Seminario de Graduacion
Seminario de Graduacion
Seminario de Graduacion
UNAN-MANAGUA
RECINTO UNIVERSITARIO RUBEN DARIO
FACULTAD DE CIENCIAS E INGENIERIAS
DEPARTAMENTO DE CONSTRUCCIÓN
CARRERA DE INGENIERIA CIVIL
Tema:
Autoras:
Tutor:
Noviembre 2017.
ÍNDICE
I. INTRODUCCIÓN ............................................................................................ 1
II. ANTECEDENTES ........................................................................................... 3
III. PLANTEAMIENTO DEL PROBLEMA ............................................................. 4
IV. JUSTIFICACIÓN ............................................................................................. 6
V. OBJETIVOS. ................................................................................................... 7
5.1. Objetivo General ........................................................................................ 7
5.2. Objetivos Específicos ................................................................................ 7
VI. MARCO TEÓRICO .......................................................................................... 8
6.1. Sistema de alcantarillado ........................................................................... 8
6.1.1. Sistema de alcantarillado convencional .................................................. 8
6.1.2. Sistema de alcantarillados no convencionales ....................................... 9
6.1.3. Sistema de alcantarillado en situ .......................................................... 10
6.2. Estudios técnicos para el diseño del sistema de alcantarillado sanitario. 11
6.3. Partes de un sistema de alcantarillado sanitario ..................................... 12
6.3.1. Pozos De Visita Sanitarios. .................................................................. 12
6.3.2. Pozos de visita con caída ..................................................................... 12
6.3.3. Conexiones Domiciliares ...................................................................... 12
6.3.4. Conductos o líneas de conducción ....................................................... 12
6.3.5. Distancia máxima entre pozos de visita sanitaria. ................................ 13
6.3.6. Características del pozo de visita. ........................................................ 13
6.4. Métodos para determinar una población futura........................................ 14
6.4.1. Método aritmético. ................................................................................ 14
6.4.2. Tasa de crecimiento o método geométrico. .......................................... 14
6.4.3. Tasa de crecimiento a porcentaje decreciente. .................................... 15
6.4.4. Método por porcentaje de saturación. .................................................. 15
6.5. Dotaciones. .............................................................................................. 15
6.6. Criterios de Diseño del Sistema de Alcantarillado Sanitario .................... 17
6.6.1. Caudal de diseño. ................................................................................. 17
6.6.2. Caudal Máximo. .................................................................................... 17
6.6.3. Caudal medio. ...................................................................................... 17
6.6.4. Caudal mínimo de aguas negras. ......................................................... 18
6.6.5. Caudal de infiltración. ........................................................................... 18
6.6.6. Caudal especial. ................................................................................... 18
6.6.7. Consumo comercial, industrial y público............................................... 18
6.6.8. Coeficiente de retorno .......................................................................... 19
6.6.9. Factor de Harmon ................................................................................. 19
6.7. Hidráulica de las Alcantarillas .................................................................. 19
6.7.1. Diámetro. .............................................................................................. 19
6.7.2. Pendiente longitudinal mínima. ............................................................. 20
6.7.3. Pendiente longitudinal máxima ............................................................. 20
6.7.4. Pérdida de carga adicional ................................................................... 20
6.7.5. Fórmula y coeficiente de rugosidad ...................................................... 20
6.7.6. Tensión de arrastre .............................................................................. 21
6.7.7. Cambio de diámetro ............................................................................. 22
6.7.8. Tirante de agua .................................................................................... 22
6.7.9. Velocidad .............................................................................................. 22
6.7.10. Ubicación de las alcantarillas ............................................................... 23
6.8. Trazado de colectores. ............................................................................ 23
6.9. Detalle del título de columnas para el cálculo del sistema de alcantarillado
sanitario ................................................................................................... 24
6.9.1. Tabla Topográfica ................................................................................. 24
6.9.2. Tabla de caudales ................................................................................ 26
6.9.3. Tabla hidráulica .................................................................................... 28
VII. DISEÑO METODOLÓGICO .......................................................................... 31
7.1. Tipo de estudio. ....................................................................................... 31
7.2. Enfoque del estudio. ................................................................................ 31
7.3. Población. ................................................................................................ 31
7.4. Muestra .................................................................................................... 31
7.5. Herramientas de análisis de datos........................................................... 32
VIII. DIAGNOSTICO DE LA SITUACION ACTUAL DE LOS BARRIOS MILAGRO
DE DIOS Y VISTA XOLOTLAN ..................................................................... 33
8.1. Descripción de las características generales del área de estudios.......... 33
8.1.1. Ubicación del área de estudio. ............................................................. 33
8.1.2. Extensión territorial. .............................................................................. 34
8.1.3. Densidad poblacional. .......................................................................... 34
8.1.4. Clima. ................................................................................................... 34
8.1.5. Transporte. ........................................................................................... 34
8.1.6. Telecomunicaciones ............................................................................. 34
8.1.7. Recolección de basura ......................................................................... 34
8.2. Resultados de la encuesta socio-económica ........................................... 35
8.3. Sistema de Alcantarillado Sanitario Propuesto ........................................ 41
8.4. Memoria de cálculo para el sistema de alcantarillado sanitario ............... 43
8.4.1. Tabla Topográfica ................................................................................. 43
8.4.2. Tabla de caudales ................................................................................ 44
8.4.3. Tabla hidráulica .................................................................................... 45
IX. PRESUPUESTO ........................................................................................... 57
X. CONCLUSIONES Y RECOMEDACIONES ................................................... 58
XI. BIBLIOGRAFÍA ............................................................................................. 60
ANEXOS
ÍNDICE DE TABLAS
I. INTRODUCCIÓN
Los barrios Milagro de Dios y Vista Xolotlán son unos de los muchos barrios en los cuales se
encuentran presente esta problemática, ubicados en el departamento de Managua, carece
de un sistema de Alcantarillado Sanitario, la población usa como medio de saneamiento los
sumideros, las aguas domesticas drenan libremente por las calles de este sector y producen
malos olores y un ambiente visual muy desagradable.
Ante esta realidad y buscando soluciones viables se presenta esta propuesta de diseño del
sistema de alcantarillado sanitario, para contribuir al saneamiento y brindarles un mejor nivel
de vida a los pobladores de este sector. Para ello se ha dividido el trabajo en 4 capitulos.
El segundo capítulo contiene una recopilación de la situación actual de los barrios, que se
realizó mediante una encuesta. Además, se incluyen algunos datos y características de los
barrios en donde se detalla la ubicación clima etc, y el tipo de enfoque del estudio.
En el tercer capítulo de este trabajo se presenta la propuesta para el diseño del sistema de
alcantarillado sanitario, tabla topográfica, hidráulica y de caudales con su respectiva memoria
de cálculo.
II. ANTECEDENTES
Los barrios Milagro de Dios y Vista Xolotlán no cuentan con una red de alcantarillado
sanitario, recientemente se realizó un levantamiento topográfico a cargo de la Alcaldía de
Managua distrito V, también se han hecho estudios de demográficos realizados por la misma
institución respectivamente.
Los habitantes de los barrios Milagro de Dios y Vista Xolotlán no cuenta con un Sistema de
Alcantarillado Sanitario, la inexistencia de este sistema provoca que la población viva en
malas condiciones que afectan su calidad de vida ya que se encuentran vulnerables a
enfermedades tales como el Dengue y Zika. La falta de una correcta deposición para las
aguas residuales es evidente generando un impacto visual muy desagradable debido a que
las aguas residuales fluyen por las calles de los barrios provocando deterioro y
estancamientos que producen malos olores y problemas tales como contaminación y
deterioro del suelo que afectan el medio ambiente, ante esta problemática es indispensable
que la población cuente con el servicio de un sistema de Alcantarillado Sanitario ya que
mejorara la calidad de vida y así mismo reducirá los casos de enfermedades respiratorias y
epidérmicas que afecta la salud de los mismos.
En las figura 1 y figura 2, se muestra las condiciones en que se encuentran las calles de los
Barrios Milagro de Dios y Vista Xolotlán así como el socavamiento que las aguas residuales
provocan en estas, deteriorando el terreno natural y las calles de asfalto causando
estancamientos que dan lugar a la propagación de zancudos, generando un impacto visual
negativo, el estado que se presentan estas calles provocan un descenso en el valor de las
propiedades.
IV. JUSTIFICACIÓN
Uno de estos asentamientos son los ahora barrios Milagro de Dios y Vista Xolotlán, la
situación actual de estos barrios desde el punto de vista de salud pública es lamentable, ya
que la disposición de aguas grises en las calles y patios contribuye a crear condiciones
insalubres en dichos barrios, la población se encuentra expuesta a un sin número de
patologías siendo una de las más comunes el dengue ya que se propaga de forma rápida
provocando en algunos casos hasta la muerte, por lo que el MINSA debe realizar continuas
luchas anti epidérmicas educativas y preventivas durante todo el año, reforzando en época
de invierno.
Lo que se pretende obtener con la realización de dicha propuesta, es brindar a estos barrios
un proyecto que vendría a complementar el sistema de saneamiento de forma adecuada,
eliminando el uso de letrinas y sumideros conectando a todas las viviendas al sistema de
Alcantarillado Sanitario. Es evidente la importancia de este servicio porque se reconoce el
marcado efecto que tiene el gozar de un sistema de alcantarillado sanitario debido a que los
pobladores de los barrios Milagro de Dios y Vista Xolotlán ya no sufrirían por la trasmisión
de enfermedades que provocan los mosquitos que se propagan en las charcas y de igual
forma no tendrían que estar costeando en gastos médicos.
Esta propuesta contribuirá para el inicio de futuros estudios que se realicen en el distrito V.
De ejecutarse este proyecto se mejoraría la calidad de vida de los habitantes, así como
también el desarrollo de los barrios con el fin de establecer un uso adecuado del sistema,
además es una acción correctiva para la protección del medio ambiente, con el fin de mejorar
el impacto ambiental y visual, de igual forma preservar la salud e higiene y mejorar la calidad
de vida de los habitantes.
V. OBJETIVOS.
Proponer el diseño del sistema de Alcantarillado Sanitario para los barrios Milagro de Dios y
Vista Xolotlán, Departamento de Managua.
Este sistema es diseñado exclusivamente para llevar (conducir) las aguas residuales,
domesticas e industriales y se pueden clasificar de la siguiente manera:
Los sistemas de alcantarillado convencionales son los más usados debido a su fácil
diseño y también a sus características especiales como disponibilidad de materiales en
el mercado local, fácil colocación, flexibilidad de acuerdo al área geográfica,
disponibilidad en cualquier diámetro, etc.,
Sin embargo, este sistema, cuenta con muchas limitaciones: Se requiere mucho tiempo
para conectar todas las viviendas, no todas las partes y materiales están disponibles
localmente, es difícil y costoso de expandir cuando cambia y crece la comunidad,
requieren diseño por expertos y supervisión de la construcción, el efluente y los lodos
(de los interceptores) requieren tratamiento secundario y/o descarga apropiada, alto costo
de capital y moderado costo de operación.
Sistemas basados en la disposición in situ (en el sitio) de las aguas residuales como las
letrinas, tanques y pozos sépticos, son sistemas de muy bajo costo apropiados para
zonas rurales o lugares donde no se cuentan con sistemas de alcantarillado, con baja
densidad poblacional y con adecuadas características del suelo.
Los pozos de visita sanitaria (PVS) o cámaras de inspección son estructuras que permiten
la inspección y limpieza de las redes sanitarias, los PVS se utilizan en todo cambio de
alineación horizontal o vertical, en todo cambio de diámetro; en las intersecciones de
dos o más alcantarillas, en el extremo de cada línea cuando se prevean futuras
ampliaciones aguas arriba.
Se deberán usar pozos de visita con caída cuando la altura entre el fondo del pozo de
visita y el fondo de la tubería de entrada sea mayor de 0.60m.
Conjunto de tuberías que funcionan como conductos libres, reciben la contribución de las
aguas residuales en cualquier punto a lo largo de su longitud. Se distinguen dos tipos de
línea de conducción que son por gravedad o bombeo.
El espaciamiento máximo entre PVS, está dado por la siguiente tabla que es para el
método tradicional de inspección en los pozos.
El diámetro interno (D) del pozo será 1.20 m, para alcantarillas con 750 mm y
menores.
Todo PVS deberá estar provisto en la parte superior de una tapa que permita una
abertura de 0.60 m de diámetro, la cual deberá estar dotada de 2 orificios de 0.03
El fondo del pozo deberá tener un acabado fino, con pendiente transversal hacia
los canales no menor del 2%. Todas las aristas vivas deberán ser redondeadas.
El caudal de diseño se trabaja con una población futura debido a esto se tiene que
hacer una proyección de la población actual para así poder obtener un aproximado de
cuánto será la población futura, para esto se pueden utilizar los siguientes métodos:
Este método es más aplicable a ciudades que no han alcanzado su desarrollo y que se
mantienen creciendo a una tasa fija y es el de mayor uso en Nicaragua. Se recomienda
usar las siguientes tasas en base al crecimiento histórico:
1) Ninguna de las localidades tendrá una tasa de crecimiento urbano mayor de 4%.
2) Ninguna de las localidades tendrá una tasa de crecimiento urbano menor del 2.5%.
𝑃𝑓 = 𝑃𝑜 (1 + 𝑖)𝑛 (Ecuación 1)
𝑃𝑜 = 𝑃𝑜𝑏𝑙𝑎𝑐𝑖𝑜𝑛 𝐴𝑐𝑡𝑢𝑎𝑙
6.5. Dotaciones.
Dotación
Clasificación de barrios L/hab/día
Zonas de media densidad: Se trata de viviendas de buen nivel de vida con áreas de
lotes que varían entre los 500m² y 700m². Todas están conectadas a la red de agua
potable.
Zonas de baja densidad: Son áreas de desarrollo con viviendas de alto costo y de
alto nivel de vida construidas en lotes de áreas mínimas 1000m². Todas están
conectadas a la red de agua potable.
El caudal de diseño corresponde a la suma de los aportes por consumo doméstico, máximo,
infiltración y caudales especiales. El dimensionamiento de los conductos deberá atender los
máximos caudales de descarga según la siguiente expresión:
Dónde:
𝑄𝑚𝑎𝑥 = Caudal máximo, en lps.
𝑄𝑖𝑛𝑓 = Caudal de infiltración, en lps.
𝑄𝑐𝑜𝑚 = Caudal comercial, en lps.
𝑄𝑐𝑜𝑚 = Caudal industrial, en lps.
𝑄𝑖𝑛𝑠𝑡 = Caudal institucional o público, en lps.
14
𝑄𝑚𝑎𝑥 = 𝑄𝑚𝑒𝑑 × (1 + ( 2 )) (Ecuación 3)
4+ √𝑝𝑜𝑏𝑙𝑎𝑐𝑖𝑜𝑛/1000
Dónde:
𝑄𝑚𝑎𝑥 = Caudal máximo en lps.
P = Población servida en miles de habitantes.
𝑄𝑚𝑒𝑑 = caudal medio en lps.
Dónde:
𝐷𝑜𝑡 = Dotación en L/hab/dia.
𝑄𝑚𝑒𝑑 = Caudal medio en lps.
Es el caudal que se puede presentar a la hora de menor consumo de agua con el cual se
verifica la velocidad para garantizar el arrastre de los sólidos. El flujo mínimo aplicado en el
diseño de alcantarillas, representa el flujo pico que resulta de la descarga de un inodoro
sanitario.
1
𝑄𝑚𝑖𝑛 = 5 𝑄𝑚𝑒𝑑 (Ecuación 5)
Para tuberías con juntas de mortero se les deberá asignar un gasto de 10,000
L/ha/día.
Para tuberías con juntas flexibles se les deberá asignar un gasto de 5000 L/ha/día.
Comercial 25,000
De acuerdo al desarrollo de la
Publico o institucional
población
El coeficiente toma en cuenta el hecho de que no toda el agua que consumida dentro del
domicilio es devuelta al alcantarillado. Este porcentaje llamado “coeficiente de retorno”
estadísticamente fluctúa entre 65% y 85% (en Nicaragua se adopta un valor de 80%).
6.7.1. Diámetro.
El diámetro mínimo en las tuberías del alcantarillado deberá ser de 6 pulgadas, y en las
conexiones domiciliares se podrá usar diámetros de 4 pulgadas. El diámetro de cualquier
tramo de tubería deberá ser igual o mayor, que el diámetro del tramo aguas arriba, por ningún
motivo podrá ser menor.
La pendiente longitudinal mínima deberá ser aquella que produzca una velocidad de auto
lavado, la cual se podrá determinar aplicando el criterio de la Tensión de Arrastre, según la
siguiente ecuación:
Ʈ=WxRxS (Ecuación 6)
Dónde:
Ʈ = Tensión de arrastre en (Pa).
W = Peso específico del líquido (N/m3).
R = Radio hidráulico a gasto mínimo (m).
S = Pendiente mínima (m/m).
6.7.3. Pendiente longitudinal máxima
Se considera pendiente longitudinal máxima aquella que produzca una velocidad de flujo
no mayor de 5 m/s para tuberías de PVC y polietileno.
Pata todo cambio de alineación sea horizontal o vertical se incluirá una pérdida de carga
igual a 0.25 V²/2g entre la entrada y la salida del pozo de visita sanitario (PVS)
correspondiente, no pudiendo ser en ninguno de los casos menor que 3cm.
Concreto 0.013
Fórmula de Manning:
2 1
(𝑅3 ×𝑆2 )
𝑉= (Ecuación 7)
𝑛
Donde:
S= Pendiente hidráulica.
n=coeficiente de Manning.
El diámetro de cualquier tramo de tubería deberá ser igual o mayor que el diámetro del tramo
aguas arriba, por ningún motivo podrá ser menor. En el caso de que un pozo de visita
descargue dos o más tuberías el diámetro de la tubería de salida deberá ser igual o mayor
que el de la tubería de entrada de mayor diámetro.
La lámina de agua debe ser calculada en un régimen uniforme y permanente siendo su valor
mínimo para el caudal inicial (Qi) igual a 0.20 d/ D y máximo, para el caudal final (Qf) igual o
inferior a 0.80 d /D a fin de proporcionar la indispensable circulación de los gases de desagüe.
Por tanto, se puede adoptar la siguiente expresión:
𝛾
≤ 0.80 (Ecuación 8)
𝑑⁰
6.7.9. Velocidad
En las vías de circulación dirigidas de Este a Oeste, las tuberías se deberán ubicar al Norte
de la línea central de la vía. En las vías de circulación dirigidas de Norte a Sur, las tuberías
se deberán ubicar al Oeste de la línea central de la vía. (INAA, 2012).
En casos de pistas de gran anchura se deberán colocar dos líneas, una en cada banda de
la pista. Las alcantarillas deben ubicarse debajo de las tuberías de agua potable y con una
separación mínima horizontal de 1.50 m.
Los trazados se refieren a la ubicación de los colectores principales y secundarios en las vías
públicas y están en función principalmente de la topografía del terreno, tipo de sistema
elegido y disposición final de las aguas.
Columna 4: Longitud
Es la distancia en metros que hay entre un pozo de visita al siguiente, considerando que
esta distancia tiene que ser menor o igual a 100 metros.
