Metrado de Muros
Metrado de Muros
Metrado de Muros
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
0
MEDIDAS
DESCRIPCION
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.03
03.03.01
03.04
03.04.01
04
04.01
04.01.01
04.02
04.02.01
04.03
04.03.01
04.04
04.04.01
04.04.02
04.05
04.05.01
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
OBRAS PROVISIONALES
CONSTRUCCIONES PROVICIONALES
ALMACENES
m2
CASETA DE GUARDIANIA
M2
CERCO DE CALAMINA h=1.80
m
CARTELES
und
INSTALACIONES PROVISIONALES
AGUA Y DESAGUE PARA LA CONSTRUCCION GLB
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO
ELIMINACION DE MATERIAL SUELTO Y BASURA m3
ELIMINACION DE MALEZA Y ARBUSTOS DE
FACIL EXTRACCION
ELIMINACION DE OBSTRUCCIONES
TALA DE ARBOLES
ELIMINACION DE RAICES
TRAZO, NIVELES Y REPLANTEO
TRAZO, NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
NIVELACION (corte e=+0.10) TIERRA COMUN
NIVELADO APISONADO
EXCAVACION
EXCAVACION DE ZANJAS
RELLENOS
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCEDENTE
(CIMIENTO + ZAPATAS) + 25% DE
ESPONJAMIENTO
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS MEZCLA 1:10
CEMENTO-HORMIGON 30% PIEDRA
SOLADO PARA ZAPATAS
SOLADO PARA ZAPATAS DE 10 cm MEZCLA
1:12 CEMENTO-HORMIGON
BASES
CIMIENTOS DE ESCALERA
SOBRECIMIENTOS
CONCRETO 1:8+25% P.M. PARA
SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO PARA
SOBRECIMIENTOS
FALSO PISO
CONCRETO EN FALSOPISO MEZCLA 1:8
CEMENTO-HORMIGON e=5cm
CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C= 210 KG/CM2
ACERO ESTRUCTURAL TRABAJADO PARA
ZAPATAS
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO PARA
COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA
COLUMNAS
VIGAS
m3
6.15
2.30
32.50
ALTO
5.15
2.00
N
DE
VECES
1.00
1.00
1.00
1.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
31.67
4.60
32.50
31.67
4.60
32.50
1.00
1.00
10.00
5.00
0.65
1.00
15.00
50.00
0.12
1.00
1.00
32.72
32.72
90.00
90.00
2.00
2.00
pza
pza
TOTAL
2.00
2.00
m2
22.00
9.50
1.00
209.00
209.00
m2
m2
15.00
20.00
2.00
7.00
1.00
1.00
30.00
140.12
30.00
140.12
m3
1.00
213.82
213.82
m3
1.00
29.18
29.18
m3
1.00
189.82
189.82
m3
1.00
43.22
43.22
m2
1.00
m3
1.00
0.29
0.29
m3
1.00
6.54
6.54
m2
1.00
m2
1.00
M3
1.00
KG
1.00
m3
1.00
m2
1.00
kg
1.00
28.05
28.05
42.27
42.27
140.20
140.20
14.02
14.02
314.30
24.96
314.30
24.96
255.13
255.13
8,806.50
8,806.50
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
1
MEDIDAS
N
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.01.01
05.04.01.02
05.04.01.03
05.04.01.04
05.04.02
05.04.02.01
05.04.02.02
05.04.02.03
05.05
05.05.01
05.05.02
05.05.03
01
01.01
01.01.01
02
02.01
02.01.01
02.02
02.02.01
02.03
02.03.01
02.04
02.04.01
02.05
02.05.01
02.06
02.06.01
03
03.01
03.01.01
03.02
03.02.01
04
04.01
04.01.01
DESCRIPCION
SUB TOTAL
LONG.
AREA
1.00
ALTO
N
DE
VECES
VOL.
25.35
85.73
5,706.00
1.00
34.50
1.00
380.50
1,950.50
1.00
390.50
1.00
1.00
2.57
2.57
12.85
146.14
1.00
20.00
60.00
540.00
1.00
146.14
20.00
60.00
1.00
1,950.50
390.50
12.85
1.00
1.00
5,706.00
34.50
380.50
1.00
TOTAL
25.35
85.73
1.00
kg
KG.
540.00
m2
1.00
m2
1.00
TARRAJEO EN INTERIORES
TARRAJEO EN INTERIORES ACABADO CON
CEMENTO-ARENA
m2
1.00
TARRAJEO EN EXTERIORES
TARRAJEO EN EXTERIORES CON CEMENTOARENA
m2
1.00
TARRAJEO EN COLUMNAS
TARRAJEO DE SUPERFICIE DE COLUMNAS
CON CEMENTO-ARENA
m2
1.00
m2
1.00
773.04
773.04
40.86
40.86
836.45
836.45
347.52
347.52
189.22
189.22
96.92
96.92
TARRAJEO EN VIGAS
TARRAJEO EN SUPERFICIE DE VIGAS CON
CEMENTO-ARENA
VESTIDURAS DE DERRAMES
VESTIDURA DE DERRAMES EN PUERTAS,
VENTANAS Y VANOS.
640.95
1.00
640.95
640.95
CIELORRASOS
CIELORRASO CON MEZCLA
CIELORRASOS CON MEZCLA DE CEMENTOARENA
m2
1.00
m2
1.00
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 4 cm
m2
1.00
554.27
554.27
35.92
35.92
140.12
140.12
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
2
MEDIDAS
N
04.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.03
04.02.03.01
05
05.01
05.01.01
06
06.01
06.01.01
07
07.01
07.02
08
08.01
08.01.01
08.01.02
08.01.03
08.01.04
08.01.05
08.02
08.02.01
09
09.01
09.01.01
10
10.01
10.01.01
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.03
10.03.01
10.03.02
11
11.01
12
12.01
12.01.01
12.02
12.02.01
DESCRIPCION
PISOS
LOSETA
PISO DE CERAMICO 0.30X0.30
LAJAS DE PIEDRA
LAJAS DE PIEDRA
PARQUET
PISO DE PARQUET HUAYACAN 6 X 30 CM
VETEADO
ALTO
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
M2
1.00
82.83
82.83
m2
1.00
26.03
26.03
m2
1.00
30.76
30.76
CONTRAZOCALOS
CONTRAZOCALO DE LOCETA CORRIENTE
CONTRAZOCALO DE LOSETA CORRIENTE DE
10 x 20 cm
ZOCALOS
MAYOLICA
ZOCALO DE MAYOLICA DE COLOR DE 11 X 11
DE 1ERA
m2
m
REVESTIMIENTO DE DESCANSO DE ESCALERA m2
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA TORNILLO 0.90 x 2.30 m2 m2
PUERTA DE MADERA TORNILLO 1.20 x 2.30 m2 m2
PUERTA DE MADERA TORNILLO 2.50 x 2.68 m2 m2
PUERTA DE MADERA TORNILLO 0.80 x 2.30 m2 m2
PUERTA DE MADERA TORNILLO 0.70 x 2.30 m2 m2
VESTIDURA INTERIOR DE CLOSET
VESTIDURA INTERIOR DE CLOSETS
pza
CARPINTERIA METALICA Y HERRERIA
BARANDAS METALICAS
BARANDA METALICA DE DIAM. 2'', H=1.0m
m
CERRAJERIA
BISAGRAS
BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza
CERRADURAS
CERRADURA DE 4 GOLPES TIPO FORTE
pza
CERRADURA DE 3 GOLPES TIPO FORTE
pza
CERRADURA DE BOLILLA DE BRONCE
pza
MANIJA DE BRONCE DE 4'' PARA PUERTAS
pza
ACCESORIOS DE CIERRE
PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50und
M.
CERROJO DE FIERRO REDONDO DE 1/2" X 0.35 M.
und
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES
p2
PINTURA
PINTURA BASE O IMPRIMANTE
PINTURA BASE O IMPRIMANTE
m2
PINTURA EN INTERIORES
PINTURA LATEX EN MUROS INTERIORES (BEIGE)
m2
12.02.02
12.02.03
12.02.04
12.02.05
12.03
N
DE
VECES
342.08
1.00
342.08
80.64
1.00
20.50
1.00
1.00
342.08
20.50
1.00
1.00
1.00
1.00
1.00
80.64
20.50
9.50
9.50
18.38
17.42
10.80
2.22
4.62
18.38
17.42
10.80
2.22
4.62
3.00
12.50
1.00
12.50
12.50
1.00
111.00
1.00
1.00
1.00
1.00
4.00
107.00
36.00
24.00
1.00
1.00
8.00
40.00
1.00
908.87
1.00
1,969.93
1,969.93
1.00
836.45
836.45
180.52
180.52
96.92
96.92
508.52
45.75
508.52
45.75
m2
1.00
m2
m2
m2
1.00
1.00
1.00
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
3
MEDIDAS
N
12.03.01
12.04
12.04.01
12.05
12.05.01
13
13.01
13.02
13.03
13.04
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.04
01.04.01
01.04.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.03.09
02.03.10
02.03.11
02.03.12
02.03.13
02.04
02.04.01
03
03.01
03.01.01
03.02
03.02.01
DESCRIPCION
m2
ALTO
N
DE
VECES
SUB TOTAL
LONG.
347.52
1.00
20.50
1.00
AREA
20.50
VOL.
KG.
TOTAL
347.52
20.50
m2
1.00
GLB
GLB
m2
m2
1.00
1.00
1.00
1.00
PZA
PZA
15.00
6.00
15.00
6.00
pza
6.00
6.00
pza
9.00
9.00
9.00
9.00
9.00
9.00
9.00
9.00
pza
pza
36.00
36.00
36.00
36.00
pto
18.00
18.00
pza
pza
und
m
m
107.96
100.20
1.00
1.00
und
29.00
und
pza
5.00
5.00
und
pza
pza
pza
und
UND
und
und
und
pza
8.00
5.00
2.00
22.00
7.00
6.00
11.00
1.00
11.00
6.00
1.00
200.50
20.47
1.00
1.00
200.50
20.47
107.96
100.20
5.00
5.00
8.00
5.00
2.00
22.00
7.00
6.00
11.00
1.00
11.00
6.00
3.00
30.00
30.00
42.00
53.44
29.00
3.00
pza
107.96
100.20
53.44
42.00
42.00
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
4
MEDIDAS
N
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
03.03.02
03.03.03
03.03.04
04
04.01
04.02
04.03
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
02
02.01
02.02
03
03.01
03.02
04
04.01
04.01.01
04.02
04.02.01
05
05.01
05.01.01
06
06.01
06.03
06.04
DESCRIPCION
m
und
und
85.80
1.00
1.00
3.00
SUB TOTAL
LONG.
85.80
KG.
TOTAL
85.80
1.00
3.00
11.00
13.00
13.00
24.00
3.00
1.00
3.00
4.00
VOL.
63.00
23.00
11.00
39.40
AREA
25.00
25.00
63.00
23.00
und
und
und
ALTO
N
DE
VECES
24.00
3.00
39.40
39.40
3.00
4.00
42.00
42.00
103.00
103.00
4.00
4.00
67.00
4.00
67.00
4.00
543.50
100.06
1.00
1.00
543.50
100.06
543.50
100.06
445.44
1,250.00
1.00
1.00
445.44
1,250.00
445.44
1,250.00
1.00
1.00
3.00
3.00
1.00
1.00
4.00
45.00
10.00
4.00
45.00
10.00
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
5
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
6
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
7
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
8
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
9
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
10
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
11
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
12
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
13
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
14
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
15
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
16
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
17
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
18
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
19
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
20
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
21
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
22
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
23
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
24
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
25
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
26
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
27
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
28
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
29
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
30
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
31
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
32
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
33
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
34
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
35
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
36
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
37
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
38
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
39
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
40
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
41
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
42
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
43
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
44
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
45
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
46
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
47
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
48
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
49
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
50
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
51
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
52
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
53
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
54
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
55
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
56
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
57
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
58
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
59
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
60
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
61
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
RESUMEN DE METRADOS
PROYECTO
OBRA
FECHA
SETIEMBRE 2008
ESPECIALIDAD
ACERO KG/ML
1/4"
0.222
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
VIVIENDA MULTIFAMILIAR
VIVIENDA MULTIFAMILIAR
HECHO POR: ING. JOHN WILLIAMS CHAMOLI FALCON
HOJA N
62
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
JULIO 2008
ESPECIALIDAD
ARQUITECTURA
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
RESTAMOS VENTANA
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
ENTRE EL EJE A-A Y C'-C'
RESTAMOS VENTANA
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
ENTRE EL EJE C''-C'' Y D-D
ENTRE EL EJE D-D- Y E-E
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
773.04
278.82
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
M2
M2
3.00
1.85
2.70
-1.70
1.00
1.00
8.10
-3.15
M2
0.60
2.70
1.00
1.62
M2
M2
M2
M2
M2
2.50
1.95
1.10
0.80
2.15
2.40
-1.70
2.70
-0.40
2.70
1.00
1.00
1.00
1.00
1.00
6.00
-3.32
2.97
-0.32
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
M2
1.50
1.25
2.70
2.70
1.00
1.00
4.05
3.38
M2
0.60
2.70
1.00
1.62
M2
3.05
2.70
1.00
8.24
M2
M2
1.50
0.83
2.70
2.70
1.00
1.00
4.05
2.24
M2
M2
M2
M2
2.50
0.58
2.85
2.35
2.40
2.70
2.40
-1.70
1.00
1.00
1.00
1.00
6.00
1.57
6.84
-4.00
M2
0.79
2.70
1.00
2.13
M2
M2
M2
M2
M2
3.10
1.95
1.40
1.95
1.55
2.40
-1.70
2.70
2.70
-1.50
1.00
1.00
1.00
1.00
1.00
7.44
-3.32
3.78
5.27
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
M2
0.60
2.95
2.70
2.70
1.00
1.00
1.62
7.97
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
JULIO 2008
ESPECIALIDAD
ARQUITECTURA
DESCRIPCION
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
ENTRE EL EJE 0-0 Y X-X
RESTAMOS VENTANA
EN EL EJE C''-C''
ENTRE EL EJE 0-0 Y X-X
EN EL EJE D-D
ENTRE EL EJE 0-0 Y X-X
ESCALERA
EN EL EJE D'-D'
ENTRE EL EJE 0-0 Y X-X
EN EL SEGUNDO NIVEL
EN EL EJE A-A
ENTRE EL EJE 0-0 Y 3-3
ENTRE EL EJE 4-4 Y 5-5
EN EL EJE 6-6
ENTRE EL EJE C''-C'' Y E-E
EN EL EJE E-E
ENTRE EL EJE X-X Y 3-3
ENTRE EL EJE 4-4 Y 6-6
EN EL EJE C''-C''
ENTRE EL EJE 5-5 Y 6-6
RESTAMOS VENTANA
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
RESTAMOS VENTANA
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
RESTAMOS VENTANA
EN EL EJE B-B
ENTRE EL EJE 3-3 Y 4-4
RESTAMOS VENTANA
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 4-4
EN EL EJE 3-3
ENTRE EL EJE A-A Y C'-C'
RESTAMOS VENTANA
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
M2
M2
M2
3.35
2.95
4.25
2.85
2.70
-1.70
2.70
-1.70
1.00
1.00
1.00
1.00
9.05
-5.02
11.48
-4.85
M2
2.85
2.70
2.00
15.39
M2
M2
2.40
1.30
2.70
-1.00
2.00
1.00
12.96
-1.30
M2
0.50
2.70
2.00
2.70
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
VOL.
KG.
TOTAL
247.11
M2
M2
6.60
3.70
2.70
2.70
1.00
1.00
17.82
9.99
M2
3.90
2.50
1.00
9.75
M2
M2
9.88
6.60
2.70
2.70
1.00
1.00
26.68
17.82
M2
M2
3.00
1.85
2.70
-1.70
1.00
1.00
8.10
-3.15
M2
0.60
2.70
1.00
1.62
M2
M2
M2
M2
M2
2.50
1.95
2.10
0.80
2.15
2.70
-1.70
2.70
-0.40
2.70
1.00
1.00
1.00
1.00
1.00
6.75
-3.32
5.67
-0.32
5.81
M2
2.80
2.70
1.00
7.56
M2
2.05
2.70
1.00
5.54
M2
M2
1.35
1.25
2.70
2.70
1.00
1.00
3.65
3.38
M2
0.60
2.70
1.00
1.62
M2
3.20
2.70
1.00
8.64
M2
M2
1.35
0.83
2.70
2.70
1.00
1.00
3.65
2.24
M2
M2
M2
M2
2.50
0.58
2.85
2.35
2.70
2.70
2.70
-1.70
1.00
1.00
1.00
1.00
6.75
1.57
7.70
-4.00
M2
M2
3.00
2.40
2.70
-1.50
1.00
1.00
8.10
-3.60
M2
M2
3.00
2.40
2.70
-1.50
1.00
1.00
8.10
-3.60
M2
4.65
2.70
1.00
12.56
M2
M2
3.10
1.95
2.70
-1.70
1.00
1.00
8.37
-3.32
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
JULIO 2008
ESPECIALIDAD
ARQUITECTURA
DESCRIPCION
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
ENTRE EL EJE C''-C'' Y D-D
ENTRE EL EJE D-D- Y E-E
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE C''-C'' Y E-E
RESTAMOS VENTANA
EN EL EJE X-X
ENTRE EL EJE A-A Y C'-C'
RESTAMOS VENTANA
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
M2
M2
0.35
2.85
1.55
2.70
2.70
-1.50
1.00
1.00
1.00
0.95
7.70
-2.33
M2
0.65
2.70
1.00
1.76
M2
0.60
2.70
1.00
1.62
M2
M2
0.75
2.80
2.70
2.70
1.00
1.00
2.03
7.56
M2
0.65
2.70
1.00
1.76
M2
3.57
2.70
1.00
9.64
M2
2.85
2.70
1.00
7.70
M2
1.20
2.70
1.00
3.24
M2
M2
4.25
2.85
2.70
-1.70
1.00
1.00
11.48
-4.85
M2
M2
3.85
2.95
2.70
-1.70
1.00
1.00
10.40
-5.02
M2
2.85
2.70
2.00
15.39
VOL.
KG.
TOTAL
ESCALERA
00.01.00
247.11
M2
773.04
33.91
lad
M3
26213.08
22.80
0.03
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
05.01.00
05.01.01
05.01.01.01
05.01.01.02
M3
M3
M3
M3
M3
M3
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
14.02
0.50
0.50
0.50
0.50
0.50
10
KG/ML
10.00
0.80
0.99
6.00
048
0.60
0.99
5.00
030
0.95
0.75
1.00
1.10
1.30
1.40
2.30
1.40
0.90
0.90
8
4
1
2
3.56
4.40
3.64
1.61
0.81
8.00
Z-3 1.40x1.30
Acero lado A
1/2" @ .15
1.33
Acero lado B
1/2" @ .15
1.23
0.93
0.99
5.00
037
1.03
0.99
6.00
049
4.00
Z-4 2.30x1.40
Acero lado A
1/2" @ .15
2.23
Acero lado B
1/2" @ .15
1.33
1.33
0.99
9.00
047
1.23
0.99
8.00
039
1.00
Z-5 0.90x0.90
Acero lado A
1/2" @ .15
0.83
Acero lado B
1/2" @ .15
0.83
05.01.02.01
ALTO
314.30
Z-2 1.00x1.10
Acero lado A
1/2" @ .175
0.93
Acero lado B
1/2" @ .175
1.03
05.01.02
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
2.23
0.99
15.00
033
1.33
0.99
9.00
012
2.00
0.83
0.99
6.00
010
0.83
0.99
6.00
010
COLUMNAS
24.96
M3
0.25
0.25
4.40
10.00
2.75
M3
0.25
0.25
4.40
9.00
2.48
M3
0.25
0.25
4.40
3.00
0.83
M3
0.25
0.25
4.40
1.00
0.28
C-2 (ESCALERAS)
M3
0.25
0.25
4.20
4.00
1.05
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
M3
M3
0.15
0.25
0.44
0.22
ALTO
2.90
2.9
N
DE
VECES
SUB TOTAL
LONG.
AREA
14.00
VOL.
KG.
TOTAL
1.52
14.00
4.47
EN EL SEGUNDO PISO:
ESQUINERAS
C-1 (VER ANEXO 02)
M3
0.25
0.25
2.90
10.00
1.81
M3
0.25
0.25
2.90
9.00
1.63
M3
0.25
0.25
2.90
3.00
0.54
M3
0.25
0.25
2.90
1.00
0.18
C-2 (ESCALERAS)
M3
0.25
0.25
2.90
4.00
0.73
M3
0.25
0.25
2.90
10.00
1.81
M3
0.25
0.25
2.90
9.00
1.63
M3
0.25
0.25
2.90
3.00
0.54
M3
0.25
0.25
2.90
1.00
0.18
C-2 (ESCALERAS)
M3
0.25
0.25
2.90
4.00
0.73
M3
0.25
0.25
2.90
2.00
0.36
M3
0.25
0.25
2.90
3.00
0.54
M3
0.25
0.25
2.90
1.00
0.18
C-2 (ESCALERAS)
M3
0.25
0.25
2.90
4.00
0.73
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EN EL TERCER PISO:
ESQUINERAS
C-1 (VER ANEXO 02)
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EN LA AZOTEA:
ESQUINERAS
C-1 (VER ANEXO 02)
INTERMEDIAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
05.01.02.02
ENCOFRADO Y DESENCOFRADO
NORMAL DE COLUMNAS
EN EL PRIMER PISO:
255.13
M2
ESQUINERAS
0.25
0.25 C-1 0.25
C-1
M2
0.70
4.20
10.00
29.40
M2
0.70
4.20
9.00
26.46
M2
0.85
4.20
3.00
10.71
0.25
INTERMEDIAS
0.25
C-1
Z-2
ULTIMAS
0.25
0.25 C-1 0.25
C-1
0.25
Z-2
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Z-3
0.25
0.25 C-10.25
C-1
M2
0.70
4.20
1.00
2.94
M2
0.85
4.20
4.00
14.28
M2
1.14
2.70
14.00
43.09
M2
0.70
2.70
10.00
18.90
M2
0.70
2.70
9.00
17.01
M2
0.85
2.70
3.00
6.89
M2
0.70
2.70
1.00
1.89
M2
0.85
2.70
4.00
9.18
M2
0.70
2.70
10.00
18.90
0.25
0.25
Z-5
C-2 (ESCALERAS)
0.25
C-2
0.25
0.25
0.31
0.16
C-3
C-3
0.41
0.26
(CERCO PERIMETRICO)
EN EL SEGUNDO PISO:
ESQUINERAS
0.25
C-1
INTERMEDIAS
0.25
C-1
Z-2
ULTIMAS
0.25
0.25 C-1 0.25
C-1
0.25
Z-2
C-1
0.25 C-10.25
0.25
0.25
Z-5
C-2 (ESCALERAS)
0.25
C-2
0.25
0.25
EN EL TERCER PISO:
ESQUINERAS
0.25
0.25 C-1 0.25
C-1
0.25
INTERMEDIAS
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
0.25
C-1
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
Z-2
M2
0.70
2.70
9.00
17.01
M2
0.85
2.70
3.00
6.89
M2
0.70
2.70
1.00
1.89
M2
0.85
2.70
4.00
9.18
M2
0.70
2.70
2.00
3.78
M2
0.70
2.70
3.00
5.67
M2
0.70
2.70
1.00
1.89
M2
0.85
2.70
4.00
9.18
0.25
ULTIMAS
0.25
0.25 C-1 0.25
C-1
0.25
Z-2
C-1
0.25
0.25
0.25
Z-5
0.25
C-2
0.25
0.25
Z-5
0.25
C-2 (ESCALERAS)
C-2
0.25
0.25
EN LA AZOTEA:
ESQUINERAS
0.25
0.25 C-1 0.25
C-1
0.25
INTERMEDIAS
0.25
C-1
Z-2
C-1
0.25
0.25
Z-5
C-2 (ESCALERAS)
0.25
C-2 0.25
0.25
05.01.02.03
ACERO EN COLUMNAS
8806.50
KG
VIVIENDA MULTIFAMILIAR
KG/ML
ESQUINERAS
C-1
KG
65/8"
ESTRIBOS 3/8
INTERMEDIAS
KG
10.00
12.08
1.55
6.00
0.00
0.83
0.56
73.00
0.00
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
C-1
ALTO
KG
65/8"
ESTRIBOS 3/8
KG
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
9.00
12.08
1.55
6.00
0.00
0.83
0.56
73.00
0.00
10.88
1.55
6.00
0.00
0.83
0.56
63.00
0.00
10.88
1.55
6.00
0.00
0.83
0.56
63.00
0.00
ULTIMAS
C-1
KG
65/8"
ESTRIBOS 3/8
KG
3.00
KG
65/8"
ESTRIBOS 3/8
KG
3.00
C-2 (ESCALERAS)
4.00
45/8"
ESTRIBOS 3/8
KG
13.81
1.55
4.00
5401.15
0.83
0.56
81.00
2371.87
14.00
43/8"
ESTRIBOS 1/4"
05.01.03
05.01.03.01
KG
4.10
0.56
4.00
743.90
0.55
0.25
26.00
289.58
VIGAS
15.50
M3
EN EL PRIMER PISO:
V-A(0.25 x 0.30), Eje A-A y Entre Ejes1-1, 22,
3-3, 4-4, 5-5
V-B (0.25 x 0.30), Ejes B-B y Entre 3-3,4-4,5-5
M3
M3
10.35
6.70
0.25
0.25
0.30
0.30
1.00
1.00
0.78
0.50
M3
10.35
0.25
0.30
1.00
0.78
M3
16.35
0.25
0.30
1.00
1.23
M3
12.35
0.25
0.30
1.00
0.93
M3
8.50
0.25
0.20
1.00
0.43
M3
8.50
0.25
0.20
1.00
0.43
M3
8.25
0.25
0.30
1.00
0.62
M3
8.50
0.25
0.30
1.00
0.64
M3
8.35
0.25
0.30
1.00
0.63
M3
4.00
0.25
0.30
1.00
0.30
M3
2.35
0.25
0.30
2.00
0.35
M3
16.74
0.15
0.20
1.00
0.50
V (0.10 x 0.20)
M3
23.95
0.10
0.20
1.00
0.48
V-Z (0.25x0.30)
M3
9.20
0.25
3.00
1.00
6.90
EN EL SEGUNDO PISO:
V-A(0.25 x 0.30), Eje A-A y Entre Ejes1-1, 22, 3-3, 4-4, 5-5
V-B (0.25 x 0.30), Ejes B-B y Entre 3-3,4-4,5-5
M3
M3
10.35
6.70
0.25
0.25
0.30
0.30
1.00
1.00
0.78
0.50
M3
10.35
0.25
0.30
1.00
0.78
M3
16.35
0.25
0.30
1.00
1.23
M3
12.35
0.25
0.30
1.00
0.93
M3
8.50
0.25
0.20
1.00
0.43
M3
8.50
0.25
0.20
1.00
0.43
M3
8.25
0.25
0.30
1.00
0.62
M3
8.50
0.25
0.30
1.00
0.64
M3
8.35
0.25
0.30
1.00
0.63
M3
4.00
0.25
0.30
1.00
0.30
V (0.25 x 0.30)
M3
2.35
0.25
0.30
2.00
0.35
EN EL TERCER PISO:
V-A(0.25 x 0.30), Eje A-A y Entre Ejes1-1, 22, 3-3, 4-4, 5-5
V-B (0.25 x 0.30), Ejes B-B y Entre 3-3,4-4,5-5
M3
M3
10.35
6.70
0.25
0.25
0.30
0.30
1.00
1.00
0.78
0.50
M3
10.35
0.25
0.30
1.00
0.78
M3
16.35
0.25
0.30
1.00
1.23
M3
12.35
0.25
0.30
1.00
0.93
ESCALERA
V (0.25 x 0.30)
VIGA DE AMARRE
V (0.15 x 0.20)
VIGA DE BORDE
ESCALERA
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
M3
8.50
0.25
0.20
1.00
0.43
M3
8.50
0.25
0.20
1.00
0.43
M3
8.25
0.25
0.30
1.00
0.62
M3
8.50
0.25
0.30
1.00
0.64
M3
8.35
0.25
0.30
1.00
0.63
M3
4.00
0.25
0.30
1.00
0.30
V (0.25 x 0.30)
M3
2.35
0.25
0.30
2.00
0.35
EN LA AZOTEA:
V-D (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33,4-4,5-5,6-6
V-E (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,3-
M3
6.75
0.25
0.30
1.00
0.51
3,4-4,5-5,6-6
V101 (0.25 x 0.20)
M3
5.75
0.25
0.30
1.00
0.43
M3
2.85
0.25
0.20
1.00
0.14
M3
2.85
0.25
0.20
1.00
0.14
M3
2.85
0.25
0.30
1.00
0.21
V (0.25 x 0.30)
M3
2.35
0.25
0.30
2.00
0.35
V (0.15 x 0.30)
M3
2.85
0.15
0.30
2.00
0.26
KG.
TOTAL
ESCALERA
ESCALERA
05.01.03.02
85.73
M2
10.45
0.65
1.00
6.79
M2
6.70
0.45
1.00
3.02
M2
10.45
0.45
1.00
4.70
M2
20.05
0.45
1.00
9.02
M2
19.05
0.65
1.00
12.38
M2
8.50
0.45
1.00
3.83
M2
8.50
0.45
1.00
3.83
M2
8.25
0.65
1.00
5.36
M2
8.50
0.65
1.00
5.53
M2
8.35
0.65
1.00
5.43
M2
4.00
0.65
1.00
2.60
M2
2.35
0.65
1.00
1.53
M2
16.74
0.40
1.00
6.70
M2
23.95
0.30
1.00
7.19
M2
9.20
0.85
1.00
7.82
EN LA AZOTEA:
V-D (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33,4-4,5-5,6-6
Cara Interior y Exterior
V-E (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33,4-4,5-5,6-6
Cara Interior y Exterior
M2
6.75
0.45
1.00
3.04
M2
5.75
0.65
1.00
3.74
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
2.85
0.45
1.00
1.28
M2
2.85
0.45
1.00
1.28
M2
2.85
0.65
1.00
1.85
VOL.
KG.
