Diseno Puente Tipo Losa Metodo LRFD
Diseno Puente Tipo Losa Metodo LRFD
Diseno Puente Tipo Losa Metodo LRFD
Pgina 1
10 m
HL-93
2
4
16
16
MATERIALES:
RESISTENCIA DEL CONCRETO (fc)
FLUENCIA DEL ACERO (fy)
CARPETA ASFLTICA
DENSIDAD DEL CONCRETO
DENSIDAD DEL ASFALTO
BOMBEO
280
4200
0.05
2400
2200
2%
Kg./cm
Kg./cm
m
Kg./cm
Kg./cm
2.4 Tn/m
2.2 Tn/m
A. PREDIMENSIONAMIENTO
LUZ DEL PUENTE
ANCHO DE CALZADA
PERALTE DE LOSA
LUZ (L,S) =
10 m
11.8 m
0.52 m
h=(1.2(S+3000))/30 =
SE ASUME
ANCHO DE SARDINEL
H. DE LA VIGA BORDE
h=
b=
hb =
0.40
0.45 m
0.40 m
0.25 m
11.80
2%
0.25
0.40
2%
0.05
0.45
12.60
B. DISEO DE LOSA
METRADO DE CARGAS
b.1 Momentos por Carga Muerta
DC
DW
Peso Concreto =
MDC = DC*L^2/8 =
1.08 Tn/m
13.50 Tn.m
Peso Asfalto =
0.11 Tn/m
Pgina 1 de 22
DW
BARAND
A
MDW = DW*L^2/8 =
2.43 Tn.m
Peso Baranda =
MBA = DW*L^2/8 =
0.08 Tn/m
0.00 Tn.m
* Camin HL-93
16
16
4
0.057
(Por Barett)
CL
Tn-m
1.5
0.1
2.451
49.76
0.645
Mcamion
5.7
4.3
16
16
48.00 Tn-m
0.80
2.50
Mcamion =
0.40
0.40
CL
5.00
Mcamion =
0.80
5.00
49.76 Tn-m
* Tandem
1.2m
12.00
12.00
4.4
Pgina 2 de 22
2.2000
52.80 Tn-m
2.50000
Mtandem =
2.2000
CL
4.4
Pgina 2
CL
52.80 Tn-m
3.80
1.90
Mtandem =
12
2.500
12
Mtandem =
52.80 Tn-m
* S/C Equivalente
1
Ms/c eq =
12.50 Tn-m
Tn/m
10.00
2.50
5.00
Ms/c eq =
5.00
12.50 Tn-m
W=
L=
10.00
MDC =
2.50
5.00
MDC =
1.08 Tn/m
10.00 m
10.80 Tn-m
13.50 Tn-m
5.00
MDC =
13.50 Tn-m
W=
0.19 Tn/m
Pgina 3 de 22
0.19 Tn/m
Pgina 3
L=
10.00 m
VDC =
1.95 Tn-m
MDC =
2.43 Tn-m
10.00
MDW =
2.43 Tn-m
Camin HL-93
16
Tandem de Diseo
16
12.00
Pgina 4 de 22
12.00
Pgina 4
10000 mm
11800 mm
W=
NL =
12600 mm
2
Di=
P=
W DIST=
4.2
4
1
1. Un Carril Cargado:
E = 250+0.42(L1*W1)^1/2
E=
4812.37
W/NL
6300 mm
3403.53
W/NL
6300 mm
52.80 Tn-m
12.50 Tn-m
1.08
18.57 Tn-m/m
SE ASUME
52.80 Tn-m
12.50 Tn-m
1.00
24.31 Tn-m/m
M LL+IM =
18.57 Tn-m/m
Pgina 5 de 22
0.95
1.05
1.05
Pgina 5
n=
Pgina 6
1.05
55.53 Tn-m
34.50 Tn-m
DISEO
34,499.39 Kg.-m
112.00 Kg./cm
1,680.00 Kg./cm
Es = 2,100,000.00 Kg./cm
Ec = 15000 fc
250,998.01
n = Es / Ec
r = fs / fc
K = n/(n + r)
j = 1 - K/3
b=
8.37
15.00
0.36
0.88
100.00 cm.
<
45.00 cm
40 cm.
40.00 cm
45.00 cm
Pgina 6 de 22
OK
Pgina 7
5.00 cm
58.30 cm
55.53 Tn-m
413.03 cm
As =
40.31 cm
As asumido =
40.31 cm
ACERO DE REPARTICIN
%Asr = 1750 / S^0.5 =
17.50 % de As
<
Asr =
7.05 cm
8.04 cm
50.00
OK
ACERO DE TEMPERATURA
DISTRIBUCIN DE ACERO
ACERO PRINCIPAL
Dimetro
# 02
# 03
# 04
# 05
# 06
# 08
# 11
pulg.
1/4
3/8
1/2
5/8
3/4
1
1 3/8
Asp =
cm.,
0.365
0.953
1.27
1.587
1.905
2.54
3.581
Permetro
cm.
