Analisis de Precio Unitario Edificio
Analisis de Precio Unitario Edificio
Analisis de Precio Unitario Edificio
FORMULARIO No. 4a
Item
Descripcin
Unidad
Cantidad
P. Unitario
1 PRELIMINARES
1.001 REPLANTEO
P. Total
14.56
m2
39.34
0.37
2 MOVIMIENTO DE TIERRAS
14.56
543.55
m3
49.00
2.70
M3
47.00
8.75
3 ESTRUCTURAS
132.30
411.25
5034.46
M3
0.92
158.38
144.92
M3
3.09
158.38
488.60
M3
1.82
158.38
288.25
M3
1.08
158.38
170.26
M3
1.15
158.38
181.35
ML
53.45
4.99
266.72
M2
27.89
14.46
403.22
M2
43.00
23.00
989.00
M3
1.14
158.38
179.76
kg
985.84
1.95
1922.39
m3
7.31
8.00
58.48
m2
43.00
6.00
258.00
M2
174.55
9.85
1719.32
ml
167.58
1.50
251.37
m2
46.50
4.48
208.30
M2
38.56
2.85
109.90
M2
43.00
2.98
316.48
5 MAMPOSTERIA
2417.02
6 ACABADOS
128.14
3501.65
m2
195.39
3.48
679.96
m2
110.90
4.57
506.79
m2
40.65
3.48
141.44
m2
64.01
22.81
1460.07
m2
34.37
11.40
391.82
m2
11.35
10.28
116.68
15.00
2.52
37.80
ML
2.45
68.20
167.09
4584.41
M2
47.65
20.35
969.68
1.00
125.00
125.00
3.00
115.40
346.20
3.00
105.42
316.26
1.00
160.45
160.45
1.00
125.00
125.00
m2
12.39
48.00
594.72
7.008 GYPSUM
m2
44.13
14.28
630.11
7.009 CLOSET
3.00
280.00
840.00
ML
2.45
160.00
392.00
GL
1.00
85.00
85.00
ptos
14.00
20.15
282.10
ptos
21.00
19.76
414.96
ptos
4.00
20.19
80.76
8.004 PUNTO TV
4.00
10.87
43.48
2.00
10.87
21.74
8.006 BREAKERS
16.00
5.12
81.92
ml
2.40
8.29
19.90
1.00
58.98
1003.84
9 INSTALACIONES SANITARIAS
58.98
708.60
PTO
16.00
25.09
401.44
PTO
10.00
20.54
205.40
ml
7.00
3.85
26.95
1.00
14.38
14.38
1.00
24.00
24.00
1.00
31.13
31.13
ML
1.00
2.65
2.65
ML
1.00
2.65
2.65
10.001 INODORO
3.00
65.43
196.29
10.002 LAVAMANO
3.00
47.01
141.03
1.00
65.00
65.00
2.00
35.38
70.76
1.00
4.73
4.73
2.00
3.79
7.58
3.00
14.00
10 INODOROS Y GRIFERIA
527.39
11 OBRAS EXTERIORES
42.00
818.30
11.001 LAVANDERIA
1.00
51.98
51.98
ML
7.00
4.58
32.06
ML
11.30
60.27
681.05
M2
2.93
18.16
53.21
TOTAL
19,470.25
%
0.07%
2.79%
25.86%
1.63%
12.41%
81.56 M2
95
7,748.20 M2
1,291.37
4,584.35
11.18
511.15
17.98%
508.50
23.55%
34.37
11.35
45.72
45.72
5,134.47
5.16%
3.64%
2.71%
4.20%
100.00%
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
October-2011
REPLANTEO Y NIVELACION
HOJA: 1
UNIDAD: M2
RENDIMIENTO: 0.017
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
6.00
COSTO
D=(CxR)
0.009
0.099
PARCIAL: (M)
0.108
COSTO/HOR
C=(AxB)
7.32
2.47
1.42
COSTO
D=(CxR)
0.121
0.041
0.023
PARCIAL: (N)
0.185
COSTO
C=(AxB)
0.045
0.032
PARCIAL: (O)
0.077
1.00
COSTO/HOR
C=(AxB)
6.00
%
2.50
26.74
29.24
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
1.00
2.47
1.00
1.42
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
TOPOGRAFO III
%
32.62
11.01
6.33
49.96
MATERIALES
DESCRIPCION
UNIDAD
TIRAS
CUARTONES
TRANSPORTE
DESCRIPCION
U.
U.
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
12.16
8.64
20.80
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
0%
0%
0%
0%
0.370
0.000
0.000
0.000
0.000
0.370
0.37
100.00
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: EXCAVACION Y DESALOJO MANUAL
HOJA: 1
UNIDAD: M2
RENDIMIENTO: 0.160
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.117
PARCIAL: (M)
0.117
COSTO/HOR
C=(AxB)
14.64
COSTO
D=(CxR)
2.342
PARCIAL: (N)
2.342
%
3.49
3.49
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
6.00
2.44
CATEGORIA I (PEON)
%
69.72
69.72
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
MATERIAL DE DESALOJO
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
4.00
1.25
0%
0%
0%
0%
0.000
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.900
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
COSTO
C=(AxB)
0.00
%
26.79
0.900
26.79
3.360
0.000
0.000
0.000
0.000
3.360
3.36
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
EXCAVACION Y DESALOJO A MAQUINA
HOJA:
UNIDAD: M3
RENDIMIENTO: 0.020
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
1.00
TARIFA
(B)
45.00
33.00
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
45.00
33.00
0.878
0.644
32.49
23.83
PARCIAL: (M)
1.521
56.32
COSTO/HOR
C=(AxB)
2.56
2.56
COSTO
D=(CxR)
0.050
0.050
PARCIAL: (N)
0.100
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.56
1.00
2.56
O.E.P. 1
O.E.P. 1
%
1.85
1.85
3.70
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
MATERIAL DE DESALOJO
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
5.00
1.20
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
1.080
%
39.99
PARCIAL: (P)
1.080
39.99
2.701
0.000
0.000
0.000
0.000
2.701
100.00
0%
0%
0%
0%
2.70
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
REPARACION INST. EXISTENTES AA.PP
HOJA: 4
UNIDAD: U
RENDIMIENTO: 1.400
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.523
PARCIAL: (M)
0.523
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
3.416
3.458
3.584
PARCIAL: (N)
10.458
COSTO
C=(AxB)
6.000
PARCIAL: (O)
6.000
%
3.08
3.08
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
20.12
20.36
21.11
61.59
MATERIALES
DESCRIPCION
UNIDAD
TUBERIA Y ACC.
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
35.33
35.33
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
0%
0%
16.981
0.000
0.000
100.00
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0.000
0.000
16.981
16.98
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
ACABADO DE OBRAS BASICAS
HOJA: 5
UNIDAD: M2
RENDIMIENTO: 0.003
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
1.00
1.00
TARIFA
(B)
45.00
26.00
16.00
COSTO/HOR
C=(AxB)
45.00
26.00
16.00
COSTO
D=(CxR)
0.002
0.117
0.068
0.042
PARCIAL: (M)
0.228
COSTO/HOR
C=(AxB)
5.12
4.94
2.44
COSTO
D=(CxR)
0.013
0.013
0.006
PARCIAL: (N)
0.033
%
0.62
44.94
25.97
15.98
87.52
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.56
2.00
2.47
1.00
2.44
O.E.P. 1
CATEGORIA III (ALBAIL)
CATEGORIA I (PEON)
%
5.11
4.93
2.44
12.48
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
COSTO
D=(AxBXC)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.260
0.000
0.000
0.000
0.000
0.260
0.26
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
RELLENO DE LASTRE HIDROCOMP. MANUAL
HOJA:
UNIDAD: M3
RENDIMIENTO: 0.400
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
COMPACTADOR
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
1.200
PARCIAL: (M)
1.200
COSTO/HOR
C=(AxB)
12.20
2.47
COSTO
D=(CxR)
4.880
0.988
PARCIAL: (N)
5.868
COSTO
C=(AxB)
1.563
0.070
PARCIAL: (O)
1.633
%
9.94
9.94
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
40.41
8.18
48.59
MATERIALES
DESCRIPCION
UNIDAD
LASTRE
AGUA
TRANSPORTE
DESCRIPCION
LASTRE
M3
M3
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.25
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.375
%
12.94
0.58
13.52
%
27.95
PARCIAL: (P)
3.375
27.95
12.076
0.000
0.000
100.00
0%
0%
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0.000
0.000
12.076
12.08
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
RELLENO MANUAL DE SUELO SELECCIONADO
MEJORAMIENTO (ACERAS)
CODIGO: 402-2(1)a
HOJA:
UNIDAD: M3
RENDIMIENTO: 0.250
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.183
0.750
PARCIAL: (M)
0.933
COSTO/HOR
C=(AxB)
12.20
2.47
COSTO
D=(CxR)
3.050
0.618
PARCIAL: (N)
3.668
COSTO
C=(AxB)
3.000
0.070
PARCIAL: (O)
3.070
3.00
COSTO/HOR
C=(AxB)
%
1.68
6.87
8.55
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
27.95
5.66
33.61
MATERIALES
DESCRIPCION
UNIDAD
MATERIAL MEJORADO
AGUA
TRANSPORTE
DESCRIPCION
MATERIAL MEJORADO
M3
M3
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.20
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.240
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
27.50
0.64
28.14
%
29.70
3.240
29.70
10.911
0.000
0.000
0.000
0.000
10.911
10.91
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
0.00
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
RELLENO DE SUB-BASE CLASE III
:403-1
HOJA:
UNIDAD: M3
RENDIMIENTO: 0.022
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
MOTONIVELADORA 155HP
RODILLO VIBRATORIO
TANQUERO 5000LTS
1.00
1.00
1.00
45.00
26.00
16.00
45.00
26.00
16.00
0.990
0.572
0.352
8.37
4.84
2.98
PARCIAL: (M)
1.914
16.19
COSTO/HOR
C=(AxB)
2.56
1.45
1.39
2.44
COSTO
D=(CxR)
0.056
0.032
0.031
0.054
PARCIAL: (N)
0.172
COSTO
C=(AxB)
5.100
0.750
PARCIAL: (O)
5.850
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.56
1.00
1.45
1.00
1.39
1.00
2.44
O.E.P. 1
O.E.P. 2
CHOFER LICENCIA TIPO B
CATEGORIA I (PEON)
%
0.48
0.27
0.26
0.45
1.46
MATERIALES
DESCRIPCION
UNIDAD
SUB-BASE CLASE 3
ARENA
M3
M3
TRANSPORTE
DESCRIPCION
UNIDAD
SUB-BASE CLASE 3
ARENA
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.20
30.00
0.12
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.240
0.18
0.648
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
43.13
6.34
49.47
%
27.40
5.48
3.888
32.88
11.824
0.000
0.000
0.000
0.000
11.824
11.82
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
RELLENO DE BASE GRANULAR
HOJA: 8
UNIDAD: M3
RENDIMIENTO: 0.022
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
MOTONIVELADORA 155HP
RODILLO VIBRATORIO
TANQUERO 5000LTS
1.00
1.00
1.00
45.00
26.00
16.00
45.00
26.00
16.00
0.990
0.572
0.352
7.66
4.43
2.72
PARCIAL: (M)
1.914
14.81
COSTO/HOR
C=(AxB)
2.56
1.45
1.39
2.44
COSTO
D=(CxR)
0.056
0.032
0.031
0.054
PARCIAL: (N)
0.172
COSTO
C=(AxB)
6.063
0.750
PARCIAL: (O)
6.813
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.56
1.00
1.45
1.00
1.39
1.00
2.44
O.E.P. 1
O.E.P. 2
CHOFER LICENCIA TIPO B
CATEGORIA I (PEON)
%
0.44
0.25
0.24
0.42
1.33
MATERIALES
DESCRIPCION
UNIDAD
M3
M3
TRANSPORTE
DESCRIPCION
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.25
30.00
0.12
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.375
0.18
0.648
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
46.92
5.80
52.72
%
26.12
5.01
4.023
31.13
12.922
0.000
0.000
0.000
0.000
12.922
12.92
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: RELLENO COMPACTADO E HIDRATADO
HOJA: 9
UNIDAD: M3
RENDIMIENTO: 0.024
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
MOTONIVELADORA 155HP
RODILLO VIBRATORIO
TANQUERO 5000LTS
1.00
1.00
1.00
45.00
26.00
16.00
45.00
26.00
16.00
1.067
0.616
0.379
12.19
7.04
4.33
PARCIAL: (M)
2.062
23.57
COSTO/HOR
C=(AxB)
2.56
1.45
1.39
2.44
COSTO
D=(CxR)
0.061
0.034
0.033
0.058
PARCIAL: (N)
0.186
COSTO
C=(AxB)
3.125
PARCIAL: (O)
3.125
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.56
1.00
1.45
1.00
1.39
1.00
2.44
O.E.P. 1
O.E.P. 2
CHOFER LICENCIA TIPO B
CATEGORIA I (PEON)
%
0.69
0.39
0.38
0.66
2.12
MATERIALES
DESCRIPCION
UNIDAD
MATERIAL MEJORADO
M3
TRANSPORTE
DESCRIPCION
UNIDAD
MATERIAL MEJORADO
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.25
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.375
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
35.72
35.72
%
38.58
3.375
38.58
8.748
0.000
0.000
0.000
0.000
8.748
8.75
100.00
NITULY S. A.
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
RELLENO DE MATERIAL PARA AREA VERDES
HOJA: 10
UNIDAD: M3
RENDIMIENTO: 0.017
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.004
0.09
PARCIAL: (M)
0.004
0.09
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.041
0.042
PARCIAL: (N)
0.083
COSTO
C=(AxB)
1.488
PARCIAL: (O)
1.488
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
0.87
0.88
1.74
MATERIALES
DESCRIPCION
UNIDAD
LASTRE
M3
TRANSPORTE
DESCRIPCION
UNIDAD
LASTRE
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.19
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.213
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
31.07
31.07
%
67.10
3.213
67.10
4.788
0.000
0.000
0.000
0.000
4.788
4.79
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: RELLENO EN ZANJAS CON MATERIAL DEL SITIO
HOJA: 11
UNIDAD: M3
RENDIMIENTO: 0.150
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
COMPACTADOR
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
0.128
0.450
%
4.08
14.31
PARCIAL: (M)
0.578
COSTO/HOR
C=(AxB)
14.64
2.47
COSTO
D=(CxR)
2.196
0.371
PARCIAL: (N)
2.567
18.39
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
6.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
69.83
11.78
81.61
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
COSTO
D=(AxBXC)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
3.145
0.000
0.000
0.000
0.000
3.145
3.14
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: RELLENO DE PIEDRA BOLA
HOJA: 12
UNIDAD: M3
RENDIMIENTO: 0.400
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
0.196
%
1.34
0.196
1.34
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
3.00
1.00
2.44
2.47
7.32
2.47
2.928
0.988
20.02
6.76
PARCIAL: (N)
3.916
26.78
COSTO
C=(AxB)
5.470
PARCIAL: (O)
5.470
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M3
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
28.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
5.040
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
37.41
37.41
%
34.47
5.040
34.47
14.622
0.000
0.000
0.000
0.000
14.622
14.62
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
BORDILLO DE H. SIMPLE INGRESO VIVIENDA
HOJA:
UNIDAD: ML
RENDIMIENTO: 0.028
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
0.038
0.085
PARCIAL: (M)
0.123
COSTO/HOR
C=(AxB)
19.52
4.94
COSTO
D=(CxR)
0.550
0.139
%
0.83
1.85
2.68
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
%
12.02
3.04
1.00
2.56
2.56
0.072
1.58
PARCIAL: (N)
0.762
16.64
COSTO
C=(AxB)
1.312
0.125
0.227
0.972
0.300
0.300
3.237
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
0.18
0.186
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
SACO
M3
M3
U
U
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
11.50
0.09
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
28.66
2.73
4.97
21.24
6.55
6.55
70.71
5.90
4.07
0.456
9.97
4.578
0.000
0.000
0.000
0.000
4.578
4.58
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
CODIGO
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
BORDILLO DE H.S. CINTA GOTERA F'C=210 Kg/cm2
:610-(1)
HOJA:
UNIDAD: ML
RENDIMIENTO: 0.160
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
0.216
0.480
PARCIAL: (M)
0.696
%
1.42
3.15
4.58
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
COSTO/HOR
COSTO
(A)
CATEGORIA I
CATEGORIA III
CATEGORIA IV
(B)
C=(AxB)
19.52
4.94
2.56
D=(CxR)
3.123
0.790
0.410
20.53
5.20
2.69
PARCIAL: (N)
4.323
28.42
COSTO
C=(AxB)
5.248
0.375
0.758
1.870
0.750
0.600
9.601
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.324
0.18
0.270
8.00
2.00
1.00
2.44
2.47
2.56
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
SACO
M3
M3
U
U
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.06
15.00
0.10
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
34.49
2.46
4.98
12.29
4.93
3.94
63.10
2.13
1.77
0.594
3.90
15.214
0.000
0.000
0.000
0.000
15.214
15.21
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
CODIGO
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
BORDILLO DE H. SIMPLE F'C=180Kg/cm2
:610-(1)
HOJA:
UNIDAD: ML
RENDIMIENTO: 0.120
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
0.162
0.360
PARCIAL: (M)
0.522
%
1.24
2.75
3.99
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
CATEGORIA I
CATEGORIA III
CATEGORIA IV
8.00
2.00
1.00
2.44
2.47
2.56
19.52
4.94
2.56
2.342
0.593
0.307
17.92
4.53
2.35
PARCIAL: (N)
3.242
24.80
COSTO
C=(AxB)
4.133
0.313
0.682
2.244
0.925
0.500
8.797
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
0.18
0.243
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
SACO
M3
M3
U
U
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
15.00
0.09
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
31.61
2.39
5.22
17.16
7.08
3.82
67.28
2.07
1.86
0.513
3.92
13.074
0.000
0.000
0.000
0.000
13.074
13.07
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
CODIGO
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
BORDILLO PARTERRE F'C=210Kg/cm2
:610-(1)
HOJA: 16
UNIDAD: ML
RENDIMIENTO: 0.150
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
VIBRADOR
CANTIDAD
(A)
1.00
1.00
TARIFA
(B)
3.00
3.00
COSTO/HOR
C=(AxB)
3.00
3.00
COSTO
D=(CxR)
0.203
0.450
0.450
PARCIAL: (M)
1.103
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
2.928
0.741
0.384
%
1.20
2.67
2.67
6.55
MANO DE OBRA
DESCRIPCION
CATEGORIA II
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
%
17.40
4.40
2.28
PARCIAL: (N)
4.053
24.08
COSTO
C=(AxB)
5.970
0.525
0.910
2.244
0.750
0.500
10.898
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.454
0.18
0.324
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
U
GLB.
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.08
15.00
0.12
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
35.47
3.12
5.40
13.33
4.46
2.97
64.75
2.69
1.92
0.778
4.62
16.831
0.000
0.000
0.000
0.000
16.831
16.83
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
CODIGO
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
MURO DE H. SIMPLE F'c=210kg/cm2
:610-(2)
HOJA: 17
UNIDAD: M3
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
1.00
TARIFA
(B)
3.00
3.00
COSTO
D=(CxR)
1.351
3.000
3.000
PARCIAL: (M)
7.351
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
19.520
4.940
2.560
PARCIAL: (N)
27.020
COSTO
C=(AxB)
45.920
3.375
6.822
22.440
4.000
0.600
83.157
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
2.916
0.18
2.430
3.00
3.00
COSTO/HOR
C=(AxB)
%
1.10
2.44
2.44
5.98
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
%
15.89
4.02
2.08
21.99
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
U
GLB.
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.54
15.00
0.90
PARCIAL: (P)
5.346
37.37
2.75
5.55
18.26
3.26
0.49
67.68
2.37
1.98
4.35
0%
0%
0%
0%
122.874
0.000
0.000
0.000
0.000
122.874
122.87
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
CODIGO:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
ACERA DE H. SIMPLE e=10 cm.f'c=210 kg/cm2
610-(2)
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.100
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.135
0.300
PARCIAL: (M)
0.435
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
1.952
0.494
0.256
PARCIAL: (N)
2.702
COSTO
C=(AxB)
4.592
0.375
0.682
0.200
PARCIAL: (O)
5.849
3.00
COSTO/HOR
C=(AxB)
%
1.41
3.14
4.55
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
20.43
5.17
2.68
28.28
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
GLB
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.06
15.00
0.09
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.324
0.18
0.243
PARCIAL: (P)
0.567
%
48.07
3.93
7.14
2.09
61.23
%
3.39
2.54
5.94
0%
0%
0%
0%
9.553
0.000
0.000
0.000
0.000
9.553
9.55
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PAVIMENTO DE CONCRETO ARMADO e=0.15m
( CON MALLA ELECTROSOLDADA)
HOJA: 18
UNIDAD: M2
RENDIMIENTO: 0.270
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.398
0.810
PARCIAL: (M)
1.208
COSTO/HOR
C=(AxB)
19.52
7.41
2.56
COSTO
D=(CxR)
5.270
2.001
0.691
PARCIAL: (N)
7.962
COSTO
C=(AxB)
6.560
0.625
1.137
0.500
2.800
PARCIAL: (O)
11.622
3.00
COSTO/HOR
C=(AxB)
%
1.83
3.73
5.56
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
24.25
9.20
3.18
36.63
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
AGUA Y OTROS
MALLA ARMEX R-283(6X10X10)
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
GLB
M2
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.10
15.00
0.15
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.540
0.18
0.405
%
30.18
2.88
5.23
2.30
12.88
53.47
%
2.48
1.86
PARCIAL: (P)
0.945
4.35
21.737
0.000
0.000
0.000
0.000
100.00
0%
0%
0%
0%
21.737
21.74
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
MURO DE HORMIGON CICLOPEO 180 Kg/Cm
HOJA: 19
UNIDAD: M3
RENDIMIENTO: 1.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
1.126
3.600
PARCIAL: (M)
4.726
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
16.267
4.117
2.133
PARCIAL: (N)
22.517
COSTO
C=(AxB)
23.616
3.125
6.443
3.282
18.700
7.500
2.000
64.666
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
2.700
0.18
2.295
0.18
1.620
3.00
COSTO/HOR
C=(AxB)
%
1.14
3.65
4.80
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
%
16.51
4.18
2.17
22.85
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
PIEDRA BOLA SELECCIONADA
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
PIEDRA BOLA SELECCIONADA
SACO
M3
M3
M3
U
U
GLB.