TOTAL
ACERO EN VIGAS
V-A(0.25 x 0.30), Eje A-A y Entre Ejes1-1, 22, 3-3, 4-4, 5-5
2 5/8" + 2 1/2"
14.57
0.1
0.12
0.00
kg/ml
1.00
0.99
2.00
14.81
1.55
2.00
0.00
14.87
1.55
4.00
0.00
4 5/8"
14.57
0.2
0.15
Bastones
2 5/8" +1 1/2" L=1.57
1 3/4" L=1.80
0.99
1.00
1.57
1.55
2.00
0.00
2.20
2.26
1.00
0.00
3.10
2.26
2.00
0.00
2.60
1.60
2.00
0.00
1.80
0.58
50.00
0.00
0.2
2 3/4" L=3.10
2 5/8" L=1.90
0.4
Estribos
0.3
0.3
0.5
3/8"
V-B (0.25 x 0.30), Ejes B-B y Entre 3-3,4-4,55
2 1/2"
7.37
0.3
0.3
4.00
7.97
1.02
2.00
0.00
9.07
1.02
2.00
0.00
1.65
1.02
1.00
0.00
2.60
1.60
1.00
0.00
2 1/2"
8.47
0.3
0.3
Bastones
1 1/2" L=1.35
0.3
1 5/8" L=2.6
2 5/8" L= 1.9
0.3
1.9
0.3
2.50
1.60
2.00
0.00
0.4
2 5/8" L=1.90
0.3
2.60
1.60
2.00
0.00
1.16
0.58
36.00
0.00
1.80
0.58
10.00
0.00
Estribos
0.18
0.3
3/8"
0.3
0.5
3/8"
V-C (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33
2 5/8"
23.7
0.4
0.4
2 5/8"
2.00
24.50
1.60
2.00
0.00
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
23.7
0.4
0.4
1 1/2" L=1.10
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
24.50
1.60
2.00
0.00
1.50
1.02
1.00
0.00
2.75
1.02
1.00
0.00
1.50
1.02
1.00
0.00
1.50
0.58
138.00
0.00
0.4
1 1/2" L=2.75
1 1/2" L=1.10
Estribos
0.4
0.15
0.5
3/8"
V-D (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33,4-4,5-5,6-6
2 1/2"
23.7
0.3
0.3
2.00
24.30
1.02
2.00
0.00
24.30
1.02
2.00
0.00
1.00
0.58
138.00
0.00
2 1/2"
23.7
0.3
Estribos
0.3
0.15
0.25
3/8"
V-E (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33,4-4,5-5,6-6
2 1/2"
23.7
0.3
0.3
2.00
24.30
1.02
2.00
0.00
24.30
1.02
2.00
0.00
1.08
0.25
120.00
0.00
2 1/2"
23.7
0.3
Estribos
0.3
0.09
0.35
1/4"
V101 (0.25 x 0.20)
2.00
2 1/2"
0.25
7.47
0.25
7.97
1.02
2.00
0.00
7.47
0.25
7.97
1.02
2.00
0.00
1.06
0.58
36.00
0.00
2 1/2"
0.25
Estribos
0.18
0.25
3/8"
V102 (0.25 x 0.20)
2.00
2 3/4"
0.4
7.37
0.4
8.17
2.26
2.00
0.00
7.37
0.3
9.57
1.60
2.00
0.00
4.67
1.60
2.00
0.00
2.20
2.26
2.00
0.00
2 5/8"
0.4
Bastones
2 5/8" L=4.67
1 3/4" L=1.80
0.4
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
Estribos
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.3
0.5
1.80
0.58
50.00
0.00
3/8"
V103 (0.25 x 0.30)
M3
16.00
2 3/8" L=3.47
0.1
Estribo 1/4"
0.1
3.67
0.58
2.00
0.00
0.1
0.30
0.25
17.00
0.00
0.1
0.1
1/4"
M3
7.00
2 3/8" L=2.47
0.1
Estribo 1/4"
0.1
2.67
0.58
2.00
0.00
0.1
0.30
0.25
12.00
0.00
0.1
0.1
1/4"
M3
2.00
2 3/8" L=1.25
0.1
Estribo 1/4"
0.1
1.45
0.58
2.00
0.00
0.1
0.30
0.25
12.00
0.00
0.1
0.1
1/4"
1.00
2 3/8" L=27.5
0.1
Estribo 1/4"
0.1
27.70
0.58
2.00
0.00
0.1
0.30
0.25
137.00
0.00
0.1
0.1
1/4"
2.00
2 3/8" L=1.4
0.1
Estribo 1/4"
0.1
1.60
0.58
2.00
0.00
0.1
0.30
0.25
7.00
0.00
0.1
0.1
1/4"
1.00
2 3/8" L=3.24
0.1
Estribo 1/4"
0.1
3.44
0.58
2.00
0.00
0.1
0.30
0.25
17.00
0.00
0.1
0.1
1/4"
ESCALERAS
V1(0.23x0.20)
2 1/2"
2.00
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
0.15
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
4.65
0.30
5.10
1.02
2.00
0.00
6.15
0.30
6.60
1.02
2.00
0.00
1.95
0.30
2.55
1.02
2.00
0.00
0.86
0.58
28.00
0.00
1.51
0.58
10.00
0.00
2 1/2"
0.15
2 1/2"
0.30
Estribos
0.18
0.15
3/8"
Estribos
0.18
0.475
3/8"
V2(0.20X0.55 )
1.00
2 1/2"
0.45
3.68
0.45
4.58
1.02
2.00
0.00
3.68
0.45
4.58
1.02
2.00
0.00
1.65
1.02
2.00
0.00
1.50
0.58
24.00
0.00
2 1/2"
0.45
1 1/2"
0.45
1.2
Estribos
0.15
0.5
3/8"
V4(0.13x0.45)
1.00
2 5/8"
0.45
3.68
0.45
4.58
1.60
2.00
0.00
3.68
0.45
4.58
1.60
2.00
0.00
1.16
0.58
24.00
0.00
2 5/8"
0.45
Estribos
0.08
0.4
3/8"
V5 (0.13x0.40)
1 1/2"
1.00
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
0.45
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
3.68
0.45
4.58
1.02
2.00
0.00
3.68
0.45
4.58
1.02
2.00
0.00
0.90
0.25
24.00
0.00
TOTAL
1 1/2"
0.45
Estribos
0.1
0.35
1/4"
2V-2 (0.20x0.30)
2.00
2 1/2"
0.25
3.68
0.25
4.18
1.02
2.00
0.00
3.68
0.25
4.18
1.02
2.00
0.00
1.00
0.58
24.00
0.00
2 1/2"
0.25
Estribos
0.15
0.25
3/8"
05.01.04
05.01.04.01
05.01.04.01.01
LOSAS
LOSA ALIGERADA h=O.20 m
CONCRETO EN LOSA ALIGERADA
FC=210 KG/CM2
16.03
M3
En Viguetas
Viguetas entre A - B Y C
M3
M3
3.67
0.10
0.15
34.00
1.87
3.61
0.10
0.15
68.00
3.68
3.55
0.10
0.15
18.00
0.96
3.27
0.10
0.15
3.00
0.15
7.07
3.67
0.05
2.00
2.59
7.07
3.61
0.05
4.00
5.10
En Losa e= 0.05
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
M3
3.55
1.37
0.05
6.00
1.46
En Volado de Escalera
M3
3.27
1.37
0.05
1.00
0.22
202.83
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
7.07
3.67
2.00
51.89
7.07
3.61
4.00
102.09
M3
3.55
1.37
6.00
29.18
En Volado de Escalera
M3
3.27
1.37
1.00
4.48
M2
23.75
2.00
9.50
Frisos
En Aulas (Frontal y posterior)
0.20
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
11 N
HOJA
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
En Aulas (Laterales)
M2
8.97
0.20
2.00
3.59
En escalera
M2
3.73
0.20
2.00
1.49
En escalera
M2
1.50
0.20
2.00
0.60
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
VOL.
KG.
TOTAL
1119.02
KG
1 corrido (positivo)
KG
23.75
20.00
1.02
484.50
1 bastn (negativo)
KG
2.35
100.00
1.02
239.70
KG
1.10
40.00
0.58
25.52
KG
1.95
100.00
0.58
113.10
Temperatura
KG
9.15
103.00
0.25
235.61
KG
3.73
3.00
1.02
11.41
1 3/8 bastn
KG
1.50
6.00
1.02
9.18
8.33
187.65
ESCALERA
1563.00
05.01.05
05.01.05.01
Und
ESCALERA
PRIMER TRAMO
M3
3.08
1.57
0.15
1.00
0.73
M3
1.64
1.72
0.20
1.00
0.56
M3
0.20
1.57
0.15
2.00
0.05
M3
0.38
1.57
0.21
1.00
0.06
11.00
0.43
M3
SEGUNDO TRAMO
3.20
1.57
0.15
1.00
0.75
M3
1.64
1.72
0.20
1.00
0.56
10.00
0.39
(0.30x0.167x1.57)/2
21.00
SEGUNDO TRAMO
05.01.05.03
(0.30x0.167x1.57)/2
M3
M3
05.01.05.02
3.54
ACERO EN ESCALERAS
M2
3.08
M2
1.64
M2
1.57
M2
3.20
M2
1.64
M2
1.57
1.57
1.00
4.84
1.72
1.00
2.81
0.17
11.00
2.88
1.00
5.02
1.72
1.00
2.82
0.17
10.00
2.62
1.57
203.09
KG
1er TRAMO
KG/ML
1/2 @ 0.20m
KG
4.25
1.02
8.00
34.68
1/2 @ 0.20m
KG
2.12
1.02
8.00
17.30
1/2 @ 0.20m
KG
2.78
1.02
8.00
22.68
1/2 @ 0.10m
KG
1.10
1.02
8.00
8.98
3/8 @ 0.25m
KG
1.57
0.58
13.00
11.84
KG
5.62
1.02
8.00
45.86
2do TRAMO
1/2 @ 0.20m
12
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
HOJA N
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
1/2 @ 0.20m
KG
2.10
1.02
4.00
8.57
3/8 @ 0.20m
KG
1.70
0.58
8.00
7.89
3/8 @ 0.20m
KG
1.70
0.58
8.00
7.89
3/8 @ 0.20m
KG
1.57
0.58
14.00
12.75
KG
3.27
0.58
5.00
9.48
KG
3.27
0.58
8.00
15.17
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
N
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
N
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
N
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
N
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
N
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
18 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
3/8"
2.00
2 1/2"
1
5.5
0.1
2 1/2"
6.60
1.02
4.00
53.86
TOTAL
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
6.05
1.02
4.00
49.38
1.80
1.02
2.00
7.34
1.60
1.02
2.00
6.53
2.40
1.02
2.00
9.79
0.96
0.58
28.00
31.18
1.16
0.58
14.00
18.84
TOTAL
5.052
2 1/2"
0.3
0.95
0.55
0.95
0.55
2 1/2"
0.1
0.2
2.05
0.15
Estribos
0.18
0.2
3/8"
Estribos
0.18
0.3
3/8"
00.00.01
00.00.01.02
LOSAS
LOSA ALIGERADA h=O.20 m
16.03
En Viguetas
Viguetas entre A - B Y C
M3
M3
3.67
0.10
0.15
34.00
1.87
3.61
0.10
0.15
68.00
3.68
3.55
0.10
0.15
18.00
0.96
3.27
0.10
0.15
3.00
0.15
7.07
3.67
0.05
2.00
2.59
7.07
3.61
0.05
4.00
5.10
En Losa e= 0.05
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
M3
3.55
1.37
0.05
6.00
1.46
En Volado de Escalera
M3
3.27
1.37
0.05
1.00
0.22
202.83
Pao A, entre 1 - 2, 6 - 7
M2
Pao A, entre 2 al 6
7.07
3.67
2.00
51.89
7.07
3.61
4.00
102.09
m2
3.55
1.37
6.00
29.18
En Volado de Escalera
m2
3.27
1.37
1.00
4.48
Frisos
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
23.75
0.20
2.00
9.50
En Aulas (Laterales)
M2
8.97
0.20
2.00
3.59
En escalera
M2
3.73
0.20
2.00
1.49
En escalera
M2
1.50
0.20
2.00
0.60
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
VOL.
KG.
TOTAL
1119.02
KG
1 corrido (positivo)
KG
23.75
20.00
1.02
484.50
1 bastn (negativo)
KG
2.35
100.00
1.02
239.70
KG
1.10
40.00
0.58
25.52
KG
1.95
100.00
0.58
113.10
Temperatura
KG
9.15
103.00
0.25
235.61
KG
3.73
3.00
1.02
11.41
1 3/8 bastn
KG
1.50
6.00
1.02
9.18
8.33
187.65
ESCALERA
1563.00
00.00.02
00.00.02.01
Und
ESCALERA
PRIMER TRAMO
M3
3.08
1.57
0.15
1.00
0.73
M3
1.64
1.72
0.20
1.00
0.56
M3
0.20
1.57
0.15
2.00
0.05
M3
0.38
1.57
0.21
1.00
0.06
11.00
0.43
M3
SEGUNDO TRAMO
3.20
1.57
0.15
1.00
0.75
M3
1.64
1.72
0.20
1.00
0.56
10.00
0.39
(0.30x0.167x1.57)/2
21.00
SEGUNDO TRAMO
00.00.02.03
(0.30x0.167x1.57)/2
M3
M3
00.00.02.02
3.54
ACERO EN ESCALERAS
M2
3.08
M2
1.64
M2
1.57
M2
3.20
M2
1.64
M2
1.57
1.57
1.00
4.84
1.72
1.00
2.81
0.17
11.00
2.88
1.00
5.02
1.72
1.00
2.82
0.17
10.00
2.62
1.57
203.09
KG
1er TRAMO
KG/ML
1/2 @ 0.20m
KG
4.25
1.02
8.00
34.68
1/2 @ 0.20m
KG
2.12
1.02
8.00
17.30
1/2 @ 0.20m
KG
2.78
1.02
8.00
22.68
1/2 @ 0.10m
KG
1.10
1.02
8.00
8.98
3/8 @ 0.25m
KG
1.57
0.58
13.00
11.84
2do TRAMO
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
21 N
HOJA
MEDIDAS
DESCRIPCION
00.00.03
00.00.03.01
00.00.03.02
00.00.03.03
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
1/2 @ 0.20m
KG
5.62
1.02
8.00
45.86
1/2 @ 0.20m
KG
2.10
1.02
4.00
8.57
3/8 @ 0.20m
KG
1.70
0.58
8.00
7.89
3/8 @ 0.20m
KG
1.70
0.58
8.00
7.89
3/8 @ 0.20m
KG
1.57
0.58
14.00
12.75
KG
3.27
0.58
5.00
9.48
KG
3.27
0.58
8.00
15.17
TOTAL
GARGOLA
0.03
M3
0.20
0.20
0.10
4.00
0.02
GARGOLA
M3
0.20
0.05
0.15
8.00
0.01
M2
0.70
0.20
4.00
0.56
M2
0.20
0.10
4.00
0.08
M2
0.15
0.05
8.00
0.06
M2
0.15
0.20
8.00
0.24
0.94
KG
4.22
KG/ML
1/4
KG
1.29
0.25
8.00
2.58
1/4
KG
0.82
0.25
8.00
1.64
00.01.00
00.01.01
ESTRUCTURAS DE MADERA
00.01.01.01
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
909.39
P2
18.26
2.00
6.00
6.00
109.56
Brida Superior
P2
18.26
2.00
6.00
6.00
109.56
Brida Inferior
p2
34.45
2.00
6.00
6.00
206.69
P2
3.77
2.00
4.00
12.00
30.18
P2
5.54
2.00
4.00
6.00
22.18
P2
1.31
2.00
4.00
12.00
10.50
P3
3.05
2.00
4.00
12.00
24.41
P4
4.04
2.00
4.00
12.00
32.28
P5
7.25
2.00
4.00
12.00
58.01
P2
0.90
0.30
1.00
24.00
69.72
P2
0.50
0.30
1.00
36.00
58.10
P2
0.60
0.30
1.00
48.00
92.97
P2
0.80
0.30
1.00
12.00
30.99
P2
0.40
0.30
1.00
24.00
30.99
P2
0.30
0.30
1.00
24.00
23.24
Cartelas
00.01.01.02
99.04
P2
18.26
2.00
3.00
4.00
36.52
P2
18.26
2.00
3.00
4.00
36.52
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
22 N
HOJA
MEDIDAS
DESCRIPCION
00.01.01.03
00.01.01.04
00.01.01.05
00.01.01.06
00.01.02
00.01.02.01
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
P2
P2
P2
P2
En escalera
P2
P2
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
26.00
2.00
3.00
2.00
26.00
80.30
2.00
3.00
16.00
642.39
14.47
3.00
4.00
9.00
130.22
1.00
8.00
2.00
108.92
14.47
1.00
8.00
2.00
19.29
VOL.
KG.
TOTAL
642.39
130.22
128.22
P2
P2
24.33
1.00
3.00
1.00
6.08
P2
36.53
1.00
3.00
2.00
18.26
24.34
COBERTURA
309.79
11.21
24.68
276.63
7.52
4.41
33.16
Escalera
Cobertura con calamina galvanizada N30 en escalera
M2
00.01.02.02
29.09
24.68
1.00
24.68
4.41
1.00
4.41
Escalera
Cumbrera con calamina galvanizada N 30
Ml
00.02.00
MUROS DE ALBAILERIA
00.02.01
00.02.02
215.60
M2
6.22
2.70
4.00
67.18
M2
6.22
2.69
4.00
66.93
M2
6.22
1.15
4.00
28.61
M2
3.70
3.07
2.00
22.72
M3
3.70
2.92
2.00
21.61
M2
1.35
0.30
2.00
0.81
M2
2.93
1.32
2.00
7.74
M2
M2
1.88
0.83
3.00
4.68
M2
2.26
0.83
3.00
5.63
0.59
1.83
3.00
3.24
3.02
0.94
4.00
11.29
2.26
0.94
2.00
4.23
0.59
1.94
3.00
3.42
M2
172.69
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
23 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
1.88
1.74
3.00
9.79
M2
2.97
1.74
3.00
15.46
M2
1.88
1.74
3.00
9.79
M2
2.97
1.74
3.00
15.46
M2
22.07
1.00
1.00
22.07
M2
1.15
2.95
6.00
20.36
0.93
2.95
6.00
16.46
1.15
2.68
2.00
6.16
0.93
2.68
2.00
4.98
VOL.
KG.
TOTAL
M2
ESCALERA
Eje B' ENTRe 8 y 9 Segundo nivel
M2
3.24
1.32
1.00
4.28
M2
1.57
1.80
1.00
2.83
M2
2.51
1.80
1.00
4.52
M2
2.51
0.55
1.00
1.38
Eje A, entre 8 y 9
M2
0.64
2.75
1.00
1.76
Baranda 1
M2
1.50
1.00
1.00
1.50
Baranda 1
M2
3.40
1.00
1.00
3.40
00.03.00
00.03.01
00.03.02
82.37
M2
M2
5.72
1.20
6.00
41.18
M2
5.72
1.20
6.00
41.18
535.69
M2
Primer nivel
Ejes 1-1,5-5,7-7
M2
6.44
3.04
3.00
58.64
M2
6.44
3.04
3.00
58.64
M2
2.42
0.94
3.00
6.79
0.97
1.94
3.00
5.63
2.52
0.94
3.00
7.11
3.00
13.76
M2
2.37
1.94
M2
3.36
1.94
3.00
19.50
M2
2.44
2.94
12.00
85.94
M2
1.06
2.94
12.00
37.33
M2
0.80
2.10
12.00
-20.16
Ejes 1-1,5-5,7-7
M2
6.44
2.64
3.00
50.91
M2
6.44
2.64
3.00
51.00
M2
3.52
1.04
4.00
14.57
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.22
Descuentos
Puerta 0.80x2.10
Segundo Nivel
M2
2.37
1.99
3.00
14.11
M2
3.36
1.99
3.00
20.01
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
24 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
2.44
2.94
4.00
28.65
M2
1.06
2.94
4.00
12.44
M2
0.80
2.10
4.00
-6.72
M2
4.40
2.20
1.00
9.68
M2
1.40
1.70
2.00
4.76
M2
1.55
1.70
1.00
2.64
M2
0.65
2.64
1.00
1.71
M2
3.00
2.20
1.00
6.60
M2
3.24
1.20
1.00
3.89
Eje 8 y 9
M2
3.60
3.70
2.00
26.64
Eje B'
M2
3.24
1.00
1.00
3.24
M2
1.60
1.00
2.00
3.20
M2
3.00
1.00
2.00
6.00
M2
VOL.
KG.
TOTAL
Descuentos
Puerta 0.80x2.10
CAJA DE ESCALERA
00.03.03
253.76
Primer nivel
Eje C-C, entre 1-1 al 7-7
M2
2.42
0.84
3.00
6.10
M2
0.97
1.84
3.00
5.35
2.52
0.84
3.00
6.35
M2
2.42
1.84
3.00
13.32
M2
3.52
1.84
3.00
19.38
M2
6.20
2.75
2.00
34.10
M2
3.52
1.04
4.00
14.57
M2
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.24
Segundo Nivel
Eje C-C, entre 1-1 al 7-7
M2
2.42
1.99
3.00
14.41
M2
3.52
1.99
3.00
20.96
M2
6.20
3.00
2.00
37.20
M2
6.20
0.60
2.00
7.44
0.55
2.00
6.82
Parapetos
Fachada principal
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
3.24
0.94
1.00
3.05
M2
3.24
1.00
1.00
3.24
M2
0.80
2.60
1.00
2.08
Escalera
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
25 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
1.30
0.95
2.00
2.47
Frontal
M2
0.20
0.10
4.00
0.08
Frontal
M2
0.15
0.05
8.00
0.06
Lateral
M2
0.25
0.20
4.00
0.20
Fondo y techo
M2
0.20
0.20
8.00
0.32
Techo
M2
0.20
0.05
8.00
0.08
Interior gargola
M2
0.40
0.20
4.00
0.32
VOL.
KG.
TOTAL
Gargolas
00.03.04
183.16
M2
0.64
2.65
2.00
3.39
M2
1.13
2.65
3.00
8.98
Eje A3, A5
M2
0.87
2.65
2.00
4.61
M2
0.25
2.65
6.00
3.98
Eje C1 Y C7
M2
0.48
2.65
2.00
2.54
M2
1.13
2.65
3.00
8.98
Eje C3, C5
M2
0.87
2.65
2.00
4.61
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.04
3.00
0.92
M3
0.25
2.54
12.00
7.62
Eje A1 Y A7
M2
0.64
2.64
2.00
3.37
M2
1.13
2.64
3.00
8.93
Eje A3, A5
M2
0.87
2.64
2.00
4.58
M2
0.25
2.64
6.00
3.95
Eje C1 Y C7
M2
0.48
2.64
2.00
2.53
M2
1.13
2.64
3.00
8.93
Eje C3, C5
M2
0.87
2.64
2.00
4.58
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
Eje A1 Y A7
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje A3, A5
M2
0.35
2.65
2.00
1.86
Eje B1, B7
M2
0.25
2.65
2.00
1.33
Eje C1 Y C7
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje C3, C5
M2
0.35
2.65
2.00
1.86
Columnetas de confinamiento
Segundo Nivel
Columnetas de confinamiento
EXTERIORES
Primer Nivel
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
26 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
Columnetas de confinamiento
Eje C-C 1er nivel
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.64
3.00
1.19
M3
0.25
1.94
12.00
5.81
Eje A1 Y A7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje A3, A5
M2
0.35
2.64
2.00
1.84
Eje B1 Y B7
M2
0.25
2.64
2.00
1.32
Eje B1 Y B7
M2
0.25
1.70
2.00
0.85
Eje C1 Y C7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje C3, C5
M2
0.35
2.64
2.00
1.84
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
0.25
0.90
16.00
Segundo Nivel
Columnetas de confinamiento
Columnetas en pazadizo
3.60
ESCALERA
00.03.05
M2
0.26
4.60
2.00
2.39
M2
0.14
5.40
2.00
1.51
Eje B'9
M2
0.30
4.60
1.00
1.38
M2
0.25
5.95
3.00
4.46
Eje A 8, A9
M2
0.40
6.10
3.00
7.32
Eje A 8, A9
M2
0.26
6.10
2.00
3.17
Columneta en pazadizo
M2
0.25
0.90
6.00
1.35
222.43
M2
INTERIORES
Primer nivel
EJE 2, 4, 6
Fondo
M2
6.45
0.35
3.00
6.77
EJE 2, 4, 6
Lateral
M2
7.07
0.35
6.00
14.85
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.15
6.00
6.36
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.35
6.00
7.46
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.35
6.00
7.46
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
Segundo Nivel
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.30
6.00
12.73
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
27 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Eje A
Lateral
M2
3.55
0.30
6.00
6.39
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.30
6.00
6.39
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
VOL.
KG.
TOTAL
Escalera
Eje 8 y 9
M2
4.30
0.25
2.00
2.15
Eje B'
1er nivel
M2
3.73
0.25
1.00
0.93
Eje B'
2do nivel
M2
3.73
0.30
1.00
1.12
M2
3.73
0.30
2.00
2.24
EJE 1 Y 7 laterales
M2
7.50
0.55
2.00
8.25
EJE 1 Y 7 laterales
M2
1.50
0.48
2.00
1.43
M2
1.50
0.35
7.00
3.68
M2
1.50
0.28
12.00
4.95
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
M2
7.50
0.30
2.00
4.50
M2
3.43
0.25
4.00
3.43
EJE 1 Y 7 laterales
M2
2.00
0.51
4.00
4.04
M2
1.50
0.35
14.00
7.35
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
Viga en voladizo
M2
23.75
0.40
1.00
9.50
Viga en voladizo
M2
3.55
0.20
6.00
4.26
Parapeto en alero
M2
23.75
0.15
2.00
7.13
M2
3.75
0.35
1.00
1.31
M2
3.75
0.30
1.00
1.13
Parapeto en alero
M2
3.75
0.70
1.00
2.63
M2
3.75
0.30
1.00
1.13
0.15
1.00
0.56
Segundo Nivel
EJE 1 Y 7 laterales
EJE 1 Y 7 laterales
Timpano
Escalera
00.03.06
12.98
30.35
0.36
1.00
10.93
Pasamanos en escalera
5.70
0.36
1.00
2.05
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
MEDIDAS
DESCRIPCION
00.03.07
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
111.28
ML
2.64
6.00
V-4 Eje AA
ML
2.42
3.00
15.81
7.26
V-5 Eje AA
ML
3.52
3.00
10.56
V-7 EJE CC
ML
2.42
3.00
7.26
V-2 EJE CC
ML
2.52
3.00
7.56
V-3 EJE CC
ML
0.84
3.00
2.52
P-1
ML
2.64
6.00
15.81
V-4 Eje AA
ML
2.42
3.00
7.26
V-5 Eje AA
ML
3.52
3.00
10.56
V-1 EJE CC
ML
3.52
4.00
14.08
V-2 EJE CC
ML
2.52
2.00
5.04
V-3 EJE CC
ML
0.84
2.00
1.68
P-2
ML
2.64
1.00
2.64
V-6
ML
3.24
1.00
3.24
ML
Segundo nivel
ESCALERA
00.03.08
842.82
Primer nivel
Eje AA, Entre 1-2, 4-5, 6-7
ML
5.29
6.00
31.74
ML
6.39
6.00
38.34
ML
4.67
6.00
28.02
ML
6.60
6.00
39.60
ML
8.60
8.00
68.80
ML
8.60
8.00
68.80
ML
5.19
6.00
31.14
ML
6.29
6.00
37.74
ML
7.91
6.00
47.46
ML
9.91
6.00
59.46
ML
11.58
8.00
92.64
ML
11.58
8.00
92.64
ML
8.57
4.00
34.28
ML
1.65
0.95
24.00
124.56
0.90
0.95
4.00
14.80
ML
1.33
0.95
4.00
18.24
ML
2.74
0.90
2.00
14.56
Segundo nivel
Voladizo
Del eje 1-1 al 7-7
00.04.00
CIELORASO
00.04.01
196.21
M2
7.18
3.64
6.00
156.81
Voladizo
M2
3.64
1.37
6.00
29.92
M2
3.24
1.42
1.00
4.60
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
29 N
HOJA
MEDIDAS
DESCRIPCION
Escalera 2 tramo
00.04.02
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
M2
3.15
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
1.55
1.00
4.88
7.18
7.60
3.00
163.70
VOL.
KG.
TOTAL
284.49
M2
M2
1.76
7.60
6.00
80.26
M2
10.85
0.60
2.00
13.02
INTERIOR
M2
5.45
3.25
1.00
17.71
LATERAL
M2
5.45
0.60
1.00
3.27
PASADIZO
M2
4.35
1.50
1.00
6.53
ESCALERA
00.04.03
190.73
INTERIOR
Aulas (segundo nivel)
ML
7.18
6.00
43.08
ML
7.60
6.00
45.60
Eje AA
ML
28.90
1.00
28.90
Eje CC
ML
28.90
1.00
28.90
EJE 1-1 Y 77
ML
10.50
2.00
21.00
INTERIOR
ML
11.95
1.00
11.95
LATERAL
ML
5.45
1.00
5.45
PASADIZO
ML
5.85
1.00
5.85
EXTERIOR
ESCALERA
00.05.00
PISOS Y VEREDAS
00.05.01
PISOS
00.05.01.01
M2
00.05.01.02
00.05.02
00.05.02.01
185.01
7.18
2.00
109.14
7.54
7.18
1.00
54.14
1.06
2.44
-6.00
-15.52
0.60
2.30
-3.00
-4.14
0.37
0.35
-6.00
-0.78
4.92
M2
3.24
1.52
1.00
M2
1.54
1.20
1.00
1.85
M2
23.62
1.30
1.00
30.71
M2
3.61
1.30
1.00
4.69
16.42
M2
2.28
0.90
6.00
12.31
M2
2.28
0.90
2.00
4.10
VEREDAS
VEREDA DE CONCRETO DE 4
M2
Frontal
M2
29.19
1.50
1.00
43.79
Posterior
M2
29.19
0.80
1.00
23.35
3.81
0.80
1.00
79.78
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
30 N
HOJA
MEDIDAS
DESCRIPCION
00.05.02.02
00.05.02.03
AREA
7.50
0.80
1.00
6.00
M2
3.62
0.80
1.00
2.90
4.68
0.80
1.00
3.74
VOL.
M3
Frontal
M3
30.22
1.00
0.08
2.42
Posterior
M3
30.22
1.00
0.08
2.42
Laterales
M3
7.23
1.00
0.08
0.58
Centrales
M3
2.32
1.00
0.08
0.19
1.50
8.00
12.00
ML
0.80
7.00
5.60
ML
0.80
2.00
1.60
Vereda lateral
ML
0.80
3.00
2.40
ML
0.80
2.00
1.60
ML
0.80
2.00
1.60
112.46
ML
Fachada posterior
ML
23.78
1.00
23.78
ML
3.81
1.00
3.81
EJE 7 AULA
ML
2.57
1.00
2.57
ML
7.50
1.00
7.50
Fachada frontal
ML
23.78
1.00
23.78
ML
1.31
1.00
1.31
ML
23.78
1.00
23.78
ML
3.19
1.00
3.19
Descanso
ML
1.58
1.00
1.58
ML
3.43
1.00
3.43
ML
1.69
1.00
1.69
Eje 8 deposito
ML
1.52
1.00
1.52
ML
2.96
1.00
2.96
Eje A deposito
ML
0.64
1.00
0.64
ML
1.50
1.00
1.50
ML
3.24
1.00
3.24
ML
1.70
1.00
1.70
Entre ejes 9 - 9
ML
4.48
1.00
4.48
TOTAL
24.80
Vereda frontal
ZOCALOS
KG.
5.61
00.06.02
SUB TOTAL
LONG.
M2
00.06.01
00.06.02.01
N
DE
VECES
Laterales
00.06.00
00.06.01.02
ALTO
Laterales
00.06.01.01
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
54.91
M2
5.72
1.20
6.00
41.18
M2
5.72
1.20
2.00
13.73
CONTRAZOCALOS
CONTRAZOCALOS DE CEMENTO DE 4"
ML
INTERIOR AULAS
ML
172.65
27.90
3.00
83.70
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
31 N
HOJA
MEDIDAS
DESCRIPCION
00.06.03
00.06.03.01
29.34
2.00
58.68
30.27
1.00
30.27
23.00
35.42
M2
1.54
M2
3.24
1.52
PUERTAS
00.07.03
00.07.03.01
TOTAL
4.92
12.78
12.78
1.00
12.78
23.00
23.00
50.60
M2
1.10
2.64
12.00
M2
0.90
2.64
1.00
2.38
M2
0.80
2.10
8.00
13.44
COLOCACION DE PUERTAS
UND
34.78
21.00
21.00
ARMARIO - CLOSET
CLOSET DE MELAMINE S/DISEO
UND
UND
3.00
3.00
PIZARRA
4.00
00.08.00
CARPINTERIA METALICA
00.08.01
VENTANA
00.08.01.01
KG.
4.92
1.00
CARPINTERIA DE MADERA
00.07.02
VOL.
35.42
00.07.01
00.07.02.01
AREA
00.07.00
00.07.01.02
SUB TOTAL
LONG.
ML
00.07.01.01
N
DE
VECES
ML
ML
00.06.03.04
ALTO
Primer descanzo
00.06.03.03
Pasos
00.06.03.02
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
83.39
M2
2.52
1.60
3.00
12.10
V-3
M2
0.84
0.60
3.00
1.51
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
V-7
M2
2.42
1.60
3.00
11.62
V-1
M2
3.52
1.60
4.00
22.53
V-2
M2
2.52
1.60
2.00
8.06
V-3
M2
0.84
0.60
2.00
1.01
V-4
M2
2.42
0.70
3.00
5.08
Segundo nivel
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
32 N
HOJA
MEDIDAS
DESCRIPCION
V-5
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
3.52
0.70
3.00
7.39
ML
3.24
0.50
1.00
1.62
VOL.
KG.
TOTAL
ESCALERA
V-6
UND
30.00
30.00
00.09.00
CERRAJERIA
00.09.01
9.00
9.00
00.09.02
UND
8.00
8.00
00.09.03
UND
9.00
9.00
00.10.00
VIDRIO SEMIDOBLE
00.10.01
VIDRIO SEMIDOBLE
00.08.01.02
COLOCACION DE VENTANAS
273.60
P2
Primer nivel
V-2
2.52
1.60
3.00
V-3
0.84
0.60
3.00
4.96
V-4
2.42
0.70
3.00
16.67
V-5
3.52
0.70
3.00
24.25
V-7
2.42
1.60
3.00
38.11
V-1
3.52
1.60
4.00
73.91
V-2
2.52
1.60
2.00
26.46
V-3
0.84
0.60
2.00
3.31
V-4
2.42
0.70
3.00
16.67
V-5
3.52
0.70
3.00
24.25
3.24
0.50
1.00
5.31
Segundo nivel
39.69
0.00
ESCALERA
V-6
00.11.00
PINTURA
00.11.01
PINTURA EN INTERIORES
00.11.01.01
ML
357.69
M2
6.44
3.04
3.00
58.64
M2
2.42
0.94
3.00
6.79
0.97
1.94
3.00
5.63
2.52
0.94
3.00
7.11
3.00
13.76
M2
2.37
1.94
M2
3.36
1.94
3.00
19.50
M2
2.44
2.94
12.00
85.94
M2
1.06
2.94
12.00
37.33
M2
0.80
2.10
12.00
-20.16
M2
6.44
2.64
3.00
50.91
Descuentos
Puerta 0.80x2.10
Segundo Nivel
Ejes 1-1,5-5,7-7
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
33 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
M2
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
3.52
1.04
4.00
14.57
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.22
M2
2.37
1.99
3.00
14.11
M2
3.36
1.99
3.00
20.01
M2
2.44
2.94
4.00
28.65
M2
1.06
2.94
4.00
12.44
M2
0.80
2.10
4.00
-6.72
VOL.
KG.