2
3
4
5
6
8
11.2
40.31 cm
Pgina 7 de 22
Peso
Kg./ml
0.25
0.58
1.02
1.60
2.26
4.04
7.95
rea
cm
0.32
0.74
1.29
2.00
2.84
5.10
10.06
Dimetro a usar =
"
Espaciamiento (S) =
0.120 cm.
S asumido =
0.120 cm.
USAR:
"
rea =
5.10 cm
Asp (final) =
42.50 cm
Pgina 8 de 22
0.12
cm.
Pgina 8
ACERO DE REPARTICIN
Asr =
Dimetro a usar =
7.05 cm
5/8 "
Espaciamiento (S) =
rea =
2.00 cm
Asp (final) =
8.00 cm
0.28 m
S asumido =
0.25 m cm.
USAR:
5/8
"
0.25
cm.
ACERO DE TEMPERATURA
Ast =
Dimetro a usar =
8.04 cm
5/8 "
Espaciamiento (S) =
0.25 cm.
S asumido =
0.20 cm.
USAR:
5/8
"
rea =
2.00 cm
Asp (final) =
10.00 cm
0.2
cm.
GRAFICA
5/8
"
0.2
cm.
5/8
"
0.25
cm.
0.12
cm.
Pgina 9 de 22
"
Pgina 9
3.5
* Camin HL-93
16
4
0.160
16
CL
Tn-m
4.2
5.8
1.6
0.580
25.92
1.000
Vcamion
10
Vcamion =
25.92 Tn-m
* Tandem
1.2m
12.00
12.00
22.56 Tn-m
0.88000
Vtandem =
1.0000
CL
8.8
10
Vtandem =
22.56 Tn-m
* S/C Equivalente
1
Ms/c eq =
5.00 Tn-m
10.00
Pgina 10 de 22
Tn/m
Pgina 10
Vs/c eq =
5.00 Tn-m
Vs/c eq =
5.40 Tn-m
10.00
Vs/c eq =
5.40 Tn-m
Vs/c eq =
0.97 Tn-m
10.00
Vs/c eq =
0.97 Tn-m
VERIFICACION DE CORTENTES
Para Una Va Cargada
V LL+IM = m(Vmax*1.33+Vs/c)/E
Vmax =
Vs/c =
m=
V LL+IM =
25.92 Tn-m
5.00 Tn-m
1.20
7.52 Tn-m/m
Vc1= 0.25*f'c*d*b
Vc2= 0.2625*B*(f'c)^.5*b*d
Pgina 11 de 22
Pgina 11
Pgina 12
Vc1= 280,000.00
Vc2= 35,139.72
21,688.24
<
31,625.75
OK
VERIFICACION DE CUANTIA
r=
0.9534%
68.58%
Pgina 12 de 22
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
10 m
HL-93
2
4
16
16
MATERIALES:
RESISTENCIA DEL CONCRETO (fc)
FLUENCIA DEL ACERO (fy)
CARPETA ASFLTICA
DENSIDAD DEL CONCRETO
DENSIDAD DEL ASFALTO
BOMBEO
280
4200
0.05
2400
2200
2%
Kg./cm
Kg./cm
m
Kg./cm
Kg./cm
2.4 Tn/m
2.2 Tn/m
A. PREDIMENSIONAMIENTO
LUZ DEL PUENTE
ANCHO DE CALZADA
PERALTE DE LOSA
LUZ (L,S) =
10 m
11.8 m
0.52 m
h=(1.2(S+3000))/30 =
SE ASUME
ANCHO DE SARDINEL
H. DE LA VIGA BORDE
h=
b=
hb =
0.40
0.45 m
0.40 m
0.25 m
11.80
2%
0.25
0.40
2%
0.05
0.45
12.60
B. DISEO DE LOSA
METRADO DE CARGAS
b.1 Momentos por Carga Muerta
DC
Peso Concreto =
MDC = DC*L^2/8 =
1.08 Tn/m
13.50 Tn.m
DW
Peso Asfalto =
MDW = DW*L^2/8 =
0.11 Tn/m
2.43 Tn.m
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
Peso Baranda =
MBA = DW*L^2/8 =
BARAND
A
0.08 Tn/m
0.00 Tn.m
16
4
0.057
(Por Barett)
CL
Tn-m
1.5
0.1
2.451
49.76
0.645
Mcamion
5.7
16
4
0.40
0.40
16
4.3
CL
48.00 Tn-m
0.80
2.50
Mcamion =
5.00
Mcamion =
0.80
5.00
49.76 Tn-m
* Tandem
1.2m
12.00
2.2000
4.4
2.50000
52.80 Tn-m
CL
2.2000
Mtandem =
12.00
CL
12
2.500
12
52.80 Tn-m
3.80
1.90
Mtandem =
4.4
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
Mtandem =
52.80 Tn-m
* S/C Equivalente
1
Ms/c eq =
12.50 Tn-m
Tn/m
10.00
2.50
5.00
Ms/c eq =
5.00
12.50 Tn-m
W=
L=
10.00
MDC =
2.50
5.00
MDC =
1.08 Tn/m
10.00 m
10.80 Tn-m
13.50 Tn-m
5.00
MDC =
13.50 Tn-m
W=
0.19 Tn/m
L=