Es la elevación de terreno aguas arribas, medidas en msnm (metros sobre el nivel del mar)
Es la elevación natural del terreno aguas abajo (A. Abajo) medidas en msnm.
Columna 13: Ø
Columna 16 = Longitud
Es la longitud de cada tramo de tubería para el movimiento de tierra en zanjas.
Columna 17: H
Es la altura promedio de las zanjas para el movimiento de tierra.
𝐻 = 𝐸𝑙𝑒𝑣. 𝑇 𝑃𝑉𝑆 𝐴𝑟𝑟𝑖𝑏𝑎 − 𝐸𝑙𝑒𝑣. 𝐼 𝑃𝑉𝑆 𝐴𝑟𝑟𝑖𝑏𝑎) + (𝐸𝑙𝑣. 𝑇 𝑃𝑉𝑆 𝑎𝑏𝑎𝑗𝑜 − 𝐸𝑙𝑒𝑣. 𝐼 𝑎𝑏𝑎𝑗𝑜)/2
(Ecuación 14)
Columna 5: Viviendas
Columna 6: Población
𝐻𝑎𝑏𝑖𝑡𝑎𝑛𝑡𝑒𝑠 = (#. 𝑉𝑖𝑣𝑖𝑒𝑛𝑑𝑎𝑠 𝑝𝑜𝑟 𝑡𝑟𝑎𝑚𝑜)(#. 𝐻𝑎𝑏𝑖𝑡𝑎𝑛𝑡𝑒𝑠 𝑝𝑜𝑟 𝑐𝑎𝑠𝑎) (Ecuación 16)
Es el caudal medio obtenido para realizar el estudio de caudales, calculado como el 80% de
retorno del caudal de diseño de agua potable.
14
𝑄𝑚𝑎𝑥 = 𝑄𝑚𝑒𝑑 × (1 + ( )) (Ecuación 3)
4+ 2√𝑝𝑜𝑏𝑙𝑎𝑐𝑖𝑜𝑛/1000
Caudal especial, está conformado por el caudal institucional, comercial y público, los cuales
suman un 9.58% de caudal medio.
El caudal de diseño (acumulado), es la suma de del tramo anterior con el siguiente en cada
tramo.
Cuando el caudal ajustado es menor de 1.5 lps se ajusta a este, ya que es el caudal mínimo
en tuberías para diseñar.
Las primeras cuatro columnas (columna 1 a Columna 4) de la tabla hidráulica son iguales a
las primeras cuatro columnas de las tablas anteriores.
Columna 7: S
Columna 8: Ф (m)
El radio hidráulico a tuvo lleno, debido a que está a tubo lleno se determina de la siguiente
manera:
Columna 17: 𝑉𝑑
𝑉𝑑
Velocidad de diseño, se determina a partir de la relación
𝑉𝑙𝑙
𝑉𝑑
𝑉𝑑 = (𝑉𝑙𝑙) × (𝑉𝑙𝑙) (Ecuación 26)
Relación de diámetros.
Columna 19: d
Diámetro de diseño, como el diámetro calculado es menor que el mínimo, se deja el
mínimo de las normas que es de 0.15 m.
Columna 20 Rh/RhII
Columna 21: 𝑅ℎ
Columna 22: Ƭ
7.3. Población.
Para la presente investigación se ha considerado que la población consiste en todos los
habitantes de los barrios Milagro de Dios y Vista Xolotlán.
7.4. Muestra
La muestra que se tomará será el 30% de las viviendas del barrio milagro de dios y Vistas
al Xolotlán, que corresponden a un total de 255 casas.
Google Earth: Software satelital empleado para ver la ubicación del local, conocer
latitud, longitud y altitud del sitio.
AutoCAD 2017: Software usado para la elaboración de los planos del sistema de
alcantarillado sanitarios.
Figura 3. Macro y Micro Localización del Barrio Milagro de Dios y Vistas al Xolotlán.
Fuente: Elaboración propia.
8.1.4. Clima.
En la ciudad de Managua las temperaturas en temporada de invierno varían entre los 22° C
y 30° C y en el verano se llega alcanzar los 38° C. Siendo estas temperaturas para los barrios
en estudio.
8.1.5. Transporte.
El servicio de transporte urbano colectivo que transita por las calles de los barrios Milagro de
Dios y Vista Xolotlán está conformado por los buses de las rutas 169 y 195 y otros medios
de transporte como las caponeras y taxis o moto- taxis.
8.1.6. Telecomunicaciones
Existen cuatro empresas privadas de telecomunicaciones que son Claro, Movistar, Yota y
Cootel.
Población.
Sistema Constructivo.
Tipos de Vivienda
Minifalda
Loseta 13%
Mediante la investigación de campo se pudo
Ripio 8%
observar que las viviendas suelen ser de 2%
Situación económica.
Como se aprecia en la gráfica el 41% de los pobladores siendo niños y adultos de la tercera
edad no trabaja y el 59% se encuentran actualmente activos, generando ingresos entre el
cual destaca el salario de menor a 5000 córdobas mensuales.
Como arrojan dichos datos con este ingreso se es muy difícil costear los gastos de canasta
básica la cual se cotiza en 12,763.8 córdobas según estadísticas del banco central de
Nicaragua.
Servicios básicos.
• Agua potable.
Ilustración 5. Registro de
servicio de agua potable.
Fuente: Elaboración propia.
• Alcantarillado Sanitario.
Deposicion de excretas
Actualmente los barrios Milagro de Dios y Vista
Sumidero
Xolotlán no cuentan con un sistema de 34%
alcantarillado sanitario, por lo que utilizan
letrinas o sumideros. El porcentaje de las Letrina
66%
viviendas que disponen de una letrina es mayor
ya que es un sistema de menor costo siendo Letrina Sumidero
más accesible para los bajos ingresos que
Ilustración 7. Deposición de excretas.
genera la población. Fuente: Elaboración propia.
Si No
Mientras que el 11% de la población respondió que no se conectarían debido a que cuenta
con sistemas como sumidero, en otros casos respondieron negativamente ya que a causa
de la mala situación económica no podrían costear los gastos que conllevarían la conexión
de sus viviendas al sistema de alcantarillado sanitario.
• Luz eléctrica.
Los barrios Milagro de Dios y Vista Xolotlán cuentan con el servicio de energía eléctrica a
cargo de DISNORTE-DISSUR, con una cobertura del 100%.
Obras existentes.
Centros de educación.
Iglesias.
El barrio Vista Xolotlán dispone de un tanque con una capacidad de 507,000 galones.
Para el diagnóstico del sistema de evacuación de aguas residuales existente en Los Barrios
Milagro de Dios y Vista Xolotlán, mediante investigaciones r e a l i z a d a s en campo, por
medio de una encuesta en la cual se obtuvo información detallada sobre el método que utilizan
los habitantes para la evacuación de aguas residuales.
En dicha encuesta se determinó que la técnica usada por los pobladores para desechar las
aguas grises es vertiéndolas a las calles, debido a esta mala práctica las calles se encuentran
en mal estado provocando socavación en el terreno y produciendo estancamientos siendo la
calle principal una de las más afectadas, también en algunos casos desvían las aguas grises
al cauce existente en el barrio Milagro de Dios.
Entre los sistemas más usados para la deposición de excretas son los sumideros y letrinas,
este segundo es el más usado en esta zona ya que no presenta un alto costo económico en
su construcción siendo el más accesible para los habitantes que cuentan con bajos ingresos
mensuales y no pueden costear la construcción de un sumidero.
Levantamiento Topográfico
El levantamiento topográfico para la realización de la Propuesta de diseño hidráulico del
sistema de alcantarillado sanitario para los barrios Milagro de Dios y Vista Xolotlán fue
proporcionado por la Alcaldía de Managua del distrito V, los cuales fueron realizados en el
año 2017 por el Ingeniero Levi Juárez.
Población Actual
Los datos de población actual fueron proporcionados por la Alcaldía de Managua del distrito
V (Ver anexo III). En los cuales se especifica un número de 684 casas para el barrio Milagro
de Dios y 561 casas totales para el barrio Vista Xolotlán. Cabe destacar que para esta
propuesta de diseño se tomaron 9 manzanas del barrio Vista Xolotlán que corresponde a
118 viviendas (dato el cual se obtuvo por conteo manual) las cuales son las afectadas ya que
no cuentan con sistema de alcantarillado sanitario. Según estas tablas la población actual
para el barrio Milagro de Dios es de 3,324 habitantes y para el barrio Vista Xolotlán es de
2,725 habitantes; para obtener el número de habitantes de las casas perjudicadas del Barrio
Vista Xolotlán se dedujo un índice de habitantes de 4.86 arrojado por la población actual de
este, de lo cual se obtuvo un total de habitantes de 573 para las 118 viviendas. En total
nuestra población actual es de 3897 habitantes.
Población de Saturación
Dotación
Punto de Descarga
La red está dirigida de sur a norte conduciendo las aguas a favor de la pendiente natural del
terreno para obtener un sistema por gravedad. El punto de conexión está ubicado en el barrio
Vista Xolotlán este pozo de visita (PVS) existente, tiene una profundidad total de 1.6m y la
tubería de salida existente es de 200mm (8”).
Columna 17: H
Columna 6: Población
14
𝑄𝑚𝑎𝑥 = 0.05 × (1 + ( )) = 0.24 𝑙𝑝𝑠
4 + 2√36/1000
Columna 7: S
1 2 1
𝑉𝑙𝑙 = × (0.0375) ⁄3 × (0.0402) ⁄2 = 2.4950𝑚/𝑠
0.009
𝑄𝑑𝑖𝑠𝑒ñ𝑜
= (1.50/1000)/(0.0441) = 0.03402
𝑄𝑙𝑙
Columna 17: 𝑉𝑑
𝑉𝑑 = (0.4644 × 2.4950) = 1.158𝑚/𝑠
Columna 19: d
𝑑 = (0.1262 × 0.15 × 100) = 1.893𝑚
Columna 21: Rh
𝑅ℎ = (0.3166 × 0.0375) = 0.0119𝑚
Columna 22: Ƭ
TABLA TOPOGRAFICA
PVS Longitud Elevación Terreno (m) Elevación Invert (m) S Tubería Movimiento de Tierra Pozos Movimiento de Tierra Zanjas
Tramo
PVS Ancho
DE A m Arriba Abajo PVS abajo m/m % PSV Hpozo Ø Vm³ Tramo Longitud (m) H V m³
arriba Zanja
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19
1 1 4 46.8 176.08 175.6 174.73 174.25 0.010 1.03 1 1.35 2.4 6.107 1 46.80 1.35 0.6 37.91
2 2 4 68.3 176.34 175.6 173.84 171.30 0.04 3.72 2 2.50 2.4 11.310 2 68.30 3.4 0.6 139.33
3 3 4 60.2 173.15 175.6 171.80 171.30 0.01 0.83 3 1.35 2.4 6.107 3 60.20 2.825 0.6 102.04
4 4 7 48.3 175.6 174.65 171.27 169.95 0.03 2.73 4 4.30 2.4 19.453 4 48.30 4.515 0.6 130.84
5 5 7 65.5 174.12 174.65 172.12 169.95 0.03 3.31 5 2.00 2.4 9.048 5 65.50 3.35 0.6 131.66
6 6 7 60.9 172.91 174.65 171.56 169.95 0.03 2.64 6 1.35 2.4 6.107 6 60.90 3.025 0.6 110.53
7 8 10 62.7 174.3 171.69 172.30 169.49 0.04 4.48 7 4.70 2.4 21.262 7 62.70 2.1 0.6 79.00
8 9 10 61.3 171.7 171.69 170.35 169.49 0.01 1.40 8 2.00 2.4 9.048 8 61.30 1.775 0.6 65.28
9 7 10 48.1 174.65 171.69 169.92 169.49 0.01 0.89 9 1.35 2.4 6.107 9 48.10 3.465 0.6 100.00
10 10 13 22.3 171.69 171.37 169.46 168.67 0.04 3.54 10 2.20 2.4 9.953 10 22.30 2.465 0.6 32.98
11 11 12 29.4 170.85 170.96 169.50 168.96 0.02 1.84 11 1.35 2.4 6.107 11 29.40 1.675 0.6 29.55
12 12 13 31.9 170.96 171.37 168.93 168.67 0.01 0.82 12 2.00 2.4 9.048 12 31.90 2.365 0.6 45.27
13 13 16 40.4 171.37 169.84 168.64 167.84 0.02 1.98 13 2.70 2.4 12.215 13 40.40 2.365 0.6 57.33
14 14 16 63.2 170.26 169.84 168.91 167.84 0.02 1.69 14 1.35 2.4 6.107 14 63.20 1.675 0.6 63.52
15 15 16 55.4 170.9 169.84 169.55 167.84 0.03 3.09 15 1.35 2.4 6.107 15 55.40 1.675 0.6 55.68
16 16 18 47.4 169.84 168.04 167.81 166.69 0.02 2.36 16 2.00 2.4 9.048 16 47.40 1.69 0.6 48.06
17 17 18 62.3 170.43 168.04 168.43 166.69 0.03 2.79 17 2.00 2.4 9.048 17 62.30 1.675 0.6 62.61
18 18 19 23.4 168.04 168.37 166.66 166.37 0.01 1.24 18 1.35 2.4 6.107 18 23.4 1.69 0.6 23.73
19 19 20 22.4 168.37 168.17 166.34 166.17 0.01 0.76 19 2.00 2.4 9.048 19 22.4 2.015 0.6 27.08
20 20 23 9.8 168.17 168.31 166.14 165.81 0.03 3.37 20 2.00 2.4 9.048 20 9.8 2.265 0.6 13.32
21 21 22 62.8 168.69 168.13 167.34 166.78 0.01 0.89 21 1.35 2.4 6.107 21 62.8 1.35 0.6 50.87
22 22 23 58.4 168.13 168.31 166.75 165.81 0.02 1.61 22 1.35 2.4 6.107 22 58.4 1.94 0.6 67.98
23 23 27 36.8 168.31 167.6 165.78 165.40 0.01 1.03 23 2.50 2.4 11.310 23 36.8 2.365 0.6 52.22
24 24 26 55.2 170.59 168.14 168.09 165.79 0.04 4.17 24 2.50 2.4 11.310 24 55.2 2.425 0.6 80.32
TABLA TOPOGRAFICA
PVS Longitud Elevacion Terreno (m) Elevacion Invert (m) S Tuberia Movimiento de Tierra Pozos Movimiento de Tierra Zanjas
Tramo
Ancho
DE A m Arriba Abajo PVS arriba PVS abajo m/m % PSV Hpozo Ø Vm³ Tramo Longitud (m) H V m³
Zanja
C. C.
C. 1 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19
2 3
25 25 26 41 167.41 168.14 166.06 165.79 0.01 0.66 25 1.35 2.4 6.107 25 41 1.85 0.6 45.51
26 26 27 55.7 168.14 167.6 165.76 165.40 0.01 0.65 26 2.30 2.4 10.405 26 55.7 2.29 0.6 76.53
27 28 29 68.5 168.08 167.67 166.73 166.32 0.01 0.60 27 2.20 2.4 9.953 27 68.5 1.35 0.6 55.48
28 29 30 68.5 167.67 167.2 166.29 164.70 0.02 2.32 28 1.35 2.4 6.107 28 68.5 1.94 0.6 79.73
29 27 30 15.5 167.6 167.2 165.37 164.70 0.04 4.32 29 1.35 2.4 6.107 29 15.5 2.365 0.6 21.99
30 30 32 33.8 167.2 168.02 164.67 164.02 0.02 1.92 30 2.50 2.4 11.310 30 33.8 3.265 0.6 66.21
31 31 32 51.7 166.07 168.02 164.72 163.02 0.03 3.29 31 1.35 2.4 6.107 31 51.7 3.175 0.6 98.49
32 33 35 52.2 164.85 166.56 163.50 162.56 0.02 1.80 32 5.00 2.4 22.619 32 52.2 2.675 0.6 83.78
33 34 35 43.8 168.37 166.56 163.87 162.56 0.03 2.99 33 1.35 2.4 6.107 33 43.8 4.25 0.6 111.69
34 35 37 48.1 164.15 163.34 162.53 161.99 0.01 1.12 34 4.50 2.4 20.358 34 48.1 1.485 0.6 42.86
35 36 37 60.3 164.2 163.34 162.85 161.99 0.01 1.43 35 4.00 2.4 18.096 35 60.3 1.35 0.6 48.84
36 37 41 55.8 163.34 164.44 161.96 160.64 0.02 2.37 36 1.35 2.4 6.107 36 55.8 2.59 0.6 86.71
37 32 40 17.3 168.02 165 162.99 162.70 0.02 1.68 37 1.35 2.4 6.107 37 17.3 3.665 0.6 38.04
38 38 39 66.9 165.34 164.98 163.99 163.63 0.01 0.54 38 1.35 2.4 6.107 38 66.9 1.35 0.6 54.19
39 39 40 80 164.98 165 163.60 162.20 0.02 1.75 39 1.35 2.4 6.107 39 80 2.09 0.6 100.32
40 40 41 32.8 165 164.44 162.17 161.44 0.02 2.23 40 2.80 2.4 12.667 40 32.8 2.915 0.6 57.37
41 42 43 95.3 163.87 162.98 162.52 161.63 0.01 0.93 41 3.80 2.4 17.191 41 95.3 1.35 0.6 77.19
42 43 44 54.6 162.98 162.99 161.60 159.99 0.03 2.95 42 1.35 2.4 6.107 42 54.6 2.19 0.6 71.74
43 41 44 15.8 164.44 162.99 160.61 159.99 0.04 3.92 43 1.35 2.4 6.107 43 15.8 3.415 0.6 32.37
44 44 48 34 162.99 160.85 159.96 159.50 0.01 1.35 44 3.00 2.4 13.572 44 34 2.19 0.6 44.68
45 45 47 56.8 162.78 161.63 161.43 160.28 0.02 2.02 45 1.35 2.4 6.107 45 56.8 1.35 0.6 46.01
46 46 47 47.2 163.7 161.63 161.70 160.28 0.03 3.01 46 2.00 2.4 9.048 46 47.2 1.675 0.6 47.44
47 47 48 68.5 161.63 160.85 160.25 158.35 0.03 2.77 47 1.35 2.4 6.107 47 68.5 1.94 0.6 79.73
48 49 50 70.9 159.81 159.44 158.46 158.09 0.01 0.52 48 2.50 2.4 11.310 48 70.9 1.35 0.6 57.43
TABLA TOPOGRAFICA
PVS Longitud Elevación Terreno (m) Elevación Invert (m) S Tubería Movimiento de Tierra Pozos Movimiento de Tierra Zanjas
Tramo
Ancho
DE A m Arriba Abajo PVS arriba PVS abajo m/m % PSV Hpozo Ø Vm³ Tramo Longitud (m) H V m³