UNIDAD
M3
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.50
15.00
0.85
15.00
0.60
23.97
3.17
6.54
3.33
18.98
7.61
2.03
65.64
2.74
2.33
1.64
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
6.615
6.71
98.524
0.000
0.000
0.000
0.000
98.524
98.52
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
REMATE DE H. SIMPLE
HOJA: 20
UNIDAD: ML
RENDIMIENTO: 0.140
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.052
PARCIAL: (M)
0.052
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.342
0.346
0.358
PARCIAL: (N)
1.046
COSTO
C=(AxB)
0.525
0.075
0.400
PARCIAL: (O)
1.000
%
2.42
2.42
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
15.80
15.99
16.57
48.36
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
SACO
M3
GLB
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.012
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.065
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
%
24.27
3.47
18.50
46.23
%
3.00
0.065
3.00
2.163
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.000
0.000
0.000
0.000
2.163
2.16
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
REPLANTILLO DE H.S E=0.05m
HOJA: 21
UNIDAD: M2
RENDIMIENTO: 0.110
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.149
0.330
PARCIAL: (M)
0.479
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
2.147
0.543
0.282
PARCIAL: (N)
2.972
COSTO
C=(AxB)
2.952
0.188
0.379
0.300
PARCIAL: (O)
3.819
3.00
COSTO/HOR
C=(AxB)
%
1.96
4.36
6.33
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
28.38
7.18
3.72
39.28
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.03
15.00
0.05
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.162
0.18
0.135
PARCIAL: (P)
0.297
%
39.02
2.48
5.01
3.96
50.47
%
2.14
1.78
3.93
0%
0%
0%
0%
7.566
0.000
0.000
0.000
0.000
7.566
7.57
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
CONTRAPISO DE H.S E=0.07m
HOJA: 22
UNIDAD: M2
RENDIMIENTO: 0.067
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.107
0.201
PARCIAL: (M)
0.308
COSTO/HOR
C=(AxB)
24.40
4.94
2.56
COSTO
D=(CxR)
1.635
0.331
0.172
PARCIAL: (N)
2.137
COSTO
C=(AxB)
3.936
0.188
0.455
0.500
PARCIAL: (O)
5.078
3.00
COSTO/HOR
C=(AxB)
%
1.36
2.56
3.92
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
10.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
20.83
4.22
2.19
27.24
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
AGUA ,ENCOFRADO Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.03
15.00
0.06
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.162
0.18
0.162
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
%
50.16
2.39
5.80
6.37
64.71
%
2.06
2.06
0.324
4.13
7.847
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.000
0.000
0.000
0.000
7.847
7.85
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: MAMPOSTERIA DE LADRILLO BURRITO ECHADO
HOJA: 23
UNIDAD: M2
RENDIMIENTO: 0.800
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.196
PARCIAL: (M)
0.196
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
1.952
1.976
PARCIAL: (N)
3.928
COSTO
C=(AxB)
6.960
1.968
0.188
0.400
PARCIAL: (O)
9.516
%
1.44
1.44
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
14.31
14.49
28.80
MATERIALES
DESCRIPCION
UNIDAD
LADRILLO BURRITO
CEMENTO
ARENA
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
U
SACO
M3
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
51.03
14.43
1.37
2.93
69.76
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
0%
0%
0%
0%
13.640
0.000
0.000
0.000
0.000
13.640
100.00
13.64
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: MAMPOSTERIA DE LADRILLO MALETA
HOJA: 24
UNIDAD: M2
RENDIMIENTO: 0.400
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.198
PARCIAL: (M)
0.198
COSTO/HOR
C=(AxB)
2.44
2.44
2.47
2.56
COSTO
D=(CxR)
0.976
0.976
0.988
1.024
PARCIAL: (N)
3.964
COSTO
C=(AxB)
1.750
0.820
0.063
0.400
PARCIAL: (O)
3.033
%
2.75
2.75
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
13.57
13.57
13.73
14.23
55.10
MATERIALES
DESCRIPCION
UNIDAD
LADRILLO MALETA
CEMENTO
ARENA
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
U
SACO
M3
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
24.32
11.40
0.87
5.56
42.15
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
0%
0%
0%
0%
7.195
0.000
0.000
0.000
0.000
7.195
7.19
100.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
MAMPOSTERIA DE BLOQUE 10 x 20 x 40 cm
HOJA: 24
UNIDAD: M2
RENDIMIENTO: 0.708
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.174
PARCIAL: (M)
0.174
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
1.728
1.749
PARCIAL: (N)
3.476
COSTO
C=(AxB)
4.290
1.896
%
1.76
1.76
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
17.54
17.76
35.30
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
GLB
UNIDAD
D.M.T.
(A)
0.03
CANTIDAD
(B)
%
43.56
19.25
0.40
0.012
0.12
PARCIAL: (O)
6.198
62.94
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0%
0%
0%
0%
9.848
0.000
0.000
0.000
0.000
9.848
9.85
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
CAMA DE PIEDRA CHISPA LAVADA
INCLUYE EMPORADA DE ARENA AL ADOQUINADO
HOJA: 25
UNIDAD: M3
RENDIMIENTO: 0.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.123
PARCIAL: (M)
0.123
COSTO/HOR
C=(AxB)
9.76
2.56
COSTO
D=(CxR)
1.952
0.512
PARCIAL: (N)
2.464
COSTO
C=(AxB)
4.675
0.625
PARCIAL: (O)
5.300
%
1.08
1.08
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
17.13
4.49
21.62
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
PIEDRA CHISPA LAVADA
ARENA
M3
M3
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
1.10
30.00
0.10
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
2.970
0.18
0.540
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
41.02
5.48
46.50
%
26.06
4.74
3.510
30.80
11.397
0.000
0.000
0.000
0.000
11.397
11.40
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
HOJA:
UNIDAD: M2
RUBRO
RENDIMIENTO: 0.333
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.165
PARCIAL: (M)
0.165
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
1.625
0.823
0.852
PARCIAL: (N)
3.300
COSTO
C=(AxB)
6.600
PARCIAL: (O)
6.600
%
1.48
1.48
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
14.55
7.37
7.64
29.56
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
ADOQUIN
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
5.00
22.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.01
1.100
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
59.11
59.11
%
9.85
1.100
9.85
11.165
0.000
0.000
0.000
0.000
11.165
11.17
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
ADOQUIN PEATONAL
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.333
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.165
1.75
PARCIAL: (M)
0.165
1.75
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
1.625
0.823
0.852
PARCIAL: (N)
3.300
COSTO
C=(AxB)
4.840
PARCIAL: (O)
4.840
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
17.28
8.75
9.06
35.09
MATERIALES
DESCRIPCION
UNIDAD
ADOQUIN PEATONAL
TRANSPORTE
DESCRIPCION
UNIDAD
ADOQUIN PEATONAL
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
5.00
22.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.01
1.100
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
51.46
51.46
%
11.70
1.100
11.70
9.405
0.000
0.000
0.000
0.000
9.405
9.41
100.00
NITULY S. A.
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
BANCAS ORNAMENTALES
HOJA:
UNIDAD: U
RENDIMIENTO: 3.000
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
2.50
COSTO/HOR
C=(AxB)
2.50
COSTO
D=(CxR)
5.316
7.500
%
2.86
4.03
PARCIAL: (M)
12.816
6.89
COSTO/HOR
C=(AxB)
21.96
9.88
2.56
1.04
COSTO
D=(CxR)
65.880
29.640
7.680
3.120
PARCIAL: (N)
106.320
COSTO
C=(AxB)
18.827
3.156
1.250
25.000
8.553
6.000
2.000
64.786
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
1.080
0.18
1.080
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
9.00
2.44
4.00
2.47
1.00
2.56
1.00
1.04
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CATEGORIA V
%
35.40
15.93
4.13
1.68
57.14
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
RIPIO 1/2"
ARENA
MARMOLINA
ACERO DE REFUERZO
ENCOFRADO
AGUA, ALAMBRE Y OTROS
SACO
M3
M3
SACO
KG
GLOBAL
GLOBAL
TRANSPORTE
DESCRIPCION
UNIDAD
RIPIO
ARENA
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.40
30.00
0.20
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
10.12
1.70
0.67
13.43
4.60
3.22
1.07
34.82
0.58
0.58
2.160
1.16
186.082
0.000
0.000
0.000
0.000
186.082
186.08
100.00
NITULY S. A.
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
LOSA DE H.A F'C=240 Kg/cm2 e=0.15m
(incluye bloques)
HOJA: 29
UNIDAD: M2
RENDIMIENTO: 0.389
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.526
%
2.29
VIBRADOR
0.03
3.00
0.09
0.035
0.15
PARCIAL: (M)
0.561
2.44
COSTO/HOR
C=(AxB)
17.08
7.41
2.56
COSTO
D=(CxR)
6.641
2.881
0.995
PARCIAL: (N)
10.517
COSTO
C=(AxB)
9.285
2.640
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
7.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
28.87
12.52
4.33
45.72
MATERIALES
DESCRIPCION
UNIDAD
M3
U
%
40.36
11.48
11.925
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
51.84
%
0.000
0.00
23.002
0.000
0.000
0.000
0.000
23.002
23.00
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: LOSA DE H.A F'C=240 Kg/cm2 e=0.15m
HOJA: 30
UNIDAD: M2
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.799
%
0.24
0.00
1.00
1.00
1.00
VIBRADOR
0.00
3.00
3.00
0.00
3.00
3.00
0.00
1.500
1.500
0.000
0.45
0.45
0.00
PARCIAL: (M)
3.799
1.15
COSTO/HOR
C=(AxB)
19.52
9.88
2.56
COSTO
D=(CxR)
9.760
4.940
1.280
PARCIAL: (N)
15.980
COSTO
C=(AxB)
4.723
17.655
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
4.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
2.95
1.49
0.39
4.83
MATERIALES
DESCRIPCION
UNIDAD
SACO
U
%
1.43
5.33
22.378
TRANSPORTE
DESCRIPCION
UNIDAD
RIPIO
ARENA
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.00
30.00
53.50
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.000
0.18
288.900
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
6.76
%
0.00
87.27
288.900
87.27
331.057
0.000
0.000
0.000
0.000
331.057
331.06
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CADENAS O RIOSTRAS DE H.A F'C=210Kg/cm2
HOJA: 31
UNIDAD: M3
RENDIMIENTO: 1.600
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
1.00
1.00
3.00
3.00
3.00
3.00
COSTO
D=(CxR)
2.557
4.800
4.800
%
0.99
1.86
1.86
PARCIAL: (M)
12.157
COSTO/HOR
C=(AxB)
19.52
9.88
2.56
COSTO
D=(CxR)
31.232
15.808
4.096
PARCIAL: (N)
51.136
COSTO
C=(AxB)
45.920
3.750
6.822
22.440
9.000
100.860
1.000
4.70
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
4.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
12.07
6.11
1.58
19.76
MATERIALES
DESCRIPCION
UNIDAD
SACO
M3
M3
U
U
KG
GBL
0.00
0.00
0.00
0.00
0.00
%
17.75
1.45
2.64
8.67
3.48
38.98
0.39
189.792
TRANSPORTE
DESCRIPCION
UNIDAD
RIPIO
ARENA
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.90
30.00
0.60
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
2.430
0.18
3.240
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
73.35
%
0.94
1.25
5.670
2.19
258.755
0.000
0.000
0.000
0.000
258.755
258.75
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: COLUMNAS DE H.A F'C=240Kg/cm2
HOJA: 32
UNIDAD: M3
RENDIMIENTO: 2.387
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
1.00
3.00
3.00
COSTO
D=(CxR)
2.060
7.161
%
1.30
4.52
PARCIAL: (M)
9.221
COSTO/HOR
C=(AxB)
9.76
4.94
2.56
COSTO
D=(CxR)
23.297
11.792
6.111
PARCIAL: (N)
41.200
COSTO
C=(AxB)
107.960
5.82
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
14.71
7.45
3.86
26.01
MATERIALES
DESCRIPCION
UNIDAD
m3
%
68.16
107.960
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
68.16
%
0.000
0.00
158.381
0.000
0.000
0.000
0.000
158.381
158.38
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: H.A PARA PLINTOS DE F'C =240KG/CM2
HOJA: 33
UNIDAD: M3
RENDIMIENTO: 1.466
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
VIBRADOR
CANTIDAD
(A)
1.00
1.00
TARIFA
(B)
3.00
3.00
COSTO/HOR
C=(AxB)
3.00
3.00
COSTO
D=(CxR)
1.982
4.397
4.397
%
1.25
2.78
2.78
PARCIAL: (M)
10.776
COSTO/HOR
C=(AxB)
9.76
7.32
7.41
2.56
COSTO
D=(CxR)
14.304
10.728
10.860
3.752
PARCIAL: (N)
39.644
COSTO
C=(AxB)
107.960
6.80
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
3.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
9.03
6.77
6.86
2.37
25.03
MATERIALES
DESCRIPCION
UNIDAD
M3
%
68.17
107.960
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
68.17
%
0.000
0.00
158.380
0.000
0.000
0.000
0.000
158.380
158.38
100.00
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 33
FECHA
:
10/1/2011
UNIDAD: M3
RUBRO
: HORMIGON EN LOSA DE CIMENTACION DE F'C =240KG/CM
RENDIMIENTO: 1.466
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
VIBRADOR
(B)
3.00
3.00
D=(CxR)
1.982
4.397
4.397
1.25
2.78
2.78
PARCIAL: (M)
10.776
6.80
COSTO/HOR
C=(AxB)
9.76
7.32
7.41
2.56
COSTO
D=(CxR)
14.304
10.728
10.860
3.752
PARCIAL: (N)
39.644
COSTO
C=(AxB)
107.960
1.00
1.00
C=(AxB)
3.00
3.00
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
3.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
9.03
6.77
6.86
2.37
25.03
MATERIALES
DESCRIPCION
UNIDAD
M3
%
68.17
107.960
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
0%
0%
0%
0%
COSTO
D=(AxBXC)
68.17
%
0.000
0.00
158.380
0.000
0.000
0.000
0.000
158.380
158.38
100.00
HOJA: 34
UNIDAD: M3
RENDIMIENTO: 1.379
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
1.00
3.00
COSTO
D=(CxR)
2.204
%
1.39
3.00
4.138
2.61
PARCIAL: (M)
6.342
4.00
COSTO/HOR
C=(AxB)
19.52
9.88
2.56
COSTO
D=(CxR)
26.922
13.626
3.531
PARCIAL: (N)
44.079
COSTO
C=(AxB)
107.960
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
4.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
17.00
8.60
2.23
27.83
MATERIALES
DESCRIPCION
UNIDAD
SACO
%
68.16
107.960
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0%
0%
0%
COSTO
D=(AxBXC)
68.16
%
0.000
0.00
158.381
0.000
0.000
0.000
0.000
158.381
158.38
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: H.A EN PISCINA E=0.10
HOJA: 35
UNIDAD: M3
RENDIMIENTO: 1.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
1.916
3.600
PARCIAL: (M)
5.516
COSTO/HOR
C=(AxB)
21.96
7.41
2.56
COSTO
D=(CxR)
26.352
8.892
3.072
PARCIAL: (N)
38.316
COSTO
C=(AxB)
45.920
5.850
3.750
86.100
52.360
10.500
2.000
206.480
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
2.430
0.18
3.240
3.00
COSTO/HOR
C=(AxB)
%
0.75
1.41
2.15
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
9.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
10.29
3.47
1.20
14.97
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
RIPIO 1/2"
ARENA
ACERO DE REFUERZO, INCLUYE TRANSPORTE
TABLAS DE ENCOFRADO
TIRAS
AGUA, ALAMBRE Y OTROS
TRANSPORTE
DESCRIPCION
RIPIO
ARENA
SACO
M3
M3
KG
U
U
GLOBAL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.90
30.00
0.60
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0%
0%
0%
17.94
2.29
1.46
33.64
20.45
4.10
0.78
80.66
0.95
1.27
5.670
2.22
255.982
0.000
0.000
0.000
0.000
255.982
255.98
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: MESONES DE H. ARMADO
HOJA: 36
UNIDAD: ML
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.496
PARCIAL: (M)
0.496
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
4.880
2.470
2.560
PARCIAL: (N)
9.910
COSTO
C=(AxB)
4.592
0.313
0.531
1.050
1.800
7.019
PARCIAL: (O)
15.304
%
1.89
1.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
18.65
9.44
9.78
37.87
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
LADRILLO MALETA
ENCOFRADO,AGUA Y OTROS
ACERO ESTRUCTURAL Fy=4200 Kg/cm2
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
GLB
KG
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
15.00
0.07
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
0.18
0.189
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0%
0%
0%
%
17.55
1.19
2.03
4.01
6.88
26.82
58.48
%
1.03
0.72
0.459
1.75
26.169
0.000
0.000
0.000
0.000
26.169
26.17
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: DINTELES DE H. ARMADO
HOJA: 37
UNIDAD: ML
RENDIMIENTO: 0.393
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.144
PARCIAL: (M)
0.144
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
1.918
0.971
PARCIAL: (N)
2.889
COSTO
C=(AxB)
0.525
0.044
0.076
0.748
0.500
PARCIAL: (O)
1.892
%
2.89
2.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
38.43
19.45
57.89
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
HIERRO,CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
GLB
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
15.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.038
0.18
0.027
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
%
10.52
0.88
1.52
14.99
10.02
37.92
%
0.76
0.54
0.065
1.30
4.990
0.000
0.000
0.000
0.000
4.990
4.99
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
TUBERIA ROSCABLE 1/2"
HOJA: 38
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.123
PARCIAL: (M)
0.123
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
1.220
1.235
PARCIAL: (N)
2.455
COSTO
C=(AxB)
1.11
2.00
PARCIAL: (O)
3.11
%
2.16
2.16
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
21.47
21.73
43.20
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
19.44
35.19
54.64
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
5.683
0.000
0.000
0.000
0.000
5.683
5.68
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
TUBERIA ROSCABLE 3/4"
HOJA: 39
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.123
PARCIAL: (M)
0.123
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
1.220
1.235
PARCIAL: (N)
2.455
COSTO
C=(AxB)
1.05
2.00
PARCIAL: (O)
3.05
%
2.18
2.18
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
21.67
21.93
43.60
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
18.71
35.52
54.22
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0.00
0.00
0.00
0.00
5.631
0.000
0.000
0.000
0.000
5.631
5.63
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
BOMBA DE IMPULSION DE 3/4 ITALIANA
HOJA: 40
UNIDAD: U
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.250
PARCIAL: (M)
0.250
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
2.440
2.560
PARCIAL: (N)
5.000
COSTO
C=(AxB)
120.00
2.00
PARCIAL: (O)
122.00
%
0.20
0.20
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
1.92
2.01
3.93
MATERIALES
DESCRIPCION
UNIDAD
U
GLB
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
94.30
1.57
95.87
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
127.250
0.000
0.000
0.000
0.000
127.250
127.25
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
MASILLADO Y ALISADO DE PISO
HOJA: 41
UNIDAD: M2
RENDIMIENTO: 0.102
100.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.025
PARCIAL: (M)
0.025
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.250
0.253
PARCIAL: (N)
0.502
COSTO
C=(AxB)
2.165
0.050
0.050
PARCIAL: (O)
2.265
%
0.88
0.88
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
8.77
8.88
17.65
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA, CLAVOS Y OTROS
SACO
M3
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
%
76.06
1.76
1.76
79.57
%
1.90
0.00
0.054
1.90
2.846
0.000
0.000
0.000
0.000
2.846
2.85
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
MASILLADO Y ALISADO DE LOSA
HOJA: 41
UNIDAD: M2
RENDIMIENTO: 0.102
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.025
%
0.84
PARCIAL: (M)
0.025
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.249
0.252
PARCIAL: (N)
0.501
COSTO
C=(AxB)
2.296
0.050
0.050
PARCIAL: (O)
2.396
0.84
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
8.36
8.47
16.83
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA, CLAVOS Y OTROS
SACO
M3
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
%
77.15
1.68
1.68
80.51
%
1.81
0.00
0.054
1.81
2.976
0.000
0.000
0.000
0.000
2.976
2.98
100.00
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ENLUCIDO HORIZONTAL
HOJA: 41
UNIDAD: M2
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
0.246
%
3.04
0.246
3.04
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
1.00
1.00
2.44
2.47
2.44
2.47
2.440
2.470
30.18
30.56
PARCIAL: (N)
4.910
60.74
COSTO
C=(AxB)
2.624
0.050
0.200
PARCIAL: (O)
2.874
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA, CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
SACO
M3
GLB.
