Metrado Final Canal de Riego Anchac Acopara
Metrado Final Canal de Riego Anchac Acopara
Metrado Final Canal de Riego Anchac Acopara
DESCRIPCIN
OBRAS PRELIMINARES
N
LARGO
UND VECE
(m)
S
ANCHO
(m)
ALTO
(m)
AREA (m2)
SUB
TOTAL
TOTAL
SEGURIDAD Y SALUD
01.01.01
glb
1.0000
1.00
01.01.02
18
18.0000
01.01.03
glb
1.0000
01.01.04
glb
1.0000
01.01.05
glb
1.0000
18.00
1.00
1.00
1.00
glb
1.0000
1.00
01.02
1.0000
01.03
glb
1.0000
1.00
1.00
1,573.3000
1,573.30
Demolicin de desarenador
ml
10
Demolicin de canal
ml
1313
ml
0.5
34
17.0000
17.00
ml
1.2
4.8000
4.80
Demolicin de Pasarela
ml
1.5
7.5000
ml
221
221.0000
02.00.02
m2
1534
3,068.0000
02.00.03
44
44.0000
44.00
02.00.04
km
1.53
1.5300
1.53
2.5104
2.51
2.57
0.7
0.62
1.1154
1.5
1.5
0.62
1.3950
1.53
9.1800
2.57
0.7
1.7990
01.01.06
2
02.00.01
3
03.01
03.01.01
DESARENADOR
m3
m2
10.98
03.02.01
m2
03.02.04
03.02.05
4.00
1.1
3.5200
4.00
2.00
1.1
26.4000
1.5
0.62
2.00
1.8600
2.22
0.62
2.7528
1.00
1.2
0.62
0.7440
2.00
7.6
0.15
1.1
2.5080
2.00
0.8
1.53
0.15
0.3672
1.00
1.53
0.15
1.3770
1.00
2.57
0.7
0.62
1.1154
1.00
1.5
0.15
0.62
0.1395
1.00
2.22
0.15
0.62
0.2065
1.00
1.2
1.2
0.15
0.2160
1.00
0.15
0.62
0.4650
16.00
0.7
3/8"
0.56
6.2720
12.00
0.65
3/8"
0.56
4.3680
8.00
3.8
3/8"
0.56
17.0240
30.00
1.05
3/8"
0.56
17.6400
10.00
0.5
3/8"
0.56
2.8000
4.00
1.35
3/8"
0.56
3.0240
3.00
2.6
3/8"
0.56
4.3680
10.00
0.9
3/8"
0.56
5.0400
6.00
1.5
3/8"
0.56
5.0400
6.00
1.5
3/8"
0.56
5.0400
4.00
0.95
22.8000
Muro de transicion
4.00
0.8
0.95
3.0400
1.00
2.00
2.72
1.00
1.5
03.03
6.39
Kg
70.62
m2
39.37
1.53
7.50
221.00
3,068.00
10.98
35.28
6.39
70.62
39.37
9.1800
0.69
3.7536
0.4
0.6000
m2
39.37
1
39.3736
39.37
39.3736
INSTALACION DE ACCESORIOS
Instalacion de accesorios para desarenador
1.00
Glb
1.00
04.01
0.8
m3
03.03.01
35.28
03.02.03
10.00
1,313.00
MOVIMIENTO DE TIERRAS
03.02.02
1,313.0000
03.01.02
10.0000
1.0000
04.01.01
m3
04.01.02
Nivelacion y Refine
m2
1.00
83.3500
2,363.4000
fondo de canal
1313
talud de canal
1313
0.7
919.1000
0.55
1,444.3000
83.35
######
04.02
04.02.01
04.02.02
m2
2
1313
0.4
1,050.4000
.losa
1313
0.55
1,444.3000
1313.14
0.15
0.4
0.7
m3
. Muros de Canal
04.02.04
1313.14
0.15
1313.14
1.1
1313.14
0.4
04.03.01
5
05.01
525.2560