TOTAL
Descuentos
Puerta 0.80x2.10
00.11.01.02
199.79
M2
0.64
2.65
2.00
3.39
M2
1.13
2.65
3.00
8.98
Eje A3, A5
M2
0.87
2.65
2.00
4.61
M2
0.25
2.65
6.00
3.98
Eje C1 Y C7
M2
0.48
2.65
2.00
2.54
M2
1.13
2.65
3.00
8.98
Eje C3, C5
M2
0.87
2.65
2.00
4.61
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.04
3.00
0.92
M3
0.25
2.54
12.00
7.62
Eje A1 Y A7
M2
0.64
2.64
2.00
3.37
M2
1.13
2.64
3.00
8.93
Eje A3, A5
M2
0.87
2.64
2.00
4.58
M2
0.25
2.64
6.00
3.95
Eje C1 Y C7
M2
0.48
2.64
2.00
2.53
M2
1.13
2.64
3.00
8.93
Eje C3, C5
M2
0.87
2.64
2.00
4.58
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
Columnetas de confinamiento
Segundo Nivel
Columnetas de confinamiento
Fondo
M2
6.45
0.35
3.00
6.77
EJE 2, 4, 6
Lateral
M2
7.07
0.35
6.00
14.85
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.15
6.00
6.36
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.35
6.00
7.46
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
34 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.35
6.00
7.46
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
VOL.
KG.
TOTAL
Segundo Nivel
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.30
6.00
12.73
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.30
6.00
6.39
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.30
6.00
6.39
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
Escalera
Eje 8 y 9
M2
4.30
0.25
2.00
2.15
Eje B'
1er nivel
M2
3.73
0.25
1.00
0.93
Eje B'
2do nivel
M2
3.73
0.30
1.00
1.12
M2
3.73
0.30
2.00
2.24
00.11.01.03
29.28
00.11.02
00.11.02.01
M2
4.40
2.20
1.00
9.68
M2
1.40
1.70
2.00
4.76
M2
1.55
1.70
1.00
2.64
M2
0.65
2.64
1.00
1.71
M2
3.00
2.20
1.00
6.60
M2
3.24
1.20
1.00
3.89
PINTURA EN EXTERIORES
294.59
M2
2.42
0.84
3.00
6.10
M2
0.97
1.84
3.00
5.35
2.52
0.84
3.00
6.35
M2
2.42
1.84
3.00
13.32
M2
3.52
1.84
3.00
19.38
M2
6.20
2.75
2.00
34.10
M2
3.52
1.04
4.00
14.57
M2
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.24
Segundo Nivel
Eje C-C, entre 1-1 al 7-7
M2
2.42
1.99
3.00
14.41
M2
3.52
1.99
3.00
20.96
M2
6.20
3.00
2.00
37.20
M2
6.20
0.60
2.00
7.44
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
35 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
0.55
2.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
6.82
Parapetos
Fachada principal
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
1.34
1.05
2.00
2.81
M2
3.24
0.94
1.00
3.05
M2
3.24
1.00
1.00
3.24
M2
0.80
2.60
1.00
2.08
M2
1.30
0.95
2.00
2.47
Eje 8 y 9
M2
3.60
3.70
2.00
26.64
Eje B'
M2
3.24
1.00
1.00
3.24
M2
1.60
1.00
2.00
3.20
M2
3.00
1.00
2.00
6.00
CAJA DE ESCALERA
00.11.02.02
205.80
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje A3, A5
M2
0.35
2.65
2.00
1.86
Eje B1, B7
M2
0.25
2.65
2.00
1.33
Eje C1 Y C7
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje C3, C5
M2
0.35
2.65
2.00
1.86
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.64
3.00
1.19
M3
0.25
1.94
12.00
5.81
Eje A1 Y A7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje A3, A5
M2
0.35
2.64
2.00
1.84
Eje B1 Y B7
M2
0.25
2.64
2.00
1.32
Eje B1 Y B7
M2
0.25
1.70
2.00
0.85
Eje C1 Y C7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje C3, C5
M2
0.35
2.64
2.00
1.84
M3
0.25
0.94
10.00
2.34
Columnetas de confinamiento
Segundo Nivel
Columnetas de confinamiento
Eje C-C 2do nivel
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
36 N
HOJA
MEDIDAS
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
0.25
0.90
16.00
VOL.
KG.
TOTAL
Columnetas en pazadizo
3.60
ESCALERA
Eje B'8 y B'9
M2
0.26
4.60
2.00
2.39
M2
0.14
5.40
2.00
1.51
Eje B'9
M2
0.30
4.60
1.00
1.38
M2
0.25
5.95
3.00
4.46
Eje A 8, A9
M2
0.40
6.10
3.00
7.32
Eje A 8, A9
M2
0.26
6.10
2.00
3.17
Columneta en pazadizo
M2
0.25
0.90
6.00
1.35
M2
7.50
0.55
2.00
8.25
EJE 1 Y 7 laterales
M2
1.50
0.48
2.00
1.43
M2
1.50
0.35
7.00
3.68
M2
1.50
0.28
12.00
4.95
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
M2
7.50
0.30
2.00
4.50
M2
3.43
0.25
4.00
3.43
EJE 1 Y 7 laterales
M2
2.00
0.51
4.00
4.04
M2
1.50
0.35
14.00
7.35
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
Viga en voladizo
M2
23.75
0.40
1.00
9.50
Viga en voladizo
M2
3.55
0.20
6.00
4.26
Parapeto en alero
M2
23.75
0.15
2.00
7.13
M2
3.75
0.35
1.00
1.31
M2
3.75
0.30
1.00
1.13
Parapeto en alero
M2
3.75
0.70
1.00
2.63
M2
3.75
0.30
1.00
1.13
0.15
1.00
0.56
Segundo Nivel
EJE 1 Y 7 laterales
EJE 1 Y 7 laterales
Timpano
Escalera
00.11.02.03
1.06
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
37 N
HOJA
MEDIDAS
DESCRIPCION
00.11.02.04
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Frontal
M2
0.20
0.10
4.00
0.08
Frontal
M2
0.15
0.05
8.00
0.06
Lateral
M2
0.25
0.20
4.00
0.20
Fondo y techo
M2
0.20
0.20
8.00
0.32
Techo
M2
0.20
0.05
8.00
0.08
Interior gargola
M2
0.40
0.20
4.00
0.32
VOL.
KG.
TOTAL
285.11
ML
23.78
1.00
23.78
ML
3.81
1.00
3.81
EJE 7 AULA
ML
2.57
1.00
2.57
ML
7.50
1.00
7.50
Fachada frontal
ML
23.78
1.00
23.78
ML
1.31
1.00
1.31
ML
23.78
1.00
23.78
ML
3.19
1.00
3.19
Descanso
ML
1.58
1.00
1.58
ML
3.43
1.00
3.43
ML
1.69
1.00
1.69
Eje 8 deposito
ML
1.52
1.00
1.52
ML
2.96
1.00
2.96
Eje A deposito
ML
0.64
1.00
0.64
ML
1.50
1.00
1.50
ML
3.24
1.00
3.24
ML
1.70
1.00
1.70
Entre ejes 9 - 9
ML
4.48
1.00
4.48
ML
27.90
3.00
83.70
ML
29.34
2.00
58.68
ML
30.27
1.00
30.27
00.11.03
00.11.03.01
00.11.03.02
196.21
M2
7.18
3.64
6.00
156.81
Voladizo
M2
3.64
1.37
6.00
29.92
M2
3.24
1.42
1.00
4.60
Escalera 2 tramo
M2
3.15
1.55
1.00
4.88
7.18
7.60
3.00
163.70
284.49
M2
M2
1.76
7.60
6.00
80.26
M2
10.85
0.60
2.00
13.02
INTERIOR
M2
5.45
3.25
1.00
17.71
LATERAL
M2
5.45
0.60
1.00
3.27
ESCALERA
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
38 N
HOJA
MEDIDAS
DESCRIPCION
PASADIZO
00.11.04
00.11.04.01
00.11.04.02
00.11.04.03
00.11.04.04
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
M2
4.35
ALTO
1.50
N
DE
VECES
SUB TOTAL
LONG.
1.00
AREA
VOL.
KG.
TOTAL
6.53
12.78
ML
ML
12.78
1.00
12.78
1.34
23.00
30.82
30.82
ML
ML
13.02
ML
EN MUROS
ML
5.84
2.00
11.68
ML
1.34
1.00
1.34
58.02
00.11.04.05
AULAS
ML
24.68
2.00
49.35
ESCALERA
ML
4.34
2.00
8.67
83.39
M2
2.52
1.60
3.00
12.10
V-3
M2
0.84
0.60
3.00
1.51
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
V-7
M2
2.42
1.60
3.00
11.62
V-1
M2
3.52
1.60
4.00
22.53
V-2
M2
2.52
1.60
2.00
8.06
V-3
M2
0.84
0.60
2.00
1.01
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
ML
3.24
0.50
1.00
1.62
Segundo nivel
ESCALERA
V-6
00.12.00
00.12.01
00.12.01.01
00.12.01.02
58.02
AULAS
ML
24.68
2.00
49.35
ESCALERA
ML
4.34
2.00
8.67
34.43
ML
9.10
1.00
9.10
ML
9.10
1.00
9.10
Escalera eje A
ML
9.10
1.00
9.10
ML
7.13
1.00
7.13
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
39 N
HOJA
MEDIDAS
DESCRIPCION
00.12.01.03
00.12.02
00.12.02.01
PZA
ALTO
3.00
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
0.40
0.20
1.60
5.00
0.40
1.60
5.00
5.20
5.20
00.12.03
00.12.03.01
M3
Frontal
M3
28.54
1.00
0.21
5.99
Posterior
M3
32.23
1.00
0.21
6.77
Laterales
M3
10.16
2.00
0.21
4.27
M3
12.00
1.00
0.21
2.52
Desfogue
10.11
Frontal
M3
28.54
1.00
0.11
3.10
Posterior
M3
32.23
1.00
0.11
3.50
Laterales
M3
10.16
2.00
0.11
2.21
M3
12.00
1.00
0.11
1.30
60.07
M2
Posterior
M2
Laterales
M2
Desfogue
00.12.03.04
19.55
Desfogue
00.12.03.03
TOTAL
15.00
5.00
0.65
00.12.03.02
KG.
0.25
00.12.02.02
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
M2
28.54
0.42
1.00
12.11
28.54
0.30
1.00
8.56
32.23
0.42
1.00
13.68
32.23
0.30
1.00
9.67
10.16
0.42
1.00
4.31
10.16
0.30
1.00
3.05
12.00
0.42
1.00
5.09
12.00
0.30
1.00
3.60
98.60
ML
0.74
8.00
5.89
Posterior
ML
0.74
8.00
5.89
Laterales
ML
0.74
7.00
5.16
Centrales
ML
0.74
2.00
1.47
ML
0.74
3.00
2.21
77.98
1.00
77.98
1.00
2.00
2.00
1.00
6.00
6.00
Desfogue
ML
00.13.00
00.13.01
00.13.02
6.00
00.13.03
2.00
2.00
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
40 N
HOJA
MEDIDAS
N
DESCRIPCION
SEGUNDO NIVEL
00.13.04
00.13.06
00.13.07
00.14.02.02
00.14.02.03
00.14.03
00.14.03.01
1.00
2.00
2.00
1.00
6.00
6.00
SEGUNDO NIVEL
1.00
2.00
2.00
PRIMER NIVEL
1.00
6.00
6.00
TOTAL
SEGUNDO NIVEL
1.00
2.00
2.00
PRIMER NIVEL
1.00
6.00
6.00
SEGUNDO NIVEL
1.00
2.00
2.00
8.00
8.00
8.00
PTO
PRIMER NIVEL
PTO
6.00
6.00
SEGUNDO NIVEL
PTO
2.00
2.00
KG.
8.00
6.00
VOL.
6.00
6.00
SALIDAS DE DESAGUE
00.14.02
AREA
1.00
INSTALACIONES SANITARIAS
00.14.02.01
SUB TOTAL
LONG.
PRIMER NIVEL
00.14.01
00.14.01.02
N
DE
VECES
00.14.00
00.14.01.01
ALTO
UND
PRIMER NIVEL
00.13.05
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
7.00
PTO
PRIMER NIVEL
PTO
3.00
3.00
SEGUNDO NIVEL
PTO
4.00
4.00
RED COLECTORA
TUBERIA DE DESAGUE PVC SAL 4"
49.15
ML
C.R. del 01 al 04
ML
16.80
1.00
C.R. del 04 al 08
C.R. del 05 al 08
C.R. del 08 al 09
16.80
ML
8.65
1.00
8.65
ML
16.80
1.00
16.80
ML
6.90
1.00
6.90
16.80
1.00
16.80
49.15
ML
C.R. del 04 al 08
ML
8.65
1.00
8.65
C.R. del 05 al 08
ML
16.80
1.00
16.80
C.R. del 08 al 09
ML
6.90
1.00
6.90
16.80
1.00
16.80
49.15
ML
C.R. del 01 al 04
ML
C.R. del 04 al 08
ML
8.65
1.00
8.65
C.R. del 05 al 08
ML
16.80
1.00
16.80
C.R. del 08 al 09
ML
6.90
1.00
6.90
ML
2.80
6.00
16.80
ML
0.70
6.00
4.20
RED DISTRIBUCION
TUBERIA DE DESAGUE PVC SAL 4"
PRIMER NIVEL
28.30
ML
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
41 N
HOJA
MEDIDAS
N
DESCRIPCION
00.14.03.02
1.00
3.50
2.10
1.00
2.10
ML
0.40
2.00
0.80
ML
0.45
2.00
0.90
1.60
6.00
9.60
0.30
6.00
1.80
1.00
4.00
4.00
3.10
1.00
3.10
3.50
3.00
10.50
1.40
2.00
2.80
0.30
2.00
0.60
0.40
2.00
0.80
3.50
4.00
14.00
21.00
1.00
21.00
18.50
1.00
18.50
21.00
1.00
21.00
18.50
1.00
18.50
SEGUNDO NIVEL
ML
ML
00.14.04
8.00
12.00
5.00
2.00
1.00
2.00
6.00
2do nivel
TEE PVC SAP - 4" X 4"
2.00
6.00
16.00
12.00
2do nivel
00.14.04.08
6.00
UND
1er nivel
00.14.04.07
8.00
UND
1er nivel
00.14.04.06
3.00
UND
2do nivel
CODO VENTILACION PVC SAL DE 4" - 2"
2.00
UND
1er nivel
00.14.04.05
17.00
UND
2do nivel
CODO PVC SAL DE 4" X 90
8.00
UND
2do nivel
00.14.04.04
TOTAL
1er nivel
00.14.04.03
KG.
39.50
ML
1er nivel
00.14.04.02
VOL.
39.50
AREA
47.20
ML
Montante de ventilacion
00.14.04.01
SUB TOTAL
LONG.
3.50
Montante de ventilacion
00.14.03.04
N
DE
VECES
ML
PRIMER NIVEL
00.14.03.03
ALTO
ML
SEGUNDO NIVEL
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
4.00
UND
3.00
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
42 N
HOJA
MEDIDAS
N
DESCRIPCION
ALTO
1er nivel
00.14.05
00.14.05.01
00.14.06.01
3.00
2do nivel
1.00
TOTAL
8.00
UND
6.00
2.00
7.00
UND
1er nivel
6.00
2do nivel
1.00
CAMARA DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24" UND
00.15.02
KG.
ADITAMENTO VARIOS
00.15.01
00.15.02.01
VOL.
4.00
1er nivel
00.15.00
00.15.01.01
AREA
2.00
2do nivel
00.14.06
SUB TOTAL
LONG.
UND
1er nivel
00.14.05.02
N
DE
VECES
1.00
2do nivel
00.14.04.09
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
1.00
9.00
9.00
16.00
PTO
1er nivel
12.00
2do nivel
4.00
REDES DE DISTRIBUCION
TUBERIA PVC SAP CLASE - 10 3/4"
57.55
ML
1er nivel
Del medidor a 1
9.20
1.00
9.20
De 1 a caja de valvula 4
27.75
1.00
27.75
De caja de valvula
5.70
3.00
17.10
3.50
1.00
3.50
Tuberia de Subida
00.15.02.02
00.15.02.03
00.15.02.04
00.15.03
00.15.03.01
26.80
ML
PRIMER NIVEL
ML
3.50
6.00
21.00
SEGUNDO NIVEL
ML
5.80
1.00
5.80
75.05
21.00
1.00
21.00
54.05
1.00
54.05
21.00
1.00
21.00
54.05
1.00
54.05
75.05
ML
7.00
UND
1er nivel
7.00
2do nivel
0.00
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
43 N
HOJA
MEDIDAS
DESCRIPCION
00.15.03.02
ALTO
00.15.04
00.15.04.01
1.00
14.00
UND
12.00
2.00
9.00
UND
1er nivel
6.00
2do nivel
3.00
LLAVES Y VALVULAS
VALVULA DE COMPUERTA 3/4"
4.00
UND
1er nivel
00.15.04.02
00.15.05
00.15.05.01
4.00
8.00
UND
1er nivel
6.00
2do nivel
2.00
PIEZAS VARIAS
6.00
2do nivel
2.00
INSTALACIONES ELECTRICAS
SALIDA DE LUZ Y FUERZA
SALIDAS DE TECHO - CENTROS DE LUZ
Aulas 1er nivel
18.00
Amb.
SS.
Administrativos
HH
2do nivel
PTO
14.00
Circulacuin
CIRCULACION
PTO
12.00
Escalera
ESCALERA
PTO
4.00
00.16.02
PTO
18.00
PTO
18.00
PTO
2.00
2.00
TABLEROS Y CUCHILLAS
1.00
00.16.02.02
36.00
Amb.
SS.
Administrativos
HH
2do nivel
00.16.02.01
48.00
PTO
PTO
00.16.01.03
8.00
1er nivel
00.16.01
00.16.01.02
4.00
00.16.00
00.16.01.01
4.00
00.15.05.02
TOTAL
8.00
2do nivel
TEE PVC SAP 1/2"
KG.
7.00
1er nivel
00.15.03.05
VOL.
1.00
UND
2do nivel
CODO PVC SAP 1/2"
AREA
7.00
1er nivel
00.15.03.04
SUB TOTAL
LONG.
6.00
2do nivel
CODO PVC SAP 3/4"
N
DE
VECES
UND
1er nivel
00.15.03.03
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
UND
1.00
1.00
1.00
1.00
1.00
UND
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
44 N
HOJA
MEDIDAS
DESCRIPCION
00.16.02.03
00.16.03
00.16.03.01
00.16.04
00.16.04.01
00.16.04.02
00.16.04.03
ALTO
N
DE
VECES
SUB TOTAL
LONG.
TOTAL
1.00
1.00
ARTEFACTOS
24.00
PZA
12.00
PZA
12.00
16.00
PZA
12.00
En Escalera
PZA
4.00
UNID
8.00
8.00
CONEXIONES INTERNAS
00.16.05.02
10.00
2.40
0.40
0.60
1.00
2.40
0.60
1.00
2.40
2.40
0.40
M2
6.71
0.40
1.00
2.68
00.17.00
VARIOS
00.17.01
00.17.03
KG.
1.00
00.17.02
VOL.
1.00
00.16.05.01
00.16.05.03
AREA
En SS.HH.
00.16.05
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
40.25
M2
1.50
0.40
1.00
0.60
M2
4.65
0.65
1.00
3.02
PARAPETO
M2
1.00
0.13
1.00
0.13
M2
4.25
0.25
1.00
1.06
4.75
0.30
1.00
1.43
PARAPETO ESCALERA
M2
1.00
0.13
1.00
0.13
M2
77.98
0.40
1.00
31.19
ML
ML
2.14
ML
ML
80.11
9.00
19.22
2.14
9.00
19.22
1.65
12.00
19.80
ML
1.65
12.00
19.80
ML
1.04
2.00
2.08
2.00
11.68
ML
5.84
11.68
45
HOJA DE METRADO
PROYECTO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
01/07/08
ESTRUCTURAS
HOJA N
MEDIDAS
00.17.04
00.17.05
DESCRIPCION
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
1.34
ML
1.34
M2
28.79
1.00
10.70
1.00
1.34
308.05
308.05
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
0
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
M2
28.79
10.70
1.00
308.05
308.05
M2
28.79
10.70
1.00
308.05
308.05
0.50
0.50
0.50
0.50
0.40
0.40
0.60
0.40
0.50
0.50
0.60
0.60
0.40
0.90
0.84
0.40
0.60
1.22
1.22
1.22
1.22
0.95
0.95
1.22
0.95
1.22
1.22
1.22
1.22
0.95
1.92
1.92
0.95
1.22
1.00
4.00
1.00
1.00
3.00
1.00
1.00
3.00
2.00
4.00
1.00
2.00
6.00
1.00
-1.00
1.00
1.00
1.31
4.64
1.41
0.76
1.09
0.65
1.68
1.09
2.84
5.43
4.22
7.79
4.34
9.88
-1.94
0.93
2.20
2.20
1.85
1.80
1.50
1.20
1.40
1.40
1.20
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
3.00
3.00
2.00
2.00
3.00
1.00
1.00
2.00
31.51
22.28
14.06
9.77
10.16
4.71
4.25
6.25
03.02.02
03.02.03
Eje A -A
m3
M3
M3
Eje B'-B'
M3
EJE C-C
M3
EJE 1-1
EJE 3-3, 5-5
EJES 2'-2', 3'-3', 5'-5'
EJE 7-7
EJE 8-8
Eje 8'-8'
Eje 9-9
M3
M3
M3
M3
M3
M3
M3
2.15
1.90
2.31
1.25
0.96
1.71
2.30
0.96
2.33
2.23
5.77
5.32
1.91
5.72
1.20
2.44
3.00
48.33
M3
M3
M3
M3
M3
M3
M3
M3
2.20
1.85
1.80
1.50
1.30
1.55
1.40
1.20
102.98
M3
M3
0.50
2.15
1.90
2.31
1.25
0.96
1.71
0.35
0.13
0.13
0.13
0.14
0.14
0.14
0.65
0.55
0.55
0.55
0.55
0.25
0.25
45.14
6.00
1.00
1.00
-1.00
-1.00
-1.00
3.00
-3.00
-3.00
2.00
-2.00
-2.00
-2.00
1.00
-1.00
-1.00
-1.00
-1.00
-1.00
1.00
-1.00
-1.00
1.00
4.00
1.00
1.00
6.00
2.00
1.73
0.06
1.01
-0.11
-0.08
-0.08
9.44
-0.34
-0.90
4.21
-0.23
-0.47
-0.30
1.41
-0.11
-0.06
-0.05
-0.09
-0.06
1.27
-0.06
0.00
-0.11
0.15
0.52
0.16
0.09
0.19
0.12
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
1
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
Interior
M3
Exterior
Muros corte 7-7
Zapatas
Z8
Menos C5
Menos Viga de cim. Eje B-B
Menos Viga de cim. Eje 8-8 y 9-9
Eje C-C
En Interiores
M3
Zapatas
Z5
Menos C2
Menos Viga de cim. Eje C-C
Menos Viga de cim. Eje 1-1 y 7-7
Zapatas
Z2
Menos C1
Menos Viga de cim. Eje C-C
Zapatas
Z4
Menos C1
Menos Viga de cim. Eje C-C
Menos Viga de cim. Eje 3-3 y 5-5
3.27
3.56
0.96
1.20
0.23
0.49
0.45
0.19
0.19
0.14
1.20
0.30
0.25
0.23
0.17
0.55
0.25
0.65
0.65
0.65
0.65
1.00
1.00
6.00
2.00
-2.00
-2.00
-2.00
0.10
0.36
0.19
1.87
-0.09
-0.16
-0.13
3.55
1.30
0.35
0.48
0.35
1.85
0.35
1.50
1.50
0.35
1.15
0.50
0.13
1.20
0.50
0.25
0.25
1.85
0.50
0.25
1.50
0.50
0.25
0.25
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
6.00
2.00
-2.00
-2.00
-2.00
3.00
-3.00
-2.00
2.00
-2.00
-2.00
-2.00
1.73
2.03
-0.23
-0.15
-0.11
6.67
-0.34
-0.49
2.93
-0.23
-0.37
-0.16
En Exteriores
3.23
2.23
0.13
1.25
0.55
0.55
2.00
4.00
0.44
6.12
6.72
9.10
0.13
0.13
0.65
0.55
2.00
1.00
1.09
0.63
6.72
1.93
0.24
6.72
6.72
0.18
0.14
0.13
0.18
0.12
0.65
0.25
0.65
0.65
0.65
4.00
12.00
-6.00
1.00
1.00
3.06
0.78
-0.12
0.76
0.50
3.86
0.13
0.65
1.00
0.31
2.44
0.14
0.25
2.00
0.16
3.00
5.60
0.18
0.19
0.17
0.55
1.00
1.00
0.09
0.57
EJE 1-1
M3
Interiores
Exteriores
KG.
TOTAL
EJE 3-3
EJE 7-7
Eje 8-8
M3
Eje 8'-8'
Eje 9-9
03.02.04
03.02.05
03.02.06
Interior
Exterior
132.72
(48.33+102.98-45.14)*1.25
03.03.00
03.03.01
03.03.01.01
M3
M2
M3
M3
M3
M3
M3
M3
132.72
163.50
3.00
-6.00
-6.00
1.00
1.00
1.00
155.78
-0.73
-1.26
3.34
3.55
2.81
1.00
1.00
1.00
1.00
1.00
1.00
43.79
20.30
3.69
6.00
1.62
3.74
79.14
29.19
25.38
4.61
7.50
2.02
4.68
1.50
0.80
0.80
0.80
0.80
0.80
2.20
1.85
1.80
1.50
1.30
2.20
1.85
1.80
1.50
1.20
14.24
0.30
0.30
0.30
0.30
0.30
3.00
3.00
2.00
2.00
3.00
4.36
3.08
1.94
1.35
1.40
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
2
MEDIDAS
DESCRIPCION
Z-6
Z-7
Z-8
03.03.02
03.03.02.01
03.03.03
03.03.03.01
03.03.03.02
M3
M3
M3
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
1.55
1.40
1.20
1.40
1.40
1.20
0.30
0.30
0.30
1.00
1.00
2.00
0.65
0.59
0.86
3.55
1.25
1.57
2.30
3.55
6.72
6.72
6.72
2.44
3.00
0.50
0.50
0.55
0.60
0.50
0.60
0.60
0.90
0.40
0.60
0.27
0.27
0.15
0.27
0.27
0.27
0.27
0.27
0.27
0.27
6.00
1.00
1.00
1.00
6.00
1.00
2.00
1.00
1.00
1.00
2.88
0.17
0.13
0.37
2.88
1.09
2.18
1.63
0.26
0.49
3.55
1.25
0.96
1.71
2.30
0.96
3.55
5.77
5.32
1.93
5.72
2.44
3.00
0.50
0.50
0.40
0.40
0.60
0.40
0.50
0.60
0.60
0.40
0.90
0.40
0.60
0.40
1.50
0.80
0.80
0.40
0.80
0.40
0.40
0.40
0.80
0.80
0.40
0.40
1.00
1.00
3.00
1.00
1.00
3.00
6.00
1.00
2.00
6.00
1.00
1.00
1.00
0.71
0.94
0.92
0.55
0.55
0.92
4.26
1.38
2.55
3.71
4.12
0.39
0.72
SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTO 1:8 C:H + 25%
M3PM
Eje A-A Entre ejes 1 y 7(Sec 5)
M3
2.42
3.55
0.77
Eje A'-A' Entre ejes 2 - 3 - 4, 5-6 Y 8-9 (Sec M3
7)
1.06
1.70
Eje B'-B' Entre ejes 8 y 9 (Sec 5)
M3
3.27
Eje B'-B' Entre ejes 2 - 3 - 4, 5-6 (Sec 7)
M3
1.06
Eje C-C Entre ejes 1 y 7 (Sec 5)
M3
2.42
3.55
Eje 1-1 Entre ejes A - B, B - C (Sec 1)
M3
3.11
Eje 3-3 Y 5-5 Entre ejes A - B, B - C (Sec 2)M3
3.11
Eje 7-7 Entre ejes A - B, B - C (Sec 3)
M3
3.11
Eje 7-7 Entre ejes A - B, B - C (Sec 4)
M3
3.11
Eje 8-8 Entre ejes A y B' (Sec 4)
M3
1.37
2.34
Eje 9-9 Entre ejes A y B ' (Sec 9)
M3
1.37
2.34
Eje 3, Y 5 Entre ejes A y B ' (Sec 7)
1.48
Eje 8' - 8' Entre ejes A y B ' (Sec 7)
2.71
0.13
0.13
0.13
0.13
0.13
0.23
0.13
0.13
0.13
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.13
0.13
0.35
0.35
0.35
0.55
0.55
0.35
0.55
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.55
0.55
3.00
3.00
1.00
3.00
1.00
1.00
3.00
3.00
3.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
0.33
0.48
0.04
0.23
0.12
0.26
0.23
0.33
0.48
0.50
1.00
0.25
0.25
0.11
0.19
0.11
0.19
0.63
0.19
0.35
0.35
0.35
0.35
0.35
0.55
0.55
0.35
0.55
0.35
0.35
0.35
0.35
6.00
3.00
6.00
2.00
1.00
6.00
2.00
2.00
6.00
6.00
3.00
6.00
3.00
CIMIENTOS.
FALSA CIMENTACION MEZCLA 1:12 + 30% PGM3
Eje A -A
M3
Escalera
Eje B'-B'
EJE C-C
EJE 1-1
EJE 3-3, 5-5
EJE 7-7
Eje 8'-8'
Eje 9-9
03.03.02.02
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Eje B'-B'
M3
EJE C-C
EJE 1-1
EJE 3-3, 5-5
EJES 2'-2', 3'-3', 5'-5'
EJE 7-7
Eje 8'-8'
Eje 9-9
M3
M3
M3
M3
M3
M3
M3
KG.
TOTAL
12.07
21.72
5.93
69.59
5.08
0.14
7.46
0.54
0.05
3.50
1.87
2.29
3.50
5.08
0.14
7.46
0.14
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
3
MEDIDAS
DESCRIPCION
Eje
Eje
Eje
Eje
Eje
M3
03.04.00
03.04.01
03.04.01.01
03.04.01.02
3.11
3.11
3.11
3.11
1.37
2.34
1.37
2.34
1.48
ALTO
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.55
FALSO PISO
CONCRETO EN FALSO PISO DE 4" DE 1:8 PARA
M2 PISO PULIDO
06 Aulas
M2
7.45
6.97
0.93
0.13
1.61
0.13
Depsito de Escalera
M2
2.96
1.13
2.84
1.25
Depsito de Escalera
M2
1.31
2.15
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=175 KG/CM2
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
ACERO EN ZAPATAS FY=4200 KG/CM2
Z-1 2.20x2.20
Acero lado A
5/8" @ .175
2.10
Acero lado B
5/8" @ .175
2.10
Z-2 1.85x1.85
Acero lado A
5/8" @ .175
1.75
Acero lado B
5/8" @ .175
1.75
Z-3 1.80x1.80
Acero lado A
5/8" @ .175
1.70
Acero lado B
5/8" @ .175
1.70
Z-4 1.50x1.50
Acero lado A
5/8" @ .175
1.40
Acero lado B
5/8" @ .175
1.40
Z-5 1.30x1.20
Acero lado A
1/2" @ .15
M3
M3
M3
M3
M3
M3
M3
M3
M3
N
DE
VECES
SUB TOTAL
LONG.
AREA
4.00
8.00
2.00
2.00
2.00
2.00
2.00
2.00
12.00
4.35
8.71
2.18
2.18
0.96
1.63
0.96
1.63
9.77
3.00
-6.00
-6.00
1.00
1.00
1.00
155.78
-0.73
-1.26
3.34
3.55
2.81
VOL.
KG.
TOTAL
163.50
23.73
2.20
1.85
1.80
1.50
1.30
1.55
1.40
1.20
2.20
1.85
1.80
1.50
1.20
1.40
1.40
1.20
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
3.00
3.00
2.00
2.00
3.00
1.00
1.00
2.00
7.26
5.13
3.24
2.25
2.34
1.09
0.98
1.44
KG/ML
3.00
2.10
1.60
12.00
121
2.10
1.60
12.00
121
742.44
3.00
1.75
1.60
10.00
084
1.75
1.60
10.00
084
2.00
1.70
1.60
10.00
054
1.70
1.60
10.00
054
2.00
1.40
1.60
8.00
036
1.40
1.60
8.00
036
3.00
1.20
1.02
8.00
029
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
4
MEDIDAS
DESCRIPCION
1.20
Acero lado B
1/2" @ .15
1.10
1.10
Z-6 1.55x1.40
Acero lado A
5/8" @ .175
1.45
Acero lado B
5/8" @ .175
1.30
03.04.02.03
VOL.
8.00
KG.
8.00
019
1.30
1.60
8.00
017
1.30
1.60
7.00
015
1.30
1.60
7.00
015
2.00
1.10
1.02
7.00
016
1.10
1.02
7.00
016
0.60
0.60
0.60
0.60
0.60
0.60
0.60
6.00
1.00
6.00
4.00
-4.00
2.00
-2.00
0.60
0.60
0.60
0.60
0.60
0.60
0.60
12.00
2.00
12.00
8.00
-8.00
4.00
-4.00
13.16
0.25
0.23
0.25
0.35
0.25
0.23
0.25
3.20
0.45
3.20
5.43
-0.14
1.09
-0.07
93.92
25.56
3.92
25.56
31.06
-1.10
9.48
-0.55
1327.11
2.00
24.70
1.02
3.00
151.16
31/2"
23.7
0.5
24.70
1.02
3.00
151.16
21/2"
23.7
0.2
24.10
1.02
2.00
98.33
Traslapes
0.60
1.02
3.00
3.67
0.54
1.68
0.58
162.00
315.71
0.2
EJE 1-1 y 7-7 (35x60)
31/2"
7.4
0.5
TOTAL
027
1.60
0.2
AREA
1.45
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C =M3
175 KG/CM2
Eje A-A
M3
3.55
Eje B'-B'
M3
3.27
Eje C-C
M3
3.55
EJE 1-1, 3-3, 5-5 Y 7-7
M3
6.47
0.23
EJE 8-8 Y 9-9
M3
3.95
0.23
0.5
SUB TOTAL
LONG.