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
%
32.46
0.62
2.47
35.55
%
0.67
0.00
0.054
0.67
8.084
0.000
0.000
0.000
0.000
8.084
8.08
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ENLUCIDO VERTICAL
HOJA: 42
UNIDAD: M2
RENDIMIENTO: 0.750
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.184
PARCIAL: (M)
0.184
COSTO/HOR
C=(AxB)
2.44
COSTO
D=(CxR)
1.830
%
3.41
3.41
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
%
33.90
1.00
2.47
2.47
1.853
34.32
PARCIAL: (N)
3.683
68.22
COSTO
C=(AxB)
1.115
0.063
0.300
PARCIAL: (O)
1.478
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA, CLAVOS Y OTROS
SACO
M3
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
%
20.66
1.16
5.56
27.37
%
1.00
0.054
1.00
5.398
0.000
0.000
0.000
0.000
5.398
5.40
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 43
October-2011
UNIDAD: ML
FILOS DE VIGAS Y COLUMNAS
RENDIMIENTO: 0.150
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.056
PARCIAL: (M)
0.056
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.366
0.371
0.384
%
3.73
3.73
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
%
24.39
24.69
25.59
PARCIAL: (N)
1.121
COSTO
C=(AxB)
0.066
0.031
0.200
PARCIAL: (O)
0.297
74.68
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA, CLAVOS Y OTROS
SACO
M3
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.005
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.027
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
%
4.37
2.08
13.33
19.79
%
1.80
0.027
1.80
1.500
0.000
0.000
0.000
0.000
1.500
1.50
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 44
October-2011
UNIDAD: ML
MOLDURAS
RENDIMIENTO: 2.130
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.783
PARCIAL: (M)
0.783
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
10.394
5.261
PARCIAL: (N)
15.656
%
4.24
4.24
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
MATERIALES
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
%
56.37
28.53
84.90
DESCRIPCION
UNIDAD
CEMENTO
ARENA
AGUA Y OTROS
SACO
M3
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
COSTO
C=(AxB)
1.640
0.063
0.300
PARCIAL: (O)
2.003
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
8.89
0.34
1.63
10.86
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
18.441
0.000
0.000
0.000
0.000
18.441
18.44
100.00
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 43
October-2011
UNIDAD: M3
ENCOFRADOS Y DESENCOFRADOS
RENDIMIENTO: 0.204
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.076
PARCIAL: (M)
0.076
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.498
0.504
0.522
PARCIAL: (N)
1.524
COSTO
C=(AxB)
0.036
3.740
2.625
%
0.95
0.95
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
%
6.22
6.30
6.53
19.05
MATERIALES
DESCRIPCION
ENCOFRADO METALICO
TABLAS DE ENCOFRADO
CUARTONES
UNIDAD
GLB
U
U
%
0.45
46.74
32.81
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
6.401
COSTO
D=(AxBXC)
80.00
%
0.000
0.00
8.001
0.000
0.000
0.000
0.000
8.001
8.00
100.00
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 43
October-2011
UNIDAD: M2
ENCOFRADO DE LOSA
RENDIMIENTO: 0.590
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.148
PARCIAL: (M)
0.148
COSTO/HOR
C=(AxB)
2.44
2.47
0.12
COSTO
D=(CxR)
1.440
1.457
0.071
PARCIAL: (N)
2.968
COSTO
C=(AxB)
0.581
0.112
1.440
0.750
PARCIAL: (O)
2.884
%
2.47
2.47
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
0.12
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
23.99
24.29
1.18
49.46
MATERIALES
DESCRIPCION
UNIDAD
ENCOFRADO METALICO
TABLAS DE ENCOFRADO
TABLERO PLYWOOD 1.22X2.44X6mm 18 capas
CUARTONES
TRANSPORTE
DESCRIPCION
GLB
U
U
U
UNIDAD
D.M.T.
CANTIDAD
TARIFA/Km
COSTO
%
9.69
1.87
24.00
12.50
48.06
%
(A)
(B)
(C)
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
0.000
0.00
6.000
0.000
0.000
0.000
0.000
6.000
6.00
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PINTURA INTERIOR
HOJA: 45
UNIDAD: M2
RENDIMIENTO: 0.397
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.097
PARCIAL: (M)
0.097
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
1.937
0.000
PARCIAL: (N)
1.937
COSTO
C=(AxB)
0.495
0.244
0.046
0.413
0.252
PARCIAL: (O)
1.450
%
2.78
2.78
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
55.59
0.00
55.59
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
GLN
SACO
SACO
TANQUE
SACO
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
14.21
7.01
1.32
11.85
7.23
41.63
%
0.00
0.00
0.00
0.00
3.484
0.000
0.000
0.000
0.000
3.484
3.48
100.00
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PINTURA EXTERIOR
HOJA: 45
UNIDAD: M2
RENDIMIENTO: 0.512
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.125
PARCIAL: (M)
0.125
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.499
0.000
PARCIAL: (N)
2.499
COSTO
C=(AxB)
0.495
0.520
0.269
0.413
0.252
PARCIAL: (O)
1.949
%
2.73
2.73
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
54.64
0.00
54.64
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
GLN
SACO
SACO
TANQUE
SACO
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
10.83
11.37
5.88
9.03
5.51
42.62
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
4.572
0.000
0.000
0.000
0.000
4.572
4.57
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PINTURA DE ACEITE
HOJA: 46
UNIDAD: M2
RENDIMIENTO: 0.600
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.146
PARCIAL: (M)
0.146
COSTO/HOR
C=(AxB)
4.88
COSTO
D=(CxR)
2.928
PARCIAL: (N)
2.928
COSTO
C=(AxB)
0.494
1.200
PARCIAL: (O)
1.694
%
3.07
3.07
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
CATEGORIA II
%
61.40
61.40
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
10.36
25.17
35.53
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
0.00
0.00
0.00
0.00
4.768
0.000
0.000
0.000
0.000
4.768
100.00
4.77
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
EMPASTADO
HOJA: 47
UNIDAD: M2
RENDIMIENTO: 0.600
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.146
PARCIAL: (M)
0.146
COSTO/HOR
C=(AxB)
4.88
COSTO
D=(CxR)
2.928
PARCIAL: (N)
2.928
COSTO
C=(AxB)
0.118
0.300
PARCIAL: (O)
0.418
%
4.19
4.19
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
CATEGORIA II
%
83.85
83.85
MATERIALES
DESCRIPCION
UNIDAD
EMPASTE
OTROS
TRANSPORTE
DESCRIPCION
M2
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
3.37
8.59
11.96
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
3.492
0.000
0.000
0.000
0.000
3.492
3.49
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
IMPERMEABILIZANTE PARA CISTERNA
HOJA: 48
UNIDAD: M2
RENDIMIENTO: 0.600
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.146
PARCIAL: (M)
0.146
COSTO/HOR
C=(AxB)
4.88
COSTO
D=(CxR)
2.928
PARCIAL: (N)
2.928
COSTO
C=(AxB)
1.030
0.600
PARCIAL: (O)
1.630
%
3.11
3.11
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
CATEGORIA II
%
62.24
62.24
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
21.89
12.75
34.65
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
4.704
0.000
0.000
0.000
0.000
4.704
4.70
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTOS DE ILUMINACION INCANDESCENTE
HOJA: 49
UNIDAD: PTO
RENDIMIENTO: 0.686
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.256
PARCIAL: (M)
0.256
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.674
1.694
1.756
PARCIAL: (N)
5.124
COSTO
C=(AxB)
11.000
0.390
1.400
0.280
1.000
0.700
PARCIAL: (O)
14.770
%
1.27
1.27
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
8.31
8.41
8.72
25.43
MATERIALES
DESCRIPCION
UNIDAD
CABLE #12
FOCO
INTERRUPTOR
CAJA RECTANGULAR
TUBO DE CONDUC. ELECT. DE 1/2"
ROSETON
TRANSPORTE
DESCRIPCION
ML
U
U
U
U
U
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
54.59
1.94
6.95
1.39
4.96
3.47
73.30
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
20.151
0.000
0.000
0.000
0.000
20.151
20.15
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ILUMINACION FLUORESCENTE 60X20
HOJA: 50
UNIDAD: PTO
RENDIMIENTO: 4.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.494
PARCIAL: (M)
1.494
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
9.760
9.880
10.240
PARCIAL: (N)
29.880
COSTO
C=(AxB)
16.650
1.000
0.280
1.400
30.000
1.000
PARCIAL: (O)
50.330
%
1.83
1.83
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
11.95
12.09
12.53
36.57
MATERIALES
DESCRIPCION
UNIDAD
CABLE #14
TUBO CONDUIT LIVIANO 1/2" 3m
CAJA RECTANGULAR
INTERRUPTOR IGEL
LAMPARA FLUORESCENTE CON ACRILICO
OTROS
TRANSPORTE
DESCRIPCION
ML
U
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
20.38
1.22
0.34
1.71
36.72
1.22
61.60
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0.00
0.00
0.00
0.00
81.704
0.000
0.000
0.000
0.000
81.704
81.70
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTO DE TELEFONICO
HOJA: 50
UNIDAD: PTO
RENDIMIENTO: 0.639
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.239
PARCIAL: (M)
0.239
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.559
1.578
1.636
PARCIAL: (N)
4.773
COSTO
C=(AxB)
2.250
2.832
0.280
0.500
PARCIAL: (O)
5.862
%
2.19
2.19
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
14.34
14.51
15.04
43.90
MATERIALES
DESCRIPCION
UNIDAD
CABLE DE TELEFONO
TOMACORRIENTE MIXTO CABLE Y TELEFONO
CAJA RECTANGULAR
OTROS
TRANSPORTE
DESCRIPCION
ML
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
20.69
26.04
2.57
4.60
53.91
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
10.874
0.000
0.000
0.000
0.000
10.874
10.87
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTO DE TV
HOJA: 50
UNIDAD: PTO
RENDIMIENTO: 0.600
100.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.224
PARCIAL: (M)
0.224
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.464
1.482
1.536
PARCIAL: (N)
4.482
COSTO
C=(AxB)
2.550
2.832
0.280
0.500
PARCIAL: (O)
6.162
%
2.06
2.06
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
13.47
13.64
14.13
41.24
MATERIALES
DESCRIPCION
UNIDAD
CABLE COAXIAL
TOMACORRIENTE MIXTO CABLE Y TELEFONO
CAJA RECTANGULAR
OTROS
TRANSPORTE
DESCRIPCION
ML
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
23.46
26.06
2.58
4.60
56.70
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0.00
0.00
0.00
0.00
10.868
0.000
0.000
0.000
0.000
10.868
10.87
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ILUMINACION CON REFLECTORES
HOJA: 51
UNIDAD: PTO
RENDIMIENTO: 4.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.494
PARCIAL: (M)
1.494
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
9.760
9.880
10.240
PARCIAL: (N)
29.880
COSTO
C=(AxB)
16.650
1.000
0.280
1.400
12.000
10.230
0.500
PARCIAL: (O)
42.060
%
2.03
2.03
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
13.29
13.45
13.94
40.69
MATERIALES
DESCRIPCION
UNIDAD
CABLE #14
TUBO CONDUIT LIVIANO 1/2" 3m
CAJA RECTANGULAR
INTERRUPTOR IGEL
BULBO REFLECTOR
PORTA BULBO
OTROS
TRANSPORTE
DESCRIPCION
ML
U
U
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
22.67
1.36
0.38
1.91
16.34
13.93
0.68
57.28
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
73.434
18.359
8.812
2.203
7.343
91.793
91.79
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTOS DE TOMACORRIENTE110V
HOJA: 52
UNIDAD: PTO
RENDIMIENTO: 1.365
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.335
PARCIAL: (M)
0.335
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
3.330
3.371
PARCIAL: (N)
6.701
COSTO
C=(AxB)
8.800
0.800
0.280
2.340
0.500
PARCIAL: (O)
12.720
%
1.70
1.70
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
16.86
17.06
0.00
33.92
MATERIALES
DESCRIPCION
UNIDAD
CABLE #12
TUBO CONDUIT LIVIANO 1/2" 3m
CAJA RECTANGULAR
TOMACORRIENTE DOBLE IGEL 110V
OTROS
TRANSPORTE
DESCRIPCION
ML
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
44.54
4.05
1.42
11.84
2.53
64.38
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0.00
0.00
0.00
0.00
19.756
0.000
0.000
0.000
0.000
19.756
19.76
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTOS DE TOMACORRIENTE 220V
HOJA: 53
UNIDAD: PTO
RENDIMIENTO: 1.042
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.256
PARCIAL: (M)
0.256
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
2.542
2.574
PARCIAL: (N)
5.116
COSTO
C=(AxB)
10.560
0.800
0.364
2.590
0.500
PARCIAL: (O)
14.814
%
1.27
1.27
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
12.60
12.75
0.00
25.35
MATERIALES
DESCRIPCION
UNIDAD
CABLE #12
TUBO CONDUIT LIVIANO 1/2" 3m
CAJA RECTANGULAR
TOMACORRIENTE DOBLE IGEL 220V
OTROS
TRANSPORTE
DESCRIPCION
ML
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
52.31
3.96
1.80
12.83
2.48
73.39
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0.00
0.00
0.00
0.00
20.186
0.000
0.000
0.000
0.000
20.186
20.19
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
ACOMETIDA ELECTRICA
HOJA:
UNIDAD: ML
RENDIMIENTO: 0.272
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.067
PARCIAL: (M)
0.067
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.664
0.672
PARCIAL: (N)
1.336
COSTO
C=(AxB)
3.360
0.120
3.412
PARCIAL: (O)
6.892
%
0.81
0.81
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
8.00
8.10
0.00
16.10
MATERIALES
DESCRIPCION
UNIDAD
CABLE # 6
PATA MULA
TUBERIA GALVANIZADA 2"X6m
TRANSPORTE
DESCRIPCION
ML
U
ML
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
40.51
1.45
41.13
83.09
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
8.294
0.000
0.000
0.000
0.000
8.294
8.29
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
ACOMETIDA DE AA.SS
HOJA: 55
UNIDAD: U
RENDIMIENTO: 0.317
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.158
PARCIAL: (M)
0.158
COSTO/HOR
C=(AxB)
2.44
4.94
2.56
COSTO
D=(CxR)
0.773
1.566
0.812
PARCIAL: (N)
3.151
COSTO
C=(AxB)
19.695
1.000
PARCIAL: (O)
20.695
%
0.66
0.66
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
3.22
6.52
3.38
13.13
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
82.05
4.17
86.22
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
24.004
0.000
0.000
0.000
0.000
24.004
24.00
100.00
NITULY S.A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
DRENAJE DE PATIO
HOJA: 55
UNIDAD: ML
RENDIMIENTO: 0.082
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.051
PARCIAL: (M)
0.051
COSTO/HOR
C=(AxB)
7.32
2.47
2.56
COSTO
D=(CxR)
0.600
0.203
0.210
PARCIAL: (N)
1.013
COSTO
C=(AxB)
2.389
0.400
PARCIAL: (O)
2.789
%
1.31
1.31
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
15.58
5.26
5.45
26.29
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U.
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
62.02
10.38
72.40
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
3.853
0.000
0.000
0.000
0.000
3.853
3.85
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTO DE AA.PP
HOJA: 56
UNIDAD: PTO
RENDIMIENTO: 1.267
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.466
PARCIAL: (M)
0.466
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
6.183
3.129
PARCIAL: (N)
9.312
COSTO
C=(AxB)
4.641
6.020
0.880
0.360
0.810
2.600
PARCIAL: (O)
15.311
%
1.86
1.86
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
24.64
12.47
0.00
37.12
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
U
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
18.50
23.99
3.51
1.43
3.23
10.36
61.03
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
0.00
0.00
0.00
25.089
0.000
0.000
0.000
0.000
25.089
25.09
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTO DE AA.PP ESPECIAL
HOJA: 57
UNIDAD: PTO
RENDIMIENTO: 3.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.195
PARCIAL: (M)
1.195
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
7.808
7.904
8.192
PARCIAL: (N)
23.904
COSTO
C=(AxB)
11.050
2.200
3.370
3.370
22.400
PARCIAL: (O)
42.390
%
1.77
1.77
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
11.57
11.71
12.14
35.42
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
ML
U
U
U
U
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
16.37
3.26
4.99
4.99
33.19
62.81
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
0.00
0.00
0.00
0.00
67.489
0.000
0.000
0.000
0.000
100.00
67.489
67.49
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
ACOMETIDA DE AA.PP
HOJA: 58
UNIDAD: ML
RENDIMIENTO: 0.490
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.120
PARCIAL: (M)
0.120
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
1.196
1.210
PARCIAL: (N)
2.406
COSTO
C=(AxB)
13.260
0.092
0.500
PARCIAL: (O)
13.852
%
0.73
0.73
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
7.30
7.39
14.69
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
80.96
0.56
3.05
84.58
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
0.00
0.00
0.00
0.00
16.379
0.000
0.000
0.000
0.000
100.00
16.379
16.38
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUNTOS DE AA.SS
HOJA: 59
UNIDAD: PTO
RENDIMIENTO: 0.577
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.216
PARCIAL: (M)
0.216
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.408
1.425
1.477
PARCIAL: (N)
4.310
COSTO
C=(AxB)
9.090
2.110
1.990
1.350
0.575
0.900
PARCIAL: (O)
16.015
%
1.05
1.05
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
6.85
6.94
7.19
20.98
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
U
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
44.25
10.27
9.69
6.57
2.80
4.38
77.97
%
0.00
0.00
0.00
0.00
20.541
0.000
0.000
0.000
0.000
20.541
20.54
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: DESAGUE DE AA.SS TUB. 160mm
HOJA: 60
UNIDAD: ML
RENDIMIENTO: 0.287
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.107
PARCIAL: (M)
0.107
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.700
0.709
0.735
PARCIAL: (N)
2.144
COSTO
C=(AxB)
6.951
1.000
PARCIAL: (O)
7.951
%
1.05
1.05
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
6.86
6.95
7.20
21.01
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
68.13
9.80
77.94
%
0%
0%
0%
0%
10.202
0.000
0.000
0.000
0.000
10.202
10.20
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE DESAGUE 110mm
HOJA: 61
UNIDAD: ML
RENDIMIENTO: 0.080
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.030
PARCIAL: (M)
0.030
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.195
0.198
0.205
PARCIAL: (N)
0.598
COSTO
C=(AxB)
3.182
1.000
PARCIAL: (O)
4.182
%
0.62
0.62
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
4.06
4.11
4.26
12.43
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
66.16
20.79
86.95
%
0%
0%
0%
0%
4.809
0.000
0.000
0.000
0.000
4.809
4.81
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
LAVAMANO CON PEDESTAL
HOJA: 62
UNIDAD: U
RENDIMIENTO: 0.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.228
PARCIAL: (M)
1.228
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
12.200
12.350
PARCIAL: (N)
24.550
COSTO
C=(AxB)
35.290
20.000
4.000
0.700
PARCIAL: (O)
59.990
%
1.43
1.43
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
14.22
14.40
28.62
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
41.15
23.32
4.66
0.82
69.94
%
0%
0%
0%
0%
85.768
0.000
0.000
0.000
0.000
85.768
85.77
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
LAVAMANO
HOJA: 63
UNIDAD: U
RENDIMIENTO: 0.975
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.316
PARCIAL: (M)
0.316
COSTO/HOR
C=(AxB)
2.44
2.44
1.28
COSTO
D=(CxR)
2.503
2.503
1.313
PARCIAL: (N)
6.318
COSTO
C=(AxB)
14.440
9.650
9.280
3.830
2.480
0.700
PARCIAL: (O)
40.380
%
0.67
0.67
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.44
0.50
2.56
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA IV (MAESTRO MAYOR)
%
5.32
5.32
2.79
13.44
MATERIALES
DESCRIPCION
UNIDAD
LAVAMANO FV
LLAVE SENCILLA
JUEGO DE LLAVE ANGULAR
Sifn de 1 1/4" resina acetal para lavabo
Desage de 1 1/4" para lavabo
OTROS
TRANSPORTE
DESCRIPCION
U
U
U
U
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
30.71
20.53
19.74
8.15
5.28
1.49
85.89
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
47.014
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.000
0.000
0.000
0.000
47.014
47.01
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
INODORO ECONOMICO FV
HOJA: 64
UNIDAD: U
RENDIMIENTO: 0.729
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.179
PARCIAL: (M)
0.179
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
1.779
1.801
PARCIAL: (N)
3.579
COSTO
C=(AxB)
50.500
7.910
1.020
2.240
PARCIAL: (O)
61.670
%
0.27
0.27
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
2.72
2.75
5.47
MATERIALES
DESCRIPCION
UNIDAD
INODORO FV BLANCO
JUEGO DE LLAVE ANGULAR PARA INODORO
SET DE PERNOS PARA INSTALACION INODORO
ANILLO DE CERA
TRANSPORTE
DESCRIPCION
U
U
U
U
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
77.18
12.09
1.56
3.42
94.26
%
0%
0%
0%
0%
65.428
0.000
0.000
0.000
0.000
65.428
65.43
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 9.006
October-2011
UNIDAD: U
RENDIMIENTO: 0.885
CAJA DE REVISION AA SS (60X60cm)
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.325
PARCIAL: (M)
0.325
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
4.319
2.186
PARCIAL: (N)
6.505
COSTO
C=(AxB)
24.300
PARCIAL: (O)
24.300
%
1.04
1.04
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
13.87
7.02
20.90
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
0.000
%
78.06
78.06
%
0.00
0%
0%
0%
0%
31.130
0.000
0.000
0.000
0.000
31.130
31.13
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: SUBIDA Y/O BAJADA, Y ALINEACION
HOJA: 66
UNIDAD: U
RENDIMIENTO: 2.300
CAJAS DE REVISION
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.410
PARCIAL: (M)
1.410
COSTO/HOR
C=(AxB)
7.32
4.94
COSTO
D=(CxR)
16.836
11.362
PARCIAL: (N)
28.198
COSTO
C=(AxB)
4.592
0.500
0.682
0.700
PARCIAL: (O)
6.474
%
3.91
3.91
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
2.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
46.66
31.49
78.15
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
VARIOS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.08
15.00
0.09
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.432
0.18
0.243
PARCIAL: (P)
%
12.73
1.39
1.89
1.94
17.94
%
36.082
9.021
4.330
1.082
3.608
45.103
45.10
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PASAMANO DE TUBO GALVANIZADO 2"
HOJA: 67
UNIDAD: ML
RENDIMIENTO: 0.300
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.074
PARCIAL: (M)
0.074
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.732
0.741
PARCIAL: (N)
1.473
COSTO
C=(AxB)
3.412
0.005
0.350
0.618
PARCIAL: (O)
4.384
%
1.24
1.24
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
12.34
12.49
24.84
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
KG
GLB
GALON
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
57.52
0.08
5.90
10.41
73.92
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
5.931
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
1.483
0.712
0.178
0.593
7.414
7.41
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: DEMOLICION DE CERRAMIENTO
HOJA: 68
UNIDAD: M2
RENDIMIENTO: 0.100
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
16.00
COSTO/HOR
C=(AxB)
16.00
COSTO
D=(CxR)
0.069
1.600
PARCIAL: (M)
1.669
COSTO/HOR
C=(AxB)
9.76
2.56
1.39
COSTO
D=(CxR)
0.976
0.256
0.139
PARCIAL: (N)
1.371
%
2.26
52.64
54.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.56
1.00
1.39
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
CHOFER LICENCIA TIPO B
%
32.11
8.42
4.57
45.11
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
C=(AxB)
0.000
COSTO
D=(AxBXC)
0.00
%
3.040
0.760
0.365
0.091
0.304
3.799
3.80
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TIRANTE PVC 6"
HOJA: 69
UNIDAD: ML
RENDIMIENTO: 0.220
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.082
PARCIAL: (M)
0.082
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
1.074
0.563
PARCIAL: (N)
1.637
COSTO
C=(AxB)
6.207
0.150
0.050
PARCIAL: (O)
6.407
%
1.01
1.01
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
13.21
6.93
20.14
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
76.39
1.85
0.62
78.85
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