Zanja
C. C.
C. 1 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19
2 3
49 50 51 78 159.44 159.25 158.06 157.55 0.01 0.65 49 1.35 2.4 6.107 49 78 1.54 0.6 72.07
50 48 51 16.4 160.85 159.25 158.35 157.90 0.03 2.74 50 1.35 2.4 6.107 50 16.4 1.925 0.6 18.94
51 51 57 32.1 159.25 157.72 157.52 156.37 0.04 3.58 51 1.70 2.4 7.691 51 32.1 1.54 0.6 29.66
52 52 54 60.5 160.67 159.83 159.32 157.83 0.02 2.46 52 1.35 2.4 6.107 52 60.5 1.675 0.6 60.80
53 53 54 42.7 161.56 159.83 159.56 157.83 0.04 4.05 53 2.00 2.4 9.048 53 42.7 2 0.6 51.24
54 54 57 77.9 159.83 157.72 157.80 155.97 0.02 2.35 54 2.00 2.4 9.048 54 77.9 1.89 0.6 88.34
55 55 56 52.4 158.49 157.78 157.14 156.43 0.01 1.35 55 1.35 2.4 6.107 55 52.4 1.35 0.6 42.44
56 56 57 72.9 157.78 157.72 156.40 155.97 0.01 0.59 56 1.35 2.4 6.107 56 72.9 1.565 0.6 68.45
57 58 60 60.7 157.69 157.15 156.34 155.80 0.01 0.89 57 1.75 2.4 7.917 57 60.7 1.35 0.6 49.17
58 59 60 47.6 159.8 157.15 156.30 155.80 0.01 1.05 58 1.35 2.4 6.107 58 47.6 2.425 0.6 69.26
59 60 63 70.2 157.15 156.41 155.77 153.61 0.03 3.08 59 3.50 2.4 15.834 59 70.2 2.09 0.6 88.03
60 61 62 54.7 158.19 157.11 156.84 155.76 0.02 1.97 60 1.35 2.4 6.107 60 54.7 1.35 0.6 44.31
61 62 63 81.6 157.11 156.41 155.73 153.61 0.03 2.60 61 1.35 2.4 6.107 61 81.6 2.09 0.6 102.33
62 64 66 59.9 155.05 154.95 153.70 152.95 0.01 1.25 62 1.35 2.4 6.107 62 59.9 1.675 0.6 60.20
63 65 66 46.3 157.23 154.95 154.73 152.95 0.04 3.84 63 2.80 2.4 12.667 63 46.3 2.25 0.6 62.51
64 66 69 70.8 154.95 154.59 152.92 151.79 0.02 1.60 64 1.35 2.4 6.107 64 70.8 2.415 0.6 102.59
65 67 68 79.1 154.78 153.58 153.43 152.23 0.02 1.52 65 2.50 2.4 11.310 65 79.1 1.35 0.6 64.07
66 68 69 59.3 153.58 154.59 152.20 151.79 0.01 0.69 66 2.00 2.4 9.048 66 59.3 2.09 0.6 74.36
67 63 69 47.6 156.41 154.59 153.58 151.79 0.04 3.76 67 1.35 2.4 6.107 67 47.6 2.815 0.6 80.40
68 57 63 51.7 157.72 156.41 155.97 155.06 0.02 1.76 68 1.35 2.4 6.107 68 51.7 1.55 0.6 48.08
69 69 75 48.7 154.59 152.08 151.76 150.08 0.03 3.45 69 2.80 2.4 12.667 69 48.7 2.415 0.6 70.57
70 70 72 61.1 153.09 152.58 151.74 151.23 0.01 0.83 70 1.35 2.4 6.107 70 61.1 1.35 0.6 49.49
71 71 72 39.3 154.35 152.58 152.35 151.23 0.03 2.85 71 2.00 2.4 9.048 71 39.3 1.675 0.6 39.50
72 72 75 72.4 152.58 152.08 151.20 150.08 0.02 1.55 72 1.35 2.4 6.107 72 72.4 1.69 0.6 73.41
TABLA TOPOGRAFICA
PVS Longitud Elevación Terreno (m) Elevación Invert (m) S Tubería Movimiento de Tierra Pozos Movimiento de Tierra Zanjas
Tramo
PVS Ancho
DE A m Arriba Abajo PVS abajo m/m % PSV Hpozo Ø Vm³ Tramo Longitud (m) H V m³
arriba Zanja
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19
73 73 74 71 152.68 152.56 151.33 150.56 0.01 1.08 73 1.35 2.4 6.107 73 71 1.675 0.6 71.35
74 74 75 58 152.56 152.08 150.53 150.08 0.01 0.78 74 2.00 2.4 9.048 74 58 2.015 0.6 70.12
75 75 82 52.7 152.08 150.55 150.05 148.05 0.04 3.80 75 2.00 2.4 9.048 75 52.7 2.265 0.6 71.62
76 76 77 61.2 151.91 151.45 150.56 149.95 0.01 1.00 76 1.35 2.4 6.107 76 61.2 1.425 0.6 52.33
77 77 79 6 151.45 151.56 149.92 149.76 0.03 2.67 77 1.50 2.4 6.786 77 6 1.665 0.6 5.99
78 78 79 40.1 152.46 151.56 151.11 149.76 0.03 3.37 78 1.35 2.4 6.107 78 40.1 1.575 0.6 37.89
79 79 82 69.7 151.56 149.95 149.73 147.45 0.03 3.27 79 1.80 2.4 8.143 79 69.7 2.165 0.6 90.54
80 80 81 75.6 152.98 151.45 151.63 150.10 0.02 2.02 80 1.35 2.4 6.107 80 75.6 1.35 0.6 61.24
81 81 82 54.1 151.45 149.95 150.07 148.60 0.03 2.72 81 1.35 2.4 6.107 81 54.1 1.365 0.6 44.31
82 82 85 30.5 149.95 148.2 147.42 146.20 0.04 4.00 82 2.50 2.4 11.310 82 30.5 2.265 0.6 41.45
83 83 84 68.2 151.98 150.06 150.63 148.71 0.03 2.82 83 1.35 2.4 6.107 83 68.2 1.35 0.6 55.24
84 84 85 62.8 150.06 148.2 148.68 146.20 0.04 3.95 84 1.35 2.4 6.107 84 62.8 1.69 0.6 63.68
85 85 88 59.3 148.2 147.78 146.17 144.28 0.03 3.19 85 2.00 2.4 9.048 85 59.3 2.765 0.6 98.38
86 86 87 71.2 148.09 147.02 146.74 145.67 0.02 1.50 86 1.35 2.4 6.107 86 71.2 1.35 0.6 57.67
87 87 88 59.5 147.02 147.78 145.64 144.28 0.02 2.29 87 1.35 2.4 6.107 87 59.5 2.44 0.6 87.11
88 88 94 68 147.78 145.03 144.25 141.23 0.04 4.44 88 3.50 2.4 15.834 88 68 3.665 0.6 149.53
89 89 91 49 147.89 147.97 146.54 145.97 0.01 1.16 89 1.35 2.4 6.107 89 49 1.675 0.6 49.24
90 90 91 56.4 148.16 147.97 143.97 143.47 0.01 0.89 90 2 2.4 9.048 90 56.4 4.345 0.6 147.03
91 91 93 41.6 147.97 146.2 143.44 141.7 0.04 4.18 91 4.5 2.4 20.358 91 41.6 4.515 0.6 112.69
92 92 93 53.5 146.94 147.8 145.59 143.3 0.04 4.28 92 1.35 2.4 6.107 92 53.5 2.925 0.6 93.89
93 93 94 42.35 147.8 145.03 143.27 142.53 0.02 1.75 93 4.5 2.4 20.358 93 42.35 3.515 0.6 89.32
94 94 98 53.3 145.03 140.91 141.2 139.56 0.03 3.08 94 3.8 2.4 17.191 94 53.3 2.59 0.6 82.83
95 95 97 84.4 145.83 145.34 144.48 142.54 0.02 2.30 95 1.35 2.4 6.107 95 84.4 2.075 0.6 105.08
96 96 97 42.8 145.34 144.67 142.51 141.87 0.01 1.50 96 1.35 2.4 6.107 96 42.8 2.815 0.6 72.29
TABLA TOPOGRAFICA
PVS Longitud Elevación Terreno (m) Elevación Invert (m) S Tubería Movimiento de Tierra Pozos Movimiento de Tierra Zanjas
Tramo
PVS Ancho
DE A m Arriba Abajo PVS abajo m/m % PSV Hpozo Ø Vm³ Tramo Longitud (m) H V m³
arriba Zanja
C.
C. 1 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19
2
97 97 98 65.16 144.67 140.91 141.84 139.56 0.03 3.50 97 2.8 2.4 12.667 97 65.16 2.09 0.6 81.71
Pozo
98 98 51.6 140.88 139.98 139.53 138.38 0.02 2.23 98 1.35 2.4 6.107 98 51.6 1.475 0.6 45.67
Existente
TABLA DE CAUDALES
POZOS DE VISITA LONGITUD POBLACION Qmed Qmax Qinf Qesp Qdis.
TRAMO VIVIENDAS Qajustado
DE A (m) Hab. lps lps lps lps Tramo acumulado
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13
POZOS DE VISITA LONGITUD VIVIENDAS POBLACION Qmed Qmax Qinf Qesp Qdis.
TRAMO Qajustado
DE A (m) Hab. lps lps lps lps Tramo acumulado
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13
Elevacion Elevación
PVS Longitud Pendiente (s) Ф All Rhll Vll Qll Vd d Rh Ƭ
invert arriba invert abajo
Tramo Qd/Qll Vd/Vll d/D Rh/RH Q ajustado
de a (m) (msnm) (msnm) m/m (m) (pulg) (m2) (m) (m/s) (m3/s) (m/s) (m) (m) (pa)
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19 C. 20 C. 21 C. 22
1 1 4 46.80 174.73 174.25 0.0103 0.15 6 0.0177 0.0375 1.2607 0.0223 0.0673 0.5695 0.7180 0.176 2.6366 0.4295 0.0161 1.621 1.50
2 2 4 68.30 173.84 171.30 0.0372 0.15 6 0.0177 0.0375 2.4006 0.0424 0.0354 0.4698 1.1278 0.129 1.9305 0.3225 0.0121 4.412 1.50
3 3 4 60.20 171.80 171.30 0.0083 0.15 6 0.0177 0.0375 1.1345 0.0200 0.0748 0.5872 0.6662 0.185 2.7765 0.4502 0.0169 1.376 1.50
4 4 7 48.30 171.27 169.95 0.0273 0.15 6 0.0177 0.0375 2.0579 0.0364 0.0412 0.4920 1.0125 0.139 2.0775 0.3453 0.0129 3.472 1.50
5 5 7 65.50 172.12 169.95 0.0331 0.15 6 0.0177 0.0375 2.2658 0.0400 0.0375 0.4787 1.0846 0.132 1.9845 0.3308 0.0124 4.032 1.50
6 6 7 60.90 171.56 169.95 0.0264 0.15 6 0.0177 0.0375 2.0240 0.0358 0.0419 0.4943 1.0005 0.14 2.0955 0.3482 0.0131 3.386 1.50
7 8 10 62.70 172.30 169.49 0.0448 0.15 6 0.0177 0.0375 2.6353 0.0466 0.0322 0.4569 1.2041 0.123 1.8480 0.3511 0.0132 5.789 1.50
8 9 10 61.30 170.35 169.49 0.0140 0.15 6 0.0177 0.0375 1.4745 0.0261 0.0576 0.5446 0.8030 0.163 2.4390 0.4007 0.0150 2.068 1.50
9 7 10 48.10 169.92 169.49 0.0089 0.15 6 0.0177 0.0375 1.1770 0.0208 0.0721 0.5805 0.6832 0.182 2.7270 0.4425 0.0166 1.455 1.50
10 10 13 22.30 169.46 168.67 0.0354 0.15 6 0.0177 0.0375 2.3430 0.0414 0.0362 0.4734 1.1092 0.13 1.9530 0.3254 0.0122 4.241 1.50
11 11 12 29.40 169.50 168.96 0.0184 0.15 6 0.0177 0.0375 1.6871 0.0298 0.0503 0.5219 0.8805 0.153 2.2875 0.3787 0.0142 2.559 1.50
12 12 13 31.90 168.93 168.67 0.0082 0.15 6 0.0177 0.0375 1.1238 0.0199 0.0755 0.5888 0.6617 0.186 2.7885 0.4518 0.0169 1.355 1.50
13 13 16 40.40 168.64 167.84 0.0198 0.15 6 0.0177 0.0375 1.7517 0.0310 0.0485 0.5162 0.9042 0.15 2.2440 0.3710 0.0139 2.703 1.50
14 14 16 63.20 168.91 167.84 0.0169 0.15 6 0.0177 0.0375 1.6197 0.0286 0.0524 0.5281 0.8554 0.156 2.3340 0.3841 0.0144 2.392 1.50
15 15 16 55.40 169.55 167.84 0.0309 0.15 6 0.0177 0.0375 2.1870 0.0386 0.0388 0.4830 1.0563 0.135 2.0175 0.3360 0.0126 3.815 1.50
16 16 18 47.40 167.81 166.69 0.0236 0.15 6 0.0177 0.0375 1.9135 0.0338 0.0444 0.5031 0.9627 0.144 2.1525 0.3568 0.0134 3.101 1.50
17 17 18 62.30 168.43 166.69 0.0279 0.15 6 0.0177 0.0375 2.0804 0.0368 0.0408 0.4906 1.0206 0.138 2.0670 0.3436 0.0129 3.530 1.50
18 18 19 23.40 166.66 166.37 0.0124 0.15 6 0.0177 0.0375 1.3858 0.0245 0.0613 0.5537 0.7673 0.168 2.5185 0.4117 0.0154 1.877 1.50
19 19 20 22.40 166.34 166.17 0.0076 0.15 6 0.0177 0.0375 1.0845 0.0192 0.0783 0.5956 0.6459 0.189 2.8395 0.4599 0.0172 1.284 1.50
20 20 23 9.80 166.14 165.81 0.0337 0.15 6 0.0177 0.0375 2.2843 0.0404 0.0440 0.5279 1.2059 0.155 2.3310 0.3839 0.0144 4.756 1.78
21 21 22 62.80 167.34 166.78 0.0089 0.15 6 0.0177 0.0375 1.1755 0.0208 0.0722 0.5808 0.6827 0.182 2.7285 0.4427 0.0166 1.452 1.50
22 22 23 58.40 166.75 165.81 0.0161 0.15 6 0.0177 0.0375 1.5793 0.0279 0.0537 0.5326 0.8411 0.157 2.3610 0.3886 0.0146 2.301 1.50
23 23 27 36.80 165.78 165.40 0.0103 0.15 6 0.0177 0.0375 1.2650 0.0224 0.0807 0.6349 0.8031 0.211 3.1635 0.5059 0.0190 1.922 1.80
Elevación Elevación
Pendiente
PVS Longitud invert invert Ф All Rhll Vll Qll Vd d Rh Ƭ
(s)
Tramo arriba abajo Qd/Qll Vd/Vll d/D Rh/RH Q ajustado
de a (m) (msnm) (msnm) m/m (m) (pulg) (m2) (m) (m/s) (m3/s) (m/s) (m) (m) (pa)
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19 C. 20 C. 21 C. 22
24 24 26 55.20 168.09 165.79 0.0417 0.15 6 0.0177 0.0375 2.5410 0.0449 0.0334 0.4619 1.1737 0.125 1.8780 0.3139 0.0118 4.811 1.50
25 25 26 41.00 166.06 165.79 0.0066 0.15 6 0.0177 0.0375 1.0102 0.0179 0.0840 0.6078 0.6140 0.196 2.9385 0.4737 0.0178 1.148 1.50
26 26 27 55.70 165.76 165.40 0.0065 0.15 6 0.0177 0.0375 1.0008 0.0177 0.0848 0.6094 0.6099 0.197 2.9520 0.4756 0.0178 1.131 1.50
27 28 29 68.50 166.73 166.32 0.0060 0.15 6 0.0177 0.0375 0.9631 0.0170 0.0881 0.6361 0.6126 0.201 3.0090 0.4834 0.0181 1.064 1.50
28 29 30 68.50 166.29 164.70 0.0232 0.15 6 0.0177 0.0375 1.8966 0.0335 0.0448 0.5043 0.9564 0.144 2.1630 0.3584 0.0134 3.060 1.50
29 27 30 15.50 165.37 164.70 0.0432 0.15 6 0.0177 0.0375 2.5881 0.0457 0.0444 0.5301 1.3720 0.158 2.3700 0.3861 0.0145 6.140 2.03
30 30 32 33.80 164.67 164.02 0.0192 0.15 6 0.0177 0.0375 1.7263 0.0305 0.0675 0.5244 0.9053 0.154 2.3055 0.3802 0.0143 2.690 2.06
31 31 32 51.70 164.72 163.02 0.0329 0.15 6 0.0177 0.0375 2.2573 0.0399 0.0376 0.4790 1.0813 0.133 1.9875 0.3313 0.0124 4.008 1.50
32 33 35 52.20 163.50 162.56 0.0180 0.15 6 0.0177 0.0375 1.6705 0.0295 0.0508 0.5235 0.8745 0.153 2.2980 0.3791 0.0142 2.511 1.50
33 34 35 43.80 163.87 162.56 0.0299 0.15 6 0.0177 0.0375 2.1528 0.0380 0.0394 0.4850 1.0441 0.136 2.0325 0.3380 0.0127 3.719 1.50
34 35 37 48.10 162.53 161.99 0.0112 0.15 6 0.0177 0.0375 1.3190 0.0233 0.0644 0.5620 0.7413 0.172 2.5800 0.4210 0.0158 1.739 1.50
35 36 37 60.30 162.85 161.99 0.0143 0.15 6 0.0177 0.0375 1.4866 0.0263 0.0571 0.5424 0.8063 0.162 2.4315 0.3993 0.0150 2.095 1.50
36 37 41 55.80 161.96 160.64 0.0237 0.15 6 0.0177 0.0375 1.9146 0.0338 0.0443 0.5028 0.9627 0.143 2.1510 0.3565 0.0134 3.102 1.50
37 32 40 17.30 162.99 162.28 0.0410 0.15 6 0.0177 0.0375 2.5218 0.0446 0.0534 0.5561 1.4024 0.169 2.5365 0.4147 0.0156 6.261 2.38
38 38 39 66.90 163.99 163.63 0.0054 0.15 6 0.0177 0.0375 0.9132 0.0161 0.0930 0.6699 0.6117 0.176 2.6400 0.5950 0.0223 1.178 1.50
39 39 40 80.00 163.60 162.28 0.0165 0.15 6 0.0177 0.0375 1.5990 0.0283 0.0531 0.5304 0.8481 0.157 2.3490 0.3864 0.0145 2.345 1.50
40 40 41 32.80 162.25 160.64 0.0491 0.15 6 0.0177 0.0375 2.7580 0.0487 0.0556 0.5585 1.5403 0.17 2.5545 0.4175 0.0157 7.539 2.71
41 42 43 95.30 162.52 161.63 0.0093 0.15 6 0.0177 0.0375 1.2030 0.0213 0.0706 0.5768 0.6939 0.18 2.6985 0.4387 0.0165 1.507 1.50
42 43 44 54.60 161.60 159.99 0.0295 0.15 6 0.0177 0.0375 2.1376 0.0378 0.0397 0.4860 1.0389 0.136 2.0400 0.3390 0.0127 3.677 1.50
43 41 44 15.80 160.61 159.99 0.0392 0.15 6 0.0177 0.0375 2.4659 0.0436 0.0701 0.5915 1.4586 0.187 2.8095 0.4545 0.0170 6.561 3.06