1.00
Z-8 1.20x1.20
Acero lado A
1/2" @ .15
1.10
Acero lado B
1/2" @ .15
1.10
03.04.02.02
1.02
N
DE
VECES
1.00
Z-7 1.40x1.40
Acero lado A
5/8" @ .175
1.30
Acero lado B
5/8" @ .175
1.30
03.04.02
03.04.02.01
ALTO
2.00
0.5
8.40
1.02
3.00
51.41
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
5
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.5
31/2"
7.4
0.5
8.40
1.02
3.00
51.41
0.3
21/2"
7.4
0.3
8.00
1.02
2.00
32.64
1.88
0.58
40.00
87.23
0.54
TOTAL
0.3
EJE 3-3 y 5-5 (35x60)
31/2"
7.4
0.5
2.00
0.5
8.40
1.02
3.00
51.41
0.5
31/2"
7.4
0.5
8.40
1.02
3.00
51.41
0.3
21/2"
7.4
0.3
8.00
1.02
2.00
32.64
1.88
0.58
40.00
87.23
0.54
0.3
EJE 8-8 y 9-9 (23x60)
21/2"
4.65
0.5
2.00
0.5
5.65
1.02
2.00
23.05
0.5
21/2"
4.65
0.5
5.65
1.02
2.00
23.05
0.2
21/2"
4.65
0.19
5.03
1.02
2.00
20.52
1.66
0.58
25.00
48.14
0.54
0.2
EJE B'-B' (23x60)
21/2"
3.73
0.5
1.00
0.5
4.73
1.02
2.00
9.65
0.5
21/2"
3.73
0.5
4.73
1.02
2.00
9.65
0.2
21/2"
3.73
0.19
4.11
1.02
2.00
8.38
1.66
0.58
20.00
19.26
0.54
0.2
03.04.03
03.04.03.01
COLUMNAS
4.51
M3
0.25
0.13
1.09
9.00
0.32
M3
0.25
0.13
2.09
3.00
0.20
M3
0.13
0.13
2.69
3.00
0.14
M3
0.25
0.13
0.94
12.00
0.36
M3
0.25
0.13
1.89
12.00
0.74
M3
0.25
0.13
1.84
12.00
0.72
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
6
MEDIDAS
DESCRIPCION
03.04.03.02
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
M3
0.25
0.13
3.35
12.00
1.31
En pazadiso
M3
0.25
0.13
0.95
14.00
0.43
En escalera descanzo
M3
0.25
0.13
1.03
4.00
0.13
M3
0.25
0.13
1.32
2.00
0.09
M3
0.23
0.13
1.32
2.00
0.08
0.35
0.50
8.57
10.00
15.00
KG.
M3
0.35
0.55
0.50
-6.00
-0.58
C-2
M3
0.35
0.50
8.57
4.00
6.00
C-3
M3
0.23
0.25
9.00
4.00
2.07
0.23
0.35
0.23
-4.00
-0.07
0.23
0.30
0.23
-8.00
-0.13
0.23
0.40
8.52
2.00
1.57
0.23
0.55
0.40
-2.00
-0.10
0.23
0.30
6.87
2.00
0.95
0.23
0.55
0.30
-2.00
-0.08
0.23
0.25
7.52
2.00
0.86
0.23
0.25
0.25
-2.00
-0.03
M3
M3
M3
TOTAL
25.46
03.04.03.03
ALTO
305.91
M2
1.70
7.30
6.00
74.46
C-1
M2
1.70
7.30
4.00
49.64
C-2
M2
1.80
7.30
4.00
52.56
C-3
M2
0.50
8.40
2.00
8.40
C-4
M2
1.03
7.25
2.00
14.94
C-5
M2
0.83
5.60
2.00
9.30
C-3 EN ESCALERA
M2
0.50
6.25
2.00
6.25
M2
0.63
1.09
9.00
6.15
M2
0.63
2.09
3.00
3.94
M2
0.26
2.69
3.00
2.09
M2
0.63
0.94
12.00
7.07
M2
0.63
1.89
12.00
14.25
M2
0.63
1.84
12.00
13.87
M2
0.63
3.35
12.00
25.33
En pazadiso
M2
0.50
0.95
22.00
10.45
En pazadiso
M2
0.13
0.95
12.00
1.48
En escalera descanzo
M2
0.63
0.95
3.00
1.80
M2
0.49
1.32
2.00
1.29
M2
0.50
1.32
2.00
1.32
En escalera PASAMANO
M2
0.50
1.32
2.00
1.32
EN COLUMNETAS
03.04.03.04
ACERO EN COLUMNAS
4317.75
KG
MODULO DE AULAS
C-1
KG/ML
KG
63/4"
10.00
9.72
2.26
6.00
1318.03
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
7
MEDIDAS
DESCRIPCION
25/8"
ESTRIBOS 3/8
KG
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
9.72
1.60
2.00
311.04
1.70
0.58
45.00
443.70
C-2
4.00
43/4"
9.72
2.26
4.00
351.48
45/8"
9.72
1.60
4.00
248.83
1.70
0.58
45.00
177.48
ESTRIBOS 3/8
KG
C-3
2.00
41/2"
ESTRIBOS 3/8
KG
10.27
1.02
4.00
83.80
0.96
0.58
54.00
60.13
C-4
2.00
45/8"
9.62
1.60
4.00
123.14
21/2"
10.27
1.02
2.00
41.90
1.26
0.58
45.00
65.77
ESTRIBOS 3/8
KG
C-5
2.00
45/8"
ESTRIBOS 3/8
KG
8.02
1.60
4.00
102.66
1.06
0.58
35.00
43.04
C-3 EN ESCALERA
2.00
41/2"
ESTRIBOS 3/8
KG
8.67
1.02
4.00
70.75
0.96
0.58
35.00
38.98
2.66
0.58
4.00
55.44
0.76
0.25
17.00
29.07
COLUMNAS DE CONFINAMIENTO
Eje C-C 1er nivel
9.00
43/8"
ESTRIBOS 1/4"
KG
3.00
43/8"
ESTRIBOS 1/4"
KG
3.66
0.58
4.00
25.44
0.76
0.25
23.00
13.11
3.00
23/8"
ESTRIBOS 1/4"
KG
4.26
0.58
2.00
14.81
0.24
0.25
27.00
4.86
12.00
43/8"
ESTRIBOS 1/4"
KG
1.34
0.58
4.00
37.17
0.76
0.25
17.00
38.76
12.00
43/8"
ESTRIBOS 1/4"
KG
3.46
0.58
4.00
96.19
0.76
0.25
23.00
52.44
12.00
43/8"
ESTRIBOS 1/4"
KG
2.24
0.58
4.00
62.22
0.76
0.25
18.00
41.04
12.00
43/8"
ESTRIBOS 1/4"
KG
4.92
0.58
4.00
136.97
0.76
0.25
23.00
52.44
En pazadiso
22.00
43/8"
ESTRIBOS 1/4"
KG
1.35
0.58
4.00
68.90
0.76
0.25
12.00
50.16
En escalera descanzo
43/8"
3.00
1.43
0.58
4.00
9.92
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
8
MEDIDAS
DESCRIPCION
ESTRIBOS 1/4"
KG
0.76
ALTO
0.25
03.04.04
03.04.04.01
03.04.04.02
KG
AREA
VOL.
12.00
KG.
TOTAL
6.84
2.89
0.58
4.00
26.82
0.76
0.25
19.00
14.44
VIGAS
1.00
5.35
0.23
0.08
8.00
0.74
EN TIMPANO ESCALERA
7.60
0.23
0.08
2.00
0.26
3.47
0.13
0.15
16.00
1.08
0.13
0.15
7.00
0.32
0.13
0.15
2.00
0.04
27.59
0.13
0.10
1.00
0.36
1.40
0.13
0.10
2.00
0.04
3.24
0.13
0.10
1.00
0.04
7.50
0.35
0.55
3.00
4.33
1.87
03.04.04.03
SUB TOTAL
LONG.
4.00
43/8"
ESTRIBOS 1/4"
N
DE
VECES
28.89
M3
M3
M3
7.50
0.23
0.35
4.00
2.42
M3
23.75
0.20
0.55
2.00
5.23
M3
23.75
0.20
0.30
2.00
2.85
M3
1.50
0.35
0.71
7.00
2.61
V5 (0.13 x 0.40)
M3
23.75
0.13
0.40
1.00
1.24
M3
7.10
0.23
0.30
2.00
0.98
M3
7.10
0.35
0.55
2.00
2.73
M3
6.85
0.23
0.25
4.00
Tringulo fachada
M3
0.23
4.00
1.02
0.94
Tringulo posterior
M3
0.23
4.00
1.02
0.94
1.58
ESCALERA
03.04.04.04
V4 (0.13 x 0.45)
M3
3.27
0.13
0.45
1.00
0.19
V1 (0.23 x 0.20)
M3
1.35
0.23
0.20
2.00
0.12
M3
2.32
0.23
0.20
2.00
0.21
V2(0.20X0.55)
M3
3.27
0.20
0.55
1.00
0.36
V3 (0.23 x variado)
M3
1.50
0.23
0.48
2.00
0.33
V5 (0.13 x 0.40)
M3
3.27
0.13
0.40
1.00
0.17
2V-1 (0.23x0.25)
M3
4.37
0.23
0.25
2.00
0.50
2V-2 (0.20x0.30)
M3
3.27
0.20
0.30
2.00
Tringulo chico
M3
0.23
2.00
0.46
0.21
Tringulo grande
M3
0.23
2.00
1.19
0.55
0.39
265.58
M2
6.47
0.35
6.00
13.59
M2
6.47
0.35
3.00
6.79
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
9
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
6.47
0.35
2.00
4.53
M2
6.47
0.15
6.00
5.82
Cara lateral
M2
23.75
0.35
3.00
24.94
M2
23.75
0.55
1.00
13.06
M2
23.75
0.20
2.00
9.50
Cara lateral
M2
23.75
0.30
4.00
28.50
M2
23.75
0.20
2.00
9.50
M2
1.50
0.48
2.00
1.43
M2
1.50
0.28
12.00
4.95
M2
1.53
0.35
7.00
3.74
M2
23.75
0.40
1.00
9.50
M2
23.75
0.20
1.00
4.75
M2
23.75
0.13
1.00
3.09
M2
7.47
0.30
4.00
8.96
Fondo de viga
M2
6.50
0.35
2.00
4.55
Cara lateral
M2
7.10
0.55
4.00
15.62
3.47
2.00
0.15
16.00
16.66
2.00
0.15
7.00
4.98
2.00
0.15
7.00
2.10
27.59
2.00
0.10
1.00
5.52
1.40
2.00
0.10
2.00
0.56
3.24
2.00
0.10
1.00
0.65
M2
3.43
0.25
8.00
6.86
M2
3.43
0.25
8.00
6.86
Tringulo grande
M2
1.02
8.00
8.14
Tringulo grande
M2
1.02
8.00
8.14
M2
1.50
0.23
4.00
1.38
M2
1.50
0.23
4.00
1.38
M2
0.23
0.15
8.00
0.28
V5 (0.13 x 0.40)
Viga de Confinamiento
ESCALERAS
nro caras
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
10
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
V1 (0.23x0.20)
M2
4.65
0.20
4.00
3.72
V3 (0.23xVARIABLE)
M2
1.50
0.48
4.00
2.85
V3 (0.23xVARIABLE) Fondo
M2
1.50
0.23
2.00
0.69
V2 (0.20X0.55 )
M2
3.27
0.20
1.00
0.65
3.27
0.35
2.00
2.29
V4 (.13x.45) Lados
M2
3.27
0.45
2.00
2.94
V4 (.13x.45) Fondo
M2
3.27
0.13
1.00
0.43
V5 (0.13x0.40)
M2
3.27
0.40
1.00
1.31
M2
3.27
0.20
1.00
0.65
M2
3.27
0.13
1.00
0.43
M2
3.27
0.30
2.00
1.96
M2
3.27
0.20
1.00
0.65
M2
4.37
0.25
3.00
3.28
M2
1.00
0.60
4.00
2.40
M2
2.00
0.60
4.00
4.80
M2
0.23
0.23
4.00
0.21
2V2 (0.20x0.30)
VOL.
KG.
TOTAL
Tmpano
2 V-1
03.04.04.05
ACERO EN VIGAS
3440.26
kg/ml
3.00
2 3/4"
0.4
7.37
0.4
8.17
2.26
2.00
110.79
8.87
0.3
9.57
1.60
2.00
91.87
4.67
1.60
2.00
44.83
2.20
2.26
1.00
14.92
3.10
2.26
2.00
42.04
2.60
1.60
2.00
24.96
1.80
0.58
50.00
156.60
2 5/8"
0.4
Bastones
2 5/8" L=4.67
1 3/4" L=1.80
0.4
2 3/4" L=3.10
0.4
2 5/8" L=1.90
Estribos
0.3
0.3
0.5
3/8"
4.00
2 1/2"
0.3
7.37
0.3
7.97
1.02
2.00
65.04
8.47
0.3
9.07
1.02
2.00
74.01
2 1/2"
0.3
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
11
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
Bastones
1 1/2" L=1.35
1.65
1.02
1.00
6.73
2.60
1.60
1.00
16.64
0.3
1 5/8" L=2.6
2 5/8" L= 1.9
0.3
1.9
0.3
2.50
1.60
2.00
32.00
0.4
2 5/8" L=1.90
0.3
2.60
1.60
2.00
33.28
1.16
0.58
36.00
96.88
1.80
0.58
10.00
41.76
Estribos
0.18
0.3
3/8"
0.3
0.5
3/8"
2.00
2 5/8"
0.4
23.7
0.4
24.50
1.60
2.00
156.80
23.7
0.4
24.50
1.60
2.00
156.80
1.50
1.02
1.00
3.06
2.75
1.02
1.00
5.61
1.50
1.02
1.00
3.06
1.50
0.58
138.00
240.12
2 5/8"
0.4
1 1/2" L=1.10
0.4
1 1/2" L=2.75
1 1/2" L=1.10
Estribos
0.4
0.15
0.5
3/8"
2.00
2 1/2"
0.3
23.7
0.3
24.30
1.02
2.00
99.14
23.7
0.3
24.30
1.02
2.00
99.14
2 1/2"
0.3
Estribos
0.15
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
12
MEDIDAS
DESCRIPCION
0.25
1.00
ALTO
0.58
N
DE
VECES
138.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
160.08
3/8"
V5 (0.13 x 0.40)
2.00
2 1/2"
0.3
23.7
0.3
24.30
1.02
2.00
99.14
23.7
0.3
24.30
1.02
2.00
99.14
1.08
0.25
120.00
64.80
2 1/2"
0.3
Estribos
0.09
0.35
1/4"
2.00
2 1/2"
0.25
7.47
0.25
7.97
1.02
2.00
32.52
7.47
0.25
7.97
1.02
2.00
32.52
1.06
0.58
36.00
44.27
2 1/2"
0.25
Estribos
0.18
0.25
3/8"
2.00
2 3/4"
0.4
7.37
0.4
8.17
2.26
2.00
73.86
7.37
0.3
9.57
1.60
2.00
61.25
4.67
1.60
2.00
29.89
2.20
2.26
2.00
19.89
1.80
0.58
50.00
104.40
2 5/8"
0.4
Bastones
2 5/8" L=4.67
1 3/4" L=1.80
0.4
Estribos
0.3
0.5
3/8"
16.00
2 3/8" L=3.47
0.1
0.1
3.67
0.58
2.00
68.12
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
13
MEDIDAS
DESCRIPCION
Estribo 1/4"
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.1
0.1
1/4"
0.1
0.30
0.25
17.00
20.40
7.00
2 3/8" L=2.47
0.1
Estribo 1/4"
0.1
2.67
0.58
2.00
21.68
0.1
0.30
0.25
12.00
6.30
0.1
0.1
1/4"
2.00
2 3/8" L=1.25
0.1
Estribo 1/4"
0.1
1.45
0.58
2.00
3.36
0.1
0.30
0.25
12.00
6.30
0.1
0.1
1/4"
1.00
2 3/8" L=27.5
0.1
Estribo 1/4"
0.1
27.70
0.58
2.00
32.13
0.1
0.30
0.25
137.00
10.28
0.1
0.1
1/4"
2.00
2 3/8" L=1.4
0.1
Estribo 1/4"
0.1
1.60
0.58
2.00
3.71
0.1
0.30
0.25
7.00
1.05
0.1
0.1
1/4"
1.00
2 3/8" L=3.24
0.1
Estribo 1/4"
0.1
3.44
0.58
2.00
3.99
0.1
0.30
0.25
17.00
1.28
0.1
0.1
1/4"
Timpanos
4.00
2 1/2"
0.5
6.10
1.02
4.00
99.55
5.60
1.02
4.00
91.39
5.5
0.1
2 1/2"
4.6
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
14
MEDIDAS
DESCRIPCION
2 1/2"
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.3
0.55
2.75
1.02
4.00
44.88
0.96
0.58
38.00
84.63
1.16
0.58
18.00
48.44
1.9
Estribos
0.18
0.2
3/8"
Estribos
0.18
0.3
3/8"
ESCALERAS
V1(0.23x0.20)
2.00
2 1/2"
0.15
4.65
0.30
5.10
1.02
2.00
20.81
6.15
0.30
6.60
1.02
2.00
26.93
1.95
0.30
2.55
1.02
2.00
10.40
0.86
0.58
28.00
27.93
1.51
0.58
10.00
17.52
2 1/2"
0.15
2 1/2"
0.30
Estribos
0.18
0.15
3/8"
Estribos
0.18
0.475
3/8"
V2(0.20X0.55 )
1.00
2 1/2"
0.45
3.68
0.45
4.58
1.02
2.00
9.34
3.68
0.45
4.58
1.02
2.00
9.34
1.65
1.02
2.00
3.37
1.50
0.58
24.00
20.88
2 1/2"
0.45
1 1/2"
0.45
1.2
Estribos
0.15
0.5
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
15
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
3/8"
V4(0.13x0.45)
1.00
2 5/8"
0.45
3.68
0.45
4.58
1.60
2.00
14.66
3.68
0.45
4.58
1.60
2.00
14.66
1.16
0.58
24.00
16.15
2 5/8"
0.45
Estribos
0.08
0.4
3/8"
V5 (0.13x0.40)
1.00
1 1/2"
0.45
3.68
0.45
4.58
1.02
2.00
9.34
3.68
0.45
4.58
1.02
2.00
9.34
0.90
0.25
24.00
5.40
1 1/2"
0.45
Estribos
0.1
0.35
1/4"
2V-2 (0.20x0.30)
2.00
2 1/2"
0.25
3.68
0.25
4.18
1.02
2.00
17.05
3.68
0.25
4.18
1.02
2.00
17.05
1.00
0.58
24.00
27.84
2 1/2"
0.25
Estribos
0.15
0.25
3/8"
2.00
2 1/2"
1
6.60
1.02
4.00
53.86
6.05
1.02
4.00
49.38
1.80
1.02
2.00
7.34
5.5
0.1
2 1/2"
5.052
2 1/2"
0.3
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
16
MEDIDAS
DESCRIPCION
0.95
0.55
0.95
0.55
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
2 1/2"
0.1
1.60
1.02
2.00
6.53
2.40
1.02
2.00
9.79
0.96
0.58
28.00
31.18
1.16
0.58
14.00
18.84
0.2
2.05
0.15
Estribos
0.18
0.2
3/8"
Estribos
0.18
0.3
3/8"
03.04.05
03.04.05.01
LOSAS
LOSA ALIGERADA h=O.20 m
16.03
En Viguetas
Viguetas entre A - B Y C
M3
M3
3.67
0.10
0.15
34.00
1.87
3.61
0.10
0.15
68.00
3.68
3.55
0.10
0.15
18.00
0.96
3.27
0.10
0.15
3.00
0.15
7.07
3.67
0.05
2.00
2.59
7.07
3.61
0.05
4.00
5.10
En Losa e= 0.05
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
M3
3.55
1.37
0.05
6.00
1.46
En Volado de Escalera
M3
3.27
1.37
0.05
1.00
0.22
202.83
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
7.07
3.67
2.00
51.89
7.07
3.61
4.00
102.09
M3
3.55
1.37
6.00
29.18
En Volado de Escalera
M3
3.27
1.37
1.00
4.48
M2
23.75
0.20
2.00
9.50
En Aulas (Laterales)
M2
8.97
0.20
2.00
3.59
En escalera
M2
3.73
0.20
2.00
1.49
En escalera
M2
1.50
0.20
2.00
0.60
Frisos
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
17
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
1119.02
KG
1 corrido (positivo)
KG
23.75
20.00
1.02
484.50
1 bastn (negativo)
KG
2.35
100.00
1.02
239.70
KG
1.10
40.00
0.58
25.52
KG
1.95
100.00
0.58
113.10
Temperatura
KG
9.15
103.00
0.25
235.61
KG
3.73
3.00
1.02
11.41
1 3/8 bastn
KG
1.50
6.00
1.02
9.18
8.33
187.65
ESCALERA
1563.00
03.04.06
03.04.06.01
Und
ESCALERA
PRIMER TRAMO
M3
3.08
1.57
0.15
1.00
0.73
M3
1.64
1.72
0.20
1.00
0.56
M3
0.20
1.57
0.15
2.00
0.05
M3
0.38
1.57
0.21
1.00
0.06
11.00
0.43
M3
SEGUNDO TRAMO
3.20
1.57
0.15
1.00
0.75
M3
1.64
1.72
0.20
1.00
0.56
10.00
0.39
(0.30x0.167x1.57)/2
21.00
SEGUNDO TRAMO
03.04.06.03
(0.30x0.167x1.57)/2
M3
M3
03.04.06.02
3.54
ACERO EN ESCALERAS
M2
3.08
M2
1.64
M2
1.57
M2
3.20
M2
1.64
M2
1.57
1.57
1.00
4.84
1.72
1.00
2.81
0.17
11.00
2.88
1.00
5.02
1.72
1.00
2.82
0.17
10.00
2.62
1.57
203.09
KG
1er TRAMO
KG/ML
1/2 @ 0.20m
KG
4.25
1.02
8.00
34.68
1/2 @ 0.20m
KG
2.12
1.02
8.00
17.30
1/2 @ 0.20m
KG
2.78
1.02
8.00
22.68
1/2 @ 0.10m
KG
1.10
1.02
8.00
8.98
3/8 @ 0.25m
KG
1.57
0.58
13.00
11.84
1/2 @ 0.20m
KG
5.62
1.02
8.00
45.86
1/2 @ 0.20m
KG
2.10
1.02
4.00
8.57
3/8 @ 0.20m
KG
1.70
0.58
8.00
7.89
3/8 @ 0.20m
KG
1.70
0.58
8.00
7.89
3/8 @ 0.20m
KG
1.57
0.58
14.00
12.75
2do TRAMO
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
18
MEDIDAS
DESCRIPCION
03.04.07
03.04.07.01
03.04.07.02
03.04.07.03
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
KG
3.27
0.58
5.00
9.48
KG
3.27
0.58
8.00
15.17
TOTAL
GARGOLA
0.03
M3
0.20
0.20
0.10
4.00
0.02
GARGOLA
M3
0.20
0.05
0.15
8.00
0.01
M2
0.70
0.20
4.00
0.56
M2
0.20
0.10
4.00
0.08
M2
0.15
0.05
8.00
0.06
M2
0.15
0.20
8.00
0.24
0.94
KG
4.22
KG/ML
1/4
KG
1.29
0.25
8.00
2.58
1/4
KG
0.82
0.25
8.00
1.64
03.05.00
03.05.01
ESTRUCTURAS DE MADERA
03.05.01.01
ALTO
909.39
P2
18.26
2.00
6.00
6.00
109.56
Brida Superior
P2
18.26
2.00
6.00
6.00
109.56
Brida Inferior
p2
34.45
2.00
6.00
6.00
206.69
P2
3.77
2.00
4.00
12.00
30.18
P2
5.54
2.00
4.00
6.00
22.18
P2
1.31
2.00
4.00
12.00
10.50
P3
3.05
2.00
4.00
12.00
24.41
P4
4.04
2.00
4.00
12.00
32.28
P5
7.25
2.00
4.00
12.00
58.01
P2
0.90
0.30
1.00
24.00
69.72
P2
0.50
0.30
1.00
36.00
58.10
P2
0.60
0.30
1.00
48.00
92.97
P2
0.80
0.30
1.00
12.00
30.99
P2
0.40
0.30
1.00
24.00
30.99
P2
0.30
0.30
1.00
24.00
23.24
Cartelas
03.05.01.02
En aulas
03.05.01.03
99.04
18.26
2.00
3.00
4.00
36.52
P2
18.26
2.00
3.00
4.00
36.52
P2
26.00
2.00
3.00
2.00
26.00
P2
P2
80.30
2.00
3.00
16.00
642.39
642.39
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
19
MEDIDAS
DESCRIPCION
03.05.01.04
03.05.01.05
03.05.01.06
03.05.02
03.05.02.01
P2
En escalera
P2
P2
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
130.22
14.47
3.00
4.00
9.00
130.22
1.00
8.00
2.00
108.92
14.47
1.00
8.00
2.00
19.29
128.22
P2
P2
24.33
1.00
3.00
1.00
6.08
P2
36.53
1.00
3.00
2.00
18.26
24.34
COBERTURA
309.79
11.21
24.68
276.63
7.52
4.41
33.16
Escalera
Cobertura con calamina galvanizada N30 en escalera
M2
03.05.02.02
29.09
24.68
1.00
24.68
4.41
1.00
4.41
Escalera
Cumbrera con calamina galvanizada N 30
Ml
03.06.00
MUROS DE ALBAILERIA
03.06.01
03.06.02
182.13
M2
6.22
2.70
4.00
67.18
M2
6.22
2.69
2.00
33.46
M2
6.22
1.15
4.00
28.61
M2
3.70
3.07
2.00
22.72
M3
3.70
2.92
2.00
21.61
M2
1.35
0.30
2.00
0.81
M2
2.93
1.32
2.00
7.74
M2
M2
1.88
0.83
3.00
4.68
M2
2.26
0.83
3.00
5.63
0.59
1.83
3.00
3.24
0.94
6.00
16.66
M2
1.88
1.74
3.00
9.79
M2
2.97
1.74
3.00
15.46
161.36
M2
1.88
1.74
1.00
3.26
2.97
1.74
4.00
20.61
M2
1.00
1.74
2.00
3.47
M2
22.07
1.00
1.00
22.07
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
20
MEDIDAS
DESCRIPCION
M2
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
1.15
2.95
6.00
20.36
0.93
2.95
6.00
16.46
ESCALERA
Eje B' ENTRe 8 y 9 Segundo nivel
M2
3.24
1.32
1.00
4.28
M2
1.57
1.80
1.00
2.83
M2
2.51
1.80
1.00
4.52
M2
2.51
0.55
1.00
1.38
Eje A, entre 8 y 9
M2
0.64
2.75
1.00
1.76
Baranda 1
M2
1.50
1.00
1.00
1.50
Baranda 1
M2
3.40
1.00
1.00
3.40
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
21
MEDIDAS
N
03.07.00
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
03.07.01
40.86
M2
M2
7.35
1.80
1.00
13.23
M2
7.30
1.80
1.00
13.14
M2
8.05
1.80
1.00
14.49
EN EL SEGUNDO NIVEL
03.07.02
40.86
M2
M2
7.35
1.80
1.00
13.23
M2
7.30
1.80
1.00
13.14
M2
8.05
1.80
1.00
14.49
EN EL TERCER NIVEL
03.07.03
03.07.02
40.86
M2
M2
7.35
1.80
1.00
13.23
M2
7.30
1.80
1.00
13.14
M2
8.05
1.80
1.00
14.49
M2
836.45
278.82
EN EL PRIMER NIVEL
EN EL EJE A-A
ENTRE EL EJE 0--0 Y 6-6
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
M2
3.00
2.70
1.00
8.10
RESTAMOS VENTANA
M2
1.85
-1.70
1.00
-3.15
M2
0.60
2.70
1.00
1.62
EN EL EJE 6-6
ENTRE EL EJE A-A Y B-B
EN EL EJE E-E
ENTRE EL EJE 0-0 Y 6-6
EN EL EJE C''-C''
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
M2
2.50
2.40
1.00
6.00
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.10
2.70
1.00
2.97
RESTAMOS VENTANA
M2
0.80
-0.40
1.00
-0.32
M2
2.15
2.70
1.00
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
1.50
2.70
1.00
4.05
M2
1.25
2.70
1.00
3.38
M2
0.60
2.70
1.00
1.62
M2
3.05
2.70
1.00
8.24
EN EL EJE B-B
ENTRE EL EJE 4'-4' Y 5-5
EN EL EJE C'-C'
ENTRE EL EJE 4''-4'' Y 5-5
EN EL EJE D-D
EN EL EJE A'-A'
ENTRE EL EJE 4-4 Y 5-5
EN EL EJE 4''-4''
ENTRE EL EJE D-D Y E-E
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
22
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
EN EL EJE 4'-4'
ENTRE EL EJE B-B Y C'-C'
M2
1.50
2.70
1.00
4.05
M2
0.83
2.70
1.00
2.24
M2
2.50
2.40
1.00
6.00
M2
0.58
2.70
1.00
1.57
M2
2.85
2.40
1.00
6.84
RESTAMOS VENTANA
M2
2.35
-1.70
1.00
-4.00
M2
0.79
2.70
1.00
2.13
EN EL EJE 4-4
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
ENTRE EL EJE A-A Y C'-C'
M2
3.10
2.40
1.00
7.44
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.40
2.70
1.00
3.78
M2
1.95
2.70
1.00
5.27
RESTAMOS VENTANA
M2
1.55
-1.50
1.00
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
0.60
2.70
1.00
1.62
M2
2.95
2.70
1.00
7.97
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE A-A Y C'-C'
M2
3.35
2.70
1.00
9.05
RESTAMOS VENTANA
M2
2.95
-1.70
1.00
-5.02
M2
4.25
2.70
1.00
11.48
RESTAMOS VENTANA
M2
2.85
-1.70
1.00
-4.85
M2
2.85
2.70
2.00
15.39
M2
2.40
2.70
2.00
12.96
RESTAMOS VENTANA
M2
1.30
-1.00
1.00
-1.30
M2
0.50
2.70
2.00
2.70
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
EN EL EJE C''-C''
ENTRE EL EJE 0-0 Y X-X
EN EL EJE D-D
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
23
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
VOL.
KG.
TOTAL
ESCALERA
EN EL EJE D'-D'
ENTRE EL EJE 0-0 Y X-X
278.82
EN EL SEGUNDO NIVEL
EN EL EJE A-A
ENTRE EL EJE 0--0 Y 6-6
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
M2
3.00
2.70
1.00
8.10
RESTAMOS VENTANA
M2
1.85
-1.70
1.00
-3.15
M2
0.60
2.70
1.00
1.62
EN EL EJE 6-6
ENTRE EL EJE A-A Y B-B
EN EL EJE E-E
ENTRE EL EJE 0-0 Y 6-6
EN EL EJE C''-C''
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
M2
2.50
2.40
1.00
6.00
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.10
2.70
1.00
2.97
RESTAMOS VENTANA
M2
0.80
-0.40
1.00
-0.32
M2
2.15
2.70
1.00
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
1.50
2.70
1.00
4.05
M2
1.25
2.70
1.00
3.38
M2
0.60
2.70
1.00
1.62
M2
3.05
2.70
1.00
8.24
M2
1.50
2.70
1.00
4.05
M2
0.83
2.70
1.00
2.24
M2
2.50
2.40
1.00
6.00
M2
0.58
2.70
1.00
1.57
M2
2.85
2.40
1.00
6.84
RESTAMOS VENTANA
M2
2.35
-1.70
1.00
-4.00
M2
0.79
2.70
1.00
2.13
M2
3.10
2.40
1.00
7.44
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
EN EL EJE B-B
ENTRE EL EJE 4'-4' Y 5-5
EN EL EJE C'-C'
ENTRE EL EJE 4''-4'' Y 5-5
EN EL EJE D-D
EN EL EJE A'-A'
ENTRE EL EJE 4-4 Y 5-5
EN EL EJE 4''-4''
ENTRE EL EJE D-D Y E-E
EN EL EJE 4'-4'
EN EL EJE 4-4
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
24
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
1.40
2.70
1.00
M2
1.95
2.70
1.00
5.27
RESTAMOS VENTANA
M2
1.55
-1.50
1.00
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
0.60
2.70
1.00
1.62
M2
2.95
2.70
1.00
7.97
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
VOL.
KG.