8.125
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
2.031
0.975
0.244
0.813
10.157
10.16
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE PVC 160mm
HOJA: 70
UNIDAD: ML
RENDIMIENTO: 0.100
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
0.488
0.247
0.256
PARCIAL: (N)
0.991
COSTO
C=(AxB)
6.620
0.150
0.050
PARCIAL: (O)
6.820
%
0.63
0.63
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
6.21
3.14
3.26
12.61
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
84.22
1.91
0.64
86.76
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
7.861
1.965
100.00
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.943
0.236
0.786
9.826
9.83
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE PVC 200mm
HOJA: 70
UNIDAD: ML
RENDIMIENTO: 0.100
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
0.488
0.247
0.256
PARCIAL: (N)
0.991
COSTO
C=(AxB)
12.255
0.150
0.050
PARCIAL: (O)
12.455
%
0.37
0.37
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
3.62
1.83
1.90
7.34
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
90.81
1.11
0.37
92.29
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
IMPREVISTOS
GASTOS GENERALES Y ADMINISTRATIVOS 12%
IMPREVISTOS 3%
UTILIDADES 10%
13.496
3.374
1.619
0.405
1.350
100.00
16.869
16.87
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE H.S. DE 200 MM
HOJA: 71
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.186
PARCIAL: (M)
0.186
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
11.010
0.656
PARCIAL: (O)
11.666
%
1.06
1.06
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
13.89
7.28
21.17
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
62.66
3.73
66.39
%
11.38
2.000
11.38
17.572
4.393
2.109
0.527
1.757
21.965
21.97
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE H.S. DE 250 mm
HOJA: 72
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.186
PARCIAL: (M)
0.186
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
11.580
0.656
PARCIAL: (O)
12.236
%
1.03
1.03
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
13.45
7.06
20.50
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
%
63.83
3.62
67.45
%
11.02
2.000
11.02
18.142
4.536
2.177
0.544
1.814
22.678
22.68
100.00
HOJA: 73
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.186
PARCIAL: (M)
0.186
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
12.900
0.656
PARCIAL: (O)
13.556
%
0.96
0.96
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
12.54
6.58
19.11
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
%
66.28
3.37
69.65
%
10.28
2.000
10.28
19.462
4.866
2.335
0.584
1.946
24.328
24.33
100.00
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE H.S. DE 350 MM
HOJA: 74
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.186
PARCIAL: (M)
0.186
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
15.100
0.656
PARCIAL: (O)
15.756
%
0.86
0.86
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
11.26
5.91
17.17
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
69.71
3.03
72.74
%
9.23
2.000
9.23
21.662
5.416
2.599
0.650
2.166
27.078
27.08
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE H.S. DE 400 mm
HOJA: 75
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.186
PARCIAL: (M)
0.186
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
19.570
0.656
PARCIAL: (O)
20.226
%
0.71
0.71
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
9.34
4.90
14.24
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
74.89
2.51
77.40
%
7.65
2.000
7.65
26.132
6.533
3.136
0.784
2.613
32.665
32.67
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE H.S. DE 500 mm
HOJA: 76
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.186
0.61
PARCIAL: (M)
0.186
0.61
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
24.060
0.656
PARCIAL: (O)
24.716
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
7.97
4.18
12.15
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.0000
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
78.57
2.14
80.71
%
6.53
2.000
6.53
30.622
7.656
3.675
0.919
3.062
38.278
38.28
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TUBERIA DE H.S. DE 600 mm
HOJA: 77
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
0.186
0.186
%
0.48
0.48
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
COSTO
C=(AxB)
32.570
0.656
PARCIAL: (O)
33.226
%
6.24
3.27
9.51
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
83.23
1.68
84.91
%
5.11
2.000
5.11
39.132
9.783
4.696
1.174
3.913
48.915
48.92
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
40,817.00
RUBRO
: SUMIDERO CON TAPA METALICA
HOJA: 78
UNIDAD: U
RENDIMIENTO: 2.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.476
%
1.12
PARCIAL: (M)
1.476
1.12
COSTO/HOR
C=(AxB)
12.20
2.56
COSTO
D=(CxR)
24.400
5.120
PARCIAL: (N)
29.520
COSTO
C=(AxB)
32.570
7.872
0.563
1.364
1.094
22.000
30.000
2.000
97.463
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
0.18
0.540
0.18
0.486
0.18
0.486
PARCIAL: (P)
3.512
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
18.49
3.88
22.37
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
M3
M3
M3
U
U
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
M3
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
15.00
0.20
15.00
0.18
30.00
0.09
131.971
32.993
15.837
3.959
13.197
164.964
164.96
24.68
5.96
0.43
1.03
0.83
16.67
22.73
1.52
73.85
1.52
0.41
0.37
0.37
2.66
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TIRANTE DE H.S =200mm
HOJA: 79
UNIDAD: ML
RENDIMIENTO: 0.330
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.163
PARCIAL: (M)
0.163
COSTO/HOR
C=(AxB)
7.32
2.56
COSTO
D=(CxR)
2.416
0.845
PARCIAL: (N)
3.260
COSTO
C=(AxB)
11.010
0.328
0.313
PARCIAL: (O)
11.651
%
1.06
1.06
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
15.74
5.51
21.25
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ARENA
U
SACO
M3
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
71.75
2.14
2.04
75.93
%
1.76
0.270
1.76
15.344
3.836
1.841
0.460
1.534
19.180
19.18
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TIRANTE DE TUBERIA DE PVC D=200mm
HOJA:
UNIDAD: ML
RENDIMIENTO: 0.300
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.112
PARCIAL: (M)
0.112
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
1.464
0.768
PARCIAL: (N)
2.232
COSTO
C=(AxB)
11.325
0.313
PARCIAL: (O)
11.638
%
0.78
0.78
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
10.27
5.39
15.66
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ARENA
U
M3
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
79.47
2.19
81.66
%
1.89
0.270
1.89
14.251
3.563
1.710
0.428
1.425
17.814
17.81
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
40,817.00
RUBRO
: POZO DE REVISION DE 600 MM,
HOJA: 80
UNIDAD: U
RENDIMIENTO: 5.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
3.690
%
0.89
PARCIAL: (M)
3.690
0.89
COSTO/HOR
C=(AxB)
12.20
2.56
COSTO
D=(CxR)
61.000
12.800
PARCIAL: (N)
73.800
COSTO
C=(AxB)
32.570
7.216
1.000
2.426
2.188
22.000
56.250
6.000
129.650
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
0.18
1.080
0.18
0.864
0.18
0.864
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
28.78
6.04
34.82
MATERIALES
DESCRIPCION
UNIDAD
UNIDAD
UNIDAD
M3
M3
M3
U
SACO
M3
M3
M3
U
GBL
GBL
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
15.00
0.40
15.00
0.32
30.00
0.16
15.37
3.40
0.47
0.58
0.53
5.30
13.55
1.45
40.65
0.94
0.26
0.21
0.21
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
4.808
1.62
211.948
52.987
25.434
6.358
21.195
264.935
264.93
77.97
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: POZO DE REVISION DE 800 MM
HOJA: 81
UNIDAD: U
RENDIMIENTO: 6.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
4.428
%
1.07
PARCIAL: (M)
4.428
1.07
COSTO/HOR
C=(AxB)
12.20
2.56
COSTO
D=(CxR)
73.200
15.360
PARCIAL: (N)
88.560
COSTO
C=(AxB)
220.710
7.872
1.125
2.729
2.188
22.000
56.250
6.000
318.874
TARIFA/Km
COSTO
(C)
D=(AxBXC)
1.00
2.000
0.16
0.480
0.16
0.432
0.16
0.432
PARCIAL: (P)
3.344
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
17.63
3.70
21.33
MATERIALES
DESCRIPCION
UNIDAD
U
SACO
M3
M3
M3
U
GBL
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
UNIDAD
M3
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
2.00
1.00
15.00
0.20
15.00
0.18
30.00
0.09
415.206
53.16
1.90
0.27
0.66
0.53
5.30
13.55
1.45
76.80
0.48
0.12
0.10
0.10
0.81
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
103.801
49.825
12.456
41.521
519.007
519.01
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: SUBIDA Y BAJADA DE POZOS
HOJA: 82
UNIDAD: U
RENDIMIENTO: 1.400
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.694
PARCIAL: (M)
0.694
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
6.832
3.458
3.584
PARCIAL: (N)
13.874
COSTO
C=(AxB)
3.280
0.938
16.285
0.500
PARCIAL: (O)
21.003
%
1.89
1.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
18.60
9.41
9.76
37.77
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
TUBO DEH.S. =600 mm
AGUA Y OTROS
SACO
M3
U
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
TUBO DEH.S. =600 mm
M3
UNIDAD
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.10
5.00
0.50
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.540
0.25
0.625
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
%
8.93
2.55
44.33
1.36
57.17
%
1.47
1.70
1.165
3.17
36.735
9.184
4.408
100.00
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
1.102
3.674
45.919
45.92
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ROTURA DE PAVIMENTO RIGIDO
HOJA: 83
UNIDAD: M2
RENDIMIENTO: 0.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
30.00
COSTO/HOR
C=(AxB)
30.00
COSTO
D=(CxR)
0.138
6.000
PARCIAL: (M)
6.138
COSTO/HOR
C=(AxB)
9.76
2.56
1.46
COSTO
D=(CxR)
1.952
0.512
0.292
PARCIAL: (N)
2.756
%
1.55
67.46
69.01
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.56
1.00
1.46
CATEGORIA I (PEON)
O.E.P. 1
MECANICO MANT.-REP. EQUIPO PESADO
%
21.95
5.76
3.28
30.99
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
COSTO
D=(AxBXC)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
8.894
2.223
1.067
0.267
0.889
100.00
11.117
11.12
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PAVIMENTO RIGIDO f'c=280 Kg/cm2 E=0,20
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.150
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
0.203
0.450
%
0.74
1.64
PARCIAL: (M)
0.653
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
2.928
0.741
0.384
PARCIAL: (N)
4.053
COSTO
C=(AxB)
10.496
0.750
1.364
1.870
6.560
0.500
PARCIAL: (O)
21.540
2.38
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
10.69
2.71
1.40
14.80
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
HIERRO
AGUA Y OTROS
SACO
M3
M3
U
KG
GLB
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.12
15.00
0.18
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.648
0.18
0.486
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
38.33
2.74
4.98
6.83
23.96
1.83
78.67
%
2.37
1.78
1.134
4.14
27.380
6.845
3.286
0.821
2.738
34.225
34.23
100.00
URBANIZACION METROPOLISS
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: IMPRIMACION ASFALTICA
CODIGO: 405-1(1)
HOJA:
UNIDAD: LT
RENDIMIENTO: 0.001
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
DISTRIBUIDORA DE ASFALTO
ESCOBA MECANICA
CANTIDAD
(A)
1.00
1.00
TARIFA
(B)
35.00
20.00
COSTO/HOR
C=(AxB)
35.00
20.00
COSTO
D=(CxR)
0.001
0.035
0.020
%
0.24
9.77
5.58
PARCIAL: (M)
0.056
COSTO/HOR
C=(AxB)
14.64
1.45
1.39
COSTO
D=(CxR)
0.015
0.001
0.001
PARCIAL: (N)
0.017
COSTO
C=(AxB)
0.204
0.005
PARCIAL: (O)
0.209
15.60
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
6.00
2.44
1.00
1.45
1.00
1.39
CATEGORIA I (PEON)
O.E.P. 2
CHOFER LICENCIA TIPO B
%
4.09
0.40
0.39
4.88
MATERIALES
DESCRIPCION
UNIDAD
ASFALTO R.C.2
KEREX
LT
LT
TRANSPORTE
DESCRIPCION
UNIDAD
ASFALTO R.C.2
LTO
D.M.T.
CANTIDAD
(A)
(B)
435.00
1.02
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.00017
0.075
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
%
56.95
1.51
58.46
%
21.06
0.075
21.06
0.358
0.090
0.043
0.011
0.036
0.448
0.45
100.00
URBANIZACION METROPOLISS
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: RIEGO DE ADHERENCIA
CODIGO: 405-2(1)
HOJA:
UNIDAD: LT
RENDIMIENTO: 0.001
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
HERRAMIENTAS MENORES (5% M.O.)
DISTRIBUIDORA DE ASFALTO
ESCOBA MECANICA
(B)
1.00
1.00
C=(AxB)
35.00
20.00
D=(CxR)
0.000
0.035
0.020
0.11
10.06
5.75
PARCIAL: (M)
0.055
15.92
COSTO/HOR
C=(AxB)
4.88
1.45
1.39
COSTO
D=(CxR)
0.005
0.001
0.001
PARCIAL: (N)
0.008
COSTO
C=(AxB)
0.204
0.005
PARCIAL: (O)
0.209
35.00
20.00
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
1.45
1.00
1.39
CATEGORIA I (PEON)
O.E.P. 2
CHOFER LICENCIA TIPO B
%
1.40
0.42
0.40
2.22
MATERIALES
DESCRIPCION
UNIDAD
ASFALTO RC 250
KEREX
TRANSPORTE
DESCRIPCION
ASFALTO RC 250
LT
LT
UNIDAD
LTO
D.M.T.
CANTIDAD
(A)
(B)
435.00
1.02
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.00017
0.075
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
58.63
1.55
60.18
%
21.68
0.075
21.68
0.348
0.087
0.042
0.010
0.035
0.435
0.43
100.00
URBANIZACION METROPOLISS
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CARPETA ASFALTICA 2"
CODIGO: 405-5
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.003
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
1.00
1.00
1.00
1.00
1.00
PLANTA DE ASFALTO
CARGADORA 115HP
FINISHER
DISTRIBUIDORA DE ASFALTO
RODILLO NEUMATICO
RODILLO LISO
TARIFA
(B)
80.00
33.00
30.00
35.00
26.00
26.00
COSTO/HOR
C=(AxB)
80.00
33.00
30.00
35.00
26.00
26.00
COSTO
D=(CxR)
0.264
0.109
0.099
0.116
0.086
0.086
PARCIAL: (M)
0.759
COSTO/HOR
C=(AxB)
29.28
14.82
7.68
4.35
COSTO
D=(CxR)
0.097
0.049
0.025
0.014
PARCIAL: (N)
0.185
COSTO
C=(AxB)
1.600
0.378
0.079
0.237
0.213
0.063
0.500
PARCIAL: (O)
3.069
%
5.43
2.24
2.03
2.37
1.76
1.76
15.60
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
12.00
2.44
6.00
2.47
3.00
2.56
3.00
1.45
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
O.E.P. 1
O.E.P. 2
%
1.99
1.01
0.52
0.30
3.81
MATERIALES
DESCRIPCION
UNIDAD
ASFALTO AP-3
DIESEL
MATERIAL TRITURADO 1/2"
MATERIAL TRITURADO 3/8"
PIEDRA CHISPA LAVADA
ARENA
ACEITE, TERMICO Y OTROS
LT
LT
M3
M3
M3
M3
GL
TRANSPORTE
DESCRIPCION
UNIDAD
M3
LT
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.05
435.00
8.000
10.00
0.04
30.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.135
0.00017
0.592
0.18
0.072
0.18
0.054
PARCIAL: (P)
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
%
32.89
7.77
1.62
4.86
4.37
1.28
10.28
63.07
%
2.77
12.16
1.48
1.11
0.853
17.52
4.865
1.216
0.584
0.146
0.487
6.082
6.08
100.00
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CARPETA ASFALTICA 3"
HOJA: 87
UNIDAD: M2
RENDIMIENTO: 0.005
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
1.00
1.00
1.00
1.00
1.00
PLANTA DE ASFALTO
CARGADORA 115HP
FINISHER
DISTRIBUIDORA DE ASFALTO
RODILLO NEUMATICO
RODILLO LISO
TARIFA
(B)
80.00
33.00
30.00
35.00
26.00
26.00
COSTO/HOR
C=(AxB)
80.00
33.00
30.00
35.00
26.00
26.00
COSTO
D=(CxR)
0.360
0.149
0.135
0.158
0.117
0.117
PARCIAL: (M)
1.035
COSTO/HOR
C=(AxB)
29.28
14.82
7.68
4.35
COSTO
D=(CxR)
0.132
0.067
0.035
0.020
PARCIAL: (N)
0.253
COSTO
C=(AxB)
2.400
0.567
0.118
0.355
0.319
0.094
0.750
PARCIAL: (O)
4.603
%
5.02
2.07
1.88
2.20
1.63
1.63
14.44
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
12.00
2.44
6.00
2.47
3.00
2.56
3.00
1.45
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
O.E.P. 1
O.E.P. 2
%
1.84
0.93
0.48
0.27
3.52
MATERIALES
DESCRIPCION
UNIDAD
ASFALTO AP-3
DIESEL
MATERIAL TRITURADO 1/2"
MATERIAL TRITURADO 3/8"
PIEDRA CHISPA LAVADA
ARENA
ACEITE, TERMICO Y OTROS
TRANSPORTE
DESCRIPCION
PIEDRA CHISPA LAVADA
ASFALTO AP-3
MATERIAL TRITURADO
ARENA
LT
LT
M3
M3
M3
M3
GL
UNIDAD
M3
LT
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.075
435.00
12.000
10.00
0.060
30.00
0.015
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.180
0.203
0.00017
0.887
0.18
0.108
0.18
0.081
PARCIAL: (P)
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
%
33.48
7.91
1.65
4.95
4.45
1.31
10.46
64.20
%
2.82
12.38
1.51
1.13
1.279
17.84
7.169
1.792
0.860
0.215
0.717
8.962
8.96
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: DTSB
HOJA: 88
UNIDAD: M2
RENDIMIENTO: 0.007
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
1.00
1.00
1.00
TARIFA
(B)
35.00
40.00
26.00
26.00
COSTO
D=(CxR)
0.014
0.245
0.280
0.182
0.182
PARCIAL: (M)
0.903
COSTO/HOR
C=(AxB)
29.28
2.56
5.12
2.90
COSTO
D=(CxR)
0.205
0.018
0.036
0.020
PARCIAL: (N)
0.279
COSTO
C=(AxB)
0.500
0.158
0.079
PARCIAL: (O)
0.737
35.00
40.00
26.00
26.00
COSTO/HOR
C=(AxB)
%
0.70
12.25
14.00
9.10
9.10
45.15
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
12.00
2.44
1.00
2.56
2.00
2.56
2.00
1.45
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
O.E.P. 1
O.E.P. 2
%
10.25
0.90
1.79
1.02
13.95
MATERIALES
DESCRIPCION
UNIDAD
ASFALTO R.C.2
RIPIO 3/4"
MATERIAL TRITURADO 3/8"
TRANSPORTE
DESCRIPCION
RIPIO 3/4"
MATERIAL TRITURADO 3/8"
LT
M3
M3
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
15.00
0.020
15.00
0.010
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
0.18
0.027
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
%
25.00
7.89
3.95
36.84
%
2.70
1.35
0.081
4.05
2.000
0.500
0.240
0.060
0.200
2.500
2.50
100.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CANALETA DE H. S CON MALLA ELECTROSOLDADA
HOJA: 89
UNIDAD: U
RENDIMIENTO: 0.471
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.636
1.413
PARCIAL: (M)
2.049
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
9.194
2.327
1.206
PARCIAL: (N)
12.726
COSTO
C=(AxB)
3.280
0.250
0.531
1.142
0.800
PARCIAL: (O)
6.003
3.00
COSTO/HOR
C=(AxB)
%
3.06
6.80
9.86
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
44.25
11.20
5.80
61.25
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
MALLA ELECTROSOLDADA 615(6.25X2.40)
ENCOFRADO,AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
M2
GLB
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.04
15.00
0.07
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.216
0.18
0.189
%
15.79
1.20
2.55
5.50
3.85
28.89
%
1.04
0.91
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
20.778
5.195
2.493
0.623
2.078
25.973
25.97
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ESTRACTOR DE AIRE
HOJA: 90
UNIDAD: U
RENDIMIENTO: 0.300
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.149
PARCIAL: (M)
0.149
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
1.464
0.741
0.768
PARCIAL: (N)
2.973
COSTO
C=(AxB)
148.000
PARCIAL: (O)
148.000
%
0.10
0.10
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
0.97
0.49
0.51
1.97
MATERIALES
DESCRIPCION
UNIDAD
ESTRACTOR DE AIRE
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
97.93
97.93
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
151.122
37.780
18.135
4.534
15.112
188.902
188.90
100.00
UBICACION:
FECHA
:
RUBRO
: BALDOSA DE GRANITO
HOJA: 91
UNIDAD: M2
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.248
PARCIAL: (M)
0.248
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
2.440
1.235
1.280
PARCIAL: (N)
4.955
COSTO
C=(AxB)
8.000
1.640
0.800
PARCIAL: (O)
10.440
%
1.58
1.58
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
15.60
7.90
8.18
31.68
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
SACO
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
51.14
10.48
5.11
66.74
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
15.643
3.911
1.877
0.469
1.564
19.553
19.55
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CERAMICA DE PISO
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.396
100.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.123
PARCIAL: (M)
0.123
COSTO/HOR
C=(AxB)
2.44
2.47
1.28
COSTO
D=(CxR)
0.966
0.978
0.507
PARCIAL: (N)
2.451
COSTO
C=(AxB)
5.890
1.312
0.500
PARCIAL: (O)
7.702
%
1.19
1.19
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
0.50
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
9.40
9.52
4.93
23.85
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
M3
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
57.32
12.77
4.87
74.95
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
10.276
0.000
0.000
0.000
0.000
10.276
10.28
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PORCELANATO
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.568
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.212
0.93
PARCIAL: (M)
0.212
0.93
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.386
1.403
1.454
PARCIAL: (N)
4.243
COSTO
C=(AxB)
16.275
1.375
0.700
PARCIAL: (O)
18.350
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
6.08
6.15
6.38
18.61
MATERIALES
DESCRIPCION
UNIDAD
PORCELANATO 60 X 60
BONDEX
POLVO DE EMPORAR Y OTROS
TRANSPORTE
DESCRIPCION
M2
SACO
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
71.37
6.03
3.07
80.46
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
22.805
0.000
0.000
0.000
0.000
22.805
22.81
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CERAMICA PARA PAREDES
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.397
100.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.148
PARCIAL: (M)
0.148
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.969
0.981
1.016
PARCIAL: (N)
2.966
COSTO
C=(AxB)
6.479
1.312
0.500
PARCIAL: (O)
8.291
%
1.30
1.30
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
M3
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
8.49
8.60
8.91
26.00
%
56.81
11.50
4.38
72.70
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
0%
0%
0%
0%
11.404
0.000
0.000
0.000
0.000
11.404
11.40
100.00
HOJA: 93
UNIDAD: M2
RENDIMIENTO: 0.400
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.296
PARCIAL: (M)
0.296
COSTO/HOR
C=(AxB)
7.32
4.94
2.56
COSTO
D=(CxR)
2.928
1.976
1.024
PARCIAL: (N)
5.928
COSTO
C=(AxB)
5.260
PARCIAL: (O)
5.260
%
2.58
2.58
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
25.50
17.21
8.92
51.62
MATERIALES
DESCRIPCION
UNIDAD
DURATECHO
TRANSPORTE
DESCRIPCION
M2
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
45.80
45.80
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
11.484
0.000
0.000
0.000
0.000
11.484
11.48
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 11.004
100.00
FECHA
RUBRO
:
10/1/2011
: CUBIERTA DE LAVANDERIA
UNIDAD: M2
RENDIMIENTO: 0.249
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.184
PARCIAL: (M)
0.184
COSTO/HOR
C=(AxB)
7.32
4.94
2.56
COSTO
D=(CxR)
1.820
1.228
0.636
PARCIAL: (N)
3.684
COSTO
C=(AxB)
7.350
1.620
5.320
PARCIAL: (O)
14.290
%
1.01
1.01
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
10.02
6.76
3.50
20.29
MATERIALES
DESCRIPCION
UNIDAD
GALVALUME E=0,30 MM
PINTURA ANTICORROSIVA
CORREA "G" 60*30*10 2mm
M2
GL
U
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
40.48
8.92
29.30
78.70
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
18.158
0.000
0.000
0.000
0.000
18.158
18.16
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: LAVANDERIA
HOJA: 11.004
UNIDAD: U
RENDIMIENTO: 0.934
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
(B)
C=(AxB)
D=(CxR)
0.575
1.11
PARCIAL: (M)
0.575
1.11
COSTO/HOR
C=(AxB)
4.88
4.88
2.56
COSTO
D=(CxR)
4.558
4.558
2.391
PARCIAL: (N)
11.507
COSTO
C=(AxB)
39.900
PARCIAL: (O)
39.900
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA IV (MAESTRO MAYOR)
%
8.77
8.77
4.60
22.14
MATERIALES
DESCRIPCION
UNIDAD
LAVANDERIA
M2
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
76.76
76.76
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
51.982
0.000
0.000
0.000
0.000
51.982
51.98
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CERRAMIENTO PERIMETRAL
HOJA: 11.003
UNIDAD: ML
RENDIMIENTO: 0.881
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.651
1.08
PARCIAL: (M)
0.651
1.08
COSTO/HOR