44 44 48 34.00 159.96 158.32 0.0482 0.15 6 0.0177 0.0375 2.7340 0.0483 0.0640 0.5761 1.5750 0.179 2.6910 0.4374 0.0164 7.761 3.09
45 45 47 56.80 161.43 160.28 0.0202 0.15 6 0.0177 0.0375 1.7713 0.0313 0.0479 0.5146 0.9115 0.149 2.2320 0.3690 0.0138 2.748 1.50
46 46 47 47.20 161.70 160.28 0.0301 0.15 6 0.0177 0.0375 2.1592 0.0382 0.0393 0.4847 1.0465 0.135 2.0295 0.3377 0.0127 3.737 1.50
47 47 48 68.50 160.25 158.32 0.0282 0.15 6 0.0177 0.0375 2.0895 0.0369 0.0406 0.4898 1.0234 0.138 2.0625 0.3428 0.0129 3.553 1.50
Elevación Elevación
Pendiente
PVS Longitud invert invert Ф All Rhll Vll Qll Vd d Rh Ƭ
(s)
Tramo arriba abajo Qd/Qll Vd/Vll d/D Rh/RH Q ajustado
de a (m) (msnm) (msnm) m/m (m) (pulg) (m2) (m) (m/s) (m3/s) (m/s) (m) (m) (pa)
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19 C. 20 C. 21 C. 22
48 49 50 70.90 158.46 158.04 0.0059 0.15 6 0.0177 0.0375 0.9581 0.0169 0.0886 0.6392 0.6124 0.201 3.0165 0.4848 0.0182 1.056 1.50
49 50 51 78.00 158.01 157.58 0.0055 0.15 6 0.0177 0.0375 0.9243 0.0163 0.0918 0.6499 0.6007 0.205 3.0705 0.5823 0.0218 1.181 1.50
50 48 51 16.40 158.32 157.58 0.0451 0.15 6 0.0177 0.0375 2.6443 0.0467 0.0784 0.6076 1.6067 0.196 2.9370 0.4734 0.0178 7.858 3.67
51 51 57 32.10 157.55 155.97 0.0492 0.15 6 0.0177 0.0375 2.7618 0.0488 0.0755 0.6014 1.6609 0.193 2.8905 0.4664 0.0175 8.445 3.68
52 52 54 60.50 159.32 157.83 0.0246 0.15 6 0.0177 0.0375 1.9536 0.0345 0.0435 0.5003 0.9774 0.142 2.1330 0.3534 0.0133 3.202 1.50
53 53 54 42.70 159.56 157.83 0.0405 0.15 6 0.0177 0.0375 2.5057 0.0443 0.0339 0.4640 1.1626 0.126 1.8900 0.3160 0.0119 4.710 1.50
54 54 57 77.90 157.80 155.97 0.0235 0.15 6 0.0177 0.0375 1.9080 0.0337 0.0445 0.5034 0.9605 0.144 2.1555 0.3572 0.0134 3.087 1.50
55 55 56 52.40 157.14 156.43 0.0135 0.15 6 0.0177 0.0375 1.4490 0.0256 0.0586 0.5483 0.7945 0.164 2.4645 0.4037 0.0151 2.012 1.50
56 56 57 72.90 156.40 155.97 0.0059 0.15 6 0.0177 0.0375 0.9561 0.0169 0.0888 0.6277 0.6001 0.201 3.0195 0.4853 0.0182 1.053 1.50
57 58 60 60.70 156.34 155.80 0.0089 0.15 6 0.0177 0.0375 1.1741 0.0207 0.0723 0.5810 0.6822 0.182 2.7300 0.4430 0.0166 1.450 1.50
58 59 60 47.60 156.30 155.80 0.0105 0.15 6 0.0177 0.0375 1.2758 0.0225 0.0665 0.5673 0.7238 0.175 2.6205 0.4273 0.0160 1.651 1.50
59 60 63 70.20 155.77 153.61 0.0308 0.15 6 0.0177 0.0375 2.1836 0.0386 0.0389 0.4833 1.0553 0.135 2.0205 0.3363 0.0126 3.807 1.50
60 61 62 54.70 156.84 155.76 0.0197 0.15 6 0.0177 0.0375 1.7492 0.0309 0.0485 0.5162 0.9029 0.15 2.2440 0.3710 0.0139 2.695 1.50
61 62 63 81.60 155.73 153.61 0.0260 0.15 6 0.0177 0.0375 2.0065 0.0355 0.0423 0.4958 0.9948 0.14 2.1045 0.3496 0.0131 3.341 1.50
62 64 66 59.90 153.70 152.95 0.0125 0.15 6 0.0177 0.0375 1.3929 0.0246 0.0609 0.5540 0.7717 0.168 2.5200 0.4120 0.0155 1.898 1.50
63 65 66 46.30 154.73 152.95 0.0384 0.15 6 0.0177 0.0375 2.4408 0.0431 0.0348 0.4673 1.1406 0.128 1.9140 0.3201 0.0120 4.527 1.50
64 66 69 70.80 152.92 151.79 0.0160 0.15 6 0.0177 0.0375 1.5727 0.0278 0.0540 0.5336 0.8392 0.158 2.3685 0.3896 0.0146 2.288 1.50
65 67 68 79.10 153.43 152.23 0.0152 0.15 6 0.0177 0.0375 1.5333 0.0271 0.0554 0.5359 0.8217 0.16 2.3985 0.3937 0.0148 2.197 1.50
66 68 69 59.30 152.20 151.79 0.0069 0.15 6 0.0177 0.0375 1.0351 0.0183 0.0820 0.6033 0.6245 0.194 2.9040 0.4683 0.0176 1.191 1.50
67 63 69 47.60 153.58 151.79 0.0376 0.15 6 0.0177 0.0375 2.4140 0.0427 0.1173 0.6683 1.6133 0.23 3.4530 0.5483 0.0206 7.585 5.01
68 57 63 51.70 155.97 153.61 0.0456 0.15 6 0.0177 0.0375 2.6596 0.0470 0.0886 0.6242 1.6601 0.205 3.0765 0.4932 0.0185 8.282 4.16
69 69 75 48.70 151.76 150.08 0.0345 0.15 6 0.0177 0.0375 2.3121 0.0409 0.1234 0.6813 1.5752 0.238 3.5730 0.5624 0.0211 7.137 5.04
70 70 72 61.10 151.74 151.23 0.0083 0.15 6 0.0177 0.0375 1.1373 0.0201 0.0746 0.5866 0.6671 0.185 2.7720 0.4496 0.0169 1.381 1.50
71 71 72 39.30 152.35 151.23 0.0285 0.15 6 0.0177 0.0375 2.1015 0.0371 0.0404 0.4889 1.0274 0.137 2.0580 0.3419 0.0128 3.584 1.50
72 72 75 72.40 151.20 150.08 0.0155 0.15 6 0.0177 0.0375 1.5483 0.0274 0.0548 0.5360 0.8299 0.159 2.3850 0.3920 0.0147 2.231 1.50
Elevación Elevación
Pendiente
PVS Longitud invert invert Ф All Rhll Vll Qll Vd d Rh Ƭ
(s)
Tramo arriba abajo Qd/Qll Vd/Vll d/D Rh/RH Q ajustado
de a (m) (msnm) (msnm) m/m (m) (pulg) (m2) (m) (m/s) (m3/s) (m/s) (m) (m) (pa)
C. 1 C. 2 C. 3 C. 4 C. 5 C. 6 C. 7 C. 8 C. 9 C. 10 C. 11 C. 12 C. 13 C. 14 C. 15 C. 16 C. 17 C. 18 C. 19 C. 20 C. 21 C. 22
73 73 74 71.00 151.33 150.56 0.0108 0.15 6 0.0177 0.0375 1.2964 0.0229 0.0655 0.5648 0.7322 0.173 2.6010 0.4244 0.0159 1.693 1.50
74 74 75 58.00 150.53 150.08 0.0078 0.15 6 0.0177 0.0375 1.0965 0.0194 0.0774 0.5935 0.6508 0.188 2.8230 0.4566 0.0171 1.303 1.50
75 75 82 52.70 150.05 147.45 0.0493 0.15 6 0.0177 0.0375 2.7650 0.0489 0.1148 0.6600 1.8249 0.226 3.3840 0.5362 0.0201 9.732 5.61
76 76 77 61.20 150.56 149.95 0.0100 0.15 6 0.0177 0.0375 1.2428 0.0220 0.0683 0.5720 0.7109 0.177 2.6550 0.4320 0.0162 1.584 1.50
77 77 79 6.00 149.92 149.76 0.0267 0.15 6 0.0177 0.0375 2.0328 0.0359 0.0418 0.4910 0.9981 0.138 2.0700 0.3440 0.0129 3.375 1.50
78 78 79 40.10 151.11 149.76 0.0337 0.15 6 0.0177 0.0375 2.2841 0.0404 0.0372 0.4776 1.0909 0.132 1.9770 0.3296 0.0124 4.082 1.50
79 79 82 69.70 149.73 147.45 0.0327 0.15 6 0.0177 0.0375 2.2515 0.0398 0.0377 0.4793 1.0791 0.133 1.9905 0.3317 0.0124 3.992 1.50
80 80 81 75.60 151.63 150.10 0.0202 0.15 6 0.0177 0.0375 1.7709 0.0313 0.0479 0.5146 0.9113 0.149 2.2320 0.3690 0.0138 2.747 1.50
81 81 82 54.10 150.07 147.45 0.0484 0.15 6 0.0177 0.0375 2.7395 0.0484 0.0310 0.4518 1.2377 0.121 1.8105 0.3038 0.0114 5.412 1.50
82 82 85 30.50 147.42 146.20 0.0400 0.15 6 0.0177 0.0375 2.4897 0.0440 0.1393 0.6963 1.7336 0.248 3.7125 0.5658 0.0212 8.326 6.13
83 83 84 68.20 150.63 148.71 0.0282 0.15 6 0.0177 0.0375 2.0887 0.0369 0.0406 0.4898 1.0230 0.138 2.0625 0.2665 0.0100 2.760 1.50
84 84 85 62.80 148.68 146.20 0.0395 0.15 6 0.0177 0.0375 2.4738 0.0437 0.0343 0.4655 1.1515 0.127 1.9005 0.3178 0.0119 4.617 1.50
85 85 88 59.30 146.17 144.28 0.0319 0.15 6 0.0177 0.0375 2.2224 0.0393 0.1621 0.7282 1.6183 0.268 4.0125 0.6210 0.0233 7.281 6.37
86 86 87 71.20 146.74 145.67 0.0150 0.15 6 0.0177 0.0375 1.5260 0.0270 0.0556 0.5383 0.8215 0.16 2.4015 0.3943 0.0148 2.180 1.50
87 87 88 59.50 145.64 144.28 0.0229 0.15 6 0.0177 0.0375 1.8820 0.0333 0.0451 0.5052 0.9508 0.145 2.1690 0.3592 0.0135 3.020 1.50
88 88 94 68.00 144.25 141.23 0.0444 0.15 6 0.0177 0.0375 2.6234 0.0464 0.1428 0.7024 1.8427 0.251 3.7635 0.5888 0.0221 9.620 6.62
89 89 91 49.00 146.54 145.97 0.0116 0.15 6 0.0177 0.0375 1.3426 0.0237 0.0632 0.5588 0.7503 0.17 2.5560 0.4178 0.0157 1.788 1.50
90 90 91 56.40 143.97 143.47 0.0089 0.15 6 0.0177 0.0375 1.1721 0.0207 0.0724 0.5813 0.6813 0.182 2.7315 0.4433 0.0166 1.446 1.50
91 91 93 41.60 143.44 141.70 0.0418 0.15 6 0.0177 0.0375 2.5459 0.0450 0.0333 0.4615 1.1749 0.125 1.8750 0.3135 0.0118 4.824 1.50
92 92 93 53.50 145.59 143.30 0.0428 0.15 6 0.0177 0.0375 2.5754 0.0455 0.0330 0.4603 1.1855 0.125 1.8675 0.3123 0.0117 4.918 1.50
93 93 94 47.50 143.27 141.23 0.0429 0.15 6 0.0177 0.0375 2.5798 0.0456 0.0329 0.4598 1.1862 0.124 1.8645 0.3118 0.0117 4.926 1.50
94 94 98 53.30 141.20 139.56 0.0308 0.15 6 0.0177 0.0375 2.1836 0.0386 0.1793 0.7525 1.6431 0.264 3.9555 0.6525 0.0245 7.386 6.92
95 95 97 84.40 144.48 142.54 0.0230 0.15 6 0.0177 0.0375 1.8873 0.0334 0.0450 0.5049 0.9529 0.145 2.1675 0.3589 0.0135 3.035 1.50
96 96 97 42.80 142.51 141.87 0.0150 0.15 6 0.0177 0.0375 1.5222 0.0269 0.0558 0.5388 0.8202 0.16 2.4060 0.3950 0.0148 2.173 1.50
97 97 98 68.20 141.84 139.56 0.0334 0.15 6 0.0177 0.0375 2.2761 0.0402 0.0373 0.4780 1.0880 0.132 1.9800 0.3300 0.0124 4.058 1.50
Pozo
98 98 51.60 139.53 138.38 0.0223 0.15 6 0.0177 0.0375 1.8584 0.0328 0.2190 0.7964 1.4800 0.316 4.7430 0.7133 0.0267 5.848 7.19
existente
IX. PRESUPUESTO
Costo
Descripción U.M. Cantidad Costos totales
Mano de Materiales Transporte y/o Unitario Mano de obra Transporte y/o
Materiales (C$)
obra (C$) (C$) equipos (C$) (C$) equipos (C$)
Preliminares
Construcciones Temporales m² C$73.00 C$261.38 C$522.75 C$87.00 C$871.13 C$19,080.74 C$38,160.75 C$6,351.00 C$63,592.49
Tubería PVC
PVS
Excavación en terreno natural m³ C$888.72 C$36.90 C$72.00 C$12.00 C$120.90 C$32,793.77 C$63,987.84 C$10,664.64 C$107,446.25
Relleno y Compactación m³ C$88.87 C$113.78 C$55.50 C$18.50 C$187.78 C$10,111.86 C$4,932.40 C$1,644.13 C$16,688.38
X. CONCLUSIONES Y RECOMEDACIONES
Con la construcción de este proyecto se evitará que los habitantes de cada uno
de los barrios en estudio, continúen descargando las aguas grises hacia las
calles y patios, evitando olores desagradables y la propagación de
enfermedades, logrando mejorar las condiciones higiénico-sanitarias de cada
barrio.
Recomendaciones
Debido a que los costos de materiales y mano de obra varían con el paso del
tiempo, es necesario realizar una actualización del presupuesto para garantizar
que el monto sea el más fiable posible.
XI. BIBLIOGRAFÍA
Sí No
De 6 a 8 De 8 a mas
Sí No
ANEXO II
Imágenes del sitio
Fotografía 1. Aguas a las orillas de Fotografía 2. Aguas a las orillas de
la calle del barrio Milagro de Dios la calle del barrio Vista Xolotlán
Hombres Mujeres
Residencial San
83 33 895 209 186 305 195 123
Lucas de Las Colinas
TOTALES 190,114 35,854 54,899 36,254 71,651 31,973
ANEXO IV
Glosario de términos
Glosario de términos.
Diseño de sitio: Es el plano de ingeniería en el cual se indica toda la infraestructura
interrelacionada con una obra a desarrollar, se hace a una escala donde se
muestren todas las obras a construir y existentes con los retiros a colindancias y
cuerpos de agua.
Agua residual: Es el residuo liquido transportado por una alcantarilla, el cual puede
incluir descargas domésticas industriales, así como también aguas lluvias,
infiltraciones y flujos de entrada. Agua que ha recibido un uso y cuya calidad ha sido
degradada por la incorporación de agentes contaminantes.
Aguas residuales: Son las aguas de uso doméstico como las del baño, del lavado
de trasto, de ropa, etc.
Agua residual de tipo ordinario: Agua residual generada por las actividades
domésticas del ser humano (uso de inodoros, duchas, lavatorios, fregaderos, lavado
de ropa, etc.)
Caudal mínimo horario: Es la mínima cantidad de agua que será requerida en una
determinada hora del día.
Caudal medio diario: Es la cantidad de agua que requiere una población en un día.
Cota invert: La parte más baja de un colector, en donde entran una o varias tuberías
y solo una de ellas es de seguimiento.
Pendiente: Inclinación necesaria con respecto a una línea horizontal, diseñada para
que el agua que conducen las alcantarillas se desplace libremente haciendo uso de
la fuerza de gravedad, la cual en alcantarillados cumple con especificaciones
establecidas.
ANEXO V
Acrónimos
Acrónimos.
Qmin:(Caudal mínimo)
Qc:(Caudal comercial)
Qins:(Caudal Institucional)
Pf:(Población futura)
Pac:(Población actual)
SIMBOLOGIA Y NOMENCLATURA
CASAS
TUTOR:
MSC. ING. ERVIN CABRERA
PVS - 49
CT=159.81 m
Invert=158.46 m
Q=0.00 L/s
PVS - 42 X H=1.35 m
X
CT=163.87 m
Invert=162.52 m
X
Q=0.00 L/s
H=1.35 m
X
X
X
X
PVS - 38
CT=165.34 m PVS - 55 PVS - 61
Invert=163.99 m CT=158.49 m CT=158.19 m PVS - 67
Q=0.00 L/s Invert=156.84 m CT=154.78 m
Invert=157.14 m X
Invert=153.43 m
H=1.35 m Q=0.00 L/s
X X
Q=0.00 L/s
X
PVS - 28 X
H=1.35 m H=1.35 m Q=0.00 L/s
CT=168.08 m X X X X
H=1.35 m
Invert=166.73 m X
X
X
Q=0.00 L/s X
X
X
H=1.35 m
X
X
PVS - 21
X
X X
CT=168.69 m
P=0.00.00 mm
L=70.9059 m/m
X
Ø=15 .71 m/s
X
X
X X
Invert=167.34 m X
V=0
X
X
X
Q=0.00 L/s PVS - 73
PVS - 83 DIBUJO:
X
H=1.35 m CT=152.68 m
X
CT=151.98 m
X
Invert=151.33 m X
CAROLINA G. ZAMORIO DELGADO
m
X Invert=150.63 m
X
X X
Q=0.00 L/s
X
X
PVS - 80 Q=0.00 L/s
X
X
X X X X
H=1.35 m
X
X
YINDIRA ESTEFANY CENTENO
X
CT=152.98 m H=1.35 m PVS - 95
L=52.014 m/mm
P=0 50.00 m
PVS - 86
X
CT=145.83 m
P=0.01 00 mm
X
Ø=150.