TOTAL
3.78
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE A-A Y C'-C'
M2
3.35
2.70
1.00
9.05
RESTAMOS VENTANA
M2
2.95
-1.70
1.00
-5.02
M2
4.25
2.70
1.00
11.48
RESTAMOS VENTANA
M2
2.85
-1.70
1.00
-4.85
M2
2.85
2.70
2.00
15.39
M2
2.40
2.70
2.00
12.96
RESTAMOS VENTANA
M2
1.30
-1.00
1.00
-1.30
M2
0.50
2.70
2.00
2.70
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
EN EL EJE C''-C''
ENTRE EL EJE 0-0 Y X-X
EN EL EJE D-D
ENTRE EL EJE 0-0 Y X-X
ESCALERA
EN EL EJE D'-D'
ENTRE EL EJE 0-0 Y X-X
278.82
EN EL TERCER NIVEL
EN EL EJE A-A
ENTRE EL EJE 0--0 Y 6-6
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
M2
3.00
2.70
1.00
8.10
EN EL EJE 6-6
ENTRE EL EJE A-A Y B-B
EN EL EJE E-E
ENTRE EL EJE 0-0 Y 6-6
EN EL EJE C''-C''
ENTRE EL EJE 5-5 Y 6-6
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
25
MEDIDAS
N
DESCRIPCION
RESTAMOS VENTANA
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
1.85
-1.70
1.00
-3.15
M2
0.60
2.70
1.00
1.62
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
M2
2.50
2.40
1.00
6.00
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.10
2.70
1.00
2.97
RESTAMOS VENTANA
M2
0.80
-0.40
1.00
-0.32
M2
2.15
2.70
1.00
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
1.50
2.70
1.00
4.05
M2
1.25
2.70
1.00
3.38
M2
0.60
2.70
1.00
1.62
M2
3.05
2.70
1.00
8.24
M2
1.50
2.70
1.00
4.05
M2
0.83
2.70
1.00
2.24
M2
2.50
2.40
1.00
6.00
M2
0.58
2.70
1.00
1.57
M2
2.85
2.40
1.00
6.84
RESTAMOS VENTANA
M2
2.35
-1.70
1.00
-4.00
M2
0.79
2.70
1.00
2.13
EN EL EJE B-B
ENTRE EL EJE 4'-4' Y 5-5
EN EL EJE C'-C'
ENTRE EL EJE 4''-4'' Y 5-5
EN EL EJE D-D
EN EL EJE A'-A'
ENTRE EL EJE 4-4 Y 5-5
EN EL EJE 4''-4''
ENTRE EL EJE D-D Y E-E
EN EL EJE 4'-4'
EN EL EJE 4-4
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
ENTRE EL EJE A-A Y C'-C'
M2
3.10
2.40
1.00
7.44
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.40
2.70
1.00
3.78
M2
1.95
2.70
1.00
5.27
RESTAMOS VENTANA
M2
1.55
-1.50
1.00
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
0.60
2.70
1.00
1.62
M2
2.95
2.70
1.00
7.97
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
EN EL EJE D-D
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
26
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
VOL.
KG.
TOTAL
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE A-A Y C'-C'
M2
3.35
2.70
1.00
9.05
RESTAMOS VENTANA
M2
2.95
-1.70
1.00
-5.02
M2
4.25
2.70
1.00
11.48
RESTAMOS VENTANA
M2
2.85
-1.70
1.00
-4.85
M2
2.85
2.70
2.00
15.39
M2
2.40
2.70
2.00
12.96
RESTAMOS VENTANA
M2
1.30
-1.00
1.00
-1.30
M2
0.50
2.70
2.00
2.70
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
M2
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
EN EL EJE C''-C''
ENTRE EL EJE 0-0 Y X-X
EN EL EJE D-D
ENTRE EL EJE 0-0 Y X-X
ESCALERA
EN EL EJE D'-D'
03.07.03
347.52
12.06
M2
9.50
2.90
1.00
27.55
PUERTA DE COCHERA
M2
4.60
-2.50
1.00
-11.50
PUERTA PRINCIPAL
M2
1.20
-2.10
1.00
-2.52
PUERTA DE SERVICIOS
M2
0.70
-2.10
1.00
-1.47
16.44
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
M2
9.50
2.90
1.00
27.55
VANOS
M2
2.95
-1.70
2.00
-10.03
PUERTA PRINCIPAL
EN EL SEGUNDO NIVEL FACHADA DE
EDIFICIO
M2
1.20
-0.90
1.00
-1.08
16.44
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
M2
9.50
2.90
1.00
27.55
VANOS
M2
2.95
-1.70
2.00
-10.03
PUERTA PRINCIPAL
M2
1.20
-0.90
1.00
-1.08
16.44
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
M2
9.50
2.90
1.00
27.55
VANOS
M2
2.95
-1.70
2.00
-10.03
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
27
MEDIDAS
DESCRIPCION
PUERTA PRINCIPAL
03.07.04
M2
1.20
ALTO
-0.90
N
DE
VECES
SUB TOTAL
LONG.
1.00
AREA
VOL.
KG.
TOTAL
-1.08
189.22
M2
0.20
4.40
10.00
8.80
M2
0.45
4.40
9.00
17.82
M2
0.85
4.40
3.00
11.22
M2
0.60
4.40
1.00
2.64
C-2 (ESCALERAS)
M2
0.85
4.20
4.00
14.28
M2
0.20
4.40
10.00
8.80
M2
0.45
4.40
9.00
17.82
M2
0.85
4.40
3.00
11.22
M2
0.60
4.40
1.00
2.64
C-2 (ESCALERAS)
M2
0.85
4.20
4.00
14.28
M2
0.20
4.40
10.00
8.80
M2
0.45
4.40
9.00
17.82
M2
0.85
4.40
3.00
11.22
M2
0.60
4.40
1.00
2.64
C-2 (ESCALERAS)
M2
0.85
4.20
4.00
14.28
M2
0.25
2.90
14.00
10.15
M2
0.70
2.90
3.00
6.09
M2
0.50
2.90
6.00
74.10
2.00
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EN EL SEGUNDO PISO:
ESQUINERAS
C-1 (VER ANEXO 02)
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EN EL TERCER PISO:
ESQUINERAS
C-1 (VER ANEXO 02)
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EXTERIORES
COLUMNAS
EN EL PRIMER NIVEL
C-3 (CERCO PERIMETRICO)
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
FACHADA = 3 VECES
ESCALERA
C-2 (ESCALERAS)
ARISTAS DE COLUMNAS
8.70
148.20
148.20
(3 NIVELES)
03.07.05
M2
96.92
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
28
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
10.45
0.65
1.00
6.79
M2
6.70
0.45
1.00
3.02
M2
10.45
0.45
1.00
4.70
M2
20.05
0.45
1.00
9.02
M2
19.05
0.65
1.00
12.38
M2
8.50
0.45
1.00
3.83
M2
8.50
0.45
1.00
3.83
M2
8.25
0.65
1.00
5.36
M2
8.50
0.65
1.00
5.53
M2
8.35
0.65
1.00
5.43
M2
4.00
0.65
1.00
2.60
M2
2.35
0.65
1.00
1.53
M2
16.74
0.40
1.00
6.70
M2
23.95
0.30
1.00
7.19
M2
9.20
0.85
1.00
7.82
M2
6.75
0.45
1.00
3.04
M2
5.75
0.65
1.00
3.74
M2
2.85
0.45
1.00
1.28
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
29
MEDIDAS
DESCRIPCION
M2
2.85
M2
2.85
ALTO
N
DE
VECES
0.45
1.00
0.65
1.00
11.00
2.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
1.28
#REF!
1.85
22.00
22.00
640.95
ML
4.50
2.40
1.00
9.35
P-2
ML
0.90
2.10
8.00
41.20
P-3
ML
1.20
2.10
1.00
5.45
P-4
ML
0.85
2.10
1.00
5.10
P-5
ML
0.80
2.10
1.00
5.05
P-6
ML
0.70
2.10
3.00
14.85
P-7
ML
1.20
1.85
1.00
4.95
P-8
ML
2.20
2.10
1.00
6.45
P-9
ML
3.00
2.70
1.00
8.45
V-1
ML
2.95
1.70
1.00
9.40
V-2
ML
2.85
1.70
1.00
9.20
V-3
ML
1.30
1.00
1.00
4.70
V-4
ML
1.20
0.30
1.00
3.10
V-5
ML
1.95
1.70
1.00
7.40
V-6
ML
1.55
1.50
1.00
6.20
V-7
ML
2.35
1.70
1.00
8.20
V-8
ML
1.95
1.70
1.00
7.40
V-9
ML
0.80
0.40
1.00
2.50
V-10
ML
1.35
0.35
1.00
3.50
V-11
ML
1.85
1.70
3.00
21.60
V-12
ML
1.70
1.70
3.00
20.70
V-13
ML
2.40
1.50
3.00
23.70
P-1
ML
4.50
2.40
1.00
9.35
P-2
ML
0.90
2.10
8.00
41.20
P-3
ML
1.20
2.10
1.00
5.45
P-4
ML
0.85
2.10
1.00
5.10
P-5
ML
0.80
2.10
1.00
5.05
P-6
ML
0.70
2.10
3.00
14.85
P-7
ML
1.20
1.85
1.00
4.95
P-8
ML
2.20
2.10
1.00
6.45
P-9
ML
3.00
2.70
1.00
8.45
V-1
ML
2.95
1.70
1.00
9.40
V-2
ML
2.85
1.70
1.00
9.20
V-3
ML
1.30
1.00
1.00
4.70
V-4
ML
1.20
0.30
1.00
3.10
VENTANAS
Segundo nivel
PUERTAS
VENTANAS
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
30
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
V-5
ML
1.95
1.70
1.00
7.40
V-6
ML
1.55
1.50
1.00
6.20
V-7
ML
2.35
1.70
1.00
8.20
V-8
ML
1.95
1.70
1.00
7.40
V-9
ML
0.80
0.40
1.00
2.50
V-10
ML
1.35
0.35
1.00
3.50
V-11
ML
1.85
1.70
3.00
21.60
P-1
ML
4.50
2.40
1.00
9.35
P-2
ML
0.90
2.10
8.00
41.20
P-3
ML
1.20
2.10
1.00
5.45
P-4
ML
0.85
2.10
1.00
5.10
P-5
ML
0.80
2.10
1.00
5.05
P-6
ML
0.70
2.10
3.00
14.85
P-7
ML
1.20
1.85
1.00
4.95
P-8
ML
2.20
2.10
1.00
6.45
P-9
ML
3.00
2.70
1.00
8.45
V-1
ML
2.95
1.70
1.00
9.40
V-2
ML
2.85
1.70
1.00
9.20
V-3
ML
1.30
1.00
1.00
4.70
V-4
ML
1.20
0.30
1.00
3.10
V-5
ML
1.95
1.70
1.00
7.40
V-6
ML
1.55
1.50
1.00
6.20
V-7
ML
2.35
1.70
1.00
8.20
Tercer nivel
PUERTAS
VENTANAS
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
31
MEDIDAS
DESCRIPCION
03.08.00
03.08.01
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
V-8
ML
1.95
1.70
1.00
7.40
V-9
ML
0.80
0.40
1.00
2.50
V-10
ML
1.35
0.35
1.00
3.50
V-11
ML
1.85
1.70
3.00
21.60
V-12
ML
1.70
1.70
3.00
20.70
V-13
ML
2.40
1.50
3.00
23.70
CIELORASO
CIELORASO CON MEZCLAS CEMENTO
ARENA 1:4
M2
Sala
M2
3.55
2.35
3.00
25.03
Comedor
M2
3.75
2.61
3.00
29.36
Recibidor
M2
2.00
1.30
3.00
7.80
Estudio
M2
2.50
1.76
3.00
13.20
Hall
M2
3.50
2.05
6.00
43.05
Bao
M2
1.20
2.56
9.00
27.60
Cocina
M2
2.50
2.74
3.00
20.55
Sala estar
M2
3.20
2.87
3.00
27.55
Terraza
M2
3.20
1.63
3.00
15.65
Patio
M2
3.55
2.55
3.00
27.16
Dormitorio
M2
3.55
5.72
9.00
182.75
Jardin
M2
3.55
4.17
6.00
88.82
Interior
M2
3.23
3.23
3.00
31.30
Laterales
M2
3.23
0.60
3.00
5.81
Fondo
M2
2.40
1.20
3.00
8.64
VOL.
KG.
TOTAL
554.27
ESCALERA
03.09.00
PISOS Y VEREDAS
03.09.01
PISOS
03.09.01.01
508.52
M2
3.55
2.35
3.00
25.03
Comedor
M2
3.75
2.61
3.00
29.36
Recibidor
M2
2.00
1.30
3.00
7.80
Estudio
M2
2.50
1.76
3.00
13.20
Hall
M2
3.50
2.05
6.00
43.05
Bao
M2
1.20
2.56
9.00
27.60
Cocina
M2
2.50
2.74
3.00
20.55
Sala estar
M2
3.20
2.87
3.00
27.55
Terraza
M2
3.20
1.63
3.00
15.65
Patio
M2
3.55
2.55
3.00
27.16
Dormitorio
M2
3.55
5.72
9.00
182.75
Jardin
M2
3.55
4.17
6.00
88.82
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
32
MEDIDAS
DESCRIPCION
18.01.00
CARPINTERIA DE MADERA
18.01.01
PUERTAS
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
4.50
2.40
1.00
10.80
M2
0.90
2.10
26.00
49.14
M2
1.20
2.10
1.00
2.52
M2
0.70
2.10
9.00
13.23
M2
0.80
2.10
2.00
3.36
M2
0.85
2.10
1.00
1.79
M2
1.20
1.85
1.00
2.22
M2
2.20
2.10
1.00
4.62
M2
3.00
2.70
1.00
8.10
18.01.02
COLOCACION DE PUERTAS
UND
18.01.02.01
18.01.02.03
KG.
TOTAL
95.78
18.01.02.02
VOL.
39.00
39.00
Marco(2" x 4")
pie2
2.00
4.00
6.00
1.00
13.12
13.12
pie2
1.50
3.00
9.20
1.00
11.32
11.32
pie2
1.00
2.00
6.20
1.00
3.39
3.39
UND
2.00
Cantidad de madera
pie2
39.00
27.83
1085.47
Cantidad de triplay
UND
39.00
2.00
78.00
2.00
pie2
2.00
4.00
5.90
1.00
12.90
12.90
pie2
1.50
3.00
8.70
1.00
10.70
10.70
pie2
1.00
2.00
6.00
1.00
3.28
3.28
UND
2.00
Cantidad de madera
pie2
39.00
26.89
1048.68
Cantidad de triplay
UND
39.00
2.00
78.00
2.00
pie2
2.00
4.00
5.70
1.00
12.47
12.47
pie2
1.50
3.00
7.70
1.00
9.47
9.47
pie2
1.00
2.00
5.60
1.00
3.06
3.06
UND
2.00
Cantidad de madera
pie2
39.00
25.00
975.11
Cantidad de triplay
UND
39.00
2.00
78.00
2.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
33
MEDIDAS
DESCRIPCION
18.01.03
18.01.04
18.01.04.01
18.01.04.02
18.01.04.03
18.01.05
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
111.00
Pz.
6.00
Pz.
78.00
Pz.
3.00
Pz.
24.00
Pz.
2.00
Pz.
2.00
Pz.
26.00
P-6 (9 puertas)
Pz.
9.00
P-4 (1 puerta)
Pz.
1.00
P-1 (1 puerta)
Pz.
1.00
Pz.
17.00
P-3 (5 puertas)
Pz.
5.00
Pz.
1.00
CERRADURAS
4.00
24.00
3.00
UND
UND
1.00
UND
1.00
UND
1.00
CARPINTERIA METALICA
18.02.01
VENTANA
18.02.01.02
ALTO
BISAGRAS
18.02.00
18.02.01.01
84.47
M2
V-1
M2
2.95
1.70
3.00
15.05
V-2
M2
2.85
1.70
3.00
14.54
V-3
M2
1.30
1.00
1.00
1.30
V-4
M2
1.20
0.30
3.00
1.08
V-5
M2
1.95
1.70
3.00
9.95
V-6
M2
1.55
1.50
3.00
6.98
V-7
M2
2.35
1.70
1.00
4.00
V-8
M2
1.95
1.70
3.00
9.95
V-9
M2
0.80
0.40
3.00
0.96
V-10
M2
1.35
0.35
3.00
1.42
V-11
M2
1.85
1.70
2.00
6.29
V-12
M2
1.70
1.70
2.00
5.78
V-13
M2
2.40
1.50
2.00
7.20
COLOCACION DE VENTANAS
UND
32.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
34
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
18.03.00
CERRAJERIA
18.03.01
8.00
18.03.02
UND
6.00
18.03.03
UND
8.00
18.04.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
35
MEDIDAS
DESCRIPCION
18.04.01
VIDRIO SEMIDOBLE
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
908.87
P2
V-1
P2
2.95
1.70
3.00
161.88
V-2
P2
2.85
1.70
3.00
156.40
V-3
P2
1.30
1.00
1.00
13.99
V-4
P2
1.20
0.30
3.00
11.62
V-5
P2
1.95
1.70
3.00
107.01
V-6
P2
1.55
1.50
3.00
75.05
V-7
P2
2.35
1.70
1.00
42.99
V-8
P2
1.95
1.70
3.00
107.01
V-9
P2
0.80
0.40
3.00
10.33
V-10
P2
1.35
0.35
3.00
15.25
V-11
P2
1.85
1.70
2.00
67.68
V-12
P2
1.70
1.70
2.00
62.19
V-13
P2
2.40
1.50
2.00
77.47
18.05.00
PINTURA
18.05.01
M2
836.45
18.05.02
M2
836.45
18.05.03
M2
836.45
EN EL PRIMER NIVEL
M2
278.82
EN EL EJE A-A
ENTRE EL EJE 0--0 Y 6-6
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
M2
3.00
2.70
1.00
8.10
RESTAMOS VENTANA
M2
1.85
-1.70
1.00
-3.15
M2
0.60
2.70
1.00
1.62
EN EL EJE 6-6
ENTRE EL EJE A-A Y B-B
EN EL EJE E-E
ENTRE EL EJE 0-0 Y 6-6
EN EL EJE C''-C''
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
M2
2.50
2.40
1.00
6.00
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.10
2.70
1.00
2.97
RESTAMOS VENTANA
M2
0.80
-0.40
1.00
-0.32
M2
2.15
2.70
1.00
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
1.50
2.70
1.00
4.05
M2
1.25
2.70
1.00
3.38
M2
0.60
2.70
1.00
1.62
EN EL EJE B-B
ENTRE EL EJE 4'-4' Y 5-5
EN EL EJE C'-C'
ENTRE EL EJE 4''-4'' Y 5-5
EN EL EJE D-D
EN EL EJE A'-A'
ENTRE EL EJE 4-4 Y 5-5
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
36
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
EN EL EJE 4''-4''
ENTRE EL EJE D-D Y E-E
M2
3.05
2.70
1.00
8.24
M2
1.50
2.70
1.00
4.05
M2
0.83
2.70
1.00
2.24
M2
2.50
2.40
1.00
6.00
M2
0.58
2.70
1.00
1.57
M2
2.85
2.40
1.00
6.84
RESTAMOS VENTANA
M2
2.35
-1.70
1.00
-4.00
M2
0.79
2.70
1.00
2.13
EN EL EJE 4'-4'
EN EL EJE 4-4
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
ENTRE EL EJE A-A Y C'-C'
M2
3.10
2.40
1.00
7.44
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.40
2.70
1.00
3.78
M2
1.95
2.70
1.00
5.27
RESTAMOS VENTANA
M2
1.55
-1.50
1.00
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
0.60
2.70
1.00
1.62
M2
2.95
2.70
1.00
7.97
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE A-A Y C'-C'
M2
3.35
2.70
1.00
9.05
RESTAMOS VENTANA
M2
2.95
-1.70
1.00
-5.02
M2
4.25
2.70
1.00
11.48
RESTAMOS VENTANA
M2
2.85
-1.70
1.00
-4.85
M2
2.85
2.70
2.00
15.39
M2
2.40
2.70
2.00
12.96
RESTAMOS VENTANA
M2
1.30
-1.00
1.00
-1.30
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
EN EL EJE C''-C''
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
37
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
0.50
2.70
2.00
2.70
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
EN EL SEGUNDO NIVEL
M2
VOL.
KG.
TOTAL
EN EL EJE D-D
ENTRE EL EJE 0-0 Y X-X
ESCALERA
EN EL EJE D'-D'
278.82
EN EL EJE A-A
ENTRE EL EJE 0--0 Y 6-6
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
M2
3.00
2.70
1.00
8.10
RESTAMOS VENTANA
M2
1.85
-1.70
1.00
-3.15
M2
0.60
2.70
1.00
1.62
EN EL EJE 6-6
ENTRE EL EJE A-A Y B-B
EN EL EJE E-E
ENTRE EL EJE 0-0 Y 6-6
EN EL EJE C''-C''
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
M2
2.50
2.40
1.00
6.00
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.10
2.70
1.00
2.97
RESTAMOS VENTANA
M2
0.80
-0.40
1.00
-0.32
M2
2.15
2.70
1.00
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
1.50
2.70
1.00
4.05
M2
1.25
2.70
1.00
3.38
M2
0.60
2.70
1.00
1.62
M2
3.05
2.70
1.00
8.24
M2
1.50
2.70
1.00
4.05
M2
0.83
2.70
1.00
2.24
M2
2.50
2.40
1.00
6.00
M2
0.58
2.70
1.00
1.57
M2
2.85
2.40
1.00
6.84
RESTAMOS VENTANA
M2
2.35
-1.70
1.00
-4.00
M2
0.79
2.70
1.00
2.13
EN EL EJE B-B
ENTRE EL EJE 4'-4' Y 5-5
EN EL EJE C'-C'
ENTRE EL EJE 4''-4'' Y 5-5
EN EL EJE D-D
EN EL EJE A'-A'
ENTRE EL EJE 4-4 Y 5-5
EN EL EJE 4''-4''
ENTRE EL EJE D-D Y E-E
EN EL EJE 4'-4'
EN EL EJE 4-4
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
38
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
3.10
2.40
1.00
7.44
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.40
2.70
1.00
3.78
M2
1.95
2.70
1.00
5.27
RESTAMOS VENTANA
M2
1.55
-1.50
1.00
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
0.60
2.70
1.00
1.62
M2
2.95
2.70
1.00
7.97
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
VOL.
KG.
TOTAL
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE A-A Y C'-C'
M2
3.35
2.70
1.00
9.05
RESTAMOS VENTANA
M2
2.95
-1.70
1.00
-5.02
M2
4.25
2.70
1.00
11.48
RESTAMOS VENTANA
M2
2.85
-1.70
1.00
-4.85
M2
2.85
2.70
2.00
15.39
M2
2.40
2.70
2.00
12.96
RESTAMOS VENTANA
M2
1.30
-1.00
1.00
-1.30
M2
0.50
2.70
2.00
2.70
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
EN EL TERCER NIVEL
M2
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
EN EL EJE C''-C''
ENTRE EL EJE 0-0 Y X-X
EN EL EJE D-D
ENTRE EL EJE 0-0 Y X-X
ESCALERA
EN EL EJE D'-D'
278.82
EN EL EJE A-A
ENTRE EL EJE 0--0 Y 6-6
M2
20.46
2.40
1.00
49.10
M2
8.58
2.40
1.00
20.59
M2
19.68
2.40
1.00
47.23
EN EL EJE 6-6
ENTRE EL EJE A-A Y B-B
EN EL EJE E-E
ENTRE EL EJE 0-0 Y 6-6
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
39
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
EN EL EJE C''-C''
ENTRE EL EJE 5-5 Y 6-6
M2
3.00
2.70
1.00
8.10
RESTAMOS VENTANA
M2
1.85
-1.70
1.00
-3.15
M2
0.60
2.70
1.00
1.62
EN EL EJE 5'-5'
ENTRE EL EJE D-D Y E-E
EN EL EJE 5-5
ENTRE EL EJE A-A Y B-B
M2
2.50
2.40
1.00
6.00
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.10
2.70
1.00
2.97
RESTAMOS VENTANA
M2
0.80
-0.40
1.00
-0.32
M2
2.15
2.70
1.00
5.81
M2
2.65
2.40
1.00
6.36
M2
2.20
2.70
1.00
5.94
M2
1.50
2.70
1.00
4.05
M2
1.25
2.70
1.00
3.38
M2
0.60
2.70
1.00
1.62
M2
3.05
2.70
1.00
8.24
M2
1.50
2.70
1.00
4.05
M2
0.83
2.70
1.00
2.24
M2
2.50
2.40
1.00
6.00
M2
0.58
2.70
1.00
1.57
M2
2.85
2.40
1.00
6.84
RESTAMOS VENTANA
M2
2.35
-1.70
1.00
-4.00
M2
0.79
2.70
1.00
2.13
EN EL EJE B-B
ENTRE EL EJE 4'-4' Y 5-5
EN EL EJE C'-C'
ENTRE EL EJE 4''-4'' Y 5-5
EN EL EJE D-D
EN EL EJE A'-A'
ENTRE EL EJE 4-4 Y 5-5
EN EL EJE 4''-4''
ENTRE EL EJE D-D Y E-E
EN EL EJE 4'-4'
EN EL EJE 4-4
EN EL EJE D-D
ENTRE EL EJE 3-3 Y 4-4
EN EL EJE 3-3
ENTRE EL EJE A-A Y C'-C'
M2
3.10
2.40
1.00
7.44
RESTAMOS VENTANA
M2
1.95
-1.70
1.00
-3.32
M2
1.40
2.70
1.00
3.78
M2
1.95
2.70
1.00
5.27
RESTAMOS VENTANA
M2
1.55
-1.50
1.00
-2.33
M2
0.65
2.70
1.00
1.76
M2
2.65
2.70
1.00
7.16
M2
0.60
2.70
1.00
1.62
M2
0.60
2.70
1.00
1.62
EN EL EJE C'-C'
ENTRE EL EJE 2-2 Y 3-3
EN EL EJE C''-C''
ENTRE EL EJE 2'-2' Y 3-3
EN EL EJE 2''-2''
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE 2'-2'
ENTRE EL EJE C''-C'' Y D-D
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
40
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
2.95
2.70
1.00
7.97
M2
0.50
2.70
1.00
1.35
M2
3.55
2.40
1.00
8.52
M2
2.00
2.40
1.00
4.80
M2
1.20
2.70
1.00
3.24
VOL.
KG.
TOTAL
EN EL EJE D-D
ENTRE EL EJE 2-2 Y 2'-2'
EN EL EJE 2-2
ENTRE EL EJE C''-C'' Y D-D
EN EL EJE C'-C'
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE D-D
ENTRE EL EJE 1-1 Y 2-2
EN EL EJE 1-1
ENTRE EL EJE A-A Y C'-C'
M2
3.35
2.70
1.00
9.05
RESTAMOS VENTANA
M2
2.95
-1.70
1.00
-5.02
M2
4.25
2.70
1.00
11.48
RESTAMOS VENTANA
M2
2.85
-1.70
1.00
-4.85
M2
2.85
2.70
2.00
15.39
M2
2.40
2.70
2.00
12.96
RESTAMOS VENTANA
M2
1.30
-1.00
1.00
-1.30
M2
0.50
2.70
2.00
2.70
M2
0.50
2.70
2.00
2.70
M2
0.70
2.70
2.00
3.78
18.05.04
M2
347.52
18.05.05
M2
347.52
18.05.06
M2
347.52
EN EL EJE X-X
ENTRE EL EJE D-D Y E-E
EN EL EJE 0-0
EN EL EJE C''-C''
ENTRE EL EJE 0-0 Y X-X
EN EL EJE D-D
ENTRE EL EJE 0-0 Y X-X
ESCALERA
EN EL EJE D'-D'
12.06
M2
9.50
2.90
1.00
27.55
PUERTA DE COCHERA
M2
4.60
-2.50
1.00
-11.50
PUERTA PRINCIPAL
M2
1.20
-2.10
1.00
-2.52
PUERTA DE SERVICIOS
EN EL PRIMER NIVEL FACHADA DE
EDIFICIO
M2
0.70
-2.10
1.00
-1.47
16.44
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
M2
9.50
2.90
1.00
27.55
VANOS
M2
2.95
-1.70
2.00
-10.03
PUERTA PRINCIPAL
EN EL SEGUNDO NIVEL FACHADA DE
EDIFICIO
M2
1.20
-0.90
1.00
-1.08
16.44
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
M2
9.50
2.90
1.00
27.55
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
41
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VANOS
M2
2.95
-1.70
2.00
-10.03
PUERTA PRINCIPAL
M2
1.20
-0.90
1.00
-1.08
VOL.
KG.