C=(AxB)
9.76
2.47
2.56
COSTO
D=(CxR)
8.599
2.176
2.255
PARCIAL: (N)
13.030
COSTO
C=(AxB)
19.433
4.740
7.920
12.000
2.500
PARCIAL: (O)
46.593
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
14.27
3.61
3.74
21.62
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
SACO
U
M3
GL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
32.24
7.86
13.14
19.91
4.15
77.30
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
60.274
0.000
0.000
0.000
0.000
60.274
60.27
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CORREAS PERFIL TIPO "G" 80*40*15 2mm
HOJA: 94
UNIDAD: ML
RENDIMIENTO: 0.800
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.200
PARCIAL: (M)
0.200
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
1.952
2.048
PARCIAL: (N)
4.000
COSTO
C=(AxB)
2.300
PARCIAL: (O)
2.300
%
3.08
3.08
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
30.03
31.51
61.54
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
35.38
35.38
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
DEPARTAMENTO DE CONSTRUCCION
0%
0%
0%
0%
6.500
0.000
0.000
0.000
0.000
6.500
6.50
100.00
HOJA: 95
UNIDAD: ML
RENDIMIENTO: 1.300
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.636
PARCIAL: (M)
0.636
COSTO/HOR
C=(AxB)
7.32
2.47
COSTO
D=(CxR)
9.516
3.211
PARCIAL: (N)
12.727
COSTO
C=(AxB)
3.800
0.800
PARCIAL: (O)
4.600
%
3.54
3.54
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
52.97
17.88
70.85
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
21.15
4.45
25.61
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
DEPARTAMENTO DE CONSTRUCCION
17.963
4.491
2.156
0.539
1.796
22.454
22.45
100.00
HOJA: 96
UNIDAD: ML
RENDIMIENTO: 0.800
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.392
PARCIAL: (M)
0.392
COSTO/HOR
C=(AxB)
7.32
2.47
COSTO
D=(CxR)
5.856
1.976
PARCIAL: (N)
7.832
COSTO
C=(AxB)
3.800
2.423
2.200
PARCIAL: (O)
8.423
%
2.35
2.35
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
35.18
11.87
47.05
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
ML
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
22.83
14.55
13.22
50.60
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
16.646
4.162
1.998
0.499
1.665
20.808
20.81
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUERTA METALICA DE TOOL DE 0.70X1,50
HOJA: 97
UNIDAD: U
RENDIMIENTO: 3.637
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.353
PARCIAL: (M)
1.353
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
17.750
9.311
PARCIAL: (N)
27.062
COSTO
C=(AxB)
8.990
25.000
62.600
PARCIAL: (O)
96.590
%
1.08
1.08
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
14.20
7.45
21.65
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
ML
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
7.19
20.00
50.08
77.27
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
125.005
0.000
0.000
0.000
0.000
125.005
125.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 98
100.00
FECHA
RUBRO
:
10/1/2011
: CANALON GALVANIZADO PARA AA.LL
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.187
PARCIAL: (M)
0.187
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.220
1.235
1.280
PARCIAL: (N)
3.735
COSTO
C=(AxB)
7.000
1.000
PARCIAL: (O)
8.000
%
1.57
1.57
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
10.23
10.36
10.74
31.33
MATERIALES
DESCRIPCION
UNIDAD
CANALON GALVANIZADO
ACCESORIOS
ML
GLB
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
58.72
8.39
67.10
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
11.922
2.980
1.431
0.358
1.192
14.902
14.90
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
HOJA: 99
100.00
FECHA
RUBRO
:
: REJA DE PROTECCION DE 1/2" PARA CANAL
UNIDAD: ML
RENDIMIENTO: 0.100
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.045
PARCIAL: (M)
0.045
COSTO/HOR
C=(AxB)
3.40
5.62
COSTO
D=(CxR)
0.340
0.562
PARCIAL: (N)
0.902
COSTO
C=(AxB)
3.627
0.900
PARCIAL: (O)
4.527
%
0.82
0.82
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
3.40
1.00
5.62
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
6.21
10.27
16.48
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
66.26
16.44
82.70
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
5.474
1.369
0.657
0.164
0.547
6.843
6.84
NITULY S. A.
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
HOJA: 100
UNIDAD: U
100.00
RUBRO
: DUCHA MESCLADORA
RENDIMIENTO: 0.635
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.237
PARCIAL: (M)
0.237
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.548
1.567
1.625
PARCIAL: (N)
4.740
COSTO
C=(AxB)
29.400
1.000
PARCIAL: (O)
30.400
%
0.67
0.67
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
4.38
4.43
4.59
13.40
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
83.10
2.83
85.93
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
35.377
0.000
0.000
0.000
0.000
35.377
35.38
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: URINARIO
HOJA: 101
UNIDAD: U
RENDIMIENTO: 1.000
100.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.374
PARCIAL: (M)
0.374
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
2.440
2.470
2.560
PARCIAL: (N)
7.470
COSTO
C=(AxB)
42.970
1.000
PARCIAL: (O)
43.970
%
0.72
0.72
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
4.71
4.77
4.94
14.42
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
82.93
1.93
84.86
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
51.814
0.000
0.000
0.000
0.000
51.814
51.81
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: FREGADERO 2P
HOJA: 102
UNIDAD: U
RENDIMIENTO: 0.600
100.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.224
PARCIAL: (M)
0.224
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.464
1.482
1.536
PARCIAL: (N)
4.482
COSTO
C=(AxB)
72.330
1.000
PARCIAL: (O)
73.330
%
0.29
0.29
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
1.88
1.90
1.97
5.74
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
92.69
1.28
93.97
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
78.036
0.000
0.000
0.000
0.000
78.036
78.04
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: REJILLA DE PISO
HOJA: 102
UNIDAD: U
RENDIMIENTO: 0.113
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.042
1.11
PARCIAL: (M)
0.042
1.11
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
0.276
0.279
0.289
PARCIAL: (N)
0.844
COSTO
C=(AxB)
2.500
0.400
PARCIAL: (O)
2.900
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
7.28
7.37
7.64
22.29
MATERIALES
DESCRIPCION
UNIDAD
REJILLAS DE PISO
ACCESORIOS
TRANSPORTE
DESCRIPCION
U
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
66.03
10.56
76.59
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
3.786
0.000
0.000
0.000
0.000
3.786
3.79
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ACCESORIOS DE BAO
HOJA: 103
UNIDAD: U
RENDIMIENTO: 0.932
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.229
PARCIAL: (M)
0.229
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
2.274
2.302
PARCIAL: (N)
4.576
COSTO
C=(AxB)
8.800
0.400
%
1.63
1.63
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
%
16.24
16.44
32.68
MATERIALES
DESCRIPCION
ACCESORIO DE BAO
OTROS
UNIDAD
U
GLB
%
62.84
2.86
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
9.200
COSTO
D=(AxBXC)
65.69
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
14.005
0.000
0.000
0.000
0.000
14.005
14.00
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: DESMONTAJE Y MONTAJE DE CUBIERTA
HOJA: 104
UNIDAD: M2
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.496
PARCIAL: (M)
0.496
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
4.880
2.470
2.560
PARCIAL: (N)
9.910
%
4.76
4.76
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
46.90
23.74
24.60
95.24
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
0.000
COSTO
D=(AxBXC)
0.00
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
10.406
0.000
0.000
0.000
0.000
10.406
10.41
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PUERTA EXTERIOR 2.00X2.00 INCL. CHAPA
HOJA: 105
UNIDAD: U
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.368
PARCIAL: (M)
0.368
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
4.880
2.470
PARCIAL: (N)
7.350
COSTO
C=(AxB)
225.000
28.000
0.600
PARCIAL: (O)
253.600
%
0.14
0.14
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
1.87
0.95
2.81
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
86.10
10.71
0.23
97.05
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES 10%
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
261.318
65.329
31.358
7.840
26.132
326.647
326.65
100.00
NITULY S. A.
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PUERTA PRINCIPAL TAMBORADA 0.90 x 2.00 INCL. CHAPA
HOJA:
UNIDAD: U
RENDIMIENTO: 1.111
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.408
PARCIAL: (M)
0.408
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
5.422
2.744
PARCIAL: (N)
8.167
COSTO
C=(AxB)
55.000
28.000
7.000
PARCIAL: (O)
90.000
%
0.41
0.41
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
5.50
2.78
8.28
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
55.80
28.40
7.10
91.30
%
98.575
24.644
11.829
2.957
9.858
123.219
123.22
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
HOJA:
UNIDAD: U
RENDIMIENTO: 5.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.555
PARCIAL: (M)
1.555
COSTO/HOR
C=(AxB)
0.60
5.62
COSTO
D=(CxR)
3.000
28.100
PARCIAL: (N)
31.100
COSTO
C=(AxB)
143.000
28.000
7.000
PARCIAL: (O)
178.000
%
0.74
0.74
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
0.30
1.00
5.62
PUERTA 1.20X2.00
CABALLETE EUROLIT
%
1.42
13.34
14.76
MATERIALES
DESCRIPCION
UNIDAD
PUERTA 1.20X2.00
CERRADURA ITALIANA VIRO
VISAGRA,CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
U
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
67.88
13.29
3.32
84.50
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
210.655
52.664
25.279
100.00
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
6.320
21.066
263.319
263.32
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PUERTA PRINCIPAL 0.90X2.00 INCL. CHAPA
HOJA: 107
UNIDAD: U
RENDIMIENTO: 4.795
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.762
PARCIAL: (M)
1.762
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
23.399
11.843
PARCIAL: (N)
35.243
COSTO
C=(AxB)
75.000
6.000
7.000
PARCIAL: (O)
88.000
%
1.41
1.41
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
18.72
9.47
28.19
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
60.00
4.80
5.60
70.40
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
0%
0%
0%
0%
125.005
0.000
0.000
0.000
0.000
125.005
100.00
125.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PUERTA INTERIOR 0.80X2.00INCL. CHAPA
HOJA: 108
UNIDAD: U
RENDIMIENTO: 5.494
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.019
PARCIAL: (M)
2.019
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
26.811
13.570
PARCIAL: (N)
40.381
COSTO
C=(AxB)
60.000
6.000
7.000
PARCIAL: (O)
73.000
%
1.75
1.75
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
23.23
11.76
34.99
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
51.99
5.20
6.07
63.26
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
115.400
0.000
0.000
0.000
0.000
115.400
115.40
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CLOSET
HOJA: 107
UNIDAD: U
RENDIMIENTO: 4.329
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.584
PARCIAL: (M)
1.584
COSTO/HOR
C=(AxB)
4.88
2.44
COSTO
D=(CxR)
21.126
10.563
PARCIAL: (N)
31.689
COSTO
C=(AxB)
230.000
9.730
7.000
PARCIAL: (O)
246.730
%
0.57
0.57
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.44
CATEGORIA I (PEON)
CATEGORIA II
%
7.54
3.77
11.32
MATERIALES
DESCRIPCION
UNIDAD
CLOSET DE AGLOMERADO
TUBO 1 1/2"X1 1/2"X1.5mm 6M
VISAGRA,CLAVOS Y OTROS
TRANSPORTE
DESCRIPCION
U
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
82.14
3.47
2.50
88.12
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
280.003
0.000
0.000
0.000
0.000
280.003
280.00
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ANAQUEL DE COCINA
HOJA: 107
UNIDAD: ML
RENDIMIENTO: 8.327
EQUIPO
DESCRIPCION
1.00
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
3.048
PARCIAL: (M)
3.048
COSTO/HOR
C=(AxB)
4.88
2.44
COSTO
D=(CxR)
40.636
20.318
PARCIAL: (N)
60.954
COSTO
C=(AxB)
89.000
%
1.90
1.90
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.44
CATEGORIA I (PEON)
CATEGORIA II
%
25.40
12.70
38.10
MATERIALES
DESCRIPCION
UNIDAD
ANAQUEL DE COCINA
ML
VISAGRA,CLAVOS Y OTROS
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
1.00
CANTIDAD
(B)
%
55.62
7.00
7.000
4.37
PARCIAL: (O)
96.000
60.00
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
160.001
0.000
0.000
0.000
0.000
160.001
160.00
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PUERTA INTERIOR 0.80X2.00INCL. CHAPA
HOJA: 108
UNIDAD: U
RENDIMIENTO: 5.494
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
5.576
PARCIAL: (M)
5.576
COSTO/HOR
C=(AxB)
10.00
10.30
COSTO
D=(CxR)
54.940
56.588
PARCIAL: (N)
111.528
COSTO
C=(AxB)
0.000
9.730
7.000
PARCIAL: (O)
16.730
%
4.17
4.17
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
5.00
1.00
10.30
0.00
SIKA TOP 144 BLANCO 5 KG
%
41.05
42.28
83.33
MATERIALES
DESCRIPCION
UNIDAD
0.00
U
U
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
0.00
7.27
5.23
12.50
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
133.835
0.000
0.000
0.000
0.000
133.835
133.83
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PUERTA DE ALUMINIO Y VIDRIO
HOJA: 109
UNIDAD: U
RENDIMIENTO: 2.909
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.069
PARCIAL: (M)
1.069
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
14.196
7.185
PARCIAL: (N)
21.381
COSTO
C=(AxB)
125.000
6.000
7.000
%
0.67
0.67
MANO DE OBRA
DESCRIPCION
CATEGORIA II
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
%
8.85
4.48
13.33
MATERIALES
DESCRIPCION
PUERTA DE ALUMINIO Y VIDRIO
CHAPA DE POMO
VISAGRA, TORNILLOS Y OTROS
UNIDAD
U
U
GBL
%
77.91
3.74
4.36
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
138.000
COSTO
D=(AxBXC)
86.01
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
160.450
0.000
0.000
0.000
0.000
160.450
160.45
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
HOJA: 110
UNIDAD: U
RENDIMIENTO: 4.849
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.782
PARCIAL: (M)
1.782
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
23.663
11.977
PARCIAL: (N)
35.640
COSTO
C=(AxB)
55.000
6.000
7.000
%
1.69
1.69
MANO DE OBRA
DESCRIPCION
CATEGORIA II
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
%
22.45
11.36
33.81
MATERIALES
DESCRIPCION
PUERTA DE BAO 0,70 X 2.00
CHAPA DE POMO
VISAGRA,CLAVOS Y OTROS
UNIDAD
U
U
GBL
%
52.17
5.69
6.64
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
68.000
COSTO
D=(AxBXC)
64.50
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
105.422
0.000
0.000
0.000
0.000
105.422
105.42
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PUERTA DE ACORDEON INCL. CHAPA(2.86M2)
HOJA: 111
UNIDAD: U
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.368
PARCIAL: (M)
0.368
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
4.880
2.470
PARCIAL: (N)
7.350
COSTO
C=(AxB)
80.080
28.000
4.000
%
0.31
0.31
MANO DE OBRA
DESCRIPCION
CATEGORIA II
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
%
4.07
2.06
6.14
MATERIALES
DESCRIPCION
LLAVE PARA LAVATORIO FV
CERRADURA ITALIANA VIRO
VARIOS
UNIDAD
M2
U
GBL
%
66.85
23.37
3.34
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
112.080
COSTO
D=(AxBXC)
93.56
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
119.798
0.000
0.000
0.000
0.000
119.798
119.80
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PASAMANO METALICO
HOJA: 112
UNIDAD: M
RENDIMIENTO: 0.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.074
PARCIAL: (M)
0.074
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
0.976
0.512
PARCIAL: (N)
1.488
COSTO
C=(AxB)
24.280
1.600
PARCIAL: (O)
25.880
%
0.27
0.27
MANO DE OBRA
DESCRIPCION
CATEGORIA II
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
%
3.56
1.87
5.42
MATERIALES
DESCRIPCION
PASAMANO METALICO
VARIOS
UNIDAD
M
GBL
%
88.48
5.83
94.31
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
27.442
0.000
0.000
0.000
0.000
27.442
27.44
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: REVESTIMIENTO DE ESCALERA
HOJA: 113
UNIDAD: ESCALON
RENDIMIENTO: 1.500
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
PULIDORA MANUAL
CANTIDAD
(A)
1.00
TARIFA
(B)
2.00
COSTO
D=(CxR)
0.743
3.000
PARCIAL: (M)
3.743
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
7.320
3.705
3.840
PARCIAL: (N)
14.865
COSTO
C=(AxB)
1.312
1.500
2.400
1.200
2.000
PARCIAL: (O)
8.412
2.00
COSTO/HOR
C=(AxB)
%
2.75
11.10
13.85
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
27.09
13.71
14.21
55.01
MATERIALES
DESCRIPCION
CEMENTO
MARMOLINA
CEMENTO BLANCO
GRANO DE MARMOL
VARIOS
TRANSPORTE
UNIDAD
SACO
SACO
SACO
SACO
GBL
%
4.86
5.55
8.88
4.44
7.40
31.13
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
27.020
0.000
0.000
0.000
0.000
27.020
27.02
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: MURO DE GAVION
HOJA: 114
UNIDAD: M3
RENDIMIENTO: 0.600
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.177
PARCIAL: (M)
1.177
COSTO/HOR
C=(AxB)
31.72
4.94
2.56
COSTO
D=(CxR)
19.032
2.964
1.536
PARCIAL: (N)
23.532
COSTO
C=(AxB)
6.564
11.500
PARCIAL: (O)
18.064
%
2.56
2.56
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
13.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
41.36
6.44
3.34
51.14
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M3
M3
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
14.27
24.99
39.26
%
M3
15.00
1.20
0.18
3.240
PARCIAL: (P)
3.240
0%
0%
0%
0%
7.04
46.013
0.000
0.000
0.000
0.000
46.013
46.01
92.96
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CUMBRERO
HOJA: 115
UNIDAD: M2
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.184
PARCIAL: (M)
0.184
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
2.440
1.235
PARCIAL: (N)
3.675
COSTO
C=(AxB)
2.520
0.600
PARCIAL: (O)
3.120
%
2.63
2.63
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
34.96
17.70
52.66
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
U
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
36.11
8.60
44.71
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
6.979
0.000
0.000
0.000
0.000
6.979
6.98
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CIELO RASO FIBROCEL SOBRE ALUMINIO
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.184
PARCIAL: (M)
0.184
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
2.440
1.235
PARCIAL: (N)
3.675
COSTO
C=(AxB)
10.500
0.700
PARCIAL: (O)
11.200
%
1.22
1.22
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
16.20
8.20
24.40
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
69.73
4.65
74.38
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
15.059
0.000
0.000
0.000
0.000
15.059
15.06
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CIELO RASO GYPSUM
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.309
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.114
PARCIAL: (M)
0.114
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
1.508
0.763
PARCIAL: (N)
2.271
COSTO
C=(AxB)
11.200
0.700
PARCIAL: (O)
11.900
%
0.79
0.79
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
10.56
5.34
15.90
MATERIALES
DESCRIPCION
UNIDAD
GYPSUM
OTROS
TRANSPORTE
DESCRIPCION
M2
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
78.41
4.90
83.31
%
0%
0%
0%
0%
14.285
0.000
0.000
0.000
0.000
14.285
14.28
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: VENTANA DE ALUMINIO Y VIDRIO
HOJA: 117
UNIDAD: M2
RENDIMIENTO: 1.329
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.488
PARCIAL: (M)
0.488
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
6.486
3.283
PARCIAL: (N)
9.768
COSTO
C=(AxB)
9.975
9.570
11.890
0.750
0.660
4.900
PARCIAL: (O)
37.745
%
1.02
1.02
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
13.51
6.84
20.35
MATERIALES
DESCRIPCION
UNIDAD
VIDRIO FLOTADO 4 mm
P. ALUMINIO MARCO VENTANA
P. ALUMINIO VENTANA
EMPAQUE VINIL
RUEDA
HERRAJE PESTILLOS Y OTROS
TRANSPORTE
DESCRIPCION
M2
ML
ML
ML
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
20.78
19.94
24.77
1.56
1.37
10.21
78.63
%
0%
0%
0%
0%
48.002
0.000
0.000
0.000
0.000
48.002
48.00
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: REJAS PROTECTORA DE VENTANAS
HOJA: 118
UNIDAD: U
RENDIMIENTO: 3.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.103
PARCIAL: (M)
1.103
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
14.640
7.410
PARCIAL: (N)
22.050
COSTO
C=(AxB)
11.200
3.800
PARCIAL: (O)
15.000
%
2.89
2.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
38.37
19.42
57.79
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
29.36
9.96
39.32
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
38.153
100.00
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.000
0.000
0.000
0.000
38.153
38.15
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CUBIERTA DE EST. MADERA Y DURATECHO
HOJA: 119
UNIDAD: M2
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.368
PARCIAL: (M)
0.368
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
4.880
2.470
PARCIAL: (N)
7.350
COSTO
C=(AxB)
6.400
5.523
0.360
PARCIAL: (O)
12.283
%
1.84
1.84
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
24.40
12.35
36.75
MATERIALES
DESCRIPCION
UNIDAD
MADERA
DURATECHO
CAPUCHON Y TIRAFONDO
TRANSPORTE
DESCRIPCION
GBL
M2
U
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
32.00
27.61
1.80
61.41
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
0%
20.001
0.000
100.00
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0.000
0.000
0.000
20.001
20.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
HOJA:
FECHA
:
UNIDAD: M2
RUBRO
: CUBIERTA DE EST. METALICA Y PLANCHAS GALVALUME E=0,30
RENDIMIENTO: 0.904
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.338
PARCIAL: (M)
0.338
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
2.206
2.233
2.314
PARCIAL: (N)
6.753
COSTO
C=(AxB)
3.510
9.056
0.773
0.963
0.358
0.600
PARCIAL: (O)
15.260
%
1.51
1.51
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
9.87
9.99
10.35
30.21
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
M2
U
GBL
TUBO
U
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
15.70
40.52
3.46
4.31
1.60
2.68
68.28
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
0%
0%
0%
22.351
0.000
0.000
0.000
100.00
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0.000
22.351
22.35
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: REPARACION DE CONTRAPISO DE H.S (AREA EXTERIOR)
HOJA: 121
UNIDAD: M2
RENDIMIENTO: 0.050
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
0.068
0.150
PARCIAL: (M)
0.218
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
0.976
0.247
0.128
PARCIAL: (N)
1.351
COSTO
C=(AxB)
4.592
0.375
0.682
0.500
PARCIAL: (O)
6.149
3.00
COSTO/HOR
C=(AxB)
%
0.82
1.81
2.63
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
11.78
2.98
1.55
16.31
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.06
15.00
0.09
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.324
0.18
0.243
%
55.43
4.53
8.23
6.04
74.22
%
3.91
2.93
PARCIAL: (P)
0.567
6.84
8.285
0.000
0.000
0.000
0.000
8.285
100.00
0%
0%
0%
0%
8.28
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CAJA DE BREAKERS DE 8-16-GE
HOJA:
UNIDAD: U
RENDIMIENTO: 2.981
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.113
PARCIAL: (M)
1.113
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
7.274
7.363
7.631
PARCIAL: (N)
22.268
COSTO
C=(AxB)
35.000
%
1.89
1.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
12.33
12.48
12.94
37.75
MATERIALES
DESCRIPCION
UNIDAD
OTROS
TRANSPORTE
DESCRIPCION
GBL
UNIDAD
D.M.T.