0.19 Tn/m
10.00 m
VDC =
1.95 Tn-m
MDC =
2.43 Tn-m
10.00
MDW =
2.43 Tn-m
Camin HL-93
Tandem de Diseo
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
16
16
12.00
12.00
10000 mm
11800 mm
W=
NL =
12600 mm
2
Di
P
W DIST
4.2
4
1
1. Un Carril Cargado:
E = 250+0.42(L1*W1)^1/2
E=
4812.37
W/NL
6300 mm
W/NL
3403.53
6300 mm
52.80 Tn-m
12.50 Tn-m
1.08
18.57 Tn-m/m
SE ASUME
52.80 Tn-m
12.50 Tn-m
1.00
24.31 Tn-m/m
M LL+IM =
18.57 Tn-m/m
0.95
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
1.05
1.05
n = nD * nR * n1
n=
1.05
55.53 Tn-m
34.50 Tn-m
DISEO
A. DISEO POR ESTADO LIMITE POR SERVICIO
VERIFICACIN DE PERALTE DE SERVICIO
Mu =
fc = 0.4 * fc
fs = 0.4 * fy
Es =
Ec = 15000 fc
n = Es / Ec
r = fs / fc
K = n/(n + r)
j = 1 - K/3
b=
34,499.39 Kg.-m
112.00
1,680.00
2,100,000.00
250,998.01
8.37
15.00
0.36
0.88
100.00
Kg./cm
Kg./cm
Kg./cm
cm.
<
45.00 cm
40 cm.
40.00 cm
45.00 cm
5.00 cm
OK
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
58.30 cm
55.53 Tn-m
413.03 cm
As =
40.31 cm
As asumido =
40.31 cm
ACERO DE REPARTICIN
%Asr = 1750 / S^0.5 =
17.50 % de As
<
Asr =
7.05 cm
8.04 cm
50.00
OK
ACERO DE TEMPERATURA
DISTRIBUCIN DE ACERO
ACERO PRINCIPAL
Dimetro
# 02
# 03
# 04
# 05
# 06
# 08
# 11
pulg.
1/4
3/8
1/2
5/8
3/4
1
1 3/8
cm.,
0.365
0.953
1.27
1.587
1.905
2.54
3.581
Asp =
Dimetro a usar =
Permetro
cm.
2
3
4
5
6
8
11.2
Peso
Kg./ml
0.25
0.58
1.02
1.60
2.26
4.04
7.95
40.31 cm
"
Espaciamiento (S) =
0.120 cm.
S asumido =
0.120 cm.
rea =
5.10 cm
Asp (final) =
42.50 cm
rea
cm
0.32
0.74
1.29
2.00
2.84
5.10
10.06
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
USAR:
"
0.12
cm.
ACERO DE REPARTICIN
Asr =
Dimetro a usar =
Espaciamiento (S) =
S asumido =
USAR:
7.05 cm
5/8 "
rea =
2.00 cm
Asp (final) =
8.00 cm
0.28 m
0.25 m cm.
5/8
"
0.25
cm.
ACERO DE TEMPERATURA
Ast =
Dimetro a usar =
8.04 cm
5/8 "
Espaciamiento (S) =
0.25 cm.
S asumido =
0.20 cm.
USAR:
5/8
5/8
"
0.2
cm.
"
rea =
2.00 cm
Asp (final) =
10.00 cm
0.2
cm.
GRAFICA
5/8
"
0.25
cm.
0.12
cm.
"
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
4
0.160
16
25.92
Tn-m
4.2
5.8
1.6
1.000
Vcamion
0.580
CL
10
Vcamion =
25.92 Tn-m
* Tandem
1.2m
22.56 Tn-m
CL
8.8
0.880
Vtandem =
12.00
1.000
12.00
10
Vtandem =
22.56 Tn-m
* S/C Equivalente
1
Ms/c eq =
5.00 Tn-m
Vs/c eq =
10.00
5.00 Tn-m
Tn/m
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
Vs/c eq =
5.40 Tn-m
10.00
Vs/c eq =
5.40 Tn-m
Vs/c eq =
0.97 Tn-m
10.00
Vs/c eq =
0.97 Tn-m
VERIFICACION DE CORTANTES
Para Una Va Cargada
V LL+IM = m(Vmax*1.33+Vs/c)/E
Vmax =
Vs/c =
m=
V LL+IM =
25.92 Tn-m
5.00 Tn-m
1.20
7.52 Tn-m/m
Vc1= 0.25*f'c*d*b
Vc2= 0.2625*B*(f'c)^.5*b*d
Vc1=
Vc2=
280,000.00
35,139.72
21,688.24
<
31,625.75
VERIFICACION DE CUANTIA
OK
Preparado por:
Diaz Rios Alejandro
Abad Quito Hilario
Contreras Quincho Abraham
r=
0.9534%
68.58%