TOTAL
16.44
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
M2
9.50
2.90
1.00
27.55
VANOS
M2
2.95
-1.70
2.00
-10.03
PUERTA PRINCIPAL
M2
1.20
-0.90
1.00
-1.08
18.05.07
M2
180.52
18.05.08
M2
180.52
18.05.09
M2
189.22
INTERIORES
COLUMNAS
EN EL PRIMER NIVEL
ESQUINERAS
C-1 (VER ANEXO 02)
M2
0.20
4.40
10.00
8.80
M2
0.45
4.40
9.00
17.82
M2
0.85
4.40
3.00
11.22
M2
0.60
4.40
1.00
2.64
C-2 (ESCALERAS)
M2
0.85
4.20
4.00
14.28
M2
0.20
4.40
10.00
8.80
M2
0.45
4.40
9.00
17.82
M2
0.85
4.40
3.00
11.22
M2
0.60
4.40
1.00
2.64
C-2 (ESCALERAS)
M2
0.85
4.20
4.00
14.28
M2
0.20
4.40
10.00
8.80
M2
0.45
4.40
9.00
17.82
M2
0.85
4.40
3.00
11.22
M2
0.60
4.40
1.00
2.64
C-2 (ESCALERAS)
M2
0.85
4.20
4.00
14.28
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EN EL SEGUNDO PISO:
ESQUINERAS
C-1 (VER ANEXO 02)
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EN EL TERCER PISO:
ESQUINERAS
C-1 (VER ANEXO 02)
INTERMEDIAS
C-1 (VER ANEXO 02)
ULTIMAS
C-1 (VER ANEXO 02)
EJE 3-3 Y D-D
EXTERIORES
COLUMNAS
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
42
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
EN EL PRIMER NIVEL
C-3 (CERCO PERIMETRICO)
M2
0.25
2.90
14.00
10.15
M2
0.70
2.90
3.00
6.09
M2
0.50
2.90
6.00
74.10
2.00
EN EL EJE 1-1
ENTRE EL EJE A-A Y E-E
FACHADA = 3 VECES
ESCALERA
C-2 (ESCALERAS)
ARISTAS DE COLUMNAS
8.70
148.20
148.20
(3 NIVELES)
18.05.10
M2
96.92
18.05.11
M2
96.92
18.05.12
M2
96.92
V-A(0.25 x 0.30), Eje A-A y Entre Ejes1-1, 22, 3-3, 4-4, 5-5
Cara Interior y Exterior
V-B (0.25 x 0.30), Ejes B-B y Entre 3-3,4-4,55
M2
10.45
0.65
1.00
6.79
M2
6.70
0.45
1.00
3.02
M2
10.45
0.45
1.00
4.70
M2
20.05
0.45
1.00
9.02
M2
19.05
0.65
1.00
12.38
M2
8.50
0.45
1.00
3.83
M2
8.50
0.45
1.00
3.83
M2
8.25
0.65
1.00
5.36
M2
8.50
0.65
1.00
5.53
M2
8.35
0.65
1.00
5.43
M2
4.00
0.65
1.00
2.60
M2
2.35
0.65
1.00
1.53
M2
16.74
0.40
1.00
6.70
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
43
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
V (0.10 x 0.20)
Cara Interior y Exterior
M2
23.95
0.30
1.00
7.19
M2
9.20
0.85
1.00
7.82
M2
6.75
0.45
1.00
3.04
M2
5.75
0.65
1.00
3.74
M2
2.85
0.45
1.00
1.28
M2
2.85
0.45
1.00
1.28
M2
2.85
0.65
1.00
1.85
18.05.13
ML
10.35
2.00
20.70
20.70
18.05.14
ML
10.35
2.00
20.70
20.70
18.05.15
ML
11.00
2.00
22.00
22.00
18.05.16
ML
640.95
18.05.17
ML
640.95
18.05.18
640.95
V-Z (0.25x0.30)
Cara Interior y Exterior
EN LA AZOTEA:
V-D (0.25 x 0.30), Ejes C-C y Entre 1-1,2-2,33,4-4,5-5,6-6
Primer nivel
PUERTAS
P-1
ML
4.50
2.40
1.00
9.35
P-2
ML
0.90
2.10
8.00
41.20
P-3
ML
1.20
2.10
1.00
5.45
P-4
ML
0.85
2.10
1.00
5.10
P-5
ML
0.80
2.10
1.00
5.05
P-6
ML
0.70
2.10
3.00
14.85
P-7
ML
1.20
1.85
1.00
4.95
P-8
ML
2.20
2.10
1.00
6.45
P-9
ML
3.00
2.70
1.00
8.45
V-1
ML
2.95
1.70
1.00
9.40
V-2
ML
2.85
1.70
1.00
9.20
V-3
ML
1.30
1.00
1.00
4.70
V-4
ML
1.20
0.30
1.00
3.10
V-5
ML
1.95
1.70
1.00
7.40
V-6
ML
1.55
1.50
1.00
6.20
V-7
ML
2.35
1.70
1.00
8.20
V-8
ML
1.95
1.70
1.00
7.40
V-9
ML
0.80
0.40
1.00
2.50
V-10
ML
1.35
0.35
1.00
3.50
VENTANAS
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
44
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
V-11
ML
1.85
1.70
3.00
21.60
V-12
ML
1.70
1.70
3.00
20.70
V-13
ML
2.40
1.50
3.00
23.70
P-1
ML
4.50
2.40
1.00
9.35
P-2
ML
0.90
2.10
8.00
41.20
P-3
ML
1.20
2.10
1.00
5.45
P-4
ML
0.85
2.10
1.00
5.10
P-5
ML
0.80
2.10
1.00
5.05
P-6
ML
0.70
2.10
3.00
14.85
P-7
ML
1.20
1.85
1.00
4.95
P-8
ML
2.20
2.10
1.00
6.45
P-9
ML
3.00
2.70
1.00
8.45
V-1
ML
2.95
1.70
1.00
9.40
V-2
ML
2.85
1.70
1.00
9.20
V-3
ML
1.30
1.00
1.00
4.70
V-4
ML
1.20
0.30
1.00
3.10
V-5
ML
1.95
1.70
1.00
7.40
V-6
ML
1.55
1.50
1.00
6.20
V-7
ML
2.35
1.70
1.00
8.20
V-8
ML
1.95
1.70
1.00
7.40
V-9
ML
0.80
0.40
1.00
2.50
V-10
ML
1.35
0.35
1.00
3.50
V-11
ML
1.85
1.70
3.00
21.60
P-1
ML
4.50
2.40
1.00
9.35
P-2
ML
0.90
2.10
8.00
41.20
P-3
ML
1.20
2.10
1.00
5.45
P-4
ML
0.85
2.10
1.00
5.10
P-5
ML
0.80
2.10
1.00
5.05
P-6
ML
0.70
2.10
3.00
14.85
P-7
ML
1.20
1.85
1.00
4.95
P-8
ML
2.20
2.10
1.00
6.45
P-9
ML
3.00
2.70
1.00
8.45
V-1
ML
2.95
1.70
1.00
9.40
V-2
ML
2.85
1.70
1.00
9.20
V-3
ML
1.30
1.00
1.00
4.70
V-4
ML
1.20
0.30
1.00
3.10
V-5
ML
1.95
1.70
1.00
7.40
V-6
ML
1.55
1.50
1.00
6.20
V-7
ML
2.35
1.70
1.00
8.20
V-8
ML
1.95
1.70
1.00
7.40
Segundo nivel
PUERTAS
VENTANAS
Tercer nivel
PUERTAS
VENTANAS
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
45
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
V-9
ML
0.80
0.40
1.00
V-10
ML
1.35
0.35
1.00
2.50
3.50
V-11
ML
1.85
1.70
3.00
21.60
V-12
ML
1.70
1.70
3.00
20.70
V-13
ML
2.40
1.50
3.00
23.70
18.05.19
IMPRIMANTE EN CIELORASO
M2
508.52
18.05.20
SELLADO EN CIELORASO
M2
508.52
18.05.21
PINTURA EN CIELORASO
M2
Sala
M2
3.55
2.35
3.00
25.03
Comedor
M2
3.75
2.61
3.00
29.36
Recibidor
M2
2.00
1.30
3.00
7.80
Estudio
M2
2.50
1.76
3.00
13.20
Hall
M2
3.50
2.05
6.00
43.05
Bao
M2
1.20
2.56
9.00
27.60
Cocina
M2
2.50
2.74
3.00
20.55
Sala estar
M2
3.20
2.87
3.00
27.55
Terraza
M2
3.20
1.63
3.00
15.65
Patio
M2
3.55
2.55
3.00
27.16
Dormitorio
M2
3.55
5.72
9.00
182.75
Jardin
M2
3.55
4.17
6.00
88.82
Interior
M2
3.23
3.23
3.00
31.30
Laterales
M2
3.23
0.60
3.00
5.81
Fondo
M2
2.40
1.20
3.00
8.64
508.52
ESCALERA
19.01.00
19.01.01
GLB
1.00
19.01.02
LIMPIEZA FINAL
GLB
1.00
19.01.03
LIMPIEZA DE VIDRIOS
168.94
M2
M2
2.95
1.70
3.00
30.09
M2
2.85
1.70
3.00
29.07
M2
1.30
1.00
1.00
2.60
M2
1.20
0.30
3.00
2.16
M2
1.95
1.70
3.00
19.89
M2
1.55
1.50
3.00
13.95
M2
2.35
1.70
1.00
7.99
M2
1.95
1.70
3.00
19.89
M2
0.80
0.40
3.00
1.92
M2
1.35
0.35
3.00
2.84
M2
1.85
1.70
2.00
12.58
M2
1.70
1.70
2.00
11.56
M2
2.40
1.50
2.00
14.40
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
46
MEDIDAS
DESCRIPCION
19.02.04
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
554.27
ENCERADOS DE PISOS
M2
Sala
M2
3.55
2.35
3.00
25.03
Comedor
M2
3.75
2.61
3.00
29.36
Recibidor
M2
2.00
1.30
3.00
7.80
Estudio
M2
2.50
1.76
3.00
13.20
Hall
M2
3.50
2.05
6.00
43.05
Bao
M2
1.20
2.56
9.00
27.60
Cocina
M2
2.50
2.74
3.00
20.55
Sala estar
M2
3.20
2.87
3.00
27.55
Terraza
M2
3.20
1.63
3.00
15.65
Patio
M2
3.55
2.55
3.00
27.16
Dormitorio
M2
3.55
5.72
9.00
182.75
Jardin
M2
3.55
4.17
6.00
88.82
Interior
M2
3.23
3.23
3.00
31.30
Laterales
M2
3.23
0.60
3.00
5.81
Fondo
M2
2.40
1.20
3.00
8.64
SEMBRIO DE GRASS
M2
Jardin N1
M2
0.70
1.70
1.00
1.19
Jardin N2
M2
0.78
1.80
1.00
1.40
Jardin N3
M2
2.95
1.03
1.00
3.02
Jardin N4
M2
4.95
3.00
1.00
14.85
ESCALERA
20.47
20.00.00
INSTALACIONES SANITARIAS
20.01.00
Pz.
Pz.
3.00
3.00
Pz.
6.00
6.00
Pz.
3.00
3.00
Pz.
6.00
6.00
Pz.
3.00
3.00
Pz.
3.00
3.00
Pz.
3.00
3.00
36.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
47
MEDIDAS
N
20.02.00
20.03.00
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Pz.
3.00
3.00
Ducha "AVANTE"
Pz.
6.00
6.00
COLOCACION DE APARATOS
Inodoro con tanque integrado (COLOR
BLANCO)"ACQUAJET"
Pz.
Pz.
3.00
3.00
Pz.
6.00
6.00
Pz.
3.00
3.00
Pz.
6.00
6.00
Pz.
3.00
3.00
Pz.
3.00
3.00
Pz.
3.00
3.00
Pz.
3.00
3.00
Ducha "AVANTE"
Pz.
6.00
6.00
COLOCACION DE ACCESORIOS
Pz.
Pz.
9.00
9.00
Pz.
9.00
9.00
Jabonera "TREBOL"
Pz.
9.00
9.00
Papelera "TREBOL"
Pz.
9.00
9.00
21.00.00
DESAGUE Y VENTILACION
21.01.00
SALIDAS DE DESAGUE
21.02.00
KG.
TOTAL
36.00
36.00
Pto.
9.00
Pto.
3.00
3.00
SEGUNDO NIVEL
Pto.
3.00
3.00
TERCER NIVEL
Pto.
3.00
3.00
VOL.
9.00
Pto.
PRIMER NIVEL
Pto.
3.00
3.00
SEGUNDO NIVEL
Pto.
3.00
3.00
TERCER NIVEL
Pto.
3.00
3.00
REDES DE DERIVACION
ML
DE LA C. R. EXTERIOR HASTA LA C. R. 01
INTERIOR
ML
9.62
1.00
9.62
DE LA C. R. 01 INTERIOR HASTA LA C. R. 02
INTERIOR
ML
6.05
1.00
6.05
ML
DE LA C. R. EXTERIOR HASTA LA C. R. 01
INTERIOR
ML
9.62
1.00
9.62
DE LA C. R. 01 INTERIOR HASTA LA C. R. 02
INTERIOR
ML
6.05
1.00
6.05
ML
DE LA C. R. EXTERIOR HASTA LA C. R. 01
INTERIOR
ML
15.67
15.67
15.67
9.62
1.00
9.62
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
48
MEDIDAS
DESCRIPCION
21.03.00
DE LA C. R. 01 INTERIOR HASTA LA C. R. 02
INTERIOR
ML
REDES DE DISTRIBUCION
ML
ML
PRIMER NIVEL
Tuberia baja del 2do al 1er piso
SEGUNDO NIVEL
Tuberia baja del 3ro al 2do piso
TERCER NIVEL
Tuberia baja del 3ro al 2do piso
AZOTEA
6.05
ALTO
N
DE
VECES
1.00
SUB TOTAL
LONG.
21.04.00
VOL.
KG.
TOTAL
6.05
60.95
ML
27.09
1.00
27.09
ML
2.90
3.00
8.70
ML
3.28
1.00
3.28
ML
2.90
3.00
8.70
ML
3.28
1.00
3.28
ML
2.90
3.00
8.70
ML
1.20
1.00
1.20
58.12
ML
ML
7.80
1.00
7.80
ML
2.90
3.00
8.70
ML
10.36
1.00
10.36
ML
2.90
3.00
8.70
ML
10.36
1.00
10.36
ML
2.90
3.00
8.70
ML
3.50
1.00
3.50
43.59
ML
27.09
1.00
27.09
ML
16.50
1.00
16.50
AREA
34.89
ML
ML
27.09
1.00
27.09
ML
7.80
1.00
7.80
2.00
UND
UND
2.00
22.00
UND
1er nivel
UND
6.00
2do nivel
UND
6.00
3ro nivel
UND
6.00
Azotea
UND
4.00
UND
2do nivel
UND
2.00
2.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
49
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
UND
3.00
2do nivel
UND
3.00
3ro nivel
UND
3.00
1er nivel
UND
3.00
2do nivel
UND
2.00
3ro nivel
UND
2.00
Azotea
UND
1.00
UND
TOTAL
8.00
1er nivel
UND
KG.
6.00
1er nivel
VOL.
6.00
UND
UND
AREA
9.00
UND
1er nivel
SUB TOTAL
LONG.
2.00
2.00
11.00
UND
1er nivel
UND
3.00
2do nivel
UND
3.00
3ro nivel
UND
3.00
Azotea
UND
2.00
ADITAMENTO VARIOS
SUMIDERO CROMADO 2" EN PISO
21.03.00
1er nivel
UND
5.00
2do nivel
UND
3.00
3ro nivel
UND
3.00
Azotea
UND
1.00
UND
8.00
1er nivel
UND
3.00
2do nivel
UND
2.00
3ro nivel
UND
2.00
Azotea
UND
1.00
Pz.
3.00
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
22.00.00
12.00
UND
3.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
50
MEDIDAS
DESCRIPCION
22.01.00
ALTO
N
DE
VECES
SUB TOTAL
LONG.
VOL.
KG.
TOTAL
30.00
PTO
1er nivel
PTO
9.00
2do nivel
PTO
9.00
3ro nivel
PTO
9.00
Azotea
PTO
3.00
REDES DE DISTRIBUCION
TUBERIA PVC SAP CLASE - 10 3/4"
85.80
ML
1er nivel
ML
Tuberia de Subida
2do nivel
25.10
1.00
25.10
ML
2.90
1.00
2.90
ML
18.00
1.00
18.00
Tuberia de Subida
ML
2.90
1.00
2.90
3er nivel
ML
18.00
1.00
18.00
Tuberia de Subida
ML
2.90
1.00
2.90
Azotea
ML
9.00
1.00
9.00
ML
7.00
1.00
7.00
Tanque Elevado
42.00
ML
PRIMER NIVEL
ML
14.00
1.00
14.00
SEGUNDO NIVEL
ML
12.50
1.00
12.50
TERCER NIVEL
ML
12.50
1.00
12.50
AZOTEA
ML
3.00
1.00
3.00
39.10
ML
14.00
1.00
14.00
ML
25.10
1.00
25.10
22.03.00
AREA
22.02.00
39.10
ML
ML
14.00
1.00
14.00
ML
25.10
1.00
25.10
ACCESORIOS DE REDES
12.00
UND
1er nivel
UND
5.00
2do nivel
UND
3.00
3er nivel
UND
3.00
Azotea
UND
1.00
12.00
UND
1er nivel
UND
5.00
2do nivel
UND
3.00
3er nivel
UND
3.00
Azotea
UND
1.00
UND
12.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
51
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
1er nivel
UND
5.00
2do nivel
UND
3.00
3er nivel
UND
3.00
Azotea
UND
1.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
66.00
UND
1er nivel
UND
20.00
2do nivel
UND
20.00
3er nivel
UND
20.00
Azotea
UND
6.00
22.04.00
12.00
UND
1er nivel
UND
5.00
2do nivel
UND
3.00
3er nivel
UND
3.00
Azotea
UND
1.00
LLAVES Y VALVULAS
VALVULA DE COMPUERTA 3/4"
11.00
UND
1er nivel
UND
4.00
2do nivel
UND
3.00
3er nivel
UND
3.00
Azotea
UND
1.00
13.00
UND
1er nivel
UND
3.00
2do nivel
UND
4.00
3er nivel
UND
4.00
Azotea
UND
2.00
PIEZAS VARIAS
CAJA CON TAPA METALICA PARA
VALVULAS DE 12" X 12"
6.00
UND
1er nivel
UND
3.00
2do nivel
UND
1.00
3er nivel
UND
1.00
Azotea
UND
1.00
16.00
UND
1er nivel
UND
4.00
2do nivel
UND
5.00
3er nivel
UND
5.00
Azotea
UND
2.00
24.00.00
24.01.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
52
MEDIDAS
DESCRIPCION
24.01.01
PTO
2.00
ML
27.50
1.00
27.50
Tuberia de Subida
ML
2.90
3.00
8.70
Azotea
ML
3.20
1.00
3.20
ACCESORIOS DE REDES
24.03.01
UND
2.00
Azotea
UND
2.00
1er nivel
25.01.00
INSTALACIONES ELECTRICAS
25.01.01
25.01.01.03
25.01.02
25.01.02.01
25.01.02.02
2.00
42.00
PTO
13.00
2doSS.
nivelHH
PTO
13.00
3er CIRCULACION
nivel
PTO
13.00
Azotea
ESCALERA
PTO
3.00
103.00
PTO
1er Aulas
nivel 1er nivel
PTO
32.00
2doSS.
nivelHH
PTO
33.00
3er nivel
PTO
33.00
Azotea
PTO
5.00
PTO
2.00
TABLEROS Y CUCHILLAS
TABLERO DE DISTRIBUCION
TERMOMAGNETICO (4)2X15A - (2)2X20A
UND
UND
1.00
1.00
UND
1.00
1.00
UND
1.00
1.00
1.00
1.00
1.00
UND
UND
UND
2.00
3.00
25.01.02.03
UND
PTO
TOTAL
2.00
UND
1er Aulas
nivel 1er nivel
KG.
4.00
UND
1er nivel
VOL.
39.40
ML
1er nivel
24.03.00
AREA
4.00
Azotea
SUB TOTAL
LONG.
PTO
2.00
REDES DE DISTRIBUCION
25.01.01.02
N
DE
VECES
PTO
24.02.01
25.01.01.01
ALTO
1er nivel
24.02.00
24.03.02
1.00
1.00
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
53
MEDIDAS
DESCRIPCION
25.01.03
25.01.03.01
25.01.04
25.01.04.01
25.01.04.02
25.01.04.03
25.01.05
25.01.05.01
25.01.05.02
25.01.05.03
25.01.06
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
1.00
1.00
ARTEFACTOS
32.00
PZA
10.00
2do nivel
PZA
10.00
3er nivel
PZA
10.00
Azotea
PZA
2.00
13.00
PZA
4.00
PZA
2.00
PZA
2.00
En aleros de Azotea
PZA
1.00
En Escalera
PZA
4.00
UND
En SS.HH.
UND
CONEXIONES INTERNAS
CONEXIN INTERNA SUBTERRANEA DEL
TG AL TD1 CON CABLE 2x6+1x4mm2-CuTHW
ML
M3
10.00
10.00
6.42
1.00
1.54
6.42
0.40
0.60
1.00
1.54
6.42
0.40
0.60
1.00
1.54
1.54
M3
480.01
ML
EN EL PRIMER PISO
ALUMBRADO EN EL CENTRO DE LUZ
c) 5x2.5 mm2-Cu-TW,15 mm PVC-SEL
ML
TOMACORRIENTE DE a) 2x4+1x2.5
mm2-Cu-TW,15 mm PVC-SEL
ML
80.05
1.00
80.05
79.95
1.00
79.95
80.05
1.00
80.05
79.95
1.00
79.95
80.05
1.00
80.05
EN EL SEGUNDO PISO
ALUMBRADO EN EL CENTRO DE LUZ
c) 5x2.5 mm2-Cu-TW,15 mm PVC-SEL
ML
TOMACORRIENTE DE a) 2x4+1x2.5
mm2-Cu-TW,15 mm PVC-SEL
ML
EN EL TERCER PISO
ALUMBRADO EN EL CENTRO DE LUZ
c) 5x2.5 mm2-Cu-TW,15 mm PVC-SEL
6.42
6.42
ML
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
ARQUITECTURA
HOJA N
54
MEDIDAS
DESCRIPCION
TOMACORRIENTE DE a) 2x4+1x2.5
mm2-Cu-TW,15 mm PVC-SEL
25.01.07
N
DE
VECES
SUB TOTAL
LONG.
79.95
1.00
79.95
4.00
1.00
4.00
VOL.
KG.
TOTAL
1.00
1.00
1.00
4.00
Pz
1.00
AREA
ML
LAMPARAS
25.01.08
ALTO
Pz
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
VIVIENDA MULTIFAMILIAR
OBRA
VIVIENDA MULTIFAMILIAR
FECHA
ESPECIALIDAD
24/08/08
ARQUITECTURA
ACERO KG/ML
1/4"
0.220
3/8"
0.560
1/2"
0.994
5/8"
1.552
3/4"
2.235
1"
3.973
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
M2
30.42
3.94
9.80
6.60
1.00
1.00
298.12
26.00
324.12
M2
30.42
3.94
9.80
6.60
1.00
1.00
298.12
26.00
324.12
0.50
0.50
0.50
0.40
0.40
0.50
0.50
0.50
0.50
0.50
0.50
0.60
0.60
0.40
0.90
0.60
0.40
0.40
0.40
0.40
1.22
1.22
1.22
0.95
0.95
1.22
1.22
1.22
1.22
1.22
1.22
1.22
1.22
0.95
1.92
1.92
0.95
0.95
0.95
1.22
1.00
4.00
1.00
3.00
3.00
1.00
4.00
1.00
1.00
1.00
2.00
1.00
2.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.05
4.64
1.41
1.09
1.09
1.19
5.43
1.42
0.74
1.73
2.28
3.67
7.79
4.34
9.88
2.57
0.96
0.97
0.69
1.32
2.20
1.85
1.80
1.50
2.10
1.80
3.07
2.90
1.65
1.20
2.40
2.40
1.40
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
2.17
3.00
3.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
31.51
22.28
14.06
9.77
5.70
4.69
9.33
7.55
11.46
3.12
7.29
6.25
12.76
04.02.02
04.02.03
Eje A -A
m3
M3
M3
M3
M3
EJE C`-C`
EJE D-D
EJE E-E
EJE 1-1
EJE 3-3, 5-5
EJES 2'-2', 3'-3', 5'-5'
EJE 7-7
EJE 8-8
Eje 9-9
M3
M3
M3
M3
M3
M3
M3
M3
M3
Eje 12-12
M3
1.73
1.90
2.31
0.96
0.96
1.95
2.23
2.33
1.21
2.83
1.87
5.02
5.32
1.91
5.72
2.24
2.54
2.55
1.81
2.70
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
2.20
1.85
1.80
1.50
1.25
1.20
1.40
1.20
3.20
1.20
1.40
1.20
1.40
54.27
145.76
57.52
6.00
1.00
-1.00
-1.00
-1.00
3.00
-3.00
-3.00
1.73
1.71
-0.11
-0.15
-0.18
9.44
-0.34
-0.90
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
Zapatas
Z3
Menos C1
Menos Viga de cim. Eje AA
Menos Viga de cim. Eje 3-3 y 5-5
Zapatas
Z7
Menos C2
Menos C4
Menos C5
Menos Viga de cim. Eje AA
Menos Viga de cim. Eje 7-7
Menos Viga de cim. Eje 8-8
Zapatas
Z13
Menos C6
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
1.80
0.35
1.45
0.65
3.07
0.35
0.23
0.13
0.33
0.40
0.40
1.40
0.35
1.80
0.50
0.25
0.35
1.40
0.50
0.40
0.40
0.25
0.35
0.23
1.40
0.35
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
2.00
-2.00
-2.00
-2.00
1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
1.00
-1.00
4.21
-0.23
-0.47
-0.30
2.79
-0.11
-0.06
-0.03
-0.05
-0.09
-0.06
1.27
-0.08
M3
0.96
0.14
0.25
6.00
0.19
0.96
0.14
0.25
6.00
0.19
2.90
0.23
0.23
0.13
1.15
1.40
0.35
1.40
0.25
0.40
0.40
0.23
1.40
0.35
0.65
0.65
0.65
0.65
0.65
0.65
0.65
1.00
-1.00
-1.00
-1.00
-2.00
1.00
-1.00
2.64
-0.04
-0.06
-0.03
-0.34
1.27
-0.08
3.55
1.80
0.35
0.85
0.65
1.85
0.35
1.50
1.50
0.35
1.15
0.50
3.20
0.35
0.23
0.13
0.48
0.35
2.17
0.13
1.20
0.50
0.25
0.25
1.85
0.50
0.25
1.50
0.50
0.25
0.25
1.65
0.50
0.40
0.40
0.25
0.35
0.23
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
6.00
1.00
-1.00
-1.00
-1.00
3.00
-3.00
-2.00
2.00
-2.00
-2.00
-2.00
1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
1.73
1.40
-0.11
-0.14
-0.11
6.67
-0.34
-0.49
2.93
-0.23
-0.37
-0.16
3.43
-0.11
-0.06
-0.03
-0.08
-0.08
-0.32
En Exteriores
3.23
2.23
0.13
1.25
0.55
0.55
2.00
4.00
0.44
6.12
1.20
4.72
6.59
0.27
0.27
0.27
0.65
0.65
0.65
1.00
1.00
1.00
0.21
0.83
1.16
6.72
0.25
0.65
2.00
2.18
Eje B'-B'
M3
EJE C`-C`
EJE D-D
EJE E-E
EJE 1-1
Interiores
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
EJE 3-3
6.72
1.93
0.24
6.72
6.72
0.18
0.14
0.13
0.18
0.12
0.65
0.25
0.65
0.65
0.65
4.00
12.00
-6.00
1.00
1.00
3.06
0.78
-0.12
0.76
0.50
12.22
0.13
0.65
1.00
0.99
Menos C3
1.40
0.23
2.40
0.25
0.65
0.65
1.00
-2.00
2.18
-0.07
Menos C6
1.40
0.35
1.40
0.35
0.65
0.65
1.00
-1.00
1.27
-0.08
2.70
2.70
2.40
0.23
0.23
0.14
0.14
1.20
0.25
0.40
0.17
0.55
0.65
0.65
0.65
1.00
1.00
1.00
-1.00
-1.00
0.06
0.20
1.87
-0.04
-0.06
EJE 7-7
Eje 8-8
M3
Eje 10-10
Z11
Eje 11-11
Z13
Eje 12-12
Interior
Exterior
M3
Z12
Menos C3
Menos C4
04.02.04
04.02.05
04.02.06
(54.27+145.76-57.52)*1.25
04.03.00
04.03.01
04.03.01.01
178.14
M2
M2
M2
M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
178.14
163.50
3.00
-6.00
-6.00
1.00
1.00
1.00
155.78
-0.73
-1.26
3.34
3.55
2.81
1.00
1.00
1.00
1.00
1.00
1.00
43.79
20.30
3.69
6.00
1.62
3.74
79.14
29.19
25.38
4.61
7.50
2.02
4.68
1.50
0.80
0.80
0.80
0.80
0.80
2.20
1.85
1.80
1.50
1.25
1.20
3.07
2.90
3.20
2.20
1.85
1.80
1.50
2.10
1.80
1.40
1.40
1.65
20.33
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
3.00
3.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
4.36
3.08
1.94
1.35
0.79
0.65
1.29
1.22
1.58
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
Z-10
Z-11
Z-12
Z-13
04.03.02
04.03.02.01
04.03.02.02
04.03.03
04.03.03.01
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
M3
M3
M3
M3
1.20
2.40
2.40
1.40
1.20
1.40
1.20
1.40
0.30
0.30
0.30
0.30
1.00
1.00
1.00
3.00
0.43
1.01
0.86
1.76
M3
M3
M3
M3
M3
M3
3.55
3.55
6.72
6.72
6.72
0.50
0.50
0.60
0.60
0.90
0.27
0.27
0.27
0.27
0.27
6.00
6.00
1.00
2.00
1.00
2.88
2.88
1.09
2.18
1.63
3.55
0.96
0.96
3.55
1.21
4.96
6.59
6.72
6.72
1.93
6.72
4.75
10.60
1.03
3.00
5.12
0.50
0.40
0.40
0.50
0.40
0.40
0.60
0.60
0.60
0.40
0.90
0.60
0.40
0.60
0.60
0.40
0.40
0.80
0.80
0.40
0.80
0.80
0.80
0.40
0.40
0.80
0.80
0.80
0.80
0.80
0.80
0.80
6.00
3.00
3.00
6.00
1.00
1.00
1.00
1.00
2.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
4.26
0.92
0.92
4.26
0.39
1.59
3.16
1.61
3.23
3.71
4.84
2.28
3.39
0.49
1.44
1.64
2.42
3.55
1.06
1.06
2.42
3.55
1.53
2.54
6.11
3.11
3.11
3.11
3.11
3.55
3.54
10.46
1.24
3.20
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.13
0.23
0.13
0.35
0.35
0.55
0.55
0.35
0.35
0.55
0.55
1.25
0.35
0.35
0.35
0.35
0.35
1.25
0.55
1.25
1.25
3.00
3.00
3.00
3.00
3.00
3.00
1.00
1.00
1.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.33
0.48
0.23
0.23
0.33
0.48
0.11
0.18
1.76
0.50
1.00
0.25
0.25
0.29
1.02
0.75
0.36
0.52
0.35
0.35
0.35
6.00
3.00
6.00
CIMIENTOS.
FALSA CIMENTACION MEZCLA 1:12 + 30% PG
Eje A -A
EJE C-C
EJE 1-1
EJE 3-3, 5-5
Eje 7-7
SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTO 1:8 C:H + 25%M3
PM
Eje A-A Entre ejes 1 y 7(Sec 5)
M3
Eje A'-A' Entre ejes 2 - 3 - 4, 5-6 Y 8-9 (Sec 7)
M3
Eje B'-B' Entre ejes 2 - 3 - 4, 5-6 (Sec 7)
M3
Eje C-C Entre ejes 1 y 7 (Sec 5)
M3
Eje C`-C` entre ejes 8-9
Eje D-D entre ejes 9-12
Eje E-E entre ejes 8-12
Eje 1-1 Entre ejes A - B, B - C (Sec 1)
M3
Eje 3-3 Y 5-5 Entre ejes A - B, B - C (Sec 2)M3
Eje 7-7 Entre ejes A - B, B - C (Sec 3)
M3
Eje 7-7 Entre ejes A - B, B - C (Sec 4)
M3
Eje 8-8 Entre ejes A y C (Sec 4)
M3
Eje 8-8 Entre ejes C y E (Sec 9)
Eje 9-9 Entre ejes A y E (Sec 7)
M3
Eje 12-12 Entre ejes D y E (Sec 11)
Eje 12-12 Entre ejes B` y E (Sec 11)
04.03.03.02
ALTO
KG.
TOTAL
10.65
38.12
9.06
104.32
5.08
0.14
7.46
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
N
DESCRIPCION
Tapa
Eje A'-A' Entre ejes 2 - 3 - 4, 5-6 Y 8-9 (Sec 7)
M3
Eje B'-B' Entre ejes 2 - 3 - 4, 5-6 (Sec 7)
M3
Eje C-C Entre ejes 1 y 7 (Sec 5)
M3
Tapa
Tapa
Eje C`-C` entre ejes 8-9
Eje D-D entre ejes 9-12
Tapa
Eje E-E entre ejes 8-12
Eje 1-1 Entre ejes A - B, B - C (Sec 1)
M3
Eje 3-3 Y 5-5 Entre ejes A - B, B - C (Sec 2)M3
Eje 7-7 Entre ejes A - B, B - C (Sec 3)
M3
Eje 7-7 Entre ejes A - B, B - C (Sec 4)
M3
Eje 8-8 Entre ejes A y C (Sec 4)
M3
Eje 8-8 Entre ejes C y E (Sec 9)
Eje 9-9 Entre ejes A y E (Sec 7)
M3
Eje 12-12 Entre ejes D y E (Sec 11)
Eje 12-12 Entre ejes B` y E (Sec 11)
04.03.04
04.03.04.01
04.04.00
04.04.01
04.04.01.01
04.04.01.02
0.77
0.13
1.06
1.06
2.42
0.13
3.55
0.13
1.53
2.54
0.13
6.11
3.11
3.11
3.11
3.11
3.55
3.54
10.46
1.24
3.20
ALTO
0.35
0.35
0.55
0.55
0.35
0.35
0.35
0.35
0.55
0.55
0.55
1.25
0.35
0.35
0.35
0.35
0.35
1.25
0.55
1.25
1.25
FALSO PISO
CONCRETO EN FALSO PISO DE 4" DE 1:8 PARAM2
PISO PULIDO
06 Aulas
M2
7.45
6.97
0.93
0.13
1.61
0.13
Vereda de circulacion
M2
1.53
9.33
4.50
10.30
SS.HH.
M2
6.11
1.53
SS.HH.
M2
1.00
1.53
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=175 KG/CM2
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-11
Z-12
Z-13
ACERO EN ZAPATAS FY=4200 KG/CM2
Z-1 2.20x2.20
Acero lado A
5/8" @ .175
2.10
Acero lado B
5/8" @ .175
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
N
DE
VECES
SUB TOTAL
LONG.
AREA
2.00
1.00
6.00
6.00
6.00
3.00
6.00
3.00
2.00
2.00
2.00
2.00
4.00
8.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.54
0.05
3.50
3.50
5.08
0.14
7.46
0.14
1.68
2.79
0.14
15.28
4.35
8.71
2.18
2.18
2.49
8.85
11.51
3.10
8.00
3.00
-6.00
-6.00
1.00
1.00
1.00
1.00
155.78
-0.73
-1.26
14.27
46.35
9.35
1.53
VOL.
KG.
TOTAL
225.30
33.88
2.20
1.85
1.80
1.50
1.25
1.20
3.07
2.90
3.20
1.20
2.40
2.40
1.40
2.20
1.85
1.80
1.50
2.10
1.80
1.40
1.40
1.65
1.20
1.40
1.20
1.40
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
3.00
3.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
7.26
5.13
3.24
2.25
1.31
1.08
2.15
2.03
2.64
0.72
1.68
1.44
2.94
KG/ML
3.00
2.10
1.60
12.00
121
2.10
1.60
12.00
121
1027.59
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
5
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
2.10
Z-2 1.85x1.85
Acero lado A
5/8" @ .175
1.75
Acero lado B
5/8" @ .175
1.75
Z-3 1.80x1.80
Acero lado A
5/8" @ .175
1.70
Acero lado B
5/8" @ .175
1.70
Z-4 1.50x1.50
Acero lado A
5/8" @ .175
1.40
Acero lado B
5/8" @ .175
1.40
Z-5 1.25x2.10
Acero lado A
1/2" @ .15
1.15
Acero lado B
1/2" @ .15
2.00
Z-6 1.20x1.80
Acero lado A
1/2" @ .15
1.10
Acero lado B
1/2" @ .15
1.70
Z-7 3.07x1.40
Acero lado A
5/8" @ .175
2.97
Acero lado B
5/8" @ .175
1.30
Z-8 2.90x1.40
Acero lado A
1/2" @ .175
2.80
Acero lado B
3.00
1.75
1.60
10.00
084
1.75
1.60
10.00
084
2.00
1.70
1.60
10.00
054
1.70
1.60
10.00
054
2.00
1.40
1.60
8.00
036
1.40
1.60
8.00
036
1.00
1.15
1.02
13.00
015
2.00
1.02
8.00
016
1.00
1.10
1.02
11.00
012
1.70
1.02
7.00
012
1.00
2.97
1.60
7.00
033
1.30
1.60
17.00
035
1.00
2.80
1.02
7.00
020
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
N
DESCRIPCION
1/2" @ .175
1.30
Z-9 1.30x1.20
Acero lado A
1/2" @ .15
1.20
Acero lado B
1/2" @ .15
1.10
Z-9 2.90x1.40
Acero lado A
5/8" @ .175
2.80
Acero lado B
5/8" @ .175
1.30
Z-10 1.20x1.20
Acero lado A
1/2" @ .15
1.10
Acero lado B
1/2" @ .15
1.10
Z-11 1.40x2.40
Acero lado A
5/8" @ .175
1.30
Acero lado B
5/8" @ .175
2.30
Z-12 1.20x2.40
Acero lado A
1/2" @ .15
1.10
Acero lado B
1/2" @ .15
2.30
Z-13 1.40x1.40
Acero lado A
5/8" @ .175
1.30
Acero lado B
5/8" @ .175
1.30
04.04.02
04.04.02.01
ALTO
1.02
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
16.00
KG.