(A)
1.00
CANTIDAD
(B)
59.34
0.60
0.600
1.02
PARCIAL: (O)
35.600
60.36
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
0.000
0.00
58.981
0.000
0.000
0.000
0.000
58.981
58.98
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BREAKERS
HOJA:
UNIDAD: U
RENDIMIENTO: 0.255
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.030
PARCIAL: (M)
0.030
COSTO/HOR
C=(AxB)
0.28
1.40
0.70
COSTO
D=(CxR)
0.071
0.357
0.179
PARCIAL: (N)
0.607
COSTO
C=(AxB)
3.880
%
0.59
0.59
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
0.28
1.00
1.40
1.00
0.70
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA III (ALBAIL)
%
1.40
6.98
3.49
11.86
MATERIALES
DESCRIPCION
UNIDAD
BREAKER
OTROS
TRANSPORTE
DESCRIPCION
GBL
UNIDAD
D.M.T.
(A)
1.00
CANTIDAD
(B)
75.82
0.60
0.600
11.73
PARCIAL: (O)
4.480
87.55
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
0.000
0.00
5.117
0.000
0.000
0.000
0.000
5.117
5.12
100.00
NITULY S. A.
DEPARTAMENTO TECNICO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
: Vivienda Tipo I
UBICACION: Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
FECHA
:
10/1/2011
RUBRO
: CONTRAPISO CON MALLA ELECTROSOLDADA
E=0.08M
HOJA: 123
UNIDAD: M2
RENDIMIENTO: 0.135
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
%
1.26
1.00
PARCIAL: (M)
MANO DE OBRA
COSTO
D=(CxR)
0.182
0.182
1.26
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
2.625
0.664
0.344
PARCIAL: (N)
3.634
COSTO
C=(AxB)
4.920
0.375
0.682
0.500
2.478
1.122
PARCIAL: (O)
10.077
%
18.16
4.59
2.38
25.13
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
AGUA Y OTROS
ELECTROMALLA 6-15
TABLAS DE ENCOFRADO
SACO
M3
M3
GBL
M2
U
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.06
15.00
0.09
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.324
0.18
0.243
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
34.02
2.59
4.72
3.46
17.14
7.76
69.69
%
2.24
1.68
0.567
3.92
14.460
0.000
0.000
0.000
0.000
14.460
14.46
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BALDOSA GRES ANTIDESLIZANTE
HOJA: 124
UNIDAD: M2
RENDIMIENTO: 0.700
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
0.261
%
1.42
0.261
1.42
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
COSTO/HOR
COSTO
(A)
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
(B)
1.00
1.00
1.00
C=(AxB)
2.44
2.47
2.56
D=(CxR)
1.708
1.729
1.792
9.27
9.38
9.72
PARCIAL: (N)
5.229
28.37
COSTO
C=(AxB)
11.000
1.640
0.300
PARCIAL: (O)
12.940
2.44
2.47
2.56
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
M3
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
%
59.68
8.90
1.63
70.21
%
0.000
0.00
18.430
0.000
0.000
0.000
0.000
18.430
18.43
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: MAMPARA DE PLYWOOD CON TELA YUTE Y VIDRIO
HOJA: 125
UNIDAD: M2
RENDIMIENTO: 3.600
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
2.223
%
2.48
2.223
2.48
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
3.00
1.00
1.00
2.44
2.47
2.56
7.32
2.47
2.56
26.352
8.892
9.216
29.41
9.93
10.29
PARCIAL: (N)
44.460
49.63
COSTO
C=(AxB)
7.135
10.667
1.900
7.500
7.425
8.280
PARCIAL: (O)
42.907
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
M2
M2
GBL
M2
ML
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
7.96
11.91
2.12
8.37
8.29
9.24
47.89
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
89.590
0.000
0.000
0.000
0.000
89.590
89.59
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: LAMPARAS TIPO GLOBO CON PEDESTAL METALICO
HOJA: 126
UNIDAD: U
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.246
PARCIAL: (M)
0.246
COSTO/HOR
C=(AxB)
2.44
COSTO
D=(CxR)
2.440
%
0.12
0.12
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
%
1.22
1.00
2.47
2.47
2.470
1.23
PARCIAL: (N)
4.910
2.45
COSTO
C=(AxB)
195.000
PARCIAL: (O)
195.000
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
97.42
97.42
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
200.156
0.000
0.000
0.000
0.000
200.156
200.16
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BASE PARA LAMPARAS 0.40X.30X.20
HOJA: 127
UNIDAD: U
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
1.107
3.000
PARCIAL: (M)
4.107
COSTO/HOR
C=(AxB)
14.64
4.94
2.56
COSTO
D=(CxR)
14.640
4.940
2.560
%
3.71
10.04
13.75
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
6.00
2.44
2.00
2.47
1.00
2.56
%
49.01
16.54
8.57
PARCIAL: (N)
22.140
74.12
COSTO
C=(AxB)
1.181
0.313
0.682
0.561
0.075
0.300
3.112
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
0.18
0.243
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
SACO
M3
M3
U
U
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
15.00
0.09
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
3.95
1.05
2.28
1.88
0.25
1.00
10.42
0.90
0.81
0.513
1.72
29.872
0.000
0.000
0.000
0.000
29.872
29.87
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: JUEGOS INFANT. (INCLUYE COLUMP., RESBALADERA,
HOJA: 128
UNIDAD: GBL
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
SOLDADORA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
0.863
3.000
PARCIAL: (M)
3.863
COSTO/HOR
C=(AxB)
9.76
4.94
2.56
COSTO
D=(CxR)
9.760
4.940
2.560
PARCIAL: (N)
17.260
%
0.16
0.55
0.71
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
2.00
2.47
1.00
2.56
%
1.79
0.91
0.47
3.17
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
U
GBL
D.M.T.
(A)
CANTIDAD
(A)
1.00
1.00
CANTIDAD
(B)
PRECIO UNIT.
(B)
488.00
35.00
488.000
35.000
89.69
6.43
PARCIAL: (O)
523.000
96.12
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
COSTO
C=(AxB)
0%
0%
0%
0%
COSTO
D=(AxBXC)
0.000
0.00
544.123
0.000
0.000
0.000
0.000
544.123
544.12
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CESPED TIPO MUSGO
HOJA: 129
UNIDAD: M2
RENDIMIENTO: 0.200
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.488
0.512
PARCIAL: (N)
1.000
COSTO
C=(AxB)
2.200
0.800
%
1.23
1.23
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
%
12.05
12.64
24.69
MATERIALES
DESCRIPCION
CESPED TIPO MUSGO
OTROS
UNIDAD
M2
GBL
%
54.32
19.75
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
3.000
COSTO
D=(AxBXC)
74.07
%
0.000
0.00
4.050
0.000
0.000
0.000
0.000
4.050
4.05
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: AREAS VERDES
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
(B)
C=(AxB)
D=(CxR)
0.187
2.55
PARCIAL: (M)
0.187
2.55
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.220
1.235
1.280
PARCIAL: (N)
3.735
COSTO
C=(AxB)
2.400
0.800
0.200
PARCIAL: (O)
3.400
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
16.66
16.87
17.48
51.01
MATERIALES
DESCRIPCION
UNIDAD
M3
GLB
GLB
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
%
32.78
10.93
2.73
46.44
%
0.000
0.00
7.322
0.000
0.000
0.000
0.000
7.322
7.32
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CERAMICA DE PAREDES
HOJA: 131
UNIDAD: M2
RENDIMIENTO: 0.920
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
(B)
C=(AxB)
D=(CxR)
0.344
2.11
PARCIAL: (M)
0.344
2.11
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
2.245
2.272
2.355
PARCIAL: (N)
6.872
COSTO
C=(AxB)
6.170
2.296
0.600
PARCIAL: (O)
9.066
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
13.79
13.96
14.47
42.21
MATERIALES
DESCRIPCION
UNIDAD
M2
M3
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
%
37.89
14.10
3.69
55.68
%
0.000
0.00
16.282
0.000
0.000
0.000
0.000
16.282
16.28
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: HORMIGON SIMPLE F'C=240Kg/cm2
HOJA: 132
UNIDAD: M3
RENDIMIENTO: 0.890
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CONCRETERA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
1.518
2.670
%
1.16
2.04
PARCIAL: (M)
4.188
3.20
COSTO/HOR
C=(AxB)
19.52
4.94
2.56
COSTO
D=(CxR)
21.933
5.551
2.876
PARCIAL: (N)
30.360
COSTO
C=(AxB)
53.136
3.563
6.595
22.440
4.500
0.500
90.733
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.078
0.18
2.349
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
%
16.78
4.25
2.20
23.23
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
AGUA, CLAVOS Y OTROS
SACO
M3
M3
U
U
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.57
15.00
0.87
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
40.65
2.73
5.05
17.17
3.44
0.38
69.42
2.35
1.80
5.427
4.15
130.708
0.000
0.000
0.000
0.000
130.708
130.71
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
HOJA: 133
UNIDAD: U
ARCOS METALICOS CON TUBO DE 2"X2mm Y MALLA GALVANIZADARENDIMIENTO: 12.00
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
SOLDADORA
MANO DE OBRA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
8.892
36.000
PARCIAL: (M)
44.892
%
2.52
10.21
12.73
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
3.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
COSTO/HOR
C=(AxB)
7.32
4.94
2.56
COSTO
D=(CxR)
87.840
59.280
30.720
PARCIAL: (N)
177.840
COSTO
C=(AxB)
72.000
47.783
10.000
PARCIAL: (O)
129.783
%
24.92
16.82
8.71
50.45
MATERIALES
DESCRIPCION
UNIDAD
MALLA GALVANIZADA
TUBO GALVANIZO 2"X2mm 6M
SOLDADURA Y OTROS
TRANSPORTE
DESCRIPCION
M2
ML
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
20.42
13.55
2.84
36.82
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
352.515
0.000
0.000
0.000
0.000
352.515
352.52
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TABLERO TIPO SANDUCHE
HOJA: 134
UNIDAD: U
RENDIMIENTO: 5.70
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
SOLDADORA
CANTIDAD
(A)
1.00
TARIFA
(B)
0.18
COSTO/HOR
C=(AxB)
0.18
COSTO
D=(CxR)
2.824
1.026
PARCIAL: (M)
3.850
COSTO/HOR
C=(AxB)
4.88
COSTO
D=(CxR)
27.816
%
2.68
0.97
3.66
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
%
26.42
CATEGORIA III
CATEGORIA IV
1.00
1.00
2.47
2.56
2.47
2.56
14.079
14.592
13.37
13.86
PARCIAL: (N)
56.487
53.65
COSTO
C=(AxB)
40.000
4.960
PARCIAL: (O)
44.960
MATERIALES
DESCRIPCION
UNIDAD
TABLERO DE BASQUET
SOLDADURA Y OTROS
GBL
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
37.99
4.71
42.70
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
105.297
0.000
0.000
0.000
0.000
105.297
105.30
100.00
NITULY S.A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 135
October-2011
UNIDAD: U
RENDIMIENTO: 4.54
PASAMANOS
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
SOLDADORA
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO/HOR
C=(AxB)
3.00
COSTO
D=(CxR)
2.248
13.610
PARCIAL: (M)
15.858
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
22.139
11.205
11.614
%
2.64
16.01
18.66
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
26.05
13.18
13.66
PARCIAL: (N)
44.958
COSTO
C=(AxB)
14.443
7.740
52.89
MATERIALES
DESCRIPCION
UNIDAD
TUBO HG DE 1 1/2" 6m
PINTURA ANTICORROSIVA
ML
GBL
DILUYENTE Y OTROS
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
1.00
CANTIDAD
(B)
%
16.99
9.11
2.00
2.000
2.35
PARCIAL: (O)
24.183
28.45
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
84.999
0.000
0.000
0.000
0.000
84.999
85.00
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: GUSANO DE LLANTAS
HOJA: 136
UNIDAD: U
RENDIMIENTO: 2.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.991
PARCIAL: (M)
0.991
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
9.760
4.940
5.120
PARCIAL: (N)
19.820
%
1.92
1.92
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
18.87
9.55
9.90
38.33
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
LLANTAS RIN # 15
LATEX SUPREMO UNIDAS
ALAMBRE #16
U
GL
KG
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
11.00
0.50
2.00
CANTIDAD
(B)
1.60
15.00
2.90
17.600
7.500
5.800
34.04
14.50
11.22
PARCIAL: (O)
30.900
59.76
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
51.711
0.000
0.000
0.000
0.000
51.711
51.71
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: SUBE Y BAJA
HOJA: 137
UNIDAD: U
RENDIMIENTO: 4.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.982
PARCIAL: (M)
1.982
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
19.520
9.880
10.240
PARCIAL: (N)
39.640
COSTO
C=(AxB)
30.000
22.470
22.867
6.450
16.000
%
1.40
1.40
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
13.80
6.99
7.24
28.03
MATERIALES
DESCRIPCION
ASIENTOS DE MADERA Y PLATINA
TUBO HG DE 2"
TUBO HG DE 2 1/2"
PINTURA ANTICORROSIVA
BASES DE H.S
UNIDAD
U
ML
ML
GL
U
%
21.22
15.89
16.17
4.56
11.31
DILUYENTE Y OTROS
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
1.00
D.M.T.