m2
3,414.1640
1
3,414.1640
0.2
1313
262.6000
262.60
221.00
110.50
221
221.0000
Trazo y Replanteo
m2
221
0.5
110.5000
0.5
MOVIMIENTO DE TIERRAS
05.02.01
m3
221
05.02.02
221
05.02.03
Cama de apoyo e= 10 cm
m3
05.02.04
m3
221
e=0.10m
Ver HOJA DE METRADOS ADUCCION
05.02.05
m3
221
05.04
05.04.01
6
06.01
06.01.01
06.03
m3
221.00
1.2
1.2
0.6
3.4560
13.82
3.4560
2.8800
1.2
1.2
1.2
2.88
1.4400
0.6
1.4400
0.1000
1
0.1
0.6
2.4000
0.8
0.6
1.9200
0.40
0.1000
m2
m3
m3
4.3200
0.1
0.6
96.54
0.2400
0.96
0.2400
m2
4.3200
4
0.6
2.4000
0.8
0.6
1.9200
m2
8.6400
2
17.28
24.1360
0.0000
06.04
221
06.03.03
06.03.05
66.30
221.00
11.05
16.40
27.63
221.00
221.00
221
06.03.02
06.03.04
22.1000
m2
0.2
m3
66.3000
MOVIMIENTO DE TIERRAS
06.02.01
0.5
0.6
Caja de inspeccion
06.01.02
######
3,414.1640
JUNTAS ASFALTICAS
05.03.01
######
2,888.9080
05.01.02
05.03
295.46
137.8797
3,414.1640
05.01.01
05.02
######
157.5768
m2
295.4565
. Losa de Canal
04.02.03
2,494.7000
.muros
4.32
17.28
34.56
8.6400
ACCESORIOS
Instalacion de tapa Metalica estriada 1.20x1.20 x 3/16" c/llave tipo bujia
Und
1.0000
4.00
0.0600
2.04
34
MOVIMIENTO DE TIERRAS
Excavacin en material Conglomerado
m3
07.02
07.02.01
0.4
1.95
0.8
1.95
4.00
1.2
Nivelacion y Refine
07.02.03
0.0600
m2
3.7050
2.1450
Encofrado y Desenccofrado
m2
1.92
0.4
1.9200
m3
0.46
2.00
1.2
0.15
0.4
0.1440
1.00
1.75
1.2
0.15
0.3150
cant
diame
long
Kg n veces
kg/m
3/8"
0.56
3.3600
3.00
3/8"
1.2
0.56
4.0320
5.00
3/8"
0.55
0.56
1.5400
6.00
3/8"
0.55
0.56
3/8"
0.56
9.00
3/8"
0.56
0.7
1.4000
0.55
1.2
1.3200
0.55
1.05
1.1550
0.4
0.4000
0.3
1.15
0.3450
07.04
07.04.01
10.0800
4.6200
m2
4.6200
1
10.0800
10.0800
m2
07.03.01
3.6960
9.00
######
10.0800
15.61
5.24
07.02.05
32.79
65.28
7.39
07.02.04
125.97
1.5600
0.55
07.02.02
0.15
4.62
157.08
157.08
4.6200
m2
0.5
0.5
0.2500
8.50
1.0000
34.00
07.04.02
8
08.01
08.01.01
Und
08.02
08.02.01
m3
08.03
Nivelacion y Refine
1.2
0.8
3.3600
1
1.6
1.2
1.2
1.9200
2.00
1.2
4.00
1.2
0.8
3.8400
Muro de Canal
2.00
1.2
0.4
0.9600
2.00
1.2
0.3
0.7200
0.6
1.4400
m3
0.72
0.3
Encofrado y Desenccofrado
m2
5.92
m3
0.40
1.00
1.2
1.1
0.3
cant
diame
long
kg/m
27.44
8.00
3/8"
1.2
0.56
10.7520
9.00
3/8"
1.3
0.56
13.1040
8.00
3/8"
0.4
0.56
3.5840