TOTAL
021
1.00
1.20
1.02
7.00
009
1.10
1.02
8.00
009
1.00
2.80
1.60
7.00
031
1.30
1.60
16.00
033
1.00
1.10
1.02
7.00
008
1.10
1.02
7.00
008
1.00
1.30
1.60
13.00
027
2.30
1.60
7.00
026
1.00
1.10
1.02
15.00
017
2.30
1.02
7.00
016
3.00
1.30
1.60
7.00
044
1.30
1.60
7.00
044
0.60
6.00
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C = M3
175 KG/CM2
Eje A-A
M3
3.55
14.29
0.25
3.20
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
7
MEDIDAS
DESCRIPCION
Eje C-C
Eje E-E
EJE 1-1, 3-3, 5-5 Y 7-7
M3
M3
M3
EJE 8-8
M3
EJE 12-12
04.04.02.02
04.04.02.03
3.55
6.11
6.47
0.23
11.45
0.23
0.23
4.47
0.23
0.23
0.23
0.35
0.25
0.23
0.40
0.25
0.23
0.25
ALTO
N
DE
VECES
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
6.00
1.00
4.00
-4.00
1.00
-2.00
-1.00
1.00
-1.00
0.60
0.60
0.60
0.60
0.60
0.60
0.60
12.00
12.00
2.00
8.00
-8.00
2.00
2.00
SUB TOTAL
LONG.
AREA
VOL.
KG.
2.94
0.84
5.43
-0.14
1.58
-0.11
-0.03
0.62
-0.03
107.51
25.56
25.56
7.33
31.06
-1.10
13.74
5.36
1471.81
2.00
24.70
1.02
3.00
151.16
0.5
31/2"
23.7
0.5
24.70
1.02
3.00
151.16
0.2
21/2"
23.7
Traslapes
0.2
24.10
1.02
2.00
98.33
0.60
1.02
3.00
3.67
1.68
0.58
162.00
315.71
0.54
0.2
EJE E-E (25x60)
31/2"
6.5
0.5
1.00
0.5
7.50
1.02
3.00
22.95
0.5
31/2"
6.5
0.5
7.50
1.02
3.00
22.95
0.3
21/2"
6.5
0.3
7.10
1.02
2.00
14.48
1.68
0.58
40.00
38.98
0.54
0.2
31/2"
7.4
2.00
0.5
0.5
TOTAL
8.40
1.02
3.00
51.41
8.40
1.02
3.00
51.41
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
8
MEDIDAS
DESCRIPCION
0.3
21/2"
7.4
0.3
0.54
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
8.00
1.02
2.00
32.64
1.88
0.58
40.00
87.23
TOTAL
0.3
EJE 3-3 y 5-5 (35x60)
31/2"
7.4
0.5
2.00
0.5
8.40
1.02
3.00
51.41
0.5
31/2"
7.4
0.5
8.40
1.02
3.00
51.41
0.3
21/2"
7.4
0.3
8.00
1.02
2.00
32.64
1.88
0.58
40.00
87.23
0.54
0.3
EJE 8-8 (23x60)
1.00
21/2"
12.12
0.5
0.5
13.12
1.02
2.00
26.76
0.5
21/2"
12.12
0.5
13.12
1.02
2.00
26.76
0.19
21/2"
12.12
0.19
12.50
1.02
2.00
25.50
1.66
0.58
68.00
65.47
0.54
0.19
EJE 12-12 (23x60)
21/2"
5.02
0.5
1.00
0.5
6.02
1.02
2.00
12.28
0.5
21/2"
5.02
0.5
6.02
1.02
2.00
12.28
0.19
21/2"
5.02
0.19
5.40
1.02
2.00
11.02
1.66
0.58
28.00
26.96
0.54
0.19
04.04.03
04.04.03.01
COLUMNAS
CONCRETO EN COLUMNETAS F'C=175 KG/CM2M3
EN COLUMNETAS
6.14
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
04.04.03.02
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
M3
0.25
0.13
1.09
9.00
0.32
M3
0.25
0.13
2.09
3.00
0.20
M3
0.13
0.13
2.69
3.00
0.14
M3
0.25
0.13
0.94
9.00
0.27
M3
0.25
0.13
1.94
3.00
0.19
M3
0.13
0.13
2.54
3.00
0.13
M3
0.25
0.13
1.89
12.00
0.74
M3
0.25
0.13
1.84
12.00
0.72
M3
0.25
0.13
3.35
12.00
1.31
M3
0.25
0.13
3.35
12.00
1.31
Eje D-D
M3
0.25
0.13
2.10
3.00
0.20
Eje 12-12
M3
0.25
0.13
2.00
1.00
0.07
En pazadiso
M3
0.25
0.13
0.95
16.00
0.49
En Rampa descanzo
M3
0.25
0.13
1.03
2.00
0.07
0.35
0.50
8.57
10.00
15.00
M3
0.35
0.55
0.50
-6.00
-0.58
C-2
M3
0.35
0.50
8.57
4.00
6.00
C-3
M3
0.23
0.25
9.00
4.00
2.07
0.23
0.35
0.23
-4.00
-0.07
0.23
0.30
0.23
-8.00
-0.13
0.23
0.40
8.52
5.00
3.92
C-4
M3
KG.
TOTAL
32.88
04.04.03.03
ALTO
0.23
0.55
0.40
-2.00
-0.10
C-5
M3
0.13
0.40
8.57
3.00
1.34
C-3 EN Rampa
M3
0.23
0.25
7.52
4.00
1.73
M3
0.23
0.40
3.60
6.00
1.99
C-6
M3
0.35
0.35
4.55
3.00
1.72
400.25
M2
1.70
7.30
6.00
74.46
C-1
M2
1.47
7.30
4.00
42.92
C-2
M2
1.80
7.30
4.00
52.56
C-3
M2
0.50
8.40
4.00
16.80
C-4
M2
1.03
7.25
3.00
22.40
C-4
M2
0.80
7.25
2.00
11.60
C-5
M2
0.73
5.60
3.00
12.26
C-3 En rampa
M2
0.50
6.25
4.00
12.50
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
10
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
0.80
3.60
6.00
17.28
C-6
M3
1.26
4.55
3.00
17.20
M2
0.63
1.09
9.00
6.15
M2
0.63
2.09
3.00
3.94
M2
0.26
2.69
3.00
2.09
M2
0.63
0.94
9.00
5.30
M2
0.63
1.94
3.00
3.66
M2
0.26
2.54
3.00
1.98
M2
0.63
1.89
12.00
14.25
M2
0.63
1.84
12.00
13.87
M2
0.63
3.35
12.00
25.33
M2
0.63
3.35
12.00
25.33
Eje D-D
M2
0.63
2.10
3.00
3.97
Eje 12-12
M2
0.63
2.00
1.00
1.26
En pazadiso
M2
0.50
0.95
22.00
10.45
En pazadiso
M2
0.13
0.95
12.00
1.48
En Rampa descanzo
M3
0.63
0.95
2.00
1.20
VOL.
KG.
TOTAL
EN COLUMNETAS
04.04.03.04
ACERO EN COLUMNAS
6278.22
KG
MODULO DE AULAS
C-1
KG/ML
KG
63/4"
25/8"
ESTRIBOS 3/8
KG
10.00
9.72
2.26
6.00
1318.03
9.72
1.70
1.60
2.00
311.04
0.58
45.00
443.70
C-2
4.00
43/4"
9.72
2.26
4.00
351.48
45/8"
9.72
1.60
4.00
248.83
1.70
0.58
45.00
177.48
10.27
1.02
4.00
167.61
0.96
0.58
54.00
120.27
45/8"
9.62
1.60
4.00
307.84
21/2"
10.27
1.02
2.00
104.75
1.26
0.58
45.00
164.43
ESTRIBOS 3/8
KG
C-3
4.00
41/2"
ESTRIBOS 3/8
KG
C-4
5.00
ESTRIBOS 3/8
KG
C-5
3.00
41/2"
8.02
1.02
4.00
98.16
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
11
MEDIDAS
DESCRIPCION
23/8"
ESTRIBOS 3/8
KG
ALTO
KG
KG.
2.00
27.91
1.06
0.58
35.00
64.55
8.67
1.02
4.00
141.49
0.96
0.58
35.00
77.95
6.00
41/2"
23/8"
C-6
VOL.
0.58
EN RAMPA
ESTRIBOS 3/8
AREA
4.00
41/2"
ESTRIBOS 3/8
SUB TOTAL
LONG.
8.02
C-3 EN RAMPA
C-5
N
DE
VECES
KG
3.60
1.02
4.00
88.13
3.60
1.06
0.58
2.00
25.06
0.58
20.00
73.78
EN RAMPA
3.00
45/8"
4.55
1.60
4.00
87.36
41/2"
4.55
1.02
2.00
27.85
1.20
0.58
20.00
41.76
2.66
0.58
4.00
55.44
0.76
0.25
17.00
29.07
ESTRIBOS 3/8
KG
COLUMNAS DE CONFINAMIENTO
Eje C-C 1er nivel
9.00
43/8"
ESTRIBOS 1/4"
KG
3.00
43/8"
ESTRIBOS 1/4"
KG
3.66
0.58
4.00
25.44
0.76
0.25
23.00
13.11
3.00
23/8"
ESTRIBOS 1/4"
KG
4.26
0.58
2.00
14.81
0.24
0.25
27.00
4.86
10.00
43/8"
ESTRIBOS 1/4"
KG
1.34
0.58
4.00
30.97
0.76
0.25
17.00
32.30
2.00
43/8"
ESTRIBOS 1/4"
KG
2.34
0.58
4.00
10.83
0.76
0.25
18.00
6.84
2.00
23/8"
ESTRIBOS 1/4"
KG
2.94
0.58
2.00
6.81
0.24
0.25
22.00
2.64
12.00
43/8"
ESTRIBOS 1/4"
KG
3.46
0.58
4.00
96.19
0.76
0.25
23.00
52.44
12.00
2.24
0.58
4.00
62.22
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
ESTRIBOS 1/4"
KG
ALTO
KG
4.92
3.95
4.00
932.83
0.76
0.25
23.00
52.44
4.92
0.58
KG
4.00
136.97
0.76
0.25
23.00
52.44
3.67
0.58
4.00
25.54
0.76
0.25
23.00
13.11
3.57
0.58
4.00
8.28
0.76
0.25
23.00
4.37
Eje D-D
KG
Eje 12-12
KG
En pazadiso
16.00
43/8"
KG
1.35
0.58
4.00
50.11
0.76
0.25
12.00
36.48
En Rampa descanzo
2.00
43/8"
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
41.04
1.00
43/8"
ESTRIBOS 1/4"
TOTAL
3.00
43/8"
ESTRIBOS 1/4"
18.00
KG.
12.00
43/8"
ESTRIBOS 1/4"
VOL.
0.25
ESTRIBOS 1/4"
AREA
12.00
43/8"
ESTRIBOS 1/4"
SUB TOTAL
LONG.
0.76
ESTRIBOS 1/4"
N
DE
VECES
KG
1.43
0.58
4.00
6.61
0.76
0.25
12.00
4.56
VIGAS
1.40
5.35
0.23
0.08
8.00
0.74
EN TIMPANO RAMPA
14.25
0.23
0.08
1.00
0.25
EN TIMPANO RAMPA
14.25
0.13
0.08
3.00
0.42
3.47
0.13
0.15
12.00
0.81
2.37
0.13
0.15
9.00
0.42
27.59
0.13
0.10
1.00
0.36
1.40
0.13
0.10
2.00
0.04
M3
10.49
0.13
0.10
2.00
0.27
M3
3.18
0.13
0.10
2.00
0.08
M3
M3
7.50
0.35
0.55
3.00
4.33
M3
7.50
0.23
0.35
4.00
2.42
M3
23.75
0.20
0.55
2.00
5.23
1.98
M3
37.07
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
M3
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
23.75
0.20
0.30
2.00
2.85
M3
1.50
0.35
0.71
7.00
2.61
M3
23.75
0.13
0.40
1.00
1.24
M3
7.10
0.23
0.30
4.00
1.96
M3
6.85
0.23
0.25
4.00
Tringulo fachada
M3
0.23
4.00
1.02
0.94
Tringulo posterior
M3
0.23
4.00
1.02
0.94
KG.
TOTAL
1.58
RAMPA
04.04.04.04
M3
12.30
0.23
0.20
1.00
0.57
M3
12.22
0.23
0.30
1.00
0.84
M3
1.50
0.23
0.43
1.00
0.15
M3
11.83
0.23
0.25
1.00
0.68
M3
1.50
0.23
0.56
1.00
0.19
M3
12.30
0.13
0.20
1.00
0.32
M3
8.83
0.13
0.30
1.00
0.34
M3
1.50
0.13
0.20
1.00
0.04
M3
11.83
0.13
0.25
1.00
0.38
M3
1.50
0.23
0.56
1.00
0.19
M3
1.91
0.25
0.25
1.00
0.12
M3
11.92
0.23
0.25
2.00
1.37
M3
1.90
0.23
0.20
2.00
0.17
M3
11.83
0.23
0.25
2.00
1.36
M3
1.50
0.23
0.56
2.00
0.39
M3
12.30
0.40
0.25
1.00
1.23
M3
1.50
0.40
0.43
1.00
0.26
V5 (0.13 x 0.40)
M3
6.57
0.13
0.40
1.00
0.34
M3
6.57
0.40
0.30
1.00
0.79
M3
6.57
0.40
0.20
4.00
2.10
M3
1.91
0.40
0.25
2.00
0.38
M3
6.57
0.23
0.25
2.00
0.76
M2
357.72
M2
6.47
0.35
6.00
13.59
M2
6.47
0.35
3.00
6.79
M2
6.47
0.35
2.00
4.53
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
14
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
6.47
0.15
6.00
5.82
Cara lateral
M2
23.75
0.35
3.00
24.94
M2
23.75
0.55
1.00
13.06
M2
23.75
0.20
2.00
9.50
Cara lateral
M2
23.75
0.30
4.00
28.50
M2
23.75
0.20
2.00
9.50
M2
1.50
0.48
2.00
1.43
M2
1.50
0.28
12.00
4.95
M2
1.53
0.35
7.00
3.74
M2
23.75
0.40
1.00
9.50
M2
23.75
0.20
1.00
4.75
M2
23.75
0.13
1.00
3.09
M2
7.47
0.30
8.00
17.93
3.47
2.00
0.15
18.00
18.74
2.47
2.00
0.15
6.00
4.45
27.59
2.00
0.10
1.00
5.52
1.40
2.00
0.10
2.00
0.56
M2
3.24
2.00
0.10
1.00
0.65
Tmpanos
M2
3.43
0.25
8.00
6.86
0.25
V5 (0.13 x 0.40)
Viga de Confinamiento
nro caras
M2
3.43
8.00
6.86
Tringulo grande
M2
1.02
8.00
8.14
Tringulo grande
M2
1.02
8.00
8.14
M2
1.50
0.23
4.00
1.38
M2
1.50
0.23
4.00
1.38
M2
0.23
0.15
8.00
0.28
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
15
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
RAMPA
Eje 8-8 viga inclinada en Rampa (23X20)
M3
12.30
0.20
2.00
4.92
M3
12.22
0.30
2.00
7.33
M3
1.50
0.23
1.00
0.35
1.50
0.43
2.00
1.28
Lateral
M3
11.83
0.25
2.00
5.91
M3
1.50
0.23
1.00
0.35
M3
1.50
0.56
2.00
1.67
M3
12.30
0.20
2.00
4.92
Fondo
M3
8.83
0.13
1.00
1.15
Lateral
M3
8.83
0.30
2.00
5.30
Fondo
M3
1.50
0.13
1.00
0.20
Lateral
M3
11.83
0.25
2.00
5.91
Fondo
M3
11.83
0.13
1.00
1.54
M3
1.50
0.13
1.00
0.20
M3
1.50
0.56
1.00
0.84
Fondo
M3
1.91
0.25
1.00
0.48
Lateral
M3
1.91
0.10
1.00
0.19
Fondo
M3
11.92
0.23
4.00
10.97
Lateral
M3
11.92
0.10
2.00
2.38
Fondo
M3
1.90
0.23
4.00
1.75
Lateral
M3
1.90
0.10
2.00
0.38
Fondo
M3
11.83
0.23
4.00
10.88
11.83
0.25
2.00
5.91
Lateral
Eje 11'-11' Y 12-12 VA-6 (23xVar.) 2DO NIVEL
M3
1.50
0.23
4.00
1.38
1.50
0.56
2.00
1.67
M3
12.30
0.40
1.00
4.92
12.30
0.25
2.00
6.15
1.50
0.40
1.00
0.60
1.50
0.56
2.00
1.67
6.57
0.13
1.00
0.85
6.57
0.40
2.00
5.26
6.57
0.40
1.00
2.63
6.57
0.15
2.00
1.97
6.57
0.40
4.00
10.51
6.57
0.20
8.00
10.51
1.91
0.40
4.00
3.05
Fondo
Lateral
Fondo
M3
Lateral
V5 (0.13 x 0.40)
Fondo
M3
Lateral
Eje A-A V6 (0.40 x 0.30)
Fondo
M3
Lateral
VA-7 (0.40 x 0.20) Ejes A-A, B-B C-C Y E-E
M3
M3
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
16
MEDIDAS
DESCRIPCION
Fondo
Lateral
04.04.04.05
M3
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
1.91
0.10
8.00
1.52
6.57
0.23
2.00
3.02
6.57
0.10
4.00
2.63
ACERO EN VIGAS
VOL.
KG.
4367.19
kg/ml
3.00
2 3/4"
0.4
7.37
0.4
8.17
2.26
2.00
110.79
8.87
0.3
9.57
1.60
2.00
91.87
4.67
1.60
2.00
44.83
2.20
2.26
1.00
14.92
3.10
2.26
2.00
42.04
2.60
1.60
2.00
24.96
1.80
0.58
50.00
156.60
2 5/8"
0.4
Bastones
2 5/8" L=4.67
1 3/4" L=1.80
0.4
2 3/4" L=3.10
2 5/8" L=1.90
0.4
Estribos
0.3
0.3
0.5
3/8"
4.00
2 1/2"
0.3
7.37
0.3
7.97
1.02
2.00
65.04
8.47
0.3
9.07
1.02
2.00
74.01
1.65
1.02
1.00
6.73
2.60
1.60
1.00
16.64
2 1/2"
0.3
Bastones
1 1/2" L=1.35
0.3
1 5/8" L=2.6
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
17
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
2 5/8" L= 1.9
0.3
1.9
0.3
2.50
1.60
2.00
32.00
0.4
2 5/8" L=1.90
0.3
2.60
1.60
2.00
33.28
1.16
0.58
36.00
96.88
1.80
0.58
10.00
41.76
Estribos
0.18
0.3
3/8"
0.3
0.5
3/8"
2.00
2 5/8"
0.4
23.7
0.4
24.50
1.60
2.00
156.80
23.7
0.4
24.50
1.60
2.00
156.80
1.50
1.02
1.00
3.06
2.75
1.02
1.00
5.61
1.50
1.02
1.00
3.06
1.50
0.58
138.00
240.12
2 5/8"
0.4
1 1/2" L=1.10
0.4
1 1/2" L=2.75
1 1/2" L=1.10
Estribos
0.4
0.15
0.5
3/8"
2.00
2 1/2"
0.3
23.7
0.3
24.30
1.02
2.00
99.14
23.7
0.3
24.30
1.02
2.00
99.14
2 1/2"
0.3
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
18
MEDIDAS
DESCRIPCION
Estribos
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.15
0.25
1.00
0.58
138.00
160.08
3/8"
V5 (0.13 x 0.40)
2.00
2 1/2"
0.3
23.7
0.3
24.30
1.02
2.00
99.14
23.7
0.3
24.30
1.02
2.00
99.14
1.08
0.25
120.00
64.80
2 1/2"
0.3
Estribos
0.09
0.35
1/4"
4.00
2 1/2"
0.25
7.47
0.25
7.97
1.02
2.00
65.04
7.47
0.25
7.97
1.02
2.00
65.04
1.06
0.58
36.00
88.53
2 1/2"
0.25
Estribos
0.18
0.25
3/8"
18.00
2 3/8" L=3.47
0.1
Estribo 1/4"
0.1
3.67
0.58
2.00
76.63
0.1
0.30
0.25
17.00
22.95
0.1
0.1
1/4"
6.00
2 3/8" L=2.47
0.1
0.1
2.67
0.58
2.00
18.58
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
19
MEDIDAS
DESCRIPCION
Estribo 1/4"
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.1
0.1
1/4"
0.1
0.30
0.25
12.00
5.40
1.00
2 3/8" L=27.5
0.1
Estribo 1/4"
0.1
27.70
0.58
2.00
32.13
0.1
0.30
0.25
137.00
10.28
0.1
0.1
1/4"
2.00
2 3/8" L=1.4
0.1
Estribo 1/4"
0.1
1.60
0.58
2.00
3.71
0.1
0.30
0.25
7.00
1.05
0.1
0.1
1/4"
1.00
2 3/8" L=3.24
0.1
Estribo 1/4"
0.1
3.44
0.58
2.00
3.99
0.1
0.30
0.25
17.00
1.28
0.1
0.1
1/4"
Timpanos
4.00
2 1/2"
0.5
6.10
1.02
4.00
99.55
5.60
1.02
4.00
91.39
2.75
1.02
4.00
44.88
5.5
0.1
2 1/2"
4.6
2 1/2"
0.3
0.55
1.9
Estribos
0.18
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
20
MEDIDAS
DESCRIPCION
0.2
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.96
0.58
38.00
84.63
1.16
0.58
18.00
48.44
3/8"
Estribos
0.18
0.3
3/8"
RAMPA
Eje 8-8 viga inclinada en Rampa (23X20)
2 1/2"
1.00
1.85
14.35
0.3
0.30
1.85
2 1/2"
16.80
1.02
2.00
34.27
16.80
1.02
2.00
34.27
0.90
0.58
65.00
33.93
0.30
#################
0.30
0.16
Estribo
0.19
1.00
2 1/2"
13.35
0.25
13.60
1.02
2.00
27.74
0.25
12.75
1.02
2.00
26.01
2.30
1.60
1.00
3.68
0.3
2.45
1.60
2.00
7.84
0.3
2.15
1.60
2.00
6.88
2 1/2"
0.25
12.25
1 5/8"
2.3
2 5/8"
1.85
0.30
2 5/8"
1.85
0.16
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
21
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.16
Estribo
0.90
0.58
81.00
42.28
0.19
1.00
2 1/2"
1.00
12.05
13.35
1.02
2.00
27.23
13.35
1.02
2.00
27.23
3.10
1.02
2.00
6.32
2.35
1.02
2.00
4.79
0.98
0.58
82.00
46.61
0.30
2 1/2"
1.00
12.05
0.30
2 1/2"
0.4
2.5
0.20
2 1/2"
1.95
0.40
0.20
Estribo
0.19
1.00
1.85
14.35
0.3
0.30
1.85
2 1/2"
16.80
1.02
2.00
34.27
16.80
1.02
2.00
34.27
0.90
0.58
65.00
33.93
0.30
#################
0.30
0.16
Estribo
0.19
1.00
2 1/2"
9.56
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
22
MEDIDAS
DESCRIPCION
0.25
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.25
10.06
1.02
2.00
20.52
0.25
9.55
1.02
2.00
19.48
2.30
1.60
1.00
3.68
0.92
0.58
50.00
26.68
2 1/2"
0.20
9.1
1 5/8"
2.3
0.27
Estribo
0.09
1.00
2 1/2"
1.00
1.00
12.05
13.35
1.02
2.00
27.23
13.35
1.02
2.00
27.23
3.10
1.02
2.00
6.32
2.35
1.02
2.00
4.79
0.78
0.58
82.00
37.10
0.30
2 1/2"
1.00
12.05
0.30
2 1/2"
0.4
2.5
0.20
2 1/2"
1.95
0.40
0.20
Estribo
0.09
1.00
2 1/2"
0.20
2 1/2"
1.85
0.20
2.25
1.02
2.00
4.59
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
23
MEDIDAS
DESCRIPCION
1.85
0.20
Estribos
0.20
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
2.25
1.02
2.00
4.59
1.04
0.58
11.00
6.64
0.21
0.21
3/8"
2.00
2 1/2"
1.85
0.3
10.15
1.75
14.35
1.02
2.00
58.55
14.15
1.02
2.00
57.73
2.30
1.60
1.00
7.36
0.96
0.58
83.00
92.43
0.30
2 1/2"
0.2
1.85
10.15
1.75 0.20
1 5/8"
1.4
0.9
Estribos
0.19
0.19
3/8"
2.00
2 1/2"
1.00
12.05
13.35
1.02
2.00
54.47
13.35
1.02
2.00
54.47
3.10
1.02
2.00
12.65
2.35
1.02
2.00
9.59
0.30
2 1/2"
1.00
12.05
0.30
2 1/2"
0.4
2.5
0.20
2 1/2"
1.95
0.40
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
24
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
0.20
Estribo
0.78
0.58
82.00
74.19
0.09
1.00
3 1/2"
1.40
10.15
1.75
13.60
1.02
3.00
41.62
12.50
1.02
3.00
38.25
0.9
2.30
1.60
1.00
3.68
0.3
2.45
1.60
2.00
7.84
0.3
2.15
1.60
3.00
10.32
0.96
0.58
83.00
46.21
0.30
3 1/2"
0.2
0.20
10.15
1.75 0.20
1 5/8"
1.4
2 5/8"
1.85
0.30
3 5/8"
1.85
Estribos
0.19
0.19
3/8"
V5 (0.13x0.40)
1.00
2 1/2"
0.45
6.45
0.45
7.35
1.02
2.00
14.99
6.45
0.45
7.35
1.02
2.00
14.99
0.90
0.25
40.00
9.00
2 1/2"
0.45
Estribos
0.1
0.35
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
25
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
1/4"
1.00
2 5/8"
0.25
6.45
0.25
6.95
1.60
2.00
22.24
6.45
0.25
6.95
1.60
2.00
22.24
6.45
0.25
6.95
1.02
2.00
14.18
6.45
0.25
6.95
1.02
2.00
14.18
0.70
0.25
40.00
7.00
2 5/8"
0.25
2 1/2"
0.25
2 1/2"
0.25
Estribos
0.35
0.25
1/4"
4.00
2 1/2"
0.15
6.45
0.15
6.75
1.02
2.00
55.08
6.45
0.15
6.75
1.02
2.00
55.08
6.45
0.15
6.75
0.58
1.00
15.66
6.45
0.15
6.75
0.58
1.00
15.66
0.50
0.25
40.00
20.00
2 1/2"
0.15
1 3/8"
0.15
1 3/8"
0.15
Estribos
0.35
0.15
1/4"
2.00
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
0.20
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
1.74
0.20
2.14
1.02
3.00
13.10
1.74
0.20
2.14
1.02
3.00
13.10
0.50
0.25
9.00
2.25
TOTAL
3 1/2"
0.20
Estribos
0.35
0.15
1/4"
2.00
2 1/2"
0.20
6.45
0.20
6.85
1.02
2.00
27.95
6.45
0.20
6.85
1.02
2.00
27.95
0.50
0.25
40.00
10.00
2 1/2"
0.20
Estribos
0.35
0.15
1/4"
04.04.05
04.04.05.01
LOSAS
LOSAS MACISAS E=0.15m
5.91
12.32
1.53
0.15
1.00
2.83
2.89
1.43
0.15
1.00
0.62
12.32
1.33
0.15
1.00
2.46
11.70
1.53
1.00
17.90
2.89
1.43
1.00
4.13
12.32
1.43
1.00
17.62
39.65
796.38
0.1
2.05
0.58
50.00
59.45
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
27
MEDIDAS
DESCRIPCION
0.1
1.85
0.1
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
2.05
0.58
50.00
59.45
12.90
1.02
9.00
118.42
13.05
1.02
9.00
119.80
2.05
0.58
14.00
16.65
2.05
0.58
14.00
16.65
7.17
1.02
8.00
58.51
6.67
1.02
8.00
54.43
1.95
0.58
50.00
56.55
1.95
0.58
50.00
56.55
12.60
1.02
7.00
89.96
0.1
0.1
0.75
0.1
1.85
0.1
0.1
6.47
0.1
0.1
1.75
0.1
0.2
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
0.2
04.04.05.02
12.2
0.2
12.60
ALTO
1.02
N
DE
VECES
SUB TOTAL
LONG.
AREA
7.00
VOL.
KG.
TOTAL
89.96
16.35
En Viguetas
Viguetas entre A - B Y C
M3
M3
3.67
0.10
0.15
34.00
1.87
3.61
0.10
0.15
68.00
3.68
3.55
0.10
0.15
18.00
0.96
6.11
0.10
0.15
3.00
0.27
7.07
3.67
0.05
2.00
2.59
7.07
3.61
0.05
4.00
5.10
En Losa e= 0.05
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
M3
3.55
1.37
0.05
6.00
1.46
En Volado de rampa
M3
6.11
1.37
0.05
1.00
0.42
207.86
Pao A, entre 1 - 2, 6 - 7
M3
Pao A, entre 2 al 6
7.07
3.67
2.00
51.89
7.07
3.61
4.00
102.09
M3
3.55
1.37
6.00
29.18
En Volado de Rampa
M3
6.11
1.37
1.00
8.37
M2
23.75
0.20
2.00
9.50
En Aulas (Laterales)
M2
8.97
0.20
2.00
3.59
En Rampa
M2
6.57
0.20
2.00
2.63
En Rampa
M2
1.50
0.20
2.00
0.60
Frisos
1133.83
KG
1 corrido (positivo)
KG
23.75
20.00
1.02
484.50
1 bastn (negativo)
KG
2.35
100.00
1.02
239.70
KG
1.10
40.00
0.58
25.52
KG
1.95
100.00
0.58
113.10
Temperatura
KG
9.15
103.00
0.25
235.61
KG
6.57
3.00
1.02
20.10
Rampa
1
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
1 1/2 bastn
KG
ALTO
2.50
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
6.00
1.02
15.30
8.33
191.54
KG.
1595.00
04.04.06
04.04.06.01
04.04.06.02
04.04.06.03
Und
GARGOLA
0.03
M3
GARGOLA
M3
0.20
0.20
0.10
4.00
0.02
GARGOLA
M3
0.20
0.05
0.15
8.00
0.01
M2
0.70
0.20
4.00
0.56
M2
0.20
0.10
4.00
0.08
M2
0.15
0.05
8.00
0.06
M2
0.15
0.20
8.00
0.24
0.94
KG
4.22
KG/ML
1/4
KG
1.29
0.25
8.00
2.58
1/4
KG
0.82
0.25
8.00
1.64
04.05.00
04.05.01
ESTRUCTURAS DE MADERA
04.05.01.01
TOTAL
909.39
P2
18.26
2.00
6.00
6.00
109.56
Brida Superior
P2
18.26
2.00
6.00
6.00
109.56
Brida Inferior
p2
34.45
2.00
6.00
6.00
206.69
P2
3.77
2.00
4.00
12.00
30.18
P2
5.54
2.00
4.00
6.00
22.18
P2
1.31
2.00
4.00
12.00
10.50
P3
3.05
2.00
4.00
12.00
24.41
P4
4.04
2.00
4.00
12.00
32.28
P5
7.25
2.00
4.00
12.00
58.01
P2
0.90
0.30
1.00
24.00
69.72
P2
0.50
0.30
1.00
36.00
58.10
P2
0.60
0.30
1.00
48.00
92.97
P2
0.80
0.30
1.00
12.00
30.99
P2
0.40
0.30
1.00
24.00
30.99
P2
0.30
0.30
1.00
24.00
23.24
Cartelas
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
30
MEDIDAS
DESCRIPCION
04.05.01.02
04.05.01.04
04.05.01.05
04.05.01.06
04.05.02
04.05.02.01
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
152.63
04.05.01.03
P2
18.26
2.00
3.00
4.00
36.52
P2
18.26
2.00
3.00
4.00
36.52
P2
39.80
2.00
3.00
4.00
79.59
P2
P2
P2
En Rampa
P2
P2
642.39
80.30
2.00
3.00
16.00
642.39
509.84
24.28
3.00
4.00
21.00
509.84
1.00
8.00
2.00
108.92
P2
1.00
8.00
2.00
28.74
P2
P2
62.99
1.00
3.00
1.00
15.75
P2
36.53
1.00
3.00
2.00
18.26
137.66
21.56
34.01
COBERTURA
381.26
M2
11.21
24.68
276.63
13.95
7.50
104.63
Rampas
04.05.02.02
32.18
Ml
24.68
1.00
24.68
Ml
7.50
1.00
7.50
Rampas
Cumbrera tipo flexiforte color rojo
04.06.00
MUROS DE ALBAILERIA
04.06.01
220.16
M2
6.22
2.70
4.00
67.18
M2
6.22
2.69
4.00
66.93
M2
6.22
1.15
4.00
28.61
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
31
MEDIDAS
DESCRIPCION
04.06.02
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
10.37
2.90
1.00
30.07
M2
10.37
2.25
1.00
23.38
M3
1.24
2.92
1.00
3.62
M2
1.24
0.30
1.00
0.37
M2
M2
1.88
0.83
3.00
4.68
M2
2.26
0.83
3.00
5.63
0.59
1.83
3.00
3.24
3.02
0.94
4.00
11.29
2.26
0.94
2.00
4.23
0.59
1.94
3.00
3.42
M2
VOL.