(A)
CANTIDAD
(B)
2.00
2.000
1.41
PARCIAL: (O)
99.787
70.57
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
141.409
0.000
0.000
0.000
0.000
141.409
141.41
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: COLUMPIOS
HOJA: 138
UNIDAD: U
RENDIMIENTO: 6.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
0.50
0.20
TARIFA
(B)
1.50
0.60
COSTO
D=(CxR)
2.973
9.000
3.600
PARCIAL: (M)
15.573
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
29.280
14.820
15.360
PARCIAL: (N)
59.460
COSTO
C=(AxB)
2.013
55.504
6.450
7.755
12.000
2.000
3.00
3.00
COSTO/HOR
C=(AxB)
%
1.85
5.60
2.24
9.69
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
18.21
9.22
9.55
36.99
MATERIALES
DESCRIPCION
TOOL GALVANIZAOD 1/32 HG
TUBO HG DE 1 1/2" 6m
PINTURA ANTICORROSIVA
CADENAS DE 1/2"
BASES DE H.S
DILUYENTE Y OTROS
UNIDAD
M2
ML
GL
ML
U
GBL
%
1.25
34.53
4.01
4.82
7.46
1.24
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
85.721
COSTO
D=(AxBXC)
53.32
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
160.754
0.000
0.000
0.000
0.000
160.754
160.75
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: RESBALADERA METALICA
HOJA: 139
UNIDAD: U
RENDIMIENTO: 6.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
0.50
0.20
TARIFA
(B)
1.50
0.60
COSTO
D=(CxR)
2.973
9.000
3.600
PARCIAL: (M)
15.573
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
29.280
14.820
15.360
PARCIAL: (N)
59.460
COSTO
C=(AxB)
14.208
48.076
6.450
3.000
8.000
PARCIAL: (O)
79.734
3.00
3.00
COSTO/HOR
C=(AxB)
%
1.92
5.82
2.33
10.06
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
18.92
9.58
9.92
38.42
MATERIALES
DESCRIPCION
TOOL GALVANIZAOD 1/32 HG
TUBO HG DE 1 1/2" 6m
PINTURA ANTICORROSIVA
BASES DE H.S
DILUYENTE Y OTROS
UNIDAD
M2
ML
GL
U
GBL
%
9.18
31.06
4.17
1.94
5.17
51.52
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
154.767
0.000
0.000
0.000
0.000
154.767
154.77
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CABALLO DE MADERA
HOJA: 140
UNIDAD: U
RENDIMIENTO: 6.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.973
PARCIAL: (M)
2.973
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
29.280
14.820
15.360
PARCIAL: (N)
59.460
COSTO
C=(AxB)
165.000
PARCIAL: (O)
165.000
%
1.31
1.31
MANO DE OBRA
DESCRIPCION
CATEGORIA I
CATEGORIA III
CATEGORIA IV
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
%
12.87
6.52
6.75
26.14
MATERIALES
DESCRIPCION
CABALLO DE MADERA
UNIDAD
U
%
72.55
72.55
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
227.433
0.000
0.000
0.000
0.000
227.433
227.43
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: JUEGO GIRATORIO
HOJA: 141
UNIDAD: U
RENDIMIENTO: 6.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.973
PARCIAL: (M)
2.973
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
29.280
14.820
15.360
PARCIAL: (N)
59.460
COSTO
C=(AxB)
100.000
PARCIAL: (O)
100.000
%
1.83
1.83
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
%
18.03
9.12
9.46
36.61
MATERIALES
DESCRIPCION
UNIDAD
JUEGO GIRATORIO
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
CANTIDAD
TARIFA/Km
COSTO
%
61.56
61.56
%
(A)
(B)
(C)
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
162.433
0.000
0.000
0.000
0.000
162.433
162.43
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CASA DE JUEGOS
HOJA: 142
UNIDAD: U
RENDIMIENTO: 6.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.973
PARCIAL: (M)
2.973
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
29.280
14.820
15.360
PARCIAL: (N)
59.460
COSTO
C=(AxB)
180.000
PARCIAL: (O)
180.000
%
1.23
1.23
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
%
12.08
6.11
6.34
24.53
MATERIALES
DESCRIPCION
UNIDAD
CASA DE JUEGOS
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
74.25
74.25
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
242.433
0.000
0.000
0.000
0.000
242.433
242.43
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: MONTAA RESBALADERA
HOJA: 143
UNIDAD: U
RENDIMIENTO: 6.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.973
PARCIAL: (M)
2.973
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
29.280
14.820
15.360
PARCIAL: (N)
59.460
COSTO
C=(AxB)
270.000
PARCIAL: (O)
270.000
%
0.89
0.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I
CATEGORIA III
CATEGORIA IV
%
8.81
4.46
4.62
17.89
MATERIALES
DESCRIPCION
UNIDAD
MONTAA DE RESBALADERA
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
81.22
81.22
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
332.433
0.000
0.000
0.000
0.000
332.433
332.43
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ASPERSORES
HOJA: 144
UNIDAD: U
RENDIMIENTO: 1.20
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.295
PARCIAL: (M)
0.295
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
2.928
2.964
PARCIAL: (N)
5.892
COSTO
C=(AxB)
5.450
0.700
PARCIAL: (O)
6.150
%
2.39
2.39
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III
%
23.73
24.03
47.76
MATERIALES
DESCRIPCION
UNIDAD
ASPERSORES
OTROS
TRANSPORTE
DESCRIPCION
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
COSTO
D=(AxBXC)
%
44.18
5.67
49.85
%
0%
0%
0%
0%
12.337
0.000
0.000
0.000
0.000
12.337
12.34
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CESPED TIPO CHINO
HOJA: 145
UNIDAD: U
RENDIMIENTO: 0.20
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.488
0.512
PARCIAL: (N)
1.000
COSTO
C=(AxB)
3.500
0.800
PARCIAL: (O)
4.300
%
0.93
0.93
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
9.12
9.57
18.69
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
65.42
14.95
80.37
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
0%
0%
0%
5.350
0.000
0.000
0.000
100.00
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0.000
5.350
5.35
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: PALMA WASHINNGTON
HOJA: 146
UNIDAD: U
RENDIMIENTO: 0.20
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.488
0.512
PARCIAL: (N)
1.000
COSTO
C=(AxB)
5.000
0.800
PARCIAL: (O)
5.800
%
0.73
0.73
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
7.12
7.47
14.60
MATERIALES
DESCRIPCION
UNIDAD
PALMA WASHINNGTON
OTROS
TRANSPORTE
DESCRIPCION
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
72.99
11.68
84.67
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
0%
0%
0%
0%
6.850
0.000
0.000
0.000
0.000
6.850
100.00
6.85
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: SAUCE LLORON
HOJA: 147
UNIDAD: U
RENDIMIENTO: 0.20
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.488
0.512
PARCIAL: (N)
1.000
COSTO
C=(AxB)
5.000
0.800
PARCIAL: (O)
5.800
%
0.73
0.73
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
7.12
7.47
14.60
MATERIALES
DESCRIPCION
UNIDAD
SAUCE LLORON
OTROS
TRANSPORTE
DESCRIPCION
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
72.99
11.68
84.67
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
6.850
0.000
0.000
0.000
0.000
6.850
6.85
100.00
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BAMBU
HOJA: 148
UNIDAD: U
RENDIMIENTO: 0.20
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.050
PARCIAL: (M)
0.050
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.488
0.512
PARCIAL: (N)
1.000
COSTO
C=(AxB)
5.000
0.800
PARCIAL: (O)
5.800
%
0.73
0.73
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
7.12
7.47
14.60
MATERIALES
DESCRIPCION
UNIDAD
BAMBU
OTROS
TRANSPORTE
DESCRIPCION
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
72.99
11.68
84.67
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0%
0%
0%
0%
6.850
0.000
0.000
0.000
0.000
6.850
6.85
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: MANGO
HOJA: 149
UNIDAD: U
RENDIMIENTO: 0.10
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.025
PARCIAL: (M)
0.025
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.244
0.256
PARCIAL: (N)
0.500
COSTO
C=(AxB)
1.500
0.800
PARCIAL: (O)
2.300
%
0.88
0.88
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
8.64
9.06
17.70
MATERIALES
DESCRIPCION
UNIDAD
MANGO
OTROS
TRANSPORTE
DESCRIPCION
U
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
53.10
28.32
81.42
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
0%
0%
0%
0%
2.825
0.000
0.000
0.000
0.000
2.825
2.83
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: COLCHON DE NIO
HOJA: 150
UNIDAD: U
RENDIMIENTO: 0.10
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.025
PARCIAL: (M)
0.025
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.244
0.256
PARCIAL: (N)
0.500
COSTO
C=(AxB)
3.300
0.800
PARCIAL: (O)
4.100
%
0.54
0.54
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
5.28
5.54
10.81
MATERIALES
DESCRIPCION
UNIDAD
COLCHON DE NIO
OTROS
U
GBL
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
71.35
17.30
88.65
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
4.625
0.000
0.000
0.000
0.000
4.625
4.63
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
HOJA: 151
UNIDAD: ML
100.00
RUBRO
RENDIMIENTO: 0.030
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.008
PARCIAL: (M)
0.008
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.073
0.077
PARCIAL: (N)
0.150
COSTO
C=(AxB)
0.300
PARCIAL: (O)
0.300
%
1.64
1.64
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
16.00
16.79
32.79
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
65.57
65.57
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.458
0.000
0.000
0.000
0.000
0.458
0.46
HOJA: 152
UNIDAD: M2
RENDIMIENTO: 0.850
100.00
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.317
PARCIAL: (M)
0.317
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
2.074
2.100
2.176
PARCIAL: (N)
6.350
COSTO
C=(AxB)
10.180
2.296
0.450
PARCIAL: (O)
12.926
%
1.62
1.62
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
10.59
10.72
11.11
32.41
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M2
M3
GBL
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
51.96
11.72
2.30
65.97
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
19.593
0.000
0.000
0.000
0.000
19.593
19.59
100.00
HOJA: 153
UNIDAD: M2
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
(B)
C=(AxB)
D=(CxR)
0.187
0.63
PARCIAL: (M)
0.187
0.63
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.220
1.235
1.280
PARCIAL: (N)
3.735
COSTO
C=(AxB)
25.760
PARCIAL: (O)
25.760
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
4.11
4.16
4.31
12.58
MATERIALES
DESCRIPCION
UNIDAD
MARMOL
M2
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
86.79
86.79
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
29.682
0.000
0.000
0.000
0.000
29.682
29.68
100.00
HOJA: 154
UNIDAD: ML
RENDIMIENTO: 0.500
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
(B)
C=(AxB)
D=(CxR)
0.186
4.76
PARCIAL: (M)
0.186
4.76
COSTO/HOR
C=(AxB)
4.88
2.56
COSTO
D=(CxR)
2.440
1.280
PARCIAL: (N)
3.720
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.56
CATEGORIA II
CATEGORIA IV (MAESTRO MAYOR)
%
62.47
32.77
95.24
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
C=(AxB)
0.000
COSTO
D=(AxBXC)
0.00
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
3.906
0.000
0.000
0.000
0.000
3.906
3.91
100.00
HOJA: 155
UNIDAD: ML
RENDIMIENTO: 0.320
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.355
%
2.12
PARCIAL: (M)
0.355
COSTO/HOR
C=(AxB)
12.20
7.41
2.56
COSTO
D=(CxR)
3.904
2.371
0.819
PARCIAL: (N)
7.094
COSTO
C=(AxB)
1.952
0.159
0.379
1.122
0.150
4.830
0.400
PARCIAL: (O)
8.992
2.12
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
23.36
14.19
4.90
42.45
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
ACERO ESTRUCTURAL Fy=4200 Kg/cm2
CLAVOS,AGUA Y OTROS
TRANSPORTE
DESCRIPCION
SACO
M3
M3
U
U
KG
GBL
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.03
15.00
0.05
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.138
0.18
0.135
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
11.68
0.95
2.27
6.71
0.90
28.90
2.39
53.80
%
0.82
0.81
0.273
1.63
16.714
0.000
0.000
0.000
0.000
16.714
16.71
100.00
HOJA: 156
UNIDAD: M2
RENDIMIENTO: 0.700
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.776
%
2.12
PARCIAL: (M)
0.776
COSTO/HOR
C=(AxB)
12.20
7.41
2.56
COSTO
D=(CxR)
8.540
5.187
1.792
PARCIAL: (N)
15.519
COSTO
C=(AxB)
3.674
0.313
0.531
2.431
0.225
12.136
0.500
PARCIAL: (O)
19.809
2.12
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
23.36
14.19
4.90
42.44
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
ACERO ESTRUCTURAL Fy=4200 Kg/cm2
CLAVOS,AGUA Y OTROS
TRANSPORTE
DESCRIPCION
SACO
M3
M3
U
U
KG
GBL
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.05
15.00
0.07
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.270
0.18
0.189
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
10.05
0.85
1.45
6.65
0.62
33.19
1.37
54.18
%
0.74
0.52
0.459
1.26
36.563
0.000
0.000
0.000
0.000
36.563
36.56
100.00
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 157
10/1/2011
UNIDAD: ML
RENDIMIENTO: 2.200
VIGAS DE ARRIOSTRAMIENTO DE H.A
(0.10X0.20)
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
MANO DE OBRA
COSTO
D=(CxR)
2.439
2.439
%
4.17
4.17
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
COSTO/HOR
C=(AxB)
12.20
7.41
2.56
COSTO
D=(CxR)
26.840
16.302
5.632
PARCIAL: (N)
48.774
COSTO
C=(AxB)
0.918
0.063
0.152
0.935
0.120
4.018
0.500
0.500
PARCIAL: (O)
7.206
%
45.86
27.85
9.62
83.34
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
ACERO ESTRUCTURAL Fy=4200 Kg/cm2
CLAVOS,AGUA Y OTROS
TRANSPORTE
DESCRIPCION
SACO
M3
M3
M3
U
U
KG
GBL
UNIDAD
ARENA
RIPIO
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
15.00
0.02
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
0.18
0.054
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
1.57
0.11
0.26
1.60
0.21
6.87
0.85
0.85
12.31
%
0.09
0.09
0.108
0.18
58.526
0.000
0.000
0.000
0.000
58.526
58.53
100.00
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 157
10/1/2011
UNIDAD: M3
RENDIMIENTO: 1.934
HORMIGON EN VIGAS DE ENTREPISO
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.144
PARCIAL: (M)
2.144
COSTO/HOR
C=(AxB)
12.20
COSTO
D=(CxR)
23.595
%
1.35
1.35
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CANTIDAD JORNAL/H
(A)
(B)
5.00
2.44
%
14.90
3.00
1.00
2.47
2.56
7.41
2.56
14.331
4.951
9.05
3.13
PARCIAL: (N)
42.877
27.07
COSTO
C=(AxB)
113.358
PARCIAL: (O)
113.358
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
M3
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
%
71.57
71.57
%
0.000
0.00
158.379
0.000
0.000
0.000
0.000
158.379
158.38
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 157
10/1/2011
UNIDAD: M3
RENDIMIENTO: 2.759
HORMIGON EN VIGAS DE CUBIERTA
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
2.381
PARCIAL: (M)
2.381
COSTO/HOR
C=(AxB)
9.76
4.94
2.56
COSTO
D=(CxR)
26.923
13.627
7.062
%
1.50
1.50
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
2.00
2.47
1.00
2.56
%
17.00
8.60
4.46
PARCIAL: (N)
47.612
COSTO
C=(AxB)
49.200
4.000
8.338
29.920
6.000
2.000
2.500
PARCIAL: (O)
101.958
30.06
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
VARIOS(CLAVOS, ALAMBRES)
ANDAMIOS METALICOS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
U
GBL
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.64
15.00
1.10
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
3.456
0.18
2.970
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
31.07
2.53
5.26
18.89
3.79
1.26
1.58
64.38
%
2.18
1.88
6.426
4.06
158.376
0.000
0.000
0.000
0.000
158.376
158.38
100.00
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 158
10/1/2011
UNIDAD: ML
RENDIMIENTO: 0.125
COLUMNETA DE H.A F'C=210 Kg/cm2
(0.20x0.20)
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.184
PARCIAL: (M)
0.184
COSTO/HOR
C=(AxB)
19.52
7.41
2.56
COSTO
D=(CxR)
2.440
0.926
0.320
PARCIAL: (N)
3.686
COSTO
C=(AxB)
1.837
0.135
0.273
1.247
0.300
4.403
0.500
PARCIAL: (O)
8.695
%
1.44
1.44
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
8.00
2.44
3.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
19.09
7.25
2.50
28.85
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
TABLAS DE ENCOFRADO
CUARTONES
ACERO ESTRUCTURAL Fy=4200 Kg/cm2
CLAVOS,AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
U
KG
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.02
15.00
0.04
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.117
0.18
0.097
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
14.37
1.06
2.14
9.76
2.35
34.46
3.91
68.04
%
0.91
0.76
0.214
1.67
12.779
0.000
0.000
0.000
0.000
12.779
12.78
100.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 159
10/1/2011
UNIDAD: ML
RENDIMIENTO: 1.300
COLUMNA FALSA 0.40X0.20
(BAJANTE DE AALL Y AA.SS)
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.801
PARCIAL: (M)
0.801
COSTO/HOR
C=(AxB)
9.76
2.56
COSTO
D=(CxR)
12.688
3.328
PARCIAL: (N)
16.016
COSTO
C=(AxB)
6.240
3.149
0.625
0.600
PARCIAL: (O)
10.614
%
2.86
2.86
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
45.36
11.90
57.26
MATERIALES
DESCRIPCION
UNIDAD
LADRILLO BURRITO
CEMENTO
ARENA
AGUA Y OTROS
TRANSPORTE
DESCRIPCION
ARENA
M2
SACO
M3
GBL
UNIDAD
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.10
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.540
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
22.31
11.26
2.23
2.15
37.95
%
1.93
0.540
1.93
27.971
0.000
0.000
0.000
0.000
27.971
27.97
100.00
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 160
10/1/2011
UNIDAD: M2
RENDIMIENTO: 0.350
DEMOLICION DE PISO Y PAREDES
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.216
PARCIAL: (M)
0.216
COSTO/HOR
C=(AxB)
9.76
2.56
COSTO
D=(CxR)
3.416
0.896
PARCIAL: (N)
4.312
%
4.76
4.76
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
75.45
19.79
95.24
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
(A)
PRECIO UNIT.
(B)
COSTO
C=(AxB)
COSTO
D=(AxBXC)
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
4.528
0.000
0.000
0.000
0.000
4.528
4.53
100.00
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 161
10/1/2011
UNIDAD: ML
RENDIMIENTO: 0.040
CONDUCTOR #10
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.010
PARCIAL: (M)
0.010
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.098
0.102
PARCIAL: (N)
0.200
COSTO
C=(AxB)
0.580
PARCIAL: (O)
0.580
%
1.27
1.27
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
12.35
12.96
25.32
MATERIALES
DESCRIPCION
UNIDAD
CABLE #10
TRANSPORTE
DESCRIPCION
ML
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
73.42
73.42
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
0.790
0.000
0.000
0.000
0.000
0.790
0.79
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 162
10/1/2011
UNIDAD: ML
RENDIMIENTO: 0.100
CONDUCTOR #6
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.025
PARCIAL: (M)
0.025
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
0.244
0.256
PARCIAL: (N)
0.500
COSTO
C=(AxB)
0.630
PARCIAL: (O)
0.630
%
2.16
2.16
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
21.13
22.16
43.29
MATERIALES
DESCRIPCION
UNIDAD
CABLE #6
TRANSPORTE
DESCRIPCION
ML
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
54.55
54.55
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
1.155
0.000
0.000
0.000
0.000
1.155
1.16
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA: 163
10/1/2011
UNIDAD: U
RENDIMIENTO: 32.00
PILETA
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
3.00
COSTO
D=(CxR)
27.616
96.000
PARCIAL: (M)
123.616
COSTO/HOR
C=(AxB)
9.76
4.94
2.56
COSTO
D=(CxR)
312.320
158.080
81.920
PARCIAL: (N)
552.320
COSTO
C=(AxB)
81.738
5.625
9.702
13.608
49.200
56.000
100.000
135.000
PARCIAL: (O)
450.873
3.00
COSTO/HOR
C=(AxB)
%
2.43
8.46
10.89
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
27.51
13.93
7.22
48.66
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
RIPIO
LADRILLO BURRITO
ACERO ESTRUCTURAL Fy=4200 Kg/cm2
ENCOFRADO DE PLYWOOD
BOMBA
TUBERIA Y ACCESORIOS
TRANSPORTE
DESCRIPCION
ARENA
RIPIO
SACO
M3
M3
U
KG
PLANCHA
U
GBL
UNIDAD
M3
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.90
15.00
1.28
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
4.860
0.18
3.456
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
7.20
0.50
0.85
1.20
4.33
4.93
8.81
11.89
39.72
%
0.43
0.30
8.316
0.73
1,135.125
0.000
0.000
0.000
0.000
1,135.125
1,135.13
100.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: TRANSFORMADOR 15 KVA
HOJA: 164
UNIDAD: U
RENDIMIENTO: 1.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
2.70
COSTO
D=(CxR)
0.250
2.700
PARCIAL: (M)
2.950
COSTO/HOR
C=(AxB)
2.44
2.56
COSTO
D=(CxR)
2.440
2.560
PARCIAL: (N)
5.000
COSTO
C=(AxB)
900.000
PARCIAL: (O)
900.000
2.70
COSTO/HOR
C=(AxB)
%
0.03
0.30
0.32
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
%
0.27
0.28
0.55
MATERIALES
DESCRIPCION
UNIDAD
TRANSFORMADOR 15 KVA
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
%
99.12
99.12
%
0.000
0.00
907.950
0.000
0.000
0.000
0.000
907.950
907.95
100.00
HOJA: 165
UNIDAD: ML
RENDIMIENTO: 0.30
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.074
PARCIAL: (M)
0.074
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.732
0.741
PARCIAL: (N)
1.473
COSTO
C=(AxB)
4.283
0.005
0.350
0.618
PARCIAL: (O)
5.256
%
1.08
1.08
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
10.76
10.89
21.65
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
KG
GBL
GALON
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
62.97
0.07
5.15
9.08
77.26
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
6.802
0.000
0.000
0.000
0.000
6.802
6.80
100.00
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ACORDEON PARA PUERTAS
HOJA: 167
UNIDAD: M2
RENDIMIENTO: 1.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.368
PARCIAL: (M)
0.368
COSTO/HOR
C=(AxB)
4.88
2.47
COSTO
D=(CxR)
4.880
2.470
PARCIAL: (N)
7.350
COSTO
C=(AxB)
28.000
3.000
4.000
PARCIAL: (O)
35.000
%
0.86
0.86
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
CATEGORIA II
CATEGORIA III (ALBAIL)
%
11.42
5.78
17.21
MATERIALES
DESCRIPCION
UNIDAD
M2
GBL
U
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
65.55
7.02
9.36
81.93
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
42.718
0.000
0.000
0.000
0.000
42.718
42.72
HOJA:
100.00
FECHA
RUBRO
:
: REUBICACION DE SUMIDEROS EXISTENTES
CODIGO:607-(3)1
UNIDAD: U
RENDIMIENTO: 1.00
EQUIPO
DESCRIPCION
CANTIDAD
(A)
1.00
TARIFA
(B)
30.00
COSTO
D=(CxR)
0.744
30.000
PARCIAL: (M)
30.744
COSTO/HOR
C=(AxB)
9.76
2.56
2.56
COSTO
D=(CxR)
9.760
2.560
2.560
PARCIAL: (N)
14.880
COSTO
C=(AxB)
3.280
0.600
5.663
PARCIAL: (O)
9.543
30.00
COSTO/HOR
C=(AxB)
%
1.32
53.34
54.66
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
4.00
2.44
1.00
2.56
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
O.E.P. 1
%
17.35
4.55
4.55
26.45
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
TUBO NOVAFORT SERIE 6 200mmX6m
TRANSPORTE
DESCRIPCION
M2
GBL
U
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.20
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
1.080
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
5.83
1.07
10.07
16.97
%
1.92
1.080
1.92
56.247
0.000
0.000
0.000
0.000
56.247
56.25
100.00
UBICACION:
FECHA
:
RUBRO
: ADOQUIN PEATONAL ORNAMENTAL
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.250
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.124
PARCIAL: (M)
0.124
COSTO/HOR
C=(AxB)
4.88
2.47
2.56
COSTO
D=(CxR)
1.220
0.618
0.640
PARCIAL: (N)
2.478
COSTO
C=(AxB)
16.650
PARCIAL: (O)
16.650
%
0.64
0.64
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
1.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
6.34
3.21
3.32
12.87
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
86.49
86.49
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
19.251
0.000
0.000
0.000
0.000
19.251
19.25
0.00
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
HOJA:
UNIDAD: U
100.00
RUBRO
RENDIMIENTO: 8.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
4.952
PARCIAL: (M)
4.952
COSTO/HOR
C=(AxB)
4.88
4.94
2.56
COSTO
D=(CxR)
39.040
39.520
20.480
PARCIAL: (N)
99.040
COSTO
C=(AxB)
60.000
PARCIAL: (O)
60.000
%
3.02
3.02
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
2.00
2.44
2.00
2.47
1.00
2.56
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
%
23.81
24.10
12.49
60.39
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
36.59
36.59
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
163.992
0.000
0.000
0.000
0.000
163.992
163.99
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA:
10/1/2011
UNIDAD: M2
REVESTIMIENTO DE GRANO LAVADO EN ESCALERA RENDIMIENTO: 0.238
EQUIPO
DESCRIPCION
CANTIDAD
TARIFA
COSTO/HOR
COSTO
(A)
(B)
C=(AxB)
D=(CxR)
0.058
2.32
PARCIAL: (M)
0.058
2.32
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
0.581
0.588
PARCIAL: (N)
1.169
COSTO
C=(AxB)
0.722
0.063
0.357
0.100
PARCIAL: (O)
1.241
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
23.03
23.31
46.33
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
GRANO LAVADO
AGUA, CLAVOS Y OTROS
SACO
M3
SACO
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.01
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
0.054
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
28.61
2.48
14.15
3.96
49.21
%
2.14
0.054
2.14
2.522
0.000
0.000
0.000
0.000
2.522
2.52
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA:
10/1/2011
UNIDAD: M2
MESON DE GRANITO
RENDIMIENTO: 5.793
EQUIPO
DESCRIPCION
HERRAMIENTAS MENORES (5% M.O.)
