Explosion de Insumos 2
Explosion de Insumos 2
Explosion de Insumos 2
Dependencia:
Fecha: 2013/06/28
Concurso No.
Obra:
Lugar:
DIRECCION
Ciudad:
CIUDAD, ESTADO
Concepto
1 MATERIALES
1. ALAMBRE RECOCIDO
Unidad
Fecha
Cantidad
Precio
Importe
KG
02-jul-2013
0.0620
$16.00
$0.99
KG
02-jul-2013
6,152.91
$40.00
$246,116.40
AGUA
AGUA ( MANEJO)
M3
02-jul-2013
0.1371
$20.00
$2.74
ALAM-BR1
KG
02-jul-2013
13.0480
$27.00
$352.30
ALAM-BR2
KG
02-jul-2013
6.0032
$28.20
$169.29
ANG-002
ANGULO DE 2"x1/4"
KG
02-jul-2013
171.3600
$11.90
$2,039.18
ANG-09
KG
02-jul-2013
440.3000
$11.90
$5,239.57
ANG-ULO2
KG
29-jun-2013
8,471.76
$11.90
$100,813.94
ANG-ULO3
KG
28-jun-2013
1,185.60
$11.90
$14,108.64
ARENA
ARENA
M3
15-dic-2011
0.1730
$180.00
$31.14
BARR-01
ML
02-jul-2013
225.1200
$28.50
$6,415.92
DIAMETRO CAL. 22
BARR-02
PZA
02-jul-2013
225.1200
$23.00
$5,177.76
CEMENTOG
MM. CAL. 22
CEMENTO GRIS
TON
02-jul-2013
0.1273
$2,300.00
$292.78
CLLC
CONECTOR NELSON
PZA
02-jul-2013
7.0000
$12.00
$84.00
CO03
LT
02-jul-2013
2.0460
$65.00
$132.99
LT
28-jun-2013
4,452.42
$42.00
$187,001.64
COLS. REGS.
CO08
CO11
LT
02-jul-2013
0.6200
$35.00
$21.70
CUADRA-2
CUADRADO 2"X2"
KG
02-jul-2013
28.2000
$11.90
$335.58
EMPAQ-1/8
PZA
01-jul-2013
310.0800
$40.00
$12,403.20
GRAVA
ESPESOR
GRAVA
M3
15-dic-2011
0.2056
$180.00
$37.01
LAM-1A
LAMINA CAL. 16
KG
02-jul-2013
23.6000
$12.90
$304.44
LAM-2A
LAMINA CAL.18
KG
02-jul-2013
37.8000
$12.90
$487.62
LAM-CAL
LAMINA CAL. 12
KG
02-jul-2013
582.8000
$1.90
$1,107.32
LAM-CAL10
KG
02-jul-2013
13,063.32
$14.90
$194,643.47
LOSA-CERO22
PZA
02-jul-2013
1.2200
$974.00
$1,188.28
M661010
MALLA 6-6/10-10
ROLLO
02-jul-2013
0.0671
$1,260.00
$84.55
MALL-01
M2
02-jul-2013
560.0000
$50.00
$28,000.00
$65.25
$8,613.00
M2
02-jul-2013
132.0000
MATCIN00110
CAL. 11.5
CINTA DE FIBRA DE VIDRIO 0.15x23 M
Rollo
02-jul-2013
0.0870
$80.00
$6.96
MATEST00160
Caja
02-jul-2013
0.0330
$290.00
$9.57
MDUROCK
15KG
PANEL DUROCK
PZA
02-jul-2013
0.3700
$420.00
$155.40
Concurso No.
