Taller 4
Taller 4
Taller 4
Abstract— This paper shows the main results achieved Figura1
with therisk assessment of the software company
analyzed where the main information assets identified
were XXXXX. The main risks identified were XXXXXX
caused by XXXX and XXXX we proposed to mitigate the
risks with XXXXX estimating a residual risk below the risk
acceptance level.
I. INTRODUCCIÓN
Figura3 Figura4
Figura6 Figura8
VI. FILEZILLA
Figura9
Introducción a la Seguridad Informática - Universidad Piloto de Colombia 4
Figura11
Figura10
Figura12
Figura19
Figura17
Figura20
Introducción a la Seguridad Informática - Universidad Piloto de Colombia 6