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
1.422
%
2.09
PARCIAL: (M)
1.422
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
14.135
14.309
PARCIAL: (N)
28.444
COSTO
C=(AxB)
26.330
2.09
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
%
20.73
20.98
41.71
MATERIALES
DESCRIPCION
UNIDAD
UNIDAD
GLB.
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
1.00
CANTIDAD
(B)
38.61
12.00
12.000
17.60
PARCIAL: (O)
38.330
56.21
TARIFA/Km
(C)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
COSTO
D=(AxBXC)
0.000
0.00
68.196
0.000
0.000
0.000
0.000
68.196
68.20
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BANCAS METALICAS ORNAMENTALES
HOJA:
UNIDAD: U
RENDIMIENTO: 1.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
0.246
0.246
%
0.23
0.23
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
COSTO/HOR
C=(AxB)
2.44
2.47
COSTO
D=(CxR)
2.440
2.470
PARCIAL: (N)
4.910
COSTO
C=(AxB)
100.000
PARCIAL: (O)
100.000
%
2.32
2.35
4.67
MATERIALES
DESCRIPCION
UNIDAD
BANCAS METALICAS
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
95.10
95.10
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
105.156
0.000
0.000
0.000
0.000
105.156
105.16
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
:
UBICACION:
FECHA
:
RUBRO
: JARDINERAS DE MAMPOSTERIA BURRITO HECHADO
HOJA:
UNIDAD: U
RENDIMIENTO: 4.000
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
PARCIAL: (M)
COSTO
D=(CxR)
1.982
%
1.94
1.982
1.94
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
2.00
1.00
1.00
2.44
2.47
2.56
4.88
2.47
2.56
19.520
9.880
10.240
19.06
9.65
10.00
PARCIAL: (N)
39.640
38.70
COSTO
C=(AxB)
15.744
1.875
34.560
2.000
5.000
PARCIAL: (O)
59.179
MATERIALES
DESCRIPCION
UNIDAD
CEMENTO
ARENA
LADRILLO BURRITO
AGUA Y OTROS
TIERRA VEGETAL EN SITIO
SACO
M3
U
GBL
M3
TRANSPORTE
DESCRIPCION
UNIDAD
ARENA
M3
D.M.T.
CANTIDAD
(A)
(B)
30.00
0.30
TARIFA/Km
COSTO
(C)
D=(AxBXC)
0.18
1.620
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
%
15.37
1.83
33.74
1.95
4.88
57.78
%
1.58
1.620
1.58
102.421
0.000
0.000
0.000
0.000
102.421
102.42
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: URBANIZACION METROPOLISS
OBRA
:
UBICACION:
FECHA
:
RUBRO
: CUBIERTA DE EST. METALICA Y EUROLIT
HOJA:
UNIDAD: M2
RENDIMIENTO: 0.625
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.233
PARCIAL: (M)
0.233
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
1.525
1.544
1.600
%
1.57
1.57
MANO DE OBRA
DESCRIPCION
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
%
10.27
10.40
10.78
PARCIAL: (N)
4.669
COSTO
C=(AxB)
2.576
3.759
0.360
0.500
2.751
PARCIAL: (O)
9.946
31.44
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
UNIDAD
ML
M2
U
GBL
ML
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
17.35
25.32
2.42
3.37
18.53
66.99
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
14.848
0.000
0.000
0.000
0.000
14.848
14.85
100.00
NITULY S.A.
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
:
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
HOJA:
10/1/2011
UNIDAD: M2
RENDIMIENTO: 0.625
CUBIERTA DE EST. METALICA Y EUROLIT
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.139
PARCIAL: (M)
0.139
COSTO/HOR
C=(AxB)
2.34
1.40
0.70
COSTO
D=(CxR)
1.463
0.875
0.438
PARCIAL: (N)
2.775
%
0.05
0.05
MANO DE OBRA
DESCRIPCION
TOMACORRIENTE DOBLE IGEL 110V
INTERRUPTOR IGEL
ROSETON
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.34
1.00
1.40
1.00
0.70
%
0.51
0.30
0.15
0.97
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNIT.
COSTO
(A)
GRES COLOMBIANO 25X25
ML
M2
U
GBL
ML
0.00
TUBO NOVAFORT SERIE 6 200mmX6m
PINTURA,SOLDADURA Y OTROS
0.00
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
(B)
8.00
0.00
67.95
0.50
7.24
C=(AxB)
8.960
0.000
271.800
0.500
2.751
3.12
0.00
94.73
0.17
0.96
PARCIAL: (O)
284.011
98.98
1.12
1.05
4.00
1.00
0.38
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
286.925
0.000
0.000
0.000
0.000
286.925
286.92
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: FREGADERO 1P
HOJA: 102
UNIDAD: U
RENDIMIENTO: 1.403
EQUIPO
i
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.524
PARCIAL: (M)
0.524
COSTO/HOR
C=(AxB)
2.44
2.47
2.56
COSTO
D=(CxR)
3.423
3.465
3.592
PARCIAL: (N)
10.480
%
0.81
0.81
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.47
1.00
2.56
%
5.27
5.33
5.53
16.12
MATERIALES
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNIT.
COSTO
(A)
LAVAPLATOS 1P
ACCESORIOS
LLAVE MESCLADORA PARA LAVAPLATOS FV
TRANSPORTE
DESCRIPCION
U
GLB
U
UNIDAD
D.M.T.
(A)
(B)
21.00
1.00
32.00
C=(AxB)
21.000
1.000
32.000
32.31
1.54
PARCIAL: (O)
54.000
33.84
1.00
1.00
1.00
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
65.004
0.000
0.000
0.000
0.000
65.004
65.00
50.77
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: LLAVE DE MANGUERA
HOJA: 10.005
UNIDAD: U
RENDIMIENTO: 0.195
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.073
PARCIAL: (M)
0.073
COSTO/HOR
C=(AxB)
2.44
2.56
2.47
COSTO
D=(CxR)
0.476
0.499
0.482
PARCIAL: (N)
1.457
COSTO
C=(AxB)
3.200
%
1.54
1.54
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
1.00
2.47
%
10.06
10.56
10.18
30.80
MATERIALES
DESCRIPCION
LLAVE DE MANGUERA
UNIDAD
U
%
67.66
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
3.200
COSTO
D=(AxBXC)
67.66
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
4.729
0.000
0.000
0.000
0.000
4.729
4.73
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BAJANTE DE AA SS
HOJA: 10.005
UNIDAD: ML
RENDIMIENTO: 0.033
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.012
PARCIAL: (M)
0.012
COSTO/HOR
C=(AxB)
2.44
2.56
2.47
COSTO
D=(CxR)
0.081
0.084
0.082
PARCIAL: (N)
0.247
COSTO
C=(AxB)
2.389
%
0.47
0.47
MANO DE OBRA
DESCRIPCION
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
CATEGORIA III (ALBAIL)
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
1.00
2.47
%
3.04
3.19
3.08
9.31
MATERIALES
DESCRIPCION
TUBO 75 MM* 3mm
UNIDAD
ML
%
90.23
PARCIAL: (O)
TRANSPORTE
DESCRIPCION
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
2.389
COSTO
D=(AxBXC)
90.23
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
2.648
0.000
0.000
0.000
0.000
2.648
2.65
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: BAJANTE DE AA PP
HOJA: 10.005
UNIDAD: ML
RENDIMIENTO: 0.120
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.045
PARCIAL: (M)
0.045
COSTO/HOR
C=(AxB)
2.44
2.56
2.47
COSTO
D=(CxR)
0.293
0.307
0.296
PARCIAL: (N)
0.896
COSTO
C=(AxB)
1.127
0.58
PARCIAL: (O)
1.707
%
1.69
1.69
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
CATEGORIA III (ALBAIL)
%
11.06
11.60
11.19
33.85
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
UNIDAD
D.M.T.
CANTIDAD
TARIFA/Km
COSTO
%
42.56
21.90
64.46
%
(A)
(B)
(C)
D=(AxBXC)
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
2.648
0.000
0.000
0.000
0.000
2.648
2.65
100.00
NITULY S. A.
DEPARTAMENTO DE CONSTRUCCION
ANALISIS DE PRECIOS UNITARIOS
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
10/1/2011
PROYECTO:
OBRA
:
UBICACION:
FECHA
:
RUBRO
: ACERO ESTRUCTURAL ARMEX
HOJA: 10.005
UNIDAD: KG
RENDIMIENTO: 0.043
EQUIPO
DESCRIPCION
CANTIDAD
(A)
TARIFA
(B)
COSTO/HOR
C=(AxB)
COSTO
D=(CxR)
0.016
PARCIAL: (M)
0.016
COSTO/HOR
C=(AxB)
2.44
2.56
2.47
COSTO
D=(CxR)
0.105
0.110
0.106
PARCIAL: (N)
0.321
COSTO
C=(AxB)
1.313
0.30
PARCIAL: (O)
1.613
%
0.82
0.82
MANO DE OBRA
DESCRIPCION
CANTIDAD JORNAL/H
(A)
(B)
1.00
2.44
1.00
2.56
1.00
2.47
CATEGORIA I (PEON)
CATEGORIA IV (MAESTRO MAYOR)
CATEGORIA III (ALBAIL)
%
5.38
5.65
5.45
16.47
MATERIALES
DESCRIPCION
UNIDAD
TRANSPORTE
DESCRIPCION
ML
GLB
UNIDAD
D.M.T.
(A)
CANTIDAD
(B)
TARIFA/Km
(C)
COSTO
D=(AxBXC)
%
67.32
15.39
82.70
%
PARCIAL: (P)
TOTAL COSTO DIRECTOS Q=(M+N+O+P)
COSTO INDIRECTOS
COSTOS Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
PRECIO UNITARIO TOTAL
PRECIO UNITARIO PRESUPUESTADO
0%
0%
0%
0%
1.950
0.000
0.000
0.000
0.000
1.950
1.95
100.00
CATEGORIA I (PEON)
CATEGORIA II
CATEGORIA III (ALBAIL)
CATEGORIA IV (MAESTRO MAYOR)
O.E.P. 1
CHOFER LICENCIA TIPO B
TOPOGRAFO III
O.E.P. 2
TRACTOR DE ORUGA D6
VOLQUETA 8M3
CARGADORA 918
TANQUERO 5000LTS
RODILLO VIBRATORIO
MOTONIVELADORA 140HP
DISTRIBUIDORA DE ASFALTO
ESCOBA MECANICA
FINISHER
RODILLO NEUMATICO
RODILLO LISO
CALDERO ASFALTICO
PLANTA DE ASFALTO
CONCRETERA
SOLDADORA
COMPACTADOR
VIBRADOR
2.44
2.44
2.47
2.56
2.56
1.39
1.42
1.45
50.00
16.00
30.00
16.00
26.00
45.00
35.00
20.00
30.00
26.00
26.00
8.00
80.00
3.00
3.00
3.00
3.00
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
CEMENTO
HORMIGON PREMESCLADO HOLCIM
PEGABLOCK
ENLUMAX
MAXIMIX
6.56
107.96
3.16
4.00
3.98
SACO
M3
SACO
SACO
SACO
AGREGADOS
ARENA
RIPIO
LASTRE
SUB-BASE CLASE 3
BASE GRANULAR CLASE 1
MATERIAL MEJORADO
MATERIAL TRITURADO 1/2"
MATERIAL TRITURADO 3/8"
PIEDRA CHISPA LAVADA
PIEDRA BOLA SELECCIONADA
MEZCLA ASFALTICA
ASFALTO R.C.2
KEREX
ASFALTO RC-250
DIESEL
TIRAS
TABLAS DE ENCOFRADO
CUARTONES
ADOQUIN VEHICULAR Fc=300Kg/Cm2. H = 9,5 CM
PINTURA
6.25
7.58
1.25
4.25
4.85
2.50
7.89
7.89
4.25
5.47
54.00
0.20
0.27
0.20
0.27
1.50
3.74
1.50
0.30
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
GL
LT
LT
LT
U
U
U
U
15.00
9.40
20.00
7.30
413.00
18.00
GLN
SACO
SACO
SACO
TQ
SACO
CEMENTO
LADRILLO
LADRILLO BURRITO
0.12
0.12
U
U
CABLE #10
CABLE #12
CABLE #14
CABLE DE TELEFONO
CABLE COAXIAL
TOMACORRIENTE MIXTO CABLE Y TELEFONO
TUBO CONDUIT LIVIANO 1/2" 3m
CAJA RECTANGULAR
TOMACORRIENTE DOBLE IGEL 110V
INTERRUPTOR IGEL
ROSETON
FOCO
PUERTAS
CERRADURA ITALIANA VIRO
CERRADURA ITALIANA VIRO
PUERTA LAUREL 1.oox2.oo
PUERTA LAUREL 0.70x2.oo
PUERTA DE ALUMINIO Y VIDRIO
CLOSET DE AGLOMERADO
ANAQUEL DE COCINA
HOJA DE EUROLIT
GANCHOS JC 1/4"
CABALLETE EUROLIT
HOJA DE DIPANEL e=35 mm
HOJA DE DIPANEL e=40 mm
HIERRO CUADRADO 3/8"
ANGULO 25x3
DURATECHO
PUERTA ENRROLLABLE
TAPA ROLLO
ITALPISO
TABLERO TERMICO DE 8-16 G.E.
BREAKER
CHAPA DE POMO
INODOROS
LAVABO EDESA BLANCO
INODORO FV BLANCO
JUEGO DE LLAVE ANGULAR PARA INODORO
SET DE PERNOS PARA INSTALACION INODORO
ANILLO DE CERA
URINARIO EDESA BLANCO
TUB. PVC. ROSCABLE 1/2" 6m
TUB. PVC. ROSCABLE 3/4" 6m
CODO DE H.G. 1/2"
TEE DE H.G. 1/2"
NEPLO DE H.G. 1/2"
TUBO DE PVC. 110 mm DESAGUEX3m
CODO PVC. 110 mm
TEE PVC. 110 mm
YEE PVC. 110 mm
TUBO DE PVC. 60 mm DESAGUEX3m
CODO PVC. 60 mm
UNION DE H.G. 1/2"
CODO PVC. 110 x 90
LLAVE PARA LAVATORIO FV
FIBROSEL 0.60x1.20
PERFIL DE ALUMINIO
TAPA DE HIERRO FUNDIDO
TUBO DEH.S. =200 mm
TUBO DEH.S. =250 mm
TUBO DEH.S. =500 mm
TUBO DEH.S. =600 mm
TUBO DEH.S. =800 mm
TUBO DEH.S. =1000 mm
0.58
0.44
0.37
0.15
0.17
2.36
2.00
0.28
2.34
1.40
0.70
0.39
ML
ML
ML
ML
ML
U
u
U
U
U
U
U
28.00
4.60
75.00
60.00
125.00
230.00
89.00
3.40
0.30
5.62
4.60
5.00
0.36
0.46
5.26
18.00
12.70
6.70
35.00
3.88
6.00
U
U
U
U
U
U
M2
M2
U
ML
M2
M2
ML
ML
M2
M2
ML
M2
U
U
U
35.29
50.50
7.91
1.02
2.24
43.32
6.63
8.60
0.44
0.18
0.27
9.09
2.11
2.70
3.09
3.98
1.15
0.28
1.62
28.00
4.80
0.50
56.25
11.01
11.58
24.06
32.57
73.57
125.36
U
U
GL
GL
U
U
U
U
U
U
U
U
U
U
U
u
U
U
U
M2
M2
ML
U
8.7767857143
0.82
1.25
3.50
5.45
7.60
6.75
8.82
13.76
16.67
21.54
27.01
35.26
11.00
32.00
5.00
10.30
2.68
2.80
2.50
0.22
0.70
45.00
33.00
45.00
0.07
3.00
73.53
19.86
22.00
11.00
20.47
0.29
0.33
0.33
1.46
30.00
12.00
31.00
4.00
1.40
3.37
22.40
1.02
3.37
20.00
28.55
0.45
16.32
10.10
0.50
4.55
12.35
148.00
40.00
7.89
0.95
1.85
8.00
2.30
27.00
69.66
7.73
24.08
Kg
Kg
U
U
U
U
U
U
U
U
U
U
M2
U
M2
U
ML
M2
U
U
M3
H
H
H
H
SACO
U
U
U
U
U
U
U
U
H
U
U
ML
U
U
U
U
U
MALLA
U
u
u
KG
U
GALON
U
H
M3
U
U
M2
ml
ml
U
U
U
SIKA FLEX
PERNO B LARGO 21/2"
CANAL C 100*50 2mm
ANGULO TIPO L 1X1/8 3mm
VARILLA DE HIERRO CUADRADA 1/6"
TOOL 1/20 GALVANIZADO
CANALON GALVANIZADO
JUEGO DE DUCHA MEZCLADORA
JUEGO DE DUCHA (ECONOMICO)
URINARIO QUANTUM(LINEA ECONOMICA)
LAVAPLATOS 2P(LINEA PLASMADE)
8.96
0.10
1.90
0.85
0.62
5.96
7.00
29.40
20.00
42.97
72.33
U
U
ML
ml
ML
M2
ML
U
U
U
U
43.32
94.16
8.80
55.00
60.00
75.00
24.28
2.50
2.00
12.00
6.00
11.50
2.40
0.15
U
U
GBL
U
U
U
M
H
H
SACO
SACO
M3
M2
U
11.00
11.20
39.09
5.10
2.90
0.25
0.33
4.90
0.70
0.09
6.32
2.59
2.36
21.00
36.00
9.50
9.73
3.75
12.90
15.10
19.57
225.00
18.62
195.00
M2
M2
pln
ml
ML
ML
U
GBL
u
U
U
U
M2
488.00
4.00
20.00
1.47
GBL
M2
M3
LTO
6.17
9.00
5.89
8.19
8.00
15.50
5.50
M2
M2
M2
M2
M2
M2
FUNDA
U
m2
U
M2
U
U
U
38.16
57.78
8.00
12.20
40.00
12.38
12.90
1.60
2.90
5.00
14.98
19.60
5.92
5.45
2.20
3.50
5.00
5.00
5.00
1.50
3.30
0.30
10.18
25.76
0.63
7.00
100.00
900.00
25.70
46.00
33.00
67.95
90.08
136.60
230.00
0.20
0.20
6.61
6.50
10.50
143.00
6.50
8.00
3.58
21.00
7.24
0.18
0.35
7.00
16.20
10.64
8.00
38.00
3.20
14.44
9.65
9.28
3.83
2.48
7.24
24.30
6,250.00
U
U
M2
U
U
U
GL
U
KG
U
U
U
M2
U
M2
M2
U
U
U
U
U
ML
M2
M2
ML
PLANCHA
U
U
U
H
H
U
U
U
U
LTO
LTO
M2
M2
M2
U
M2
SACO 20 kilos
M2
U
ml
ML
ML
M2
GL
U
M3
U
U
U
U
U
U
U
U
U
GL
#REF!
1.00
#REF!
1.00
1.00
RODILLO VIBRATORIO
0.18
3.82
5.53
0.8
10
1.25
01/0.4
0.5555555556
4.4
2.5
20
100
DATOS:
NITULY S.A.
TITULO:
PROYECTO:
OBRA:
UBICACION:
FECHA:
COSTOS GENERALES Y ADMINISTRATIVOS
IMPREVISTOS
UTILIDADES
NITULY S. A.
URBANIZACION METROPOLISS
Vivienda Tipo I
Va Manta - Rocafuerte y Tercer Tramo Va Circunvalacin
October-2011
0%
0%
0%
Circunvalacin