L=54.7 9 m/m
X
X
CT=148.09 m
V=
V=0.9
Invert=144.48 m
X
X X Q=0.00 L/s Invert=146.74 m
X
PVS - 89
X
.4 m
Q=0.00 L/s
X
P=0.00.00 m
L=66 054 m/m
H=1.35 m
Ø==105.61 m/s
X
X
X
Q=0.00 L/s
V
CT=147.89 m
X
X X
X
H=1.35 m
X
X X
H=1.35 m
X
X
P=0.00.00 mm
L=95 09 m/m
0 m/s
Ø=15 .69 m/s
X
X Invert=146.54 m
.9 m
V=0 X
Q=0.00 L/s
X
X
X
X
H=1.35 m
X
X X
.3 m
X
X
X
X X
X
Ø=150
P=0.01.00 mm
X
P=0.00.00 mm
L=79.15 m/m
L=68 06 m/m
Ø=15 X1 m/s
X
XV=0
X
X
m
X X
V=0.6
X
X
X
PVS - 50
.5 m
X
X
.82 m
X
P=0.00.00 mm
L=62 08 m/m
Ø=10 X
X
X
X X
X
CT=159.44 m
V= .6
X
PVS - 56 X
Ø=150.0
X
P=0.010 m/mm
X
m
X
L=71.0 m m
X
X
V=0.73 m/
X
X
X X Invert=158.06 m CT=157.78 m
X X X X X
5
PVS - 62
X
X
.8 m
X
/s
Q=0.13 L/s Invert=156.40 m CT=157.11 m
X
X
H=1.35 m
X
8 m/s
X
Q=0.07 L/s
X
X
X
X
X
Invert=155.73 m
X
X X
X
P=0.00.00 mm
L=68 28 m/m
X
Ø=15.02 m/s
X H=1.35 m X X
P=0.00.00 mm
V=1
L=75.620 m/m
Ø=105.91 m/s X
Q=0.05 L/s
X X X
X X
V= X
X
X X
X
s
H=1.35 m X
L=49 11 m/m
P=0.0
Ø=105.75 m/s
X
V=
X
.2 m
X
PVS - 39
X
X
X
X
X
X
CT=164.98 m
X
X X
X
.0 m
m
X X
0.00
X
Invert=163.63 m
X
X
X X
P=0.00.00 mm
L=71 15 m/m
Ø=15.82 m/s
X
X
V=0
Q=0.15 L/s X
H=1.35m X X
mm
X
X X
.2 m
L=84.023 m/mm
X
P=0 50.00 m
Ø=10.95 m/s
X
X X
PVS - 29
V=
PVS - 22 CT=167.67 m
.4 m
CT=168.13 m Invert=166.29 m X
X
X
X
Invert=166.75 m Q=0.09 L/s PVS - 43 PVS - 68 X
X
X
X
H=1.35 m CT=162.98 m CT=153.58 m PVS - 91
X
X
Q=0.22 L/s
X
X
PVS - 74 CT=147.97 m
X
H=1.35 m Invert=161.60 m Invert=152.20 m X
CT=152.56 m
X
X X X
Q=0.16 L/s Q=0.09 L/s X Invert=143.44 m
X
X X X
H=1.35 m H=1.35 m Invert=150.53 m Q=0.11 L/s X X
X
X
PVS - 84
X
X
DISEÑO:
X
Q=0.10 L/s
X
H=4.50 m
X
X
X
X
CT=150.06 m
P=0.0
L=78 055 m/m
P=0.00.00 mm
L=72 72 m/m
Ø=150.85 m/s
Ø==
X
H=2.00 m Invert=148.68 m
V 0.6
V=
X
X
X
PVS - 81
150.0
X
X
X
X
X
X X
CT=151.45 m Q=0.12 L/s X
m
.0 m
X
.9 m
H=1.35 m 6.4
L=5 .008 m/mm
X X
X
X
X
X
X
X
0m/s
X
P=0 50.00 m
P=0.026
Ø=150.99 m/s
L=81.6 m/m
PVS - 87
X
0 mm
Q=0.10 L/s PVS - 90
V=0
CT=147.02 m 1
H=1.35 m Ø 0.68 m/s
= YINDIRA ESTEFANY CENTENO
X
Invert=145.64 m CT=148.16 m
V=
X
X
Q=0.10 L/s Invert=143.97 m
.00 mm
X
m
Q=0.00 L/s
X
H=1.35 m
L=41.041 m/mm
P=0 50.00 m
X
Ø==11.17 m/s
P=0.00.00 mm
L=80 16 m/m
X
Ø=15 4 m/s
H=2.00 m
V
V=0.8
PVS - 2 X
P=0.0
L=58 16 m/m
Ø==
X
CT=176.34 m X
PVS - 97
.6 m
V 0.8
P=0.00.00 mm
L=54 29 m/m
.0 m
Ø=151.03 m/s
X
Invert=173.84 m PVS - 5
L=68 23 m/m
P=0.0
Ø=15.95 m/s
CT=144.67 m
150.0
X
X
CT=174.12 m V=0
V=
Ø=150.0
P=0.006 0 mm
L=59.3 mm/m
.4 m
Q=0.00 L/s X X
Invert=141.84 m
V=0.6
H=2.50 m Invert=172.12 m X
.6 m
PVS - 8 PVS - 57
Ø=150.00 mm
Q=0.20 L/s
4 m/s
P=0.007 m/
XV=
.5 m
X
L=58.0 m m
X
X
X
0.00
0 mm
Q=0.00 L/s
X
CT=174.30 m X X
PVS - 96 H=2.80 m
X
H=2.00 m PVS - 51 CT=157.72 m
0.65 m/s
Invert=172.30 m
X
CT=145.34 m
X
Invert=155.97 m
2 m/s
X
CT=159.25 m
.8 m
X
mm
X
PVS - 48 Invert=157.52 m Q=4.16 L/s L=42 15 m/m
P=0.00.00 mm
L=62.839 m/m
X
Ø=15.15 m/s
H=2.00 m Q=0.00 L/s
Ø=150 3 m/s
P=0.030
L=54.1 m/m
CT=160.85 m
V=1
H=1.80 m PVS - 93 P=0.0 mm
X
V=1.2
X
X X X
Q=3.67 L/s CT=147.80 m H=1.35 m 0.00
X
Invert=158.35 m
X
H=1.70 m Ø=150.82 m/s
X
X
PVS - 44 Q=3.66 L/s PVS - 63 Invert=143.27 m
X
PVS - 15 CT=162.99 m V=
X
X
PVS - 23 H=2.50 m
.00 mm
m
CT=170.90 m Q=0.24 L/s
X
CT=156.41 m
X
m
X X X
X
Invert=169.55 m PVS - 41 Invert=159.96 m H=4.50 m
CT=168.31 m X Invert=153.58 m
P=0.00.00 mm
L=59 22 m/m
Ø=105.95 m/s
CT=164.44 m Q=3.08 L/sX L=32.1 m PVS - 69
V=
Invert=165.78 m
X
X
Q=0.00 L/s
X X X
Invert=160.61 m
X
H=3.00 m m Q=5.00 L/s CT=154.59 m PVS - 75 .5 m
P=0.040 m/m
X
L=16.430 m/m 3
X
PVS - 92 5
X
X
PVS - 32 PVS - 40X Q=3.05 L/s H=2.80 m CT=152.08 m
0 mm P=0.01.7 m Invert=151.76 m
.5 m
CT=146.94 m .0
X
Ø=150.0m P= 50.00 mm
X
0
X
X
m
m/ mm
CT=167.20 m
X
CT=168.17 m m PVS - 82
X
P=0.01000 mm H=2.80 m
X X
Q=2.03 L/s Invert=162.99 m Invert=162.17 m V=1.60.00 mm Q=5.60 L/s Q=0.00 L/s V=1
s
Ø =0 .8
V=1.60
X
Invert=166.14 Invert=164.70 m PVS - 85
X
0. H=2.00 m CT=149.95 m H=1.35 m
P =9
X
Q=2.70 L/s
.00 mm
X X
m/s
X
Q=2.05 L/s
X
Q=1.77 L/s L=36 m
X
57 Invert=147.42 m
X
X
X
CT=148.20 m
X
1.
X
X
P=0.0.9
L
L=47.6 m
X
P=0.03 m/m
H=2.50 m
V=1.12X m/s X
H=2.00 m
L=68.3 m
X
10 mm Q=6.12 L/s Invert=146.17 m X
P=0.039m
P=0 50.00 m
X
Ø=150.00m/m
X
Ø=11.08 m/s
X
X
Ø=150.00 mm
P=0.037 m/m
P=0.03 m/m
X X
V=
L
L=65.5 m
X
P==15.4 m H=2.50 m
V=1.08 m/s
X
Q=6.12 L/s PVS - 88
L=42.020 m/mm
P=0 50.00 m
mm 0.020 L=15.8 /s L=48.7 m
X
Ø=1500.043 m/m P=
5.16
V=1.2 m/s
Ø=150.00 mm
X
V=0.80 m/s H=2.00 m
P=0.04 m/m
V=1
L=33.8 m
V=1.45 m CT=147.78 m
L=62.7 m
m L=32.8 m
X
X X X
L=17.3 m/m V=1.61 m/s P=0.034 m/m
X
X
.00 m
X
P=0.020 m/m /s L=52.7 m
V=1.54 m
X
V=1.37 m Ø=150.00 mm Invert=144.25 m
P=0.020 0 mm
.35 m
X
X
X
X
m/s P=0.049 m/m
m
Ø=150.00 mm
X X
V=1.57 m/s Q=6.36 L/s
Ø=150.0m/s
X
PVS - 94
Ø=150.00 mm
X
P=0.007 m/m
Ø=150.00 mm X
X X
L=30.5 m
V=0.64 m/s
X
V= 1. 40 V=1.82 m/s P=0.040 m/ CT=145.03 m
X
X
X
V=1.05m/s
X
X
X
Ø=150.00
P=0.003 mm
L=55.4 mm/m
X
X
X X
Ø=150.00 m Invert=141.20 m
X X X X
X
V=1.73 m/smm
X
L=59.3
X
X X X X X PVS - 19
CT=168.37 m P=0.031m
Q=6.61 L/s FECHA:
X
X
H=3.80 m
X
X
Ø=150.0 m/m
Ø=150.00m/s
Ø=150.0
P=0.023 0 mm
P=0.028 m/mm
L=77.9 mm/m
L=68.5 m m
Invert=166.34 m
X
V=1.02
V=0.96
PVS - 98
X
V=1.61 0 mm
X
X X
Q=1.35 L/s X
Ø=150.00
X
P=0.041 m/mm
L=55.8 m m
CT=140.91 m
X
m/s
X
V=0.76 m/s
X
Ø=150.0
P=0.006 0 mm
L=55.7 m/m
H=2.00 m
V=0.60 m/
Invert=139.53 m
X
L=68.0
NOVIEMBRE 2017
X L=52.2 m
PVS - 1
X
X X
PVS - 4
Ø=150.00 s
P=0.032 mm
Ø=150.00
P=0.030 mm
L=70.2 mm/m
m/s
CT=176.08 m PVS - 7 X X
Ø=150.04 m/m H=1.35 m
V=1.08 m/
X
CT=175.60 m
X
X
X
V= 1.05
Invert=174.73 m CT=174.65 m PVS - 10 0 mm
X
X
X
V=1.84 m/s PVS EXISTENTE
X
Invert=171.27 m Invert=169.92 m CT=171.69 m PVS - 13 X X
X
Q=0.00 L/s
P=0.01.00 mm
Ø=15083 m/s
L=70.86 m/m
PVS - 18 CT=139.98 m
V=0.76 m/s
X
V= 0.
Ø=150.00 mm
P=0.01 m/m
Q=0.30 L/s
X
X
L=23.4 m
X
CT=171.37 m
s
Ø=150 m/s
P=0.015
X
L=72.4 m/m
X
m/m
X
H=4.70 m
V= 0.82
Q=0.79 L/s Invert=168.64 m
X
X
m/s
X
Ø=150.00 mm
Invert=167.81 m Q=1.32 L/s X
0 mm
P=0.032 m/m
X
m
X
X X X
L=69.7 m
L=46.8 m L=48.3 m H=2.70 m X V=1.64 m/s
X
X
PVS - 31
V=1.07 m/s
H=1.35 m
X
X
.00 mm
P=0.010 m/m
X
CT=166.07 m
X
P=0.02 m/m PVS - 25 L=51.6
X
m
X
Ø=150.00 mm L=40.4 m
X
Ø=150.00 mm V=1.01 m/s Ø=150.00 mm L=22.3 m
P=0.01 m/m Invert=166.06 m Q=0.00 L/s Ø=15022 m/m
V=1.48.00 mm
X X
V=0.68m/s P=0.03 m/m L=47.4 m Q=0.00 L/s H=1.35 m PVS - 37
Ø=150.00 mm
X
X X X
Ø=150.00 mm H=1.35 m PVS - 26 PVS - 34 CT=163.34 m PVS - 46 m/s
V=0.90m/s P=0.02 m/m
X
X
V=1.10mX /s CT=168.14 m CT=163.70 m
X
X
X
X
X
Ø=150.00 mm X Invert=165.76 m
X
X X
L=41.0 Invert=163.87 m Q=0.34 L/s Invert=161.70 m CT=161.63 m CT=161.56 m
X
X
X
V=0.96 m/s m X
Q=0.14 L/s
X
P=0.006 m/ X
Q=0.00 L/s PVS - 35 H=1.35 m Q=0.00 L/s Invert=160.25 m Invert=159.56 m PVS - 54 X
X
X
H=2.30 m CT=164.15 m H=2.00 m
Ø=150.00 m
Ø=150.00 mm
X
Q=0.13 L/s PVS - 59
L=31.9 m
X
X X
Invert=162.53 m CT=159.83 m
V=0.69 m/smm
X X
X
L=43.8 m
X
H=1.35 m H=2.00 m Invert=157.80 m CT=159.80 m
X
X
P=0.030 m/m
X
Q=0.12 L/s P=0.011 0 mm
X
Invert=156.30 m
X
PVS - 60
X
X
P=0.02 m/m
X
Q=0.11 L/s
X
H=4.00 m Ø=150.0m/sX Ø=150.00 mm L=42.7 m CT=157.15 m
Ø=150.00 mm Q=0.00 L/s PVS - 65
X
H=2.00 m
X
V=X0.74 V= 1.04 m/s P=0.040 m/m
Ø=150.00 mm
X
V=0.66 m/m
P=0.008 m/m
X
Ø=150.00 mm
X
V=1.04 m/s PVS - 66
P=0.002 m/m
L=47.6 m
X
V=1.0m/m
Ø=150.00 mm
L=60.9 m
X X X
Q=0.08 L/s Invert=154.73 m PVS - 71
Ø=150.00 mm
P=0.01 m/m
V=0.80 m/s
X m/s X
X
X
H=1.35 m X
Q=0.00 L/s CT=154.35 m
X
PVS - 12 X
PVS - 72
X Ø=150.00 mm H=2.50 m
X
L=4 6.3 mX Invert=152.92 m Invert=152.35 m CT=152.46 m
AS
X
Q=0.00 L/s X
Ø=150.00 mm
P=0.01m/m
X
Invert=168.96 m X
H=2.00 m Invert=151.20 m
L=63.2 m
CT=151.56 m
X
Q=0.00 L/s P=0.026
X
Ø=150.00 mm
V=0.85 m/s
H=2.00 m L=39.3 m
AS
X X
Q=0.04 L/s Q=0.09 L/s Invert=149.73 mØ=150.00m/ m
AS
X
X
H=1.35 m
X
H=2.00 m
X X
X V= X1.14 m/s P=0.028 m/m H=1.35 m mm
Ø=150.X 00
P=0.02 m mm
X
L=62.3 m/m
X
X
X
Ø=150.00 mm L=40.1 m
V=1.02 m/s
Ø=150.00
P=0.04 m/ mm
L=55.2 m m
H=1.80 m
X
X
X X
X
V=1.02 m/s P=0.032 m/m
Ø=150.0
P=0.014 0 mm
V=0.88m/s
L=60.3 mm/m
Ø=150.00
PVS - 77
P=0.01 m/m
X
V=0.80
X X
L=29.4
X
V=1.17 m/s
X
Ø=150.0
X
P=0.018 m/mm
Ø=150.0 m/s
P=0.020 0 mm
L=51.7 m m
Ø=150.00 mm
L=56.8 m/m
X X
CT=151.45 m
V=0.86 m/s
X
X
X V=1.09 m/s X
X
V= 0.91 X
Invert=149.92 m
X
X
X
X
X
Q=0.07 L/s
X
X
X X
H=1.50 m
Ø=150.0
m/s
P=0.024 m/mm
m X
L=60.5 m m
X X
X
m
X X
0
X
mmX
X
1:1300
V=0.97
PVS - 3
X
Ø=150.0
P=0.008m/mm
PVS - 6
L=60.7 m m
CT=173.15 m
X
X V=0
Invert=171.80 m X X CT=172.91X m X
PVS - 9
X
PVS - 11
0 /s
Invert=171.56 m CT=171.70 m
Ø=150.00m/s
P=0.012 m/m
Q=0.00 L/s
L=59.9 m
X
CT=170.85 m
V=0.77
X
m
X
Invert=170.35 m
.68 m/s
Q=0.00 L/s
X
X
H=1.35 m
X
X
Invert=169.50 m
X
H=1.35 m
X
Q=0.00 L/s
0
PVS - 14
X
Ø==0
P=0.008 0 mm
Q=0.00 L/s
L=61.1 mm/m
X
V .66
X X X X X H=1.35 m CT=170.26 m PVS - 24
X
X
H=1.35 m
X X X
X X X
X
PVS - 17 PVS - 33
150.0 m/s
X X X
Invert=168.91 m CT=170.59 m
V=0.71 m/s
Ø=150.00
P=0.010 m/m
CT=170.43 m CT=164.85 m
L=61.2 m
Q=0.00 L/s Invert=168.09 m
mm
X
X
H=1.35 m Q=0.00 L/s CT=164.20 m CT=162.78 m
X
X
AS
X
Q=0.00 L/s H=2.50 m Q=0.00 L/s Invert=162.85 m Invert=161.43 m
X
X
H=2.00 mX H=1.35 m
X
X X X
X X Q=0.00 L/s Q=0.00 L/s
X
X
X H=1.35 m H=1.35 m
mm
PVS - 52
X
AS
X
X
CT=160.67 m
X
Invert=159.32 m
X
PVS - 58
X
X
X
X Q=0.00 L/s CT=157.69 m
H=1.35 m Invert=156.34 m PVS - 64
Q=0.00 L/s CT=155.07 m
H=1.35 m Invert=153.70 m
Q=0.00 L/s PVS - 70
X
H=1.35 m CT=153.09 m
Invert=151.74 m
X X X
PVS - 76
Q=0.00 L/s CT=151.91 m
H=1.35 m Invert=150.56 m
Q=0.00 L/s AS AS
X
X X X
H=1.35 m
UBICACIÓN:
NOTAS GENERALES
1. Red de Recolección Principal, serán de Ø6" PVC SDR-41 localizada a 1.50 m de la cuneta proyectada de
las vías.
3. Toda la tubería se instalará de acuerdo a las normas vigentes de construcción por ENACAL e INAA.
CONTENIDO:
4. Excavación para instalar tubería. El ancho de la zanja no será mayor que el diámetro nominal de la
tubería más 0.45 m. ni menor de 0.60 m. En caso de encontrarse con material inestable como: basura o PLANO CONJUNTO
materiales orgánicos y materiales arcillosos se deberá excavar 0.10 m más y posteriormente rellenar con RED PROPUESTA DE
arena con un módulo de finura de aproximadamente. RECOLECCIÓN DE AGUAS
RESIDUALES
5. El material de excavación se deberá disponer de tal manera que no obstruya el paso de personas y
vehículos. El material de excavación en las zonas de altas pendientes se deberán disponer aguas debajo
de la pendiente para evitar accidentes.
