.40 7.30 2.92
EJE 2-2 /E-G CORTE 2-2 1 1.10 1.00 1.10
EJE 2-2 /E-G CORTE 2-2 2 1.10 4.70 10.34
EJE 2-2 /F-G CORTE 2-2 1 1.10 2.75 3.03
EJE 3-3/A-B CORTE 3-3 1 0.65 4.85 3.15
EJE 2´-2´ /A-B CORTE 2-2 1 1.10 1.45 1.60
VERTICAL
EJE 1-1 /E-H CV1(0.40*2.00) 1 2.00 0.40 7.30 5.84
EJE 3-3 /E-H CV1(0.40*2.00) 1 2.00 0.40 7.30 5.84
EJE 2-2 /E-G CV1(0.40*2.00) 2 2.00 0.40 4.75 7.60
EJE2"-2"/F´-G 1 2.00 0.40 2.75 2.20
EJE 3-3 /A-B´ CV1(0.40*0.4) 1 0.40 0.40 4.30 0.688
CIMIENTO EN ESCALERA01 1 0.80 0.40 1.50 0.48
CIMIENTO EN ESCALERA02 1 0.80 0.40 1.85 0.59
VERTICALES
1-1/E-G VS(0.25*0.20) 1 0.25 0.20 5.45 0.27
2-2/E-G CORTE VA (0.25*0.20) 2 0.20 0.25 4.65 0.47
2´-2´/E-G V103 (0.15*0.50) 1 0.50 0.50 3.90 0.98
3-3/E-F´ CORTE VS1 (0.15*0.20) 1 0.20 0.15 3.55 0.11
SEGUNDO PISO
HORIZONTAL
G´-G´ /2-3 V201(0.15*0.50) 1 0.5 0.15 3.95 0.30
G-G /2-3 V202(0.25*0.50) 1 0.5 0.25 4.95 0.62
VERTICALES
1-1/D-F VS(0.25*0.20) 1 0.20 0.25 3.00 0.15
2-2/D-H V204 (0.25*0.50) 1 0.50 0.25 7.50 0.94
2-2/G-H V206 (0.15*0.50) 1 0.50 0.15 1.10 0.08
EJE A-A ENTRE 2´Y 3 VA( 0.25*0.20) 2 0.20 0.25 2.00 0.20
EJE 3-3 ENTRE A-B' VS( 0.25*0.20) 2 0.2 0.25 3.10 0.31
SEGUNDO PISO
PAÑO 01 1 0.20 3.95 1.05 0.83
1 0.20 3.65 0.60 0.44
HORIZONTALES
EJE F´-F´/2-2´ 1 2.5 1.4 3.5
EJE F´-F´/2-2´ 1 2.5 0.85 2.125
PRIMER PISO
VERTICALES
EJE2-2/D-F 1 2.6 2.9 7.54
EJE2-2/G-H 1 2.6 0.75 1.95
EJE2´-2´/F-H 1 2.6 4.3 11.18
EJE 3-3/A-B´ 1 2.6 2.75 7.15
EJE 2´-2´/A-B´ 1 2.6 1.85 4.81
EJE 1-3/D-F 2 2.6 2.9 15.08
HORIZONTALES
EJE H-H/2-2" 1 2.6 1.2 3.12
EJE F-F/2"-3 1 2.6 0.9 2.34
EJE H-H/2-3 1 0.5 2.75 1.375
1 2.6 1.5 3.9
cara de escalera 02 1 1 1.4 1.4
PRIMER PISO
1 2.6 1 2.60
1 2.6 1 2.60
3 2.6 0.8 6.24
1 2.6 0.85 2.21
1 2.6 2.3 5.98
DEPOSITO 4 2.6 0.8 8.32