Metrados Pabellon San Andres Apostol - I Et
Metrados Pabellon San Andres Apostol - I Et
Metrados Pabellon San Andres Apostol - I Et
04.02.00 COLUMNAS
04.02.01 CONCRETO F'C=210 KG/CM2 EN COLUMNAS M3
C-1 (cuadrado de 0.25x0.25m) 4.00 1.00 0.25 0.25 5.15 1.29
C-2 (rectangular de 0.15x0.25m) 6.00 1.00 0.15 0.25 5.15 1.16
C-3 (circular de 0.25m de diámetro) 5.00 1.00 Area= 0.05 5.15 1.26
04.03.00 VIGAS
04.03.01 CONCRETO F'C=210 KG/CM2 EN VIGAS M3
Eje A-A y EJE C-C, VP-101 (25x35) 2.00 1.00 13.95 0.25 0.35 2.44
Eje B-B, VP-102 (35x35) 1.00 1.00 13.95 0.35 0.35 1.71
Eje 4-4, Eje 5-5, EJE 6-6, EJE 7-7 y EJE 8-8, VS-101 (25x20) 5.00 1.00 4.95 0.25 0.20 1.24
Viga de amarre extrema central (25x20) 2.00 1.00 2.60 0.25 0.20 0.26
Viga de amarre intermedia central (15x20) 3.00 1.00 2.60 0.15 0.20 0.23
04.04.04 LADRILLO HUECO ARCILLA 15x30x30 CM, TECHO ALIGERADO UND Factor/m2
En losa de techo incluido el pasadizo 2.00 1.00 3.20 2.00 8.00 102.40
2.00 1.00 3.20 2.10 8.00 107.52
2.00 1.00 3.15 2.00 8.00 100.80
2.00 1.00 3.15 2.10 8.00 105.84
07.00.00 BRUÑAS
07.01.00 BRUÑADO EXTERIOR DE MUROS ML
En muros laterales del pabellón 4.00 1.00 2.10 8.40
4.00 1.00 2.05 8.20
10.00.00 PINTURA
10.01.00 PINTURA EN MUROS EXTERIORES AL LATEX 02 MANOS M2
Muros laterales del pabellón 2.00 1.00 2.60 4.65 24.18
Columnas circulares 5.00 1.00 Per= 0.79 4.65 18.26
12.00.00 VARIOS
12.01.00 LIMPIEZA FINAL DE OBRA M2
Interior de nichos del pabellón 96.00 1.00 2.35 0.70 157.92
96.00 2.00 2.35 0.60 270.72
Zona de construcción del pabellón de nichos 1.00 1.00 15.00 6.00 90.00
TOTAL
14.00
90.00
68.81
21.00
18.41
4.66
14.38
56.81
92.33
TOTAL
8.76
2.55
21.90
20.46
10.23
321.71
TOTAL
3.71
45.32
20.22
820.08
5.88
58.72
497.88
TOTAL
4.62
59.63
144.15
416.56
21.76
197.90
573.75
64.50
TOTAL
131.14
42.44
121.60
36.51
96.64
16.60
37.73
6.73
21.80
42.44
36.51
TOTAL
10.00
2.00
518.64