DISEÑO DE RED DE ALCANTARILLADO SANITARIO
6. Los dispositivos o cajas de inspección serán fabricados e instalados de acuerdo a los planos de detalles. ESCALA INDICADA
7. La tapa de los dispositivos de inspección deberán quedar a la elevación mostrada o a como lo apruebe el
supervisor.
8. Durante el replanteo topográfico se deberá verificar los niveles mostrados en los planos para el trazado
de tuberías y profundidades de los pozos de visita. En caso de no coincidir los valores de campo con los del
plano el contratista deberá notificar inmediatamente al ingeniero supervisor para las consideraciones LAMINA HOJA
técnicas correspondientes.
9. El contratista deberá construir las caídas correspondientes en los PVS según sea necesario.
10. Antes de iniciar la ejecución de cualquier actividad el contratista deberá notificar al ingeniero supervisor, 2
de igual manera cuando en el proceso de construcción se detecte algún imprevisto que modifique el diseño
original, el contratista también debe notificarlo con tiempo suficiente al supervisor a fin de solventar
técnicamente el problema. AS-1
19
PVS - 4
PVS - 1 CT=175.60 m
CT=176.18 m Invert 1=174.25 m PVS - 7
CT=174.65 m PVS - 10 PVS - 13
Invert=173.18 m Invert 2=171.27 m CT=171.69 m
Q=0.30 L/s Invert=169.92 m CT=171.37 m PVS - 16
Q=0.00 L/s Invert=169.46 m
H=4.30 m Q=0.57 L/s Invert=168.64 m CT=169.84 m
H=3.00 m Q=0.87 L/s
L=46.8 m H=4.70 m Q=0.99 L/s Invert=167.81 m TEMA:
H=2.20 m H=2.70 m
P=0.01 m/m L=48.3 m Q=1.24 L/s PROPUESTA DE DISEÑO HIDRÁULICO
Ø=150.00 mm P=0.027 m/m L=48.1 m
Ø=150.00 mm P=0.01 m/m
L=22.3 m H=2.00 m PVS - 18 DEL SISTEMA DE ALCANTARILLADO
P=0.04 m/m L=40.4 m CT=168.04 m
Ø=150.00 mm P=0.02 m/m SANITARIO PARA LOS BARRIOS
Ø=150.00 mm
Ø=150.00 mm L=47.4 m Invert=166.66 m MILAGRO DE DIOS Y VISTA XOLOTLAN,
P=0.02 m/m Q=1.43 L/s DEPARTAMENTO DE MANAGUA
Ø=150.00 mm
H=1.35 m
PLANTA AVENIDA 1
TUTOR:
PVS - 1
177.00 CT: 176.18 m MSC. ING. ERVIN CABRERA BARAHONA
165.00
CONTENIDO:
163.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200 0+225 0+250 0+275 0+300
3
AS - 2
19
PVS - 5 PVS - 7
CT=174.12 m CT=174.65 m
PVS - 2 Invert=172.12 m Invert=169.92 m
PVS - 4
CT=176.34 m CT=175.60 m Q=0.00 L/s Q=0.57 L/s
Invert=173.84 m L=68.3 m Invert=171.27 m H=2.00 m H=4.73 m
L=65.5 m
Q=0.00 L/s P=0.4 m/m Q=0.30 L/s P=0.03 m/m
H=2.50 m Ø=150.00 mm H=4.33 m
Ø=150.00 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
SANITARIO PARA LOS BARRIOS
MILAGRO DE DIOS Y VISTA XOLOTLAN,
DEPARTAMENTO DE MANAGUA
PVS - 7
PVS - 2 CT: 174.65 m
CT: 176.34 m PVS - 5 Invert: 169.92 m
177.00 175.00 CT: 174.12 m
Invert: 173.84 m PVS - 4 Q=0.57 L/s
Q=0.00 L/s Invert: 172.12 m H=4.73 m
CT: 175.60 m TUTOR:
H=2.50 m Q=0.00 L/s
176.00 Invert: 171.27 m 174.00 H=2.00 m
Q=0.30 L/s MSC. ING. ERVIN CABRERA BARAHONA
H=4.33 m
175.00 173.00
174.00 172.00
FECHA:
NOVIEMBRE 2017
PVS - 7
PVS - 3 PVS - 4 CT=174.65 m
CT=173.15 m CT=175.60 m Invert=169.92 m
Invert=171.80 m L=60.2 m Invert=171.27 m PVS - 6 Q=0.57 L/s
Q=0.00 L/s P=0.01m/m
Q=0.30 L/s CT=172.91 m H=4.73 m
Ø=150.00 mm
H=1.35 m H=4.33 m Invert=171.56 m L=60.9 m ESCALA:
P=0.3 m/m
Q=0.00 L/s Ø=150.00 mm
V= 1:125 H= 1:1250
H=1.35 m
PVS - 4 PVS - 7
CT: 175.60 m CT: 174.65 m UBICACION:
176.00 Invert: 171.27 m 175.00 Invert: 169.92 m
Q=0.30 L/s Q=0.57 L/s BARRIO MILAGRO DE DIOS Y VISTA
H=4.33 m XOLOTLAN
H=4.73 m
175.00 174.00 PVS - 6
CT: 172.91 m
PVS - 3 Invert: 171.56 m
174.00 CT: 173.15 m 173.00 Q=0.00 L/s
Invert: 171.80 m H=1.35 m CONTENIDO:
Q=0.00 L/s
173.00 H=1.35 m 172.00
PLANTA - PERFILES
172.00 171.00
P=0.01 P=0.0
m
L=60.2 /m L=60 3 m/m
171.00
Ø=150.0 m 170.00 Ø=150 .9 m
0 mm .00 mm
170.00 169.00
0+000 0+025 0+050 0+075 0+100 0+000 0+025 0+050 0+075 0+100
LAMINA HOJA
PLANTA PERFIL PVS 3 AL PVS 4 PLANTA PERFIL PVS 6 AL PVS 7
4
AS - 3
19
PVS - 11 PVS - 12
PVS - 8 CT=170.85 m CT=170.96 m PVS - 13
CT=174.30 m Invert=169.50 m Invert=168.93 m CT=171.37 m
Invert=172.30 m PVS - 10 Q=0.00 L/s Invert=168.64 m
CT=171.69 m Q=0.04 L/s
Q=0.00 L/s H=1.35 m H=2.00 m Q=0.99 L/s
H=2.00 m L=62.7 m Invert=169.46 m L=29.4 m L=31.9 m H=2.70 m
P=0.04 m/m P=0.02 m/m P=0.01 m/m
Ø=150.00 mm
Q=0.87 L/s Ø=150.00 mm Ø=150.00 mm
H=2.20 m
TEMA:
PVS - 8
PROPUESTA DE DISEÑO HIDRÁULICO
175.00 CT: 174.30 m
DEL SISTEMA DE ALCANTARILLADO
Invert: 172.30 m
SANITARIO PARA LOS BARRIOS
Q=0.00 L/s PVS - 11 PVS - 13
MILAGRO DE DIOS Y VISTA XOLOTLAN,
174.00 H=2.00 m 172.00 CT: 170.85 m PVS - 12 CT: 171.37 m
DEPARTAMENTO DE MANAGUA
Invert: 169.50m CT: 170.96 m Invert: 168.64 m
Q=0.00 L/s Invert: 168.93 m Q=0.99 L/s
173.00 171.00 H=1.35 m Q=0.04 L/s H=2.70 m
PVS - 10 H=2.00 m
CT: 171.69 m
172.00 Invert: 169.46 m 170.00 TUTOR:
Q=0.87 L/s
H=2.20 m MSC. ING. ERVIN CABRERA BARAHONA
P=0.02
171.00 P= 169.00 m/m
0.0 L=29.4
4m m P=0.01 m/m
L Ø=150
Ø= =62.7 /m .00 mm L=31.9 m
170.00 150 m 168.00 Ø=150.00 mm
.00
mm
DIBUJO:
PVS - 23
CT=168.31 m
PVS - 21 PVS - 22
CT=168.69 m Invert=165.78 m FECHA:
PVS - 9 PVS - 10 L=62.8 m CT=168.13 m Q=1.93 L/s
CT=171.70 m Invert=167.34 m Invert=166.75 m L=58.4 m
CT=171.69 m Q=0.00 L/s P=0.01 m/m P=0.02m/m H=2.50 m NOVIEMBRE 2017
Invert=170.35 m L=61.3 m Invert=169.46 m Ø=150.00 mm Q=0.22 L/s
Q=0.00 L/s P=0.01 m/m H=1.35 m H=1.35 m Ø=150.00 mm
Ø=150.00 mm
Q=0.87 L/s
H=1.35 m H=2.20 m
ESCALA:
V= 1:125 H= 1:1250
UBICACION:
170.00 167.00
P=0.01 m/m P=0.01 m/m PLANTA - PERFILES
L=61.3 m L=62.8 m
Ø=150.00 m Ø=150.00 mm P=0.02
169.00 m 166.00 L m/m
Ø=15=058.4 m
.00 mm
168.00 165.00
0+000 0+025 0+050 0+075 0+100 0+000 0+025 0+050 0+075 0+100 0+125 0+150
PLANTA PERFIL PVS 9 AL PVS 10
PLANTA PERFIL PVS 21 AL PVS 23
LAMINA HOJA
5
AS - 4
19
PVS - 25
CT=167.41 m PVS - 26
Invert=166.06 m CT=168.14 m
Q=0.00 L/s Invert=165.76 m
PVS - 16 H=1.35 m Q=0.14 L/s
PVS - 14 CT=169.84 m L=41.0 m H=2.38 m
CT=170.26 m Invert=167.81 m P=0.01 m/m
Invert=168.91 m Q=1.24 L/s Ø=150.00 mm
Q=0.00 L/s H=2.03 m
H=1.35 m L=63.2 m
P=0.02 m/m
Ø=150.00 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
PVS - 26 SANITARIO PARA LOS BARRIOS
PVS - 14 169.00 CT: 168.14 m MILAGRO DE DIOS Y VISTA XOLOTLAN,
171.00 CT: 170.26 m PVS - 16 PVS - 25 Invert: 165.76 m DEPARTAMENTO DE MANAGUA
Invert: 168.91 m CT: 169.84 m CT: 167.41 m Q=0.14 L/s
168.00 Invert: 166.06 m H=2.38 m
Q=0.00 L/s Invert: 167.81 m
170.00 H=1.35 m Q=1.24 L/s Q=0.00 L/s
H=2.03 m 167.00 H=1.35 m
169.00 TUTOR:
164.00
166.00 0+000 0+025 0+050 0+075 CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
0+000 0+025 0+050 0+075 0+100 PLANTA PERFIL PVS 25 AL PVS 26
PVS - 26 DIBUJO:
CT=168.14 m
Invert=165.76 m PVS - 27 CAROLINA G. ZAMORIO DELGADO.
PVS - 24 CT=167.60 m YINDIRA ESTEFANY CENTENO
Q=0.14 L/s Invert=165.37 m
CT=170.59 m H=2.38 m
L=55.2 m L=55.7 m Q=2.22 L/s
Invert=168.09 m P=0.04m/m P=0.01m/m
Q=0.00 L/s Ø=150.00 mm Ø=150.00 mm H=2.23 m
H=2.50 m
FECHA:
PVS - 15 PVS - 16
CT=170.90 m CT=169.84 m
NOVIEMBRE 2017
Invert=169.55 m L=55.4 m Invert=167.81 m
Q=0.00 L/s P=0.03m/m Q=1.24 L/s
Ø=150.00 mm
H=1.35 m H=2.00 m
PVS - 24
CT=170.59 m ESCALA:
171.00 Invert= 168.09 m
Q=0.00 L/s V= 1:125 H= 1:1250
H=2.50 m
170.00
PVS - 15
CT: 170.90 m PVS - 26
Invert: 169.55 m 169.00 CT: 168.14 m
171.00 Q=0.00 L/s PVS - 16 Invert: 165.76 m PVS - 27 UBICACION:
CT: 169.84 m Q=0.14 L/s CT: 167.60 m
H=1.35 m Invert: 165.37 m BARRIO MILAGRO DE DIOS Y VISTA
Invert: 167.81 m 168.00 H=2.30 m
XOLOTLAN
170.00 Q=2.22 L/s
Q=1.24 L/s
H=2.00 m P= H=2.20 m
167.00 0.0
169.00 L 4
Ø= =55. m/m
15 2
P= 0.0 m
166.00 0m
L=5 0.03 m/ m CONTENIDO:
5
168.00 Ø=1 .4 m m
50.0 P=0.01 m
0m /m
m 165.00 PLANTA - PERFILES
L=55.7 m
167.00 Ø=150.00
m m
0+000 0+025 0+050 0+075 0+100 164.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150
PLANTA PERFIL PVS 15 AL PVS 16
PLANTA PERFIL PVS 24 AL PVS 27
LAMINA HOJA
6
AS - 5
19
PVS - 37
PVS - 34 CT=163.34 m
PVS - 29 CT=168.37 m
PVS - 28 CT=167.60 m PVS - 30 Invert=161.96 m
CT=167.20 m Invert=163.87 m PVS - 35 Q=0.34 L/s
CT=168.08 m Invert=166.29 m CT=164.15 m
Invert=164.67 m Q=0.00 L/s H=1.38 m
Invert=166.73 m Q=0.09 L/s Invert=162.53 m L=48.1 mm
Q=2.46 L/s H=4.50 m L=43.8 m
Q=0.00 L/s H=1.31 m P=0.03 m/ Q=0.12 L/s P=0.01 m/
mm
H=1.35 m L=68.5 m L=68.5 m H=2.53 m
Ø=150.00
m H=1.62 m Ø=150.00
P=0.01m/m P=0.02m/m mm
Ø=150.00 mm Ø=150.00 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
PVS - 34 DEL SISTEMA DE ALCANTARILLADO
169.00 CT: 168.37 m SANITARIO PARA LOS BARRIOS
Invert: 163.87 m MILAGRO DE DIOS Y VISTA XOLOTLAN,
Q=0.00 L/s DEPARTAMENTO DE MANAGUA
H=4.50 m
168.00
PVS - 28 PVS - 35
169.00 CT: 164.15 m
CT: 168.08 m
Invert: 166.73 m PVS - 29 Invert: 162.53 m
167.00
CT: 167.60 m PVS - 30 Q=0.12 L/s
168.00 Q=0.00 L/s Invert: 166.29 m CT: 167.20 m H=4.00 m TUTOR:
H=1.35 m Q=0.09 L/s Invert: 164.67 m 166.00 MSC. ING. ERVIN CABRERA BARAHONA
H=1.35 m Q=2.46 L/s
167.00
H=2.50 m
165.00
P=0.01 m/m
166.00 L=68.5 m PVS - 37
Ø=150.00 mm 164.00 CT: 163.34 m
P=0.02 Invert: 161.96 m
m/m
165.00 L=68.5 m Q=0.34 L/s CAROLINA G. ZAMORIO DELGADO.
P=0 H=1.35 m YINDIRA ESTEFANY CENTENO
Ø=150.0 163.00 .03 m
0 mm L= /m
Ø=1 43.8 m
164.00 50.0
0 mm
162.00 P=0.01 m
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 /m
L=48.1 m
PLANTA PERFIL PVS 28 AL PVS 30 Ø=150.0
0 mm
161.00
DIBUJO:
0+000 0+025 0+050 0+075 0+100 0+125 CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
PLANTA PERFIL PVS 34 AL PVS 37
PVS - 32
PVS - 31 CT=168.02 m
CT=166.07 m Invert=162.99 m FECHA:
Invert=164.72 m PVS - 35
Q=2.60 L/s CT=164.15 m NOVIEMBRE 2017
Q=0.00 L/s H=5.00 m PVS - 33
H=1.50 m L=52.2 m Invert=162.53 m
P=0.03m/m CT=164.85 m
Q=0.12 L/s
Ø=150.00 mm Invert=163.50 m
H=1.62 m L=51.7 m
P=0.02m/m Q=0.00 L/s
Ø=150.00 mm H=1.35 m ESCALA:
V= 1:125 H= 1:1250
169.00 PVS - 32
CT: 168.02 m
Invert: 162.99 m
UBICACION:
168.00 Q=2.60 L/s
H=5.00 m PVS - 35 BARRIO MILAGRO DE DIOS Y VISTA
CT: 164.15 m XOLOTLAN
167.00 PVS - 31 167.00
CT: 166.07 m Invert: 162.53 m
Invert: 164.72 m Q=0.12 L/s
Q=0.00 L/s H=4.00 m
166.00 166.00 PVS - 33
H=1.35 m
CT: 164.85 m
Invert: 163.50 m CONTENIDO:
165.00 165.00 Q=0.00 L/s
H=1.35 m
PLANTA - PERFILES
164.00 P= 164.00
0.0
L=5 3 m/m
Ø= 2.2 m P=0.0
163.00 150 163.00 2 m/m
.00 L=5
mm Ø=1501.7 m
.00 mm
162.00 162.00
0+000 0+025 0+050 0+075 0+100 0+000 0+025 0+050 0+075 0+100
LAMINA HOJA
PLANTA PERFIL PVS 31 AL PVS 32 PLANTA PERFIL PVS 33 AL PVS 35
7
AS - 6
19
PVS - 37
PVS - 36 CT=163.34 m PVS - 44
CT=164.20 m Invert=161.96 m CT=162.99 m
Q=0.34 L/s Invert=159.96 m
Invert=162.85 m PVS - 41 PVS - 42 PVS - 43
L=60.3 m H=1.35 m Q=3.64 L/s
Q=0.00 L/s
P=0.01 m/m L=55.8 m
CT=164.44 m CT=163.87 m CT=162.98 m
H=3.00 m
Invert=160.61 m
H=1.35 m Ø=150.00 mm P=0.02 m/m Q=3.37 L/s Invert=162.52 m L=95.3 m Invert=161.60 m L=54.6 m
Ø=150.00 mm H=3.80m Q=0.00 L/s P=0.01 m/m Q=0.16 L/s P=0.03 m/m
H=1.35 m Ø=150.00 mm H=1.35 m Ø=150.00 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
SANITARIO PARA LOS BARRIOS
MILAGRO DE DIOS Y VISTA XOLOTLAN,
DEPARTAMENTO DE MANAGUA
PVS - 42
CT: 163.87 m
PVS - 41 Invert: 162.52 m
PVS - 36 CT: 164.44 m 164.00 Q=0.00 L/s PVS - 43 PVS - 44
165.00 CT: 164.20 m Invert: 160.61 m H=1.35 m CT: 162.98 m CT: 162.99 m
Invert: 162.85 m Invert: 161.60 m Invert: 159.96 m TUTOR:
Q=3.37 L/s
Q=0.00 L/s PVS - 37 H=3.80 m Q=0.16 L/s Q=3.64 L/s
CT: 163.34 m 163.00 H=3.00 m MSC. ING. ERVIN CABRERA BARAHONA
164.00 H=1.35 m H=1.35 m
Invert: 161.96 m
Q=0.34 L/s
H=1.35 m 162.00
163.00 P=0.01 m/m
L=95.3 m
P=0.01 m 161.00
/m Ø=150.00 m
162.00 L=60.3 m m P=0
.