1.2
1.1
1.2
0.3
1.1
0.3
Kg n veces
35.50
2.38
0.3960
164.64
23.86
3.58
m2
4.0200
0.7200
0.6600
4.0200
1
24.12
2.6400
m2
4.32
0.7200
08.03.05
5.76
20.16
08.03.04
34.00
0.9600
Losa de pasarela
08.03.03
0.5
m2
Losa de Pasarela
08.03.02
0.9600
2
1.0000
MOVIMIENTO DE TIERRAS
Cimientos ciclopeos
08.01.02
4.02
24.12
4.0200
VARIOS
09.01
09.02
glb
1.0000
ENSAYOS DE LABORATORIO
glb
1.0000
09.03
glb
1.0000
09.04
glb
1.0000
10
10.01
FLETE
FLETE RURAL
glb
1.0000
10.02
FLETE TERRESTRE
glb
1.0000
435222.51
1.00
1.00
1.00
1.00
1.00
1.00
HOJA DE METRADOS
OBRA
: CANAL ENTUBADO
METRADOS
ITEM
DESCRIPCION
04.00.00
04.01.00
04.01.01
04.01.02
LINEA DE ADUCCION
TRABAJOS PRELIMINARES
Limpieza de terreno manual
Control topografico durante la ejecucin
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
MOVIMIENTO DE TIERRAS
Excavacin Manual en Material suelto
Refine y Nivelacion de terreno normal para tuberia
Colocacion de cama de apoyo e= 10 cm
Relleno y comp. Con material de prestamo
Relleno con material propio
04.03.00
04.03.01
04.04.00
04.04.01
DIMENSIONES
N DE
VECES
LARGO
ANCHO
1.00
1.00
221.00
221.00
1.00
0.50
1.00
1.00
1.00
221.00
221.00
221.00
0.50
1.00
221.00
1.00
221.00
GLB
Und
3.00
e=0.10m
0.50
OS
MENSIONES
ALTO
0.60
PARCIAL
TOTAL
UNIDAD
TOTAL
UNID.
221.00
110.50
221.00
110.50
221.00
110.50
M2
M2
66.30
66.30
66.30
221.00
11.05
16.40
27.63
M3
Ml
M3
M3
M3
221.00
ML
221.00
Ml
e=0.10m
0.20
22.10
22.10
GLB
3.00
1.00
3.00
Und
0.2
66.30
82.88
82.88 M3
PARTIDA
1 Cama de apoyo
Und.
Ancho
m3
Longitud
Altura
Volumen
0.5
221.00
0.1
11.05
0.5
221.00
0.3
33.15
0.088141515
221.00
Total ( por factor de Esponjamiento 1.20)
16.404
19.48
m3
m3
m3
m3
82.88
27.454
0.5
221.00
0.2
27.63
55.08
27.80
33.76
PARTIDA N
07.03.02
INSTALACION DEL SERVICIO DE PEQUEAS REPRESAS PARA RIEGO PRESURIZADO EN EL CASERIO DE QUINUAPAMPA CEN
- CAJAMARCA
DESCRIPCION
DISEO DE FIERRO
DIAM. (F)
CANT
3/8
3.00
Acero Horizontal
3/8
3.00
Longitudinal
3/8
5.00
Transversal
3/8
5.00
LONGITUD
KG/ML
PESO
DE METRADOS ACERO
N VECES
LONG
1/4
4.00
1.00
12.00
4.00
1.30
15.60
1.00
1.55
7.75
1.00
1.55
7.75
0.00
0.25
0.00
43.10
0.56
24.14
0.00
0.99
0.00
TOTAL
0.00
1.55
0.00
(Kg)
(Kg)
3/4
0.00
2.24
0.00
24.14
24.14
0.00
3.97
0.00