Obra:
Lugar:
DIRECCION
Ciudad:
CIUDAD, ESTADO
Concepto
Unidad
Fecha
Cantidad
Precio
Importe
Pieza
02-jul-2013
0.3300
$100.00
$33.00
Pieza
02-jul-2013
0.6700
$260.00
$174.20
$56,197.47
1 MATERIALES
MPMCAN0B330
MPMPOS0B405
PERF-2X2
KG
29-jun-2013
4,568.90
$12.30
PERF-IPR
KG
02-jul-2013
183.8000
$13.00
$2,389.40
PERF-IPR1
KG
02-jul-2013
7,664.00
$13.00
$99,632.00
PERF-PTR3
KG
02-jul-2013
495.6000
$12.30
$6,095.88
PERT-1X1
KG
02-jul-2013
41.2000
$12.30
$506.76
PIJA
PIJA
PZA
02-jul-2013
3.0000
$0.70
$2.10
PINT-ESM
LT
02-jul-2013
0.6720
$85.00
$57.12
PLAC-01
KG
02-jul-2013
115,552.50
$11.20
$1,294,188.00
POST-1
PZA
02-jul-2013
151.2000
$310.00
$46,872.00
$425.00
$24,752.00
20
PZA
02-jul-2013
58.2400
PTR-4
KG
02-jul-2013
51.2000
$12.40
$634.88
PUERT-01
PZA
02-jul-2013
66.0000
$550.00
$36,300.00
RED-ONDO
REDONDO 1/2"
KG
02-jul-2013
1,785.00
$11.70
$20,884.50
REJILL.01
PZA
02-jul-2013
0.8400
$9,000.00
$7,560.00
SELL
LT
02-jul-2013
0.1680
$47.40
$7.96
SOL-ERA
KG
02-jul-2013
6,485.50
$12.10
$78,474.55
SOLL-09
KG
02-jul-2013
89.0400
$12.10
$1,077.38
SOPORT
PZA
02-jul-2013
155.0000
$634.00
$98,270.00
SOPORTE
LOTE
02-jul-2013
1.0000
$27,000.00
$27,000.00
PERFILES METALICOS
TAQUETE
THINNER
THINNER STANDARD
TORAR
TORNILLO AUTORROSCABLE
PZA
02-jul-2013
14.0000
$1.00
$14.00
TQUETE
PZA
27-jun-2013
1,216.00
$26.00
$31,616.00
TUB-C30
KG
02-jul-2013
12,197.50
$12.30
$150,029.25
TUB-C40
KG
02-jul-2013
83.2000
$24.40
Total: MATERIALES
PZA
02-jul-2013
3.0000
$0.50
$1.50
LT
28-jun-2013
2,212.96
$16.00
$35,407.42
$2,030.08
$2,835,584.83
Concurso No.
Obra:
Lugar:
DIRECCION
Ciudad:
CIUDAD, ESTADO
Concepto
2 MANO DE OBRA
PEON
Unidad
Fecha
Cantidad
Precio
Importe
JOR
02-jul-2013
0.7895
$300.00
$236.84
MO021
AYUDANTE GENERAL
JOR
02-jul-2013
56.7880
$299.99
$17,035.83
MO031
AYUDANTE ESPECIALIZADO
JOR
02-jul-2013
2,236.61
$349.99
$782,792.27
MO041
OFICIAL ALBAIL
JOR
02-jul-2013
0.1579
$399.99
$63.15
MO051
OFICIAL FIERRERO
JOR
02-jul-2013
0.0750
$399.99
$30.00
MO053
OFICIAL PINTOR
JOR
02-jul-2013
0.2480
$399.99
$99.20
MO061
OFICIAL HERRERO
JOR
02-jul-2013
1,043.75
$450.00
$469,687.50
MO064
OFICIAL COLOCADOR
JOR
02-jul-2013
56.4650
$400.00
$22,586.00
MO091
OFICIAL SOLDADOR
JOR
02-jul-2013
1,188.66
$500.00
$594,331.62
INGENIERO SUPERVISOR
JOR
20-jun-2013
110.4896
$600.00
MO-ING
$66,293.75
$1,953,156.16
Concurso No.
Obra:
Lugar:
DIRECCION
Ciudad:
CIUDAD, ESTADO
Concepto
3 EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
Unidad
Fecha
Cantidad
Precio
Importe
26-jun-2013
%MO2
ANDAMIOS
15-dic-2011
$9.38
%MO5
EQUIPO DE SEGURIDAD
26-jun-2013
$96,934.79
EQECORTE
HOR
02-jul-2013
728.3306
$799.23
$582,103.63
EQPLAN
HOR
02-jul-2013
338.4468
$7.08
$2,396.20
EQREV
HOR
02-jul-2013
0.1632
$60.55
$9.88
EQVIB
DE HP
VIBRADOR PARA CONCRETO
HOR
02-jul-2013
0.4650
$52.26
$58,946.19
$24.30
$740,424.37
%Incidencia
4.45%
0.01%
0.04%
0.09%
1.82%
0.26%
0.12%
0.09%
0.01%
3.38%
0.01%
0.22%
0.01%
0.01%
0.02%
3.52%
0.02%
0.51%
0.16%
%Incidencia
1.02%
0.04%
1.80%
0.11%
0.01%
23.41%
0.85%
0.45%
0.01%
0.66%
0.38%
0.14%
1.42%
0.02%
1.78%
0.49%
0.64%
0.57%
2.71%
0.04%
%Incidencia
0.31%
14.16%
8.49%
0.41%
10.75%
1.20%
%Incidencia
1.07%
1.75%
10.53%
0.04%