L=5 03 m/m
Ø=150.00 CAROLINA G. ZAMORIO DELGADO.
mm P=0.02 YINDIRA ESTEFANY CENTENO
m/m 160.00 Ø= 4.6 m
161.00 L=55.8 150
m .00
Ø=150.0 mm
0 mm 159.00
160.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200
0+000 0+025 0+050 0+075 0+100 0+125 0+150
PLANTA PERFIL PVS 42 AL PVS 44 DIBUJO:
PVS - 47
CT=161.63 m FECHA:
PVS - 40 Invert=160.25 m
PVS - 39 CT=165.00 m Q=0.13 L/s
PVS - 48 NOVIEMBRE 2017
PVS - 38 CT=160.85 m
CT=164.98 m Invert=162.25 m PVS - 45 H=1.38 m
CT=165.34 m L=80.0 m Invert=158.32 m
L=66.9 m Invert=163.60 m Q=2.93 L/s CT=162.78 m
Invert=163.99 m Q=0.15 L/s P=0.02 m/m Q=3.92 L/s
Q=0.00 L/s P=0.01 m/m Ø=150.00 mm H=2.83 m Invert=161.43 m L=56.8 m
Ø=150.00 mm H=1.38 m P=0.02 m/m L=68.5 m H=2.50 m
H=1.35 m Q=0.00 L/s Ø=150.00 mm
P=0.03 m/m
Ø=150.00 mm
H=1.35 m ESCALA:
V= 1:125 H= 1:1250
UBICACION:
PVS - 45
PVS - 38 CT: 162.78 m BARRIO MILAGRO DE DIOS Y VISTA
CT: 165.34 m PVS - 40 Invert: 161.43 m XOLOTLAN
166.00 PVS - 39 163.00 Q=0.00 L/s
Invert: 163.99 m CT: 164.98 m CT: 165.08 m H=1.35 m PVS - 47
Q=0.00 L/s Invert: 163.60 m Invert: 162.25 m CT: 161.63 m
H=1.35 m Q=0.15 L/s Q=2.93 L/s Invert: 160.25 m
165.00 H=2.80 m 162.00 PVS - 48
H=1.35 m Q=0.13 L/s
H=1.35 m CT: 160.82 m
Invert: 158.32 m CONTENIDO:
164.00 161.00 Q=3.92 L/s
P=0.0
H=2.50 m
P=0.01 m/m L=56 2 m/m PLANTA - PERFILES
L=66.9 m .8 m
163.00 160.00 Ø=1
50.0
Ø=150.00 m 0 mm
m P=0.0
2 m/m P=0
162.00 L=80 159.00 .03
.0 m m/m
L
Ø=15
0.00 Ø=1=68.5
mm 50.0 m
0m
m
161.00 158.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
LAMINA HOJA
PLANTA PERFIL PVS 38 AL PVS 40 PLANTA PERFIL PVS 45 AL PVS 48
8
AS - 7
19
PVS - 46
CT=163.70 m PVS - 51
PVS - 47 CT=159.28 m
CF=161.70 m CT=161.63 m PVS - 49 PVS - 50
CF=157.55 m
Q=0.00 L/s L=47.2 m
P=0.053 m/m CF=160.25 m CT=159.81 m CT=159.44 m L=78.0 m Q=4.22 L/s
H=2.00 m Q=0.13 L/s CF=158.46 m CF=158.01 m
Ø=150.00 mm L=70.9 m P=0.034 m/m H=1.73 m
H=1.38 m Q=0.00 L/s P=0.063 m/m Q=0.13 L/s Ø=150.00 mm
Ø=150.00 mm H=1.38 m
H=1.35 m
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
SANITARIO PARA LOS BARRIOS
PVS - 46 MILAGRO DE DIOS Y VISTA XOLOTLAN,
Rim: 163.70 m DEPARTAMENTO DE MANAGUA
Invert: 161.70 m
164.00
Q=0.00 L/s PVS - 49
Rim: 159.81 m PVS - 50
H=2.00 m Invert: 158.46 m PVS - 51
163.00 Rim: 159.39 m Rim: 159.28 m
160.00
PVS - 47 Q=0.00 L/s Invert: 158.01 m Invert: 157.55 m
Rim: 161.63 m TUTOR:
H=1.35 m Q=0.13 L/s Q=4.22 L/s
162.00 Invert: 160.25 m
159.00 H=1.35 m H=1.70 m MSC. ING. ERVIN CABRERA BARAHONA
Q=0.13 L/s
P=0 H=1.35 m
161.00 L .03 m 158.00 P=0.01 m/m
Ø=1=47.2 m /m
50.0 L=70.9 m
0 mm P=0.01 m/m
Ø=150.00 mm
160.00 157.00 L=78.0 m
0+000 0+025 0+050 0+075 Ø=150.00 mm
CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
156.00
PLANTA PERFIL PVS 46 AL PVS 47
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
DIBUJO:
FECHA:
PVS - 54
CT=159.83 m NOVIEMBRE 2017
PVS - 52 CF=157.80 m
PVS - 53 PVS - 54 Q=0.11 L/s
CT=160.67 m PVS - 57
CT=161.56 m CT=159.83 m CF=159.32 m H=2.03 m CT=157.72 m
CF=159.56 m CF=157.80 m L=60.5 m
Q=0.00 L/s Q=0.00 L/s P=0.014 m/m L=77.9 m CF=155.92 m
Q=0.11 L/s H=1.35 m Ø=150.00 mm P=0.094 m/m Q=4.60 L/s
H=2.00 m Ø=150.00 mm ESCALA:
H=2.03 m H=1.80 m
L=42.7 m
P=0.041 m/m V= 1:100 H= 1:1000
Ø=150.00 mm
PVS - 52
Rim: 160.67 m
PVS - 53 161.00 Invert: 159.32 m UBICACION:
Rim: 161.56 m PVS - 54
Q=0.00 L/s Rim: 159.83 m
162.00 Invert: 159.56 m BARRIO MILAGRO DE DIOS Y VISTA
H=1.35 m Invert: 157.80 m XOLOTLAN
Q=0.00 L/s 160.00
Q=0.11 L/s
H=2.00 m
161.00 PVS - 54 H=2.00 m
Rim: 159.83 m 159.00
PVS - 57
Elevacion (m)
Invert: 157.80 m
160.00 P=0.02 m Rim: 157.72 m
Q=0.11 L/s /m Invert: 155.92 m CONTENIDO:
158.00 L=60.5 m
H=2.00 m
Ø=150.0 Q=4.60 L/s
159.00 P=0 0 mm PLANTA - PERFILES
. H=1.75 m
L=4 04 m/m 157.00 P=0.02
Ø= 2.7 m L=77.9 m/m
150
158.00 .00
mm Ø=150 m
.00 mm
156.00
157.00
0+000 0+025 0+050 0+075 155.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
PLANTA PERFIL PVS 53 AL PVS 54
PLANTA PERFIL PVS 52 AL PVS 57 LAMINA HOJA
9
AS - 8
19
PVS - 57
PVS - 51 CT=157.72 m
PVS - 48 CT=159.25 m Invert=155.97 m
CT=160.85 m Invert=157.52 m Q=4.60 L/s PVS - 63 PVS - 69
Invert=158.35 m Q=4.22 L/s PVS - 75
PVS - 44 H=1.80 m CT=156.41 m CT=154.59 m
CT=162.99 m Q=3.92 L/s H=1.73 m CT=152.08 m PVS - 82
PVS - 41 Invert=153.58 m Invert=151.76 m PVS - 85
PVS - 32 CT=164.44 m Invert=159.96 m H=2.50 m 16.4 m L=32.1 m L=51.7 Invert=150.05 m CT=149.95 m
PVS - 40 m/m Q=4.97 L/s
PVS - 23 PVS - 27 L= m/m P=0.04 P=0.02 m Q=5.35 L/s CT=148.20 m
CT=168.31 m PVS - 30 CT=168.02 m CT=165.00 m Invert=160.61 m Q=3.64 L/s m
L=34.0 m/m
P=0.03 0 mm Ø=150.00 mm Q=5.71 L/s Invert=147.42 m
CT=167.60 m CT=167.20 m H=3.03 m Ø=150.0 Ø=150 m/m H=3.53 m H=2.83 m Invert=146.17 m PVS - 88
Invert=165.78 m Invert=165.37 m Invert=162.99 m
Invert=162.17 m Q=3.37 L/s P=0.01 0 mm .00 m
L=47.6 m H=2.35 m Q=6.17 L/s
Invert=164.67 m m Q=6.40 L/s CT=147.78 m
Q=1.93 L/s Q=2.22 L/s Q=2.60 L/s Q=2.93 L/s H=3.83 m .8 m Ø=150.0 P=3.76% L=48.7 m H=2.53 m
H=2.23 m Q=2.46 L/s H=5.03 m H=2.83 m L=15 m/m L=52.7 m H=2.03 m Invert=144.25 m PVS - 94
H=2.53 m m 4 P=0.03 m/m
L=36.9 m H=2.53 m L=32.8 m/m P=0.0 0 mm Ø=150.00 mm P=0.04 m/m L=30.5 m
Q=6.63 L/s CT=145.03 m
L=15.4 02 .0
P=0.01 m/m P=0. Ø=150 Ø=150.00 mm Ø=150.00 mm P=0.04 m/m L=59.3 m Invert=141.20 m PVS - 98
Ø=150.00 mm P=0.04
m
L=33.8 m L=17.3 m 15 0. 00 mm Ø=150.00 mm H=3.53 m
m/
Ø=150.0 m /m Ø= P=0.03 Q=7.00 L/s CT=140.91 m
0 mm
P=0.02 m/m P=0.02m Ø=150.00 mm
L=68.0 m
Invert=139.53 m
Ø=150.00 mm 0 mm H=3.83 m
Ø=150.0 P=0.04 m/m
Ø=150.00 Q=7.38 L/s Pozo Existente
mm L=53.3 m H=1.38 m
P=0.03 m/m CT=139.98 m
Ø=150.00 Invert=138.38 m
mm
L=51.6 m
P=0.02 m/m Q=7.42 L/s
Ø=150.0
0 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
SANITARIO PARA LOS BARRIOS
MILAGRO DE DIOS Y VISTA XOLOTLAN,
DEPARTAMENTO DE MANAGUA
TUTOR:
PVS - 23
CT=168.31 m PVS - 27 MSC. ING. ERVIN CABRERA BARAHONA
CT=167.60 m PVS - 32
CF=165.78 m CT=168.02 m
CF=165.37 m
Q=1.93 L/s Q=2.22 L/s PVS - 30 Invert 1=164.02 m
169.00 H=2.50 m CT=167.20 m Invert 2=169.02 m
H=2.20 m
CF=164.67 m Q=2.60 L/s
Q=2.46 L/s H=5.00 m
168.00 H=2.50 m
167.00 PVS - 40
CT=165.00 m
Invert 1=162.70m
166.00 Invert 2=162.20 m
Q=2.93 L/s PVS - 41 CAROLINA G. ZAMORIO DELGADO.
P=0.01 m H=2.80 m CT=164.44 m
/m P=0 YINDIRA ESTEFANY CENTENO
165.00 L=36 Invert 1=161.44m
Ø=150.0.9 m .
L 04 m Invert 2=160.64 m
0 mm Ø==15.4 /m P= Q=3.37 L/s PVS - 44
164.00 150 m
.00 L=30.02 m/m H=3.80 m CT=162.99 m
mm Ø=1 3.8 m CF=159.96 m
50.00
mm Q=3.64 L/s
163.00 H=3.00 m
P
L =0 PVS - 48
162.00 Ø= =17..302 m CT=160.85 m
150 /m
.00 m P Invert 1=159.50 m
mm L= =0.0 Invert 2=158.35 m
161.00 Ø= 32.8 2 m Q=3.92 L/s
DIBUJO:
150 /m
.00 m P=
H=2.50 m PVS - 51
mm 0.0 CT=159.25 m
160.00 Ø= L=1 4 m/ Invert 1=157.90 m CAROLINA G. ZAMORIO DELGADO.
15 5.8 m Invert 2=157.55 m
0.0 m P= Q=4.22 L/s
PVS - 57 YINDIRA ESTEFANY CENTENO
159.00 0m
m Ø L=30.01
CT=157.72 m
H=1.70 m Invert 1=156.37m
=1 4.0 m/m Invert 2=155.97 m
50 m P=
158.00 .00 Q=4.60 L/s
mm L 0. PVS - 63
Ø==160. 3 m
H=1.80 m
CT=156.41 m
15 4 m /m Invert 1=155.06m
157.00 0.0
0m P Invert 2=153.61 m
m L =0.
Ø= =32.104 m
Q=4.97 L/s
156.00 15 H=2.80 m
0.0 m /m PVS - 69 FECHA:
0m CT=154.59 m
m CF=151.76 m
155.00 P=
0 Q=5.35 L/s NOVIEMBRE 2017
L .02
Ø= =51.7 m/m
H=2.80 m
154.00 150 m
.00 PVS - 75
mm CT=152.08 m
153.00 CF=150.05 m
P= Q=5.71 L/s
0
L .0
Ø==47 4 m/
H=2.35 m
152.00 ESCALA:
15 .6 m m
0.0 PVS - 82
0m CT=149.95 m
151.00 m Invert=148.05 m V= 1:125 H= 1:1250
P=
L 0. Q=6.17 L/s
150.00 Ø= =48.03 m/ H=2.50 m PVS - 85
150 7 m m CT=148.20 m
.00
mm CF=146.17 m PVS - 88
149.00 Q=6.40 L/s CT=147.78 m
P
L =0.0 H=2.00 m CF=144.25 m
148.00 Ø= =52.74 m/m Q=6.63 L/s
150 m H=3.50 m
.00
mm
147.00 UBICACION:
P
L =0.0 PVS - 94
146.00 Ø= =30.54 m/m CT=145.03 m BARRIO MILAGRO DE DIOS Y VISTA
150 m Invert=141.23m
.00 XOLOTLAN
mm Q=6.92 L/s
145.00 P=0 H=3.80 m
L= .03 m
Ø=1 59.3 m /m
144.00 50.0
0m
m
143.00
P PVS - 98
L =0. CT=140.91 m CONTENIDO:
142.00 Ø= =68.004 m/ CF=139.53 m
150 m
.00 m Q=7.15 L/s Pozo Existente
141.00 mm H=1.35 m CT=139.98 m
CF=138.38 m PLANTA - PERFILES
Q=7.19 L/s
140.00 P
L =0.0
Ø= =53.33 m/m
150 m
139.00 .00
mm P
L =0.0
138.00 Ø= =51.62 m/m
150 m
.00
mm
137.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200 0+225 0+250 0+275 0+300 0+325 0+350 0+375 0+400 0+425 0+450 0+475 0+500 0+525 0+550 0+575 0+600 0+625 0+650 0+675 0+700 0+725
PLANTA PERFIL PVS 23 AL PVS EXISTENTE
Escala Vertical 1:225
Escala Horizontal 1:2250
LAMINA HOJA
10
AS - 9
19
PVS - 60
PVS - 59 CT=157.15 m
CT=159.80 m PVS - 60
Invert=155.77 m CT=157.15 m
Invert=156.30 m Q=0.08 L/s Invert=155.77 m
Q=0.00 L/s PVS - 58
H=1.38 m CT=157.69 m Q=0.08 L/s
H=3.50 m L=47.6 m Invert=156.34 m H=1.38 m PVS - 63
L=60.7 m CT=157.11 m
P=0.01 m/m Q=0.00 L/s P=0.01m/m L=70.2 m
Invert=153.58 m
Ø=150.00 mm H=1.35 m Ø=150.00 mm P=0.3 m/m
Ø=150.00 mm Q=4.97 L/s
H=3.53 m
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
SANITARIO PARA LOS BARRIOS
MILAGRO DE DIOS Y VISTA XOLOTLAN,
PVS - 59 DEPARTAMENTO DE MANAGUA
Rim: 159.80 m
Invert: 156.30 m PVS - 58
160.00 Q=0.00 L/s Rim: 157.69 m
H=3.50 m Invert: 156.34 m PVS - 60
158.00 Rim: 157.15 m
Q=0.00 L/s
159.00 H=1.35 m Invert: 155.77 m
TUTOR:
Q=0.08 L/s
157.00
PVS - 60 H=1.38 m MSC. ING. ERVIN CABRERA BARAHONA
158.00 Rim: 157.15 m
Invert: 155.77 m PVS - 63
156.00 P=0.01 m/m Rim: 157.11 m
Q=0.08 L/s
157.00 L=60.7 m Invert: 153.58 m
H=1.35 m
Ø=150.00 m Q=4.97 L/s
155.00 m
H=2.80 m
156.00 P=0.01 m/m P=0
.
L=47.6 m L=70 03 m/m CAROLINA G. ZAMORIO DELGADO.
Ø=150.00 mm 154.00 Ø=1 .2 m YINDIRA ESTEFANY CENTENO
50.0
0 mm
155.00
0+000 0+025 0+050 0+075 153.00
PLANTA PERFIL PVS 59 AL PVS 60 0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
PVS - 63 FECHA:
PVS - 62 CT=157.11 m
PVS - 56 PVS - 57
PVS - 61 CT=157.11 m Invert=153.58 m
CT=158.19 m L=81.6 m NOVIEMBRE 2017
PVS - 55 CT=157.78 m CT=157.72 m L=54.7 m
Invert=155.73 m Q=4.97 L/s
CT=158.49 m Invert=156.84 m P=0.03 m/m
Invert=156.40 m Invert=155.92 m P=0.020 m/m Q=0.05 L/s Ø=150.00 mm H=3.53 m
Invert=157.14 m L=52.4 m Q=0.07 L/s L=72.9 m Q=0.00 L/s H=1.38 m
Q=4.60 L/s Ø=150.00 mm
Q=0.00 L/s P=0.01 m/m H=1.38 m P=0.01 m/m H=1.35 m
Ø=150.00 mm Ø=150.00 mm H=1.80 m
H=1.35 m
ESCALA:
V= 1:125 H= 1:1250
PVS - 61
159.00 Rim: 158.19 m
Invert: 156.84 m
Q=0.00 L/s PVS - 62
158.00 H=1.35 m Rim: 157.11 m
PVS - 55 UBICACION:
Rim: 158.49 m Invert: 155.73 m
159.00 Invert: 157.14 m Q=0.05 L/s
PVS - 56 PVS - 57 157.00 H=1.35 m BARRIO MILAGRO DE DIOS Y VISTA
Q=0.00 L/s Rim: 157.78 m Rim: 157.72 m XOLOTLAN
LAMINA HOJA
11
AS - 10
19
PVS - 68 PVS - 69
CT=153.58 m CT=154.59 m
PVS - 65 Invert=152.20 m Invert=151.76 m
PVS - 67 Q=5.35 L/s
CT=157.23 m CT=154.78 m Q=0.09 L/s
Invert=154.73 m PVS - 66 H=1.38 m H=2.83 m
Q=0.00 L/s CT=154.95 m Invert=153.43 m L=79.1 m L=59.3 m
Q=0.00 L/s P=0.02 m/m P=0.01 m/m
H=2.50 m Invert=152.92 m Ø=150.00 mm Ø=150.00 mm
L=46.3 m Q=0.11 L/s H=1.35 m
P=0.04 m/m H=2.03 m
Ø=150.00 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
PVS - 65 SANITARIO PARA LOS BARRIOS
158.00 CT: 157.23 m MILAGRO DE DIOS Y VISTA XOLOTLAN,
Invert: 154.73 m DEPARTAMENTO DE MANAGUA
PVS - 67
Q=0.00 L/s PVS - 69
157.00 CT: 154.78 m
H=2.50 m Invert: 153.43 m CT: 154.59 m
155.00 Invert: 151.76 m
Q=0.00 L/s PVS - 68
156.00 PVS - 66 Q=5.35 L/s
H=1.35 m CT: 153.58 m TUTOR:
CT: 154.95 m H=2.80 m
154.00 Invert: 152.20 m
Invert: 152.92 m MSC. ING. ERVIN CABRERA BARAHONA
155.00 Q=0.09 L/s
Q=0.11 L/s
H=1.35 m
H=2.00 m 153.00
154.00 P=0.02
m/m
P=0.04 m 152.00 L=79.1
/m m
Ø=150.0
153.00 L=46.3 m 0 mm
P=0.01 m/m
Ø=150.00 CAROLINA G. ZAMORIO DELGADO.
mm 151.00 L=59.3 m YINDIRA ESTEFANY CENTENO
Ø=150.00 mm
152.00
0+000 0+025 0+050 0+075 150.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
PLANTA PERFIL PVS 65 AL PVS 66
PLANTA PERFIL PVS 67 AL PVS 69
DIBUJO:
PVS - 72
CT=152.58 m
Invert=151.20 m
PVS - 66 PVS - 70 Q=0.09 L/s PVS - 75 FECHA:
CT=154.95 m CT=153.09 m H=1.38 m CT=152.08 m
Invert=152.92 m PVS - 69 Invert=150.05 m
Q=0.11 L/s
Invert=151.74 m L=61.1 m L=72.4 m NOVIEMBRE 2017
CT=154.59 m
H=2.03 m Q=0.00 L/s P=0.01 m/m P=0.02 m/m Q=5.71 L/s
Invert=151.76 m Ø=150.00 mm Ø=150.00 mm
PVS - 64 Q=5.35 L/s H=1.35 m H=2.35 m
CT=155.05 m L=59.9 m H=2.83 m
Invert=153.70 m P=0.01 m/m L=70.8 m
Q=0.00 L/s Ø=150.00 mm P=0.02 m/m
H=1.35 m Ø=150.00 mm ESCALA:
V= 1:125 H= 1:1250
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
LAMINA HOJA
12
AS - 11
19
PVS - 71 PVS - 79 PVS - 77
CT=154.35 m CT=151.56 m CT=151.45 m
Invert=152.35 m Invert=149.92 m PVS - 76
PVS - 72 Invert=149.73 m CT=151.91 m PVS - 77
Q=0.00 L/s CT=152.58 m Q=0.07 L/s
H=2.00 m Invert=151.20 m Q=0.12 L/s Invert=150.56 m CT=151.45 m
Q=0.09 L/s H=1.83 m H=1.53 m Q=0.00 L/s L=61.2 m Invert=149.92 m
L=39.3 m H=1.38 m H=1.35 m P=0.01 m/m
P=0.03 m/m Q=0.07 L/s
Ø=150.00 mm H=1.53 m
Ø=150.00 mm
L=6.0 m
P=0.03 m/m
Ø=150.00 mm
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
SANITARIO PARA LOS BARRIOS
MILAGRO DE DIOS Y VISTA XOLOTLAN,
DEPARTAMENTO DE MANAGUA
PVS - 71 PVS - 77
155.00 CT: 154.35 m CT: 151.45 m
Invert: 152.35 m Invert: 149.92 m PVS - 76
PVS - 79 CT: 151.91 m
Q=0.00 L/s Q=0.07 L/s CT: 151.56 m PVS - 77
154.00 H=1.50 m Invert: 150.56 m
H=2.00 m 152.00 Invert: 149.73 m CT: 151.45 m TUTOR:
PVS - 72 152.00 Q=0.00 L/s Invert: 149.92 m
Q=0.12 L/s MSC. ING. ERVIN CABRERA BARAHONA
CT: 152.58 m H=1.35 m Q=0.07 L/s
153.00 Invert: 151.20 m H=1.80 m
151.00 H=1.50 m
151.00
Q=0.09 L/s
H=1.35 m
152.00 150.00 P=0.01 m
P= 150.00 L=61.2 m /m
P= L= 0.0
0.0
Ø
L=3 3m/m Ø=150.00 m
0. 6.0 0 m
=1
m
03 m m
Ø= 9.3 m
5
151.00 149.00
m
150 CAROLINA G. ZAMORIO DELGADO.
149.00
/m
.00 YINDIRA ESTEFANY CENTENO
mm
0+000 0+025 0+050 0+075 0+100
150.00 148.00
0+000 0+025 0+050 0+075 0+000 0+025 0+050
PLANTA PERFIL PVS 77 AL PVS 79 PLANTA PERFIL PVS 77 AL PVS 79 PLANTA PERFIL PVS 76 AL PVS 77
PVS - 82
PVS - 78 CT=150.55 m
CT=152.46 m PVS - 79
CT=151.56 m Invert=147.42 m FECHA:
Invert=151.11 m PVS - 79 Q=6.17 L/s
Invert=149.73 m
Q=0.00 L/s
Q=0.12 L/s
CT=151.56 m H=2.53 m
H=1.35 m L=69.7 m NOVIEMBRE 2017
H=1.83 m Invert=149.73 m
P=0.03 m/m
L=40.1 m Q=0.12 L/s Ø=150.00 mm
P=0.03 m/m H=1.83 m
Ø=150.00 mm
ESCALA:
V= 1:125 H= 1:1250
PVS - 79 UBICACION:
CT: 151.56 m
152.00 Invert: 149.73 m BARRIO MILAGRO DE DIOS Y VISTA
PVS - 78 Q=0.12 L/s XOLOTLAN
CT: 152.46 m H=1.80 m
153.00 Invert: 151.11 m 151.00 PVS - 82
PVS - 79 CT: 149.95 m
Q=0.00 L/s CT: 151.56 m Invert: 147.42 m
152.00 H=1.35 m Invert: 149.73 m 150.00 Q=6.17 L/s
H=2.50 m CONTENIDO:
Q=0.12 L/s
H=1.80 m
151.00 149.00 PLANTA - PERFILES
P=0 P=0.0
.03 3 m/m
Ø=1L=40.1 m/m L=69
150.00 50.0 m 148.00 Ø=15 .7 m
0m 0.00 m
m m
149.00 147.00
0+000 0+025 0+050 0+075 0+000 0+025 0+050 0+075 0+100
PLANTA PERFIL PVS 77 AL PVS 79
PLANTA PERFIL PVS 77 AL PVS 79
LAMINA HOJA
13
AS - 12
19
PVS - 87
PVS - 80 PVS - 81 CT=147.02 m
CT=152.98 m CT=151.45 m PVS - 82 Invert=145.64 m PVS - 88
Invert=151.63 m Invert=150.07 m CT=149.95 m
Q=0.10 L/s PVS - 86 Q=0.10 L/s CT=147.78 m
Q=0.00 L/s Invert =147.42 m
H=1.35 m H=1.35 m Q=6.12 L/s CT=148.09 m H=1.38 m Invert=144.25 m
L=75.6 m
L=54.1 m H=2.50 m Invert=146.74 m L=59.5 m Q=6.63 L/s
P=0.087 m/m L=71.2 m P=0.02 m/m
Ø=150.00 mm P=0.060 m/m Q=0.00 L/s H=3.53 m
Ø=150.00 mm P=0.02 m/m Ø=150.00 mm
V=0.91 m/s H=1.35 m Ø=150.00 mm
V=1.23 m/s
TEMA:
PVS - 80 PVS - 86 PROPUESTA DE DISEÑO HIDRÁULICO
149.00 CT: 148.09 m PVS - 88
CT: 152.98 m DEL SISTEMA DE ALCANTARILLADO
Invert: 151.63 m Invert: 146.74 m CT: 147.78 m SANITARIO PARA LOS BARRIOS
Q=0.00 L/s PVS - 87 Invert: 144.25 m MILAGRO DE DIOS Y VISTA XOLOTLAN,
153.00 Q=0.00 L/s 148.00
CT: 147.02 m Q=6.63 L/s DEPARTAMENTO DE MANAGUA
H=1.35 m PVS - 81 H=1.35 m
Invert: 145.64 m H=3.50 m
CT: 151.45 m
152.00 Invert: 150.07 m 147.00 Q=0.10 L/s
Q=0.10 L/s H=1.35 m
PVS - 89
CT: 147.89 m PVS - 91 ESCALA:
CT: 147.97 m PVS - 93
Invert: 146.54 m CT: 147.80 m
Q=0.00 L/s Invert: 143.44 m V= 1:125 H= 1:1250
PVS - 83 Invert: 143.27 m
148.00 H=1.35 m Q=0.11 L/s
CT: 151.98 m H=4.50 m Q=0.24 L/s
Invert: 150.63 m H=4.50 m
152.00 Q=0.00 L/s 147.00
H=1.35 m
UBICACION:
151.00 PVS - 84 PVS - 94
CT: 150.06 m 146.00
CT: 145.03 m BARRIO MILAGRO DE DIOS Y VISTA
Invert: 148.68 m P Invert: 141.20 m XOLOTLAN
L =0 Q=7.00 L/s
150.00 Q=0.12 L/s 145.00 Ø= =49 .01
15 .0 m H=3.80 m
H=1.35 m 0.0 m /m
PVS - 85 0m
P=0.0 m
149.00 3 m/m CT: 148.20 m 144.00
L=68 Invert: 146.17 m
.2 CONTENIDO:
Ø=15 m
0.00 Q=6.40 L/s
148.00 mm P=0.04 m/m
H=2.00m 143.00
PLANTA - PERFILES
L=41.6 m
P= Ø=150.00 mm P=
0.0 0.0
147.00 L=6 4 m/m 142.00 L= 2 m/m
Ø= 2.8 m Ø= 47.5
150 15 m
.00 0.0
146.00 mm 141.00 0m
m
145.00 140.00
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175
LAMINA HOJA
PLANTA PERFIL PVS 83 AL PVS 85 PLANTA PERFIL PVS 89 AL PVS 94
14
AS - 13
19
PVS - 97
PVS - 95 CT=144.67 m
CT=145.83 m Invert=141.84 m PVS - 98
Invert=144.48 m Q=0.20 L/s CT=140.91 m PVS - 90
PVS - 91
Q=0.00 L/s H=2.83 m Invert=139.53 m CT=148.16 m CT=147.97 m
H=1.35 m Invert=143.97 m L=56.4 m
L=65.16 m Q=7.38 L/s P=0.01 m/m Invert=143.44 m
L=84.0 m P=0.03 m/m H=1.38 m Q=0.00 L/s Ø=150.00 mm Q=0.11 L/s
P=0.02 m/m Ø=150.00 mm H=4.19 m
Ø=150.00 mm H=4.53 m
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
PVS - 95 SANITARIO PARA LOS BARRIOS
CT: 145.83 m MILAGRO DE DIOS Y VISTA XOLOTLAN,
Invert: 144.48 m DEPARTAMENTO DE MANAGUA
146.00
Q=0.00 L/s PVS - 97
H=1.35 m CT: 144.67 m
145.00 Invert: 141.84 m
Q=0.20 L/s
H=2.80 m TUTOR:
144.00 149.00 PVS - 91
CT: 147.97 m MSC. ING. ERVIN CABRERA BARAHONA
Invert: 143.44 m
143.00 P= 148.00 Q=0.11 L/s
0 H=4.50 m
L= .02 m
Ø= 84.4 /m
142.00 15 m 147.00 PVS - 90
0.0 PVS - 98
0m CT: 140.91 m CT: 148.16 m
m Invert: 143.97 m
Invert: 139.53 m CAROLINA G. ZAMORIO DELGADO.
141.00 146.00 Q=0.00 L/s YINDIRA ESTEFANY CENTENO
Q=7.38 L/s
H=2.00 m
P=0 H=1.35 m
.03 m
L=6
140.00 5.16 /m 145.00
Ø=1 m
50.0
0m
m
139.00 144.00
P=0.01 m
L=56.4 m /m DIBUJO:
Ø=150.00 m
138.00 143.00 m CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200 0+000 0+025 0+050 0+075 0+100
PLANTA PERFIL PVS 90 AL PVS 91
PLANTA PERFIL PVS 95 AL PVS 98
FECHA:
NOVIEMBRE 2017
PVS - 92 PVS - 93
CT=146.94 m CT=147.80 m
PVS - 96
Invert=145.59 m Invert=143.27 m
CT=145.34 m Q=0.00 L/s Q=0.24 L/s
Invert=143.96 m H=1.35 m L=53.5 m H=4.53 m ESCALA:
PVS - 97 P=0.04 m/m
Q=0.00 L/s CT=144.67 m Ø=150.00 mm
H=1.38 m Invert=141.84 m V= 1:100 H= 1:1000
L=42.8 m
P=0.01 m/m Q=0.20 L/s
Ø=150.00 mm H=2.83 m
UBICACION:
143.00 P= 145.00
0
Ø= L=4.01 m
15 2.8 /m P=
0.0 m 0
142.00 0m 144.00 Ø= L=5 .04 m
m 150 3.5 /m
.00 m
mm
141.00 143.00
0+000 0+025 0+050 0+075 0+000 0+025 0+050 0+075 0+100
PLANTA PERFIL PVS 96 AL PVS 97 LAMINA HOJA
PLANTA PERFIL PVS 92 AL PVS 93
15
AS - 14
19
Especificaciones Generales.
0.09 0.09
0.03 0.03
1. Todas las dimensiones están expresadas en metros.
2. El concreto a utilizar en tapa, brocales y base debe tener un factor fc' = TEMA:
0.23
210kg/cm2 en proporción 1:2:3; equivalente a 1 saco de cemento + 3 PROPUESTA DE DISEÑO HIDRÁULICO
cubetas de arena + 5 cubetas de piedrín. Hierro No 4 @ 0.12 DEL SISTEMA DE ALCANTARILLADO
En ambos sentidos 0.15 SANITARIO PARA LOS BARRIOS
MILAGRO DE DIOS Y VISTA XOLOTLAN,
DEPARTAMENTO DE MANAGUA
0.04 0.04
0.04
3.En general el eje de las tuberías deberá quedar localizado a 2.00m al
0.05
oeste en la dirección norte-sur y a 2.00m al norte de este-oeste.
0.12
TUTOR:
0.15
MSC. ING. ERVIN CABRERA BARAHONA
4. La profundidad del tendido a nivel de corona será 1.20m Hierro No 3 + Estribo
0.04
del nivel de la calle, como mínimo. No 2 @ 0.25
0.04
Hierro No 4 @ 0.12
0.08
En ambos sentidos
0.03
5. Los tubos serán de pvc SDR- 41.
DETALLE 1 DETALLE 2 CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
1:200 DETALLE DE SOLERA INTERMEDIA 1:150
TAPADERA DE POZO DE VISITA TIPICO
6. El acero de refuerzo debe poseer un factor Fy = 2810 Kg/cm².
FECHA:
10. Las especificaciones técnicas del INAA prevalecen sobre cualquier otra. V= 1:125 H= 1:1250
UBICACION:
0.05
0.05
0.05
0.05
0.15
CONTENIDO:
0.
28
0.03
DETALLE 3 DETALLE 4
BASE DE POZO DE VISITA TIPICO 1:25 1:25
ESCALONES LAMINA HOJA
16
AS - 15
19
Diametro interno del pozo=1.20
1.04 Diametro de tubo variable
Ladrillo Cuarteron
DIBUJO:
FECHA:
NOVIEMBRE 2017
Diametro interno del pozo=1.20
Diametro de tubo variable
Diametro interno del pozo=1.20
Ladrillo de punta
ESCALA:
Diametro de tubo variable Diametro interno del pozo=1.20
V= 1:125 H= 1:1250
Canal
(Medio Tubo)
UBICACION:
CONTENIDO:
DETALLES DE POZO
LAMINA HOJA
17
AS - 16
19
VER DETALLE 1
VER DETALLE 1
0.20
0.20
Escalones
a cada 5 ladrillos
Escalones
a cada 5 ladrillos
0.95
0.95
VER DETALLE 4
0.15
VER DETALLE 2 VER DETALLE 4
0.15
VER DETALLE 2
TEMA:
PROPUESTA DE DISEÑO HIDRÁULICO
DEL SISTEMA DE ALCANTARILLADO
Relleno Relleno
Repello de 0.01 SANITARIO PARA LOS BARRIOS
Ladrillo de barro trapezoidal Relleno MILAGRO DE DIOS Y VISTA XOLOTLAN,
Ladrillo de barro trapezoidal DEPARTAMENTO DE MANAGUA
Variable
Variable
Repello Repello
Repello Repello TUTOR:
Variable
MSC. ING. ERVIN CABRERA BARAHONA
Diametro
Variable Diametro
Variable
0.15
VER DETALLE 3
0.15
VER DETALLE 3 CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
0.22 0.22 1.20 0.22 0.22
0.22 1.20 0.22
DETALLE DETALLE
POZO DE VISITA TIPICO PARA 1:40 POZO DE VISITA TIPICO PARA 1:40
PROFUNDIDADES MENORES DE 3.7m DIBUJO:
PROFUNDIDADES MAYORES DE 3.7m
CAROLINA G. ZAMORIO DELGADO.
YINDIRA ESTEFANY CENTENO
FECHA:
VER DETALLE 1
NOVIEMBRE 2017
VER DETALLE 1
0.20
0.20
Escalones
a cada 5 ladrillos ESCALA:
Escalones
0.95
VER DETALLE 4
0.95
0.15
UBICACION:
0.15
Relleno REPELLO DE 0.01 BARRIO MILAGRO DE DIOS Y VISTA
Relleno Repello de 0.01 XOLOTLAN
Variable
Repello Repello Repello Repello Codo a 45º de 6" CONTENIDO:
DETALLES DE POZO
Diametro Canal (Medio Tubo)
Variable
0.15
6.77
DETALLE DETALLE 18
POZO DE VISITA TIPICO CON CAIDA TIPO A 1:40 POZO DE VISITA TIPICO CON CAIDA TIPO B 1:40 AS - 17
19
Viene de casa tuberia
PVC de 4"
Codo 4"
PVC
TEMA:
Colector General PROPUESTA DE DISEÑO HIDRÁULICO
Viene de casa tuberia DEL SISTEMA DE ALCANTARILLADO
PVC de 4" Tuberia PVC diametro variable
Tuberia de PVC 4" SANITARIO PARA LOS BARRIOS
Yee reductora de PVC de 4"
Pendiente de 2% minimo MILAGRO DE DIOS Y VISTA XOLOTLAN,
DEPARTAMENTO DE MANAGUA
A calle
Tuberia de PVC 4"
Colector General Pendiente de 2% minimo
Tuberia PVC diametro variable TUTOR:
A desfogue
FECHA:
Tapa de caja de registro sanitario
NOVIEMBRE 2017
ESCALA:
1.20
V= 1:125 H= 1:1250
PVC de 4"
Viene de casa tuberia
Variable
DETALLES DE POZO
Ladrillo cuarterón trapezoidal
Corte a-a
0.15