KG.
TOTAL
217.12
M2
1.88
1.74
3.00
9.79
M2
2.97
1.74
3.00
15.46
M2
1.88
1.74
3.00
9.79
M2
2.97
1.74
3.00
15.46
M2
22.07
1.00
1.00
22.07
M2
1.15
2.95
6.00
20.36
0.93
2.95
6.00
16.46
M2
1.15
2.68
6.00
18.49
0.93
2.68
6.00
14.95
9.29
1.15
1.00
10.68
5.60
0.85
0.50
2.38
RAMPA
Eje 9-9
M2
Eje 10-10
1er piso
M2
1.40
2.40
1.00
3.36
Eje 12-12
1er piso
M2
2.95
2.92
1.00
8.61
Eje C'-C'
1er piso
M2
1.50
2.10
1.00
3.15
M2
10.66
0.80
1.00
8.53
M2
3.18
0.80
2.00
5.09
04.07.00
04.07.01
122.74
M2
M2
5.72
1.20
6.00
41.18
M2
5.72
1.20
6.00
41.18
M2
8.44
1.20
1.00
10.13
M2
12.04
1.20
1.00
14.45
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
32
MEDIDAS
DESCRIPCION
04.07.02
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
6.98
1.20
1.00
8.38
M2
6.19
1.20
1.00
7.42
Ejes 1-1,5-5,7-7
M2
6.44
3.04
3.00
58.64
M2
6.44
3.04
3.00
58.64
M2
2.42
0.94
3.00
6.79
0.97
1.94
3.00
5.63
2.52
0.94
3.00
7.11
M2
2.37
1.94
3.00
13.76
M2
3.36
1.94
3.00
19.50
M2
2.44
2.94
12.00
85.94
M2
1.06
2.94
12.00
37.33
M2
0.80
2.10
12.00
-20.16
Ejes 1-1,5-5,7-7
M2
6.44
2.64
3.00
50.91
M2
6.44
2.64
3.00
51.00
M2
3.52
1.04
4.00
14.57
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.22
3.00
14.11
Descuentos
Segundo Nivel
M2
2.37
1.99
M2
3.36
1.99
3.00
20.01
M2
2.44
2.94
12.00
85.94
M2
1.06
2.94
12.00
37.33
M2
0.80
2.10
12.00
-20.16
M2
12.22
5.62
1.00
68.62
M3
10.49
1.40
2.00
29.37
M2
5.60
0.85
1.00
4.76
Eje 10-10
M2
1.40
2.40
2.00
6.72
M2
10.66
0.80
2.00
17.05
Eje 12-12
M2
1.66
2.60
1.00
4.32
Eje 12-12
M2
3.23
2.60
1.00
8.40
Descuentos
Puerta 0.80x2.10
RAMPA
Caja de rampa
KG.
TOTAL
757.85
M2
Primer nivel
Puerta 0.80x2.10
VOL.
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
33
MEDIDAS
DESCRIPCION
04.07.03
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Eje 12-12
Pasamanos
M2
12.10
0.80
2.00
19.36
Eje A-A
Pasamanos
M2
3.18
1.00
2.00
6.36
Eje C'-C'
M2
1.50
2.15
2.00
6.45
Eje D-D
Pasamanos
M2
3.18
1.00
2.00
6.36
Eje D-D
1er piso
M2
3.18
2.10
2.00
13.36
Menos P2
M2
0.80
2.10
4.00
6.72
Menos P3
M2
0.70
2.10
2.00
2.94
14.63
Eje E-E
1er piso
M2
3.18
2.30
2.00
Eje E-E
pasamanos
M2
3.18
1.00
2.00
6.36
parapeto fachada
M2
6.60
0.95
2.00
12.54
M2
M2
2.42
0.84
3.00
6.10
M2
0.97
1.84
3.00
5.35
2.52
0.84
3.00
6.35
M2
2.42
1.84
3.00
13.32
M2
3.52
1.84
3.00
19.38
M2
6.20
2.75
2.00
34.10
M2
3.52
1.04
4.00
14.57
M2
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.24
Segundo Nivel
Eje C-C, entre 1-1 al 7-7
M2
2.42
1.99
3.00
14.41
M2
3.52
1.99
3.00
20.96
M2
6.20
3.00
2.00
37.20
M2
6.20
0.60
2.00
7.44
0.55
2.00
6.82
Parapetos
Fachada principal
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
4.75
5.62
1.00
26.67
Eje 12-12
M2
5.16
2.15
1.00
11.10
Rampa
KG.
TOTAL
280.69
Primer nivel
Eje C-C, entre 1-1 al 7-7
VOL.
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
34
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
Gargolas
04.07.04
Frontal
M2
0.20
0.10
4.00
0.08
Frontal
M2
0.15
0.05
8.00
0.06
Lateral
M2
0.25
0.20
4.00
0.20
Fondo y techo
M2
0.20
0.20
8.00
0.32
Techo
M2
0.20
0.05
8.00
0.08
Interior gargola
M2
0.40
0.20
4.00
0.32
M2
206.47
INTERIORES
Primer Nivel
Eje A1 Y A7
M2
0.64
2.65
2.00
3.39
M2
1.13
2.65
3.00
8.98
Eje A3, A5
M2
0.87
2.65
2.00
4.61
M2
0.25
2.65
6.00
3.98
Eje C1 Y C7
M2
0.48
2.65
2.00
2.54
M2
1.13
2.65
3.00
8.98
Eje C3, C5
M2
0.87
2.65
2.00
4.61
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.04
3.00
0.92
M3
0.25
2.54
12.00
7.62
Eje A1 Y A7
M2
0.64
2.64
2.00
3.37
M2
1.13
2.64
3.00
8.93
Eje A3, A5
M2
0.87
2.64
2.00
4.58
M2
0.25
2.64
6.00
3.95
Eje C1 Y C7
M2
0.48
2.64
2.00
2.53
M2
1.13
2.64
3.00
8.93
Eje C3, C5
M2
0.87
2.64
2.00
4.58
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
Columnetas de confinamiento
Segundo Nivel
Columnetas de confinamiento
EXTERIORES
Primer Nivel
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
35
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Eje A1 Y A7
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje A3, A5
M2
0.35
2.65
2.00
1.86
Eje B1, B7
M2
0.25
2.65
2.00
1.33
Eje C1 Y C7
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje C3, C5
M2
0.35
2.65
2.00
1.86
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.64
3.00
1.19
M3
0.25
1.94
12.00
5.81
Eje A1 Y A7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje A3, A5
M2
0.35
2.64
2.00
1.84
Eje B1 Y B7
M2
0.25
2.64
2.00
1.32
Eje B1 Y B7
M2
0.25
1.70
2.00
0.85
Eje C1 Y C7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje C3, C5
M2
0.35
2.64
2.00
1.84
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
0.25
0.90
16.00
Columnetas de confinamiento
Segundo Nivel
Columnetas de confinamiento
Columnetas en pazadizo
3.60
RAMPA
EJE 8-8
C4
0.63
5.62
2.00
7.08
C4
0.40
5.62
2.00
4.50
C3
0.50
5.62
1.00
2.81
EJE 9-9
C5
0.80
5.62
2.00
8.99
EJE 10-10
C3
0.50
2.40
2.00
2.40
EJE 11-11
C6
1.26
2.50
3.00
9.45
EJE 12-12
C4
0.90
5.62
1.00
5.06
EJE 12-12
C3
0.50
5.62
1.00
2.81
0.25
0.90
8.00
1.80
Columneta en pazadizo
M2
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
36
MEDIDAS
DESCRIPCION
04.07.05
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Primer nivel
EJE 2, 4, 6
Fondo
M2
6.45
0.35
3.00
6.77
EJE 2, 4, 6
Lateral
M2
7.07
0.35
6.00
14.85
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.15
6.00
6.36
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.35
6.00
7.46
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.35
6.00
7.46
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
Segundo Nivel
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.30
6.00
12.73
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.30
6.00
6.39
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.30
6.00
6.39
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
M3
12.30
0.20
2.00
4.92
M3
12.22
0.30
2.00
7.33
M3
1.50
0.23
1.00
0.35
1.50
0.43
2.00
1.28
Rampa
Lateral
M3
11.83
0.25
2.00
5.91
M3
1.50
0.23
1.00
0.35
M3
1.50
0.56
2.00
1.67
M3
12.30
0.20
2.00
4.92
Fondo
M3
8.83
0.13
1.00
1.15
Lateral
M3
8.83
0.30
2.00
5.30
Fondo
M3
1.50
0.13
1.00
0.20
Lateral
M3
11.83
0.25
2.00
5.91
Fondo
M3
11.83
0.13
1.00
1.54
M3
1.50
0.13
1.00
0.20
KG.
TOTAL
342.39
M2
INTERIORES
VOL.
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
37
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M3
1.50
0.56
1.00
0.84
Fondo
M3
1.91
0.25
1.00
0.48
Lateral
M3
1.91
0.10
1.00
0.19
Fondo
M3
11.92
0.23
4.00
10.97
Lateral
M3
11.92
0.10
2.00
2.38
Fondo
M3
1.90
0.23
4.00
1.75
Lateral
M3
1.90
0.10
2.00
0.38
Fondo
M3
11.83
0.23
4.00
10.88
11.83
0.25
2.00
5.91
Lateral
Eje 11'-11' Y 12-12 VA-6 (23xVar.) 2DO NIVEL
M3
1.50
0.23
4.00
1.38
1.50
0.56
2.00
1.67
M3
12.30
0.40
1.00
4.92
12.30
0.25
2.00
6.15
1.50
0.40
1.00
0.60
1.50
0.56
2.00
1.67
6.57
0.13
1.00
0.85
6.57
0.40
2.00
5.26
6.57
0.40
1.00
2.63
6.57
0.15
2.00
1.97
6.57
0.40
4.00
10.51
6.57
0.20
8.00
10.51
1.91
0.40
4.00
3.05
1.91
0.10
8.00
1.52
6.57
0.23
2.00
3.02
6.57
0.10
4.00
2.63
Fondo
Lateral
Fondo
M3
Lateral
V5 (0.13 x 0.40)
Fondo
M3
Lateral
Eje A-A V6 (0.40 x 0.30)
Fondo
M3
Lateral
VA-7 (0.40 x 0.20) Ejes A-A, B-B C-C Y E-E
M3
M3
Fondo
M3
Lateral
EXTERIORES
Primer nivel
EJE 1 Y 7 laterales
M2
7.50
0.55
2.00
8.25
EJE 1 Y 7 laterales
M2
1.50
0.48
2.00
1.43
M2
1.50
0.35
7.00
3.68
M2
1.50
0.28
12.00
4.95
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
M2
7.50
0.30
2.00
4.50
Segundo Nivel
EJE 1 Y 7 laterales
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
38
MEDIDAS
DESCRIPCION
EJE 1 Y 7 laterales
04.07.06
04.07.07
Timpano
ALTO
M2
3.43
0.25
EJE 1 Y 7 laterales
M2
2.00
M2
1.50
M2
N
DE
VECES
SUB TOTAL
LONG.
AREA
4.00
3.43
0.51
4.00
4.04
0.35
14.00
7.35
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
Viga en voladizo
M2
23.75
0.40
1.00
9.50
Viga en voladizo
M2
3.55
0.20
6.00
4.26
Parapeto en alero
M2
23.75
0.15
2.00
7.13
KG.
TOTAL
25.01
30.35
0.36
1.00
10.93
Pasamanos en rampa
10.10
0.36
1.00
3.64
Pasamanos en rampa
12.10
0.36
1.00
4.36
Pasamanos en rampa
10.55
0.36
1.00
3.80
Pasamanos en rampa
3.18
0.36
2.00
2.29
VOL.
118.90
ML
Primer nivel
P-1
ML
2.64
6.00
15.81
V-4 Eje AA
ML
2.42
3.00
7.26
V-5 Eje AA
ML
3.52
3.00
10.56
V-7 EJE CC
ML
2.42
3.00
7.26
V-2 EJE CC
ML
2.52
3.00
7.56
V-3 EJE CC
ML
0.84
3.00
2.52
P-1
ML
2.64
6.00
15.81
V-4 Eje AA
ML
2.42
3.00
7.26
V-5 Eje AA
ML
3.52
3.00
10.56
V-1 EJE CC
ML
3.52
4.00
14.08
V-2 EJE CC
ML
2.52
2.00
5.04
V-3 EJE CC
ML
0.84
2.00
1.68
P-2
ML
2.10
4.00
8.40
P-3
ML
2.10
2.00
4.20
V-8
ML
0.45
2.00
0.90
Segundo nivel
Rampa
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
39
MEDIDAS
DESCRIPCION
04.07.08
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
842.82
ML
Primer nivel
Eje AA, Entre 1-2, 4-5, 6-7
ML
5.29
6.00
31.74
ML
6.39
6.00
38.34
ML
4.67
6.00
28.02
ML
6.60
6.00
39.60
ML
8.60
8.00
68.80
ML
8.60
8.00
68.80
ML
5.19
6.00
31.14
ML
6.29
6.00
37.74
ML
7.91
6.00
47.46
ML
9.91
6.00
59.46
ML
11.58
8.00
92.64
ML
11.58
8.00
92.64
ML
8.57
4.00
34.28
ML
1.65
0.95
24.00
124.56
0.90
0.95
4.00
14.80
ML
1.33
0.95
4.00
18.24
ML
2.74
0.90
2.00
14.56
Segundo nivel
Voladizo
Del eje 1-1 al 7-7
04.08.00
CIELORRASO
04.08.01
04.08.02
227.75
M2
7.18
3.64
6.00
156.81
Voladizo
M2
3.64
1.37
6.00
29.92
Debajo de Rampa
M2
11.70
1.50
1.00
17.55
Debajo de Rampa
M2
3.00
1.65
1.00
4.95
Rampa 2 tramo
M2
11.95
1.55
1.00
18.52
350.62
M2
7.18
7.60
3.00
163.70
M2
1.76
7.60
6.00
80.26
M2
10.85
0.60
2.00
13.02
INTERIOR
M2
11.56
6.34
1.00
73.29
LATERAL
M2
11.56
0.80
1.00
9.25
PASADIZO
M2
7.40
1.50
1.00
11.10
Rampa
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
40
MEDIDAS
DESCRIPCION
04.08.03
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
242.40
INTERIOR
Aulas (segundo nivel)
ML
7.18
6.00
43.08
ML
7.60
6.00
45.60
Eje AA
ML
28.90
1.00
28.90
Eje CC
ML
28.90
1.00
28.90
EJE 1-1 Y 77
ML
10.50
2.00
21.00
INTERIOR
ML
11.56
1.00
11.56
LATERAL
ML
11.56
1.00
11.56
PASADIZO
ML
7.40
7.00
51.80
EXTERIOR
RAMPA
04.09.00
PISOS Y VEREDAS
04.09.01
PISOS
04.09.01.01
M2
M2
04.09.01.02
04.09.02
04.09.02.01
220.97
7.60
7.18
2.00
7.54
7.18
1.00
109.14
54.14
1.06
2.44
-6.00
-15.52
0.60
2.30
-3.00
-4.14
0.37
0.35
-6.00
-0.78
Debajo de rampa
M2
4.68
8.30
1.00
38.84
M2
23.62
1.30
1.00
30.71
M2
6.60
1.30
1.00
8.58
44.18
M2
2.28
0.90
6.00
12.31
M2
2.28
0.90
6.00
12.31
M2
4.52
2.03
1.00
9.18
M2
2.96
1.50
1.00
4.44
M2
2.96
1.50
1.00
4.44
M2
1.50
1.00
1.00
1.50
VEREDAS
VEREDA DE CONCRETO DE 4
M2
Frontal aulas
M2
23.78
1.50
1.00
35.67
Posterior
M2
23.78
0.80
1.00
19.02
aulas
64.67
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
Frontal
04.09.02.02
04.09.02.03
Rampa
M2
1.00
9.98
VOL.
M3
23.78
1.00
0.08
1.90
Posterior
Aulas
M3
23.78
1.00
0.08
1.90
Frontal
Rampa
M3
6.65
1.00
0.08
0.53
1.50
8.00
12.00
ML
0.80
7.00
5.60
Fachada posterior
aulas
148.06
ML
ML
23.78
1.00
23.78
EJE 7 AULA
ML
2.57
1.00
2.57
ML
7.50
1.00
7.50
Fachada frontal
ML
23.78
1.00
23.78
ML
1.31
1.00
1.31
ML
23.78
1.00
23.78
ML
12.32
2.00
24.64
ML
6.20
1.00
6.20
ML
3.00
1.00
3.00
ML
12.32
2.00
24.64
Debajo de Rampa
ML
1.70
1.00
1.70
ML
5.16
1.00
5.16
TOTAL
17.60
Vereda frontal
KG.
4.33
M3
ZOCALOS
04.10.02
AREA
Aulas
04.10.02.01
SUB TOTAL
LONG.
Frontal
04.10.01
04.10.01.02
1.50
N
DE
VECES
04.10.00
04.10.01.01
6.65
ALTO
122.74
M2
5.72
1.20
6.00
41.18
M2
5.72
1.20
6.00
41.18
M2
8.44
1.20
1.00
10.13
M2
12.04
1.20
1.00
14.45
M2
6.98
1.20
1.00
8.38
M2
6.19
1.20
1.00
7.42
CONTRAZOCALOS
CONTRAZOCALOS DE CEMENTO DE 4"
ML
172.65
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
42
MEDIDAS
DESCRIPCION
INTERIOR AULAS
04.10.03
04.10.03.01
04.10.03.03
04.10.03.04
ALTO
27.90
3.00
83.70
ML
29.34
2.00
58.68
ML
30.27
1.00
30.27
4.00
18.08
ML
4.52
Debajo de Rampa
M2
Debajo de Rampa
Rampa 2 tramo
1.50
1.00
M2
3.00
1.65
1.00
4.95
M2
11.95
1.55
1.00
18.52
34.20
ML
10.15
1.00
10.15
ML
2.95
1.00
2.95
ML
10.55
2.00
21.10
4.00
59.77
M2
1.10
2.64
M2
0.80
2.10
2.00
3.36
M2
0.80
2.10
12.00
20.16
M2
0.70
2.10
1.00
1.47
COLOCACION DE PUERTAS
UND
12.00
27.00
34.78
27.00
ARMARIO - CLOSET
CLOSET DE MELAMINE S/DISEO
L=2.30m x 2.10m x 0.60m
04.11.03
TOTAL
17.55
PUERTAS
04.11.03.01
KG.
41.02
11.70
04.11.01
04.11.02
VOL.
18.08
CARPINTERIA DE MADERA
04.11.02.01
AREA
04.11.00
04.11.01.02
SUB TOTAL
LONG.
ML
04.11.01.01
N
DE
VECES
Pasos
04.10.03.02
6.00
UND
UND
6.00
PIZARRA
PIZARRA TIPO ACRILICO DE 1.20X3.00 M I/ MARCO
UND Y PORTA PLUMON DE ALUMINIO
6.00S/DISEO
6.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
43
MEDIDAS
DESCRIPCION
04.12.00
CARPINTERIA METALICA
04.12.01
VENTANA
04.12.01.01
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
81.13
M2
2.52
1.60
3.00
12.10
V-3
M2
0.84
0.60
3.00
1.51
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
V-7
M2
2.42
1.60
3.00
11.62
V-1
M2
3.52
1.60
3.00
16.90
V-2
M2
2.52
1.60
3.00
12.10
V-3
M2
0.84
0.60
3.00
1.51
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
ML
0.45
0.50
2.00
0.45
Segundo nivel
Rampa
V-8
04.12.01.02
COLOCACION DE VENTANAS
UND
32.00
32.00
04.13.00
CERRAJERIA
04.13.01
UND
9.00
9.00
04.13.02
UND
15.00
15.00
04.13.03
UND
9.00
9.00
04.14.00
VIDRIO SEMIDOBLE
04.14.01
VIDRIO SEMIDOBLE
266.16
P2
Primer nivel
V-2
M2
2.52
1.60
3.00
39.69
V-3
M2
0.84
0.60
3.00
4.96
V-4
M2
2.42
0.70
3.00
16.67
V-5
M2
3.52
0.70
3.00
24.25
V-7
M2
2.42
1.60
3.00
38.11
M2
3.52
1.60
3.00
55.43
Segundo nivel
V-1
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
44
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
V-2
M2
2.52
1.60
3.00
V-3
M2
0.84
0.60
3.00
4.96
V-4
M2
2.42
0.70
3.00
16.67
V-5
M2
3.52
0.70
3.00
24.25
ML
0.45
0.50
2.00
1.48
VOL.
KG.
TOTAL
39.69
Rampa
V-8
04.15.00
PINTURA
04.15.01
PINTURA EN INTERIORES
04.15.01.01
556.23
M2
6.44
3.04
3.00
58.64
M2
6.44
3.04
3.00
58.64
M2
2.42
0.94
3.00
6.79
0.97
1.94
3.00
5.63
2.52
0.94
3.00
7.11
M2
2.37
1.94
3.00
13.76
M2
3.36
1.94
3.00
19.50
M2
2.44
2.94
12.00
85.94
M2
1.06
2.94
12.00
37.33
M2
0.80
2.10
12.00
-20.16
Ejes 1-1,5-5,7-7
M2
6.44
2.64
3.00
50.91
M2
6.44
2.64
3.00
51.00
M2
3.52
1.04
4.00
14.57
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.22
Descuentos
Puerta 0.80x2.10
Segundo Nivel
M2
2.37
1.99
3.00
14.11
M2
3.36
1.99
3.00
20.01
M2
2.44
2.94
12.00
85.94
M2
1.06
2.94
12.00
37.33
M2
0.80
2.10
12.00
-20.16
Descuentos
Puerta 0.80x2.10
04.15.01.02
326.50
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
45
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Eje A1 Y A7
M2
0.64
2.65
2.00
3.39
M2
1.13
2.65
3.00
8.98
Eje A3, A5
M2
0.87
2.65
2.00
4.61
M2
0.25
2.65
6.00
3.98
Eje C1 Y C7
M2
0.48
2.65
2.00
2.54
M2
1.13
2.65
3.00
8.98
Eje C3, C5
M2
0.87
2.65
2.00
4.61
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.04
3.00
0.92
M3
0.25
2.54
12.00
7.62
Eje A1 Y A7
M2
0.64
2.64
2.00
3.37
M2
1.13
2.64
3.00
8.93
Eje A3, A5
M2
0.87
2.64
2.00
4.58
M2
0.25
2.64
6.00
3.95
Eje C1 Y C7
M2
0.48
2.64
2.00
2.53
M2
1.13
2.64
3.00
8.93
Eje C3, C5
M2
0.87
2.64
2.00
4.58
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
Columnetas de confinamiento
Segundo Nivel
Columnetas de confinamiento
Fondo
M2
6.45
0.35
3.00
6.77
EJE 2, 4, 6
Lateral
M2
7.07
0.35
6.00
14.85
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.15
6.00
6.36
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.35
6.00
7.46
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.35
6.00
7.46
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
46
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Segundo Nivel
EJE 1, 3, 5, 7
Lateral
M2
7.07
0.30
6.00
12.73
Eje A
Fondo
M2
3.55
0.20
6.00
4.26
Eje A
Lateral
M2
3.55
0.30
6.00
6.39
Eje C
Fondo
M2
3.55
0.20
6.00
4.26
Eje C
Lateral
M2
3.55
0.30
6.00
6.39
M2
3.52
0.15
3.00
1.58
M2
2.42
0.15
3.00
1.09
M2
3.52
0.15
6.00
3.17
M3
12.30
0.20
2.00
4.92
M3
12.22
0.30
2.00
7.33
M3
1.50
0.23
1.00
0.35
1.50
0.43
2.00
1.28
M3
11.83
0.25
2.00
5.91
M3
1.50
0.23
1.00
0.35
M3
1.50
0.56
2.00
1.67
M3
12.30
0.20
2.00
4.92
Fondo
M3
8.83
0.13
1.00
1.15
Lateral
M3
8.83
0.30
2.00
5.30
Fondo
M3
1.50
0.13
1.00
0.20
Lateral
M3
11.83
0.25
2.00
5.91
Fondo
Rampa
Lateral
M3
11.83
0.13
1.00
1.54
M3
1.50
0.13
1.00
0.20
M3
1.50
0.56
1.00
0.84
Fondo
M3
1.91
0.25
1.00
0.48
Lateral
M3
1.91
0.10
1.00
0.19
Fondo
M3
11.92
0.23
4.00
10.97
Lateral
M3
11.92
0.10
2.00
2.38
Fondo
M3
1.90
0.23
4.00
1.75
Lateral
M3
1.90
0.10
2.00
0.38
Fondo
M3
11.83
0.23
4.00
10.88
11.83
0.25
2.00
5.91
Lateral
Eje 11'-11' Y 12-12 VA-6 (23xVar.) 2DO NIVEL
M3
1.50
0.23
4.00
1.38
1.50
0.56
2.00
1.67
M3
12.30
0.40
1.00
4.92
12.30
0.25
2.00
6.15
1.50
0.40
1.00
0.60
Fondo
Lateral
Fondo
M3
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
47
MEDIDAS
DESCRIPCION
Lateral
V5 (0.13 x 0.40)
Fondo
M3
Lateral
Eje A-A V6 (0.40 x 0.30)
Fondo
M3
Lateral
VA-7 (0.40 x 0.20) Ejes A-A, B-B C-C Y E-E
M3
M3
Fondo
M3
Lateral
04.15.01.03
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
1.50
0.56
2.00
1.67
6.57
0.13
1.00
0.85
6.57
0.40
2.00
5.26
6.57
0.40
1.00
2.63
6.57
0.15
2.00
1.97
6.57
0.40
4.00
10.51
6.57
0.20
8.00
10.51
1.91
0.40
4.00
3.05
1.91
0.10
8.00
1.52
6.57
0.23
2.00
3.02
6.57
0.10
4.00
2.63
VOL.
KG.
TOTAL
234.32
M2
12.22
5.62
1.00
68.62
M3
10.49
1.40
2.00
29.37
M2
5.60
0.85
1.00
4.76
Eje 10-10
M2
1.40
2.40
2.00
6.72
M2
10.66
0.80
2.00
17.05
Eje 12-12
M2
1.66
2.60
1.00
4.32
Eje 12-12
M2
3.23
2.60
1.00
8.40
Eje 12-12
Pasamanos
M2
12.10
0.80
2.00
19.36
Eje A-A
Pasamanos
M2
3.18
1.00
2.00
6.36
Eje C'-C'
M2
1.50
2.15
2.00
6.45
Eje D-D
Pasamanos
M2
3.18
1.00
2.00
6.36
Eje D-D
1er piso
M2
3.18
2.10
2.00
13.36
Menos P2
M2
0.80
2.10
4.00
6.72
Menos P3
M2
0.70
2.10
2.00
2.94
14.63
Eje E-E
1er piso
M2
3.18
2.30
2.00
Eje E-E
pasamanos
M2
3.18
1.00
2.00
6.36
M2
6.60
0.95
2.00
12.54
parapeto fachada
04.15.02
04.15.02.01
PINTURA EN EXTERIORES
279.63
M2
2.42
0.84
3.00
6.10
M2
0.97
1.84
3.00
5.35
2.52
0.84
3.00
6.35
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
48
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
2.42
1.84
3.00
13.32
M2
3.52
1.84
3.00
19.38
M2
6.20
2.75
2.00
34.10
M2
3.52
1.04
4.00
14.57
M2
0.97
2.04
2.00
3.96
2.52
1.04
2.00
5.24
VOL.
KG.
TOTAL
Segundo Nivel
Eje C-C, entre 1-1 al 7-7
M2
2.42
1.99
3.00
14.41
M2
3.52
1.99
3.00
20.96
M2
6.20
3.00
2.00
37.20
M2
6.20
0.60
2.00
7.44
0.55
2.00
6.82
Parapetos
Fachada principal
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
1.65
1.05
4.00
6.93
M2
1.62
1.05
8.00
13.61
M2
1.33
1.05
2.00
2.79
M2
4.75
5.62
1.00
26.67
Eje 12-12
M2
5.16
2.15
1.00
11.10
Rampa
04.15.02.02
222.36
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje A3, A5
M2
0.35
2.65
2.00
1.86
Eje B1, B7
M2
0.25
2.65
2.00
1.33
Eje C1 Y C7
M2
0.90
2.65
2.00
4.77
M2
0.35
2.65
3.00
2.78
Eje C3, C5
M2
0.35
2.65
2.00
1.86
M3
0.25
1.04
9.00
2.33
M3
0.25
2.04
3.00
1.53
M3
0.15
2.64
3.00
1.19
M3
0.25
1.94
12.00
5.81
Columnetas de confinamiento
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
49
MEDIDAS
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
Segundo Nivel
Eje A1 Y A7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje A3, A5
M2
0.35
2.64
2.00
1.84
Eje B1 Y B7
M2
0.25
2.64
2.00
1.32
Eje B1 Y B7
M2
0.25
1.70
2.00
0.85
Eje C1 Y C7
M2
0.90
2.64
2.00
4.74
M2
0.35
2.64
3.00
2.77
Eje C3, C5
M2
0.35
2.64
2.00
1.84
M3
0.25
0.94
10.00
2.34
M3
0.25
1.94
2.00
0.97
M3
0.15
2.54
2.00
0.76
M3
0.25
1.94
12.00
5.81
0.25
0.90
16.00
Columnetas de confinamiento
Columnetas en pazadizo
3.60
RAMPA
EJE 8-8
C4
0.63
5.62
2.00
7.08
C4
0.40
5.62
2.00
4.50
C3
0.50
5.62
1.00
2.81
EJE 9-9
C5
0.80
5.62
2.00
8.99
EJE 10-10
C3
0.50
2.40
2.00
2.40
EJE 11-11
C6
1.26
2.50
3.00
9.45
EJE 12-12
C4
0.90
5.62
1.00
5.06
EJE 12-12
C3
0.50
5.62
1.00
2.81
0.25
0.90
8.00
1.80
Columneta en pazadizo
M2
M2
7.50
0.55
2.00
8.25
EJE 1 Y 7 laterales
M2
1.50
0.48
2.00
1.43
M2
1.50
0.35
7.00
3.68
M2
1.50
0.28
12.00
4.95
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
Segundo Nivel
VOL.
KG.
TOTAL
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
50
MEDIDAS
DESCRIPCION
EJE 1 Y 7 laterales
EJE 1 Y 7 laterales
04.15.02.03
Timpano
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
M2
7.50
0.30
2.00
4.50
M2
3.43
0.25
4.00
3.43
EJE 1 Y 7 laterales
M2
2.00
0.51
4.00
4.04
M2
1.50
0.35
14.00
7.35
M2
3.52
0.15
6.00
3.17
M2
23.75
0.55
1.00
13.06
M2
3.52
0.15
3.00
1.58
M2
3.42
0.15
3.00
1.54
M2
3.55
0.35
6.00
7.46
Viga en voladizo
M2
23.75
0.40
1.00
9.50
Viga en voladizo
M2
3.55
0.20
6.00
4.26
Parapeto en alero
M2
23.75
0.15
2.00
7.13
VOL.
KG.
TOTAL
1.06
04.15.02.04
Frontal
M2
0.20
0.10
4.00
0.08
Frontal
M2
0.15
0.05
8.00
0.06
Lateral
M2
0.25
0.20
4.00
0.20
Fondo y techo
M2
0.20
0.20
8.00
0.32
Techo
M2
0.20
0.05
8.00
0.08
Interior gargola
M2
0.40
0.20
4.00
0.32
320.71
aulas
ML
23.78
1.00
23.78
EJE 7 AULA
ML
2.57
1.00
2.57
ML
7.50
1.00
7.50
Fachada frontal
ML
23.78
1.00
23.78
ML
1.31
1.00
1.31
ML
23.78
1.00
23.78
ML
12.32
2.00
24.64
ML
6.20
1.00
6.20
ML
3.00
1.00
3.00
ML
12.32
2.00
24.64
Debajo de Rampa
ML
1.70
1.00
1.70
ML
5.16
1.00
5.16
ML
27.90
3.00
83.70
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
51
MEDIDAS
DESCRIPCION
04.15.03
04.15.03.01
04.15.03.02
ALTO
N
DE
VECES
SUB TOTAL
LONG.
ML
29.34
2.00
58.68
ML
30.27
1.00
30.27
AREA
VOL.
KG.
TOTAL
227.75
M2
7.18
3.64
6.00
156.81
Voladizo
M2
3.64
1.37
6.00
29.92
Debajo de Rampa
M2
11.70
1.50
1.00
17.55
Debajo de Rampa
M2
3.00
1.65
1.00
4.95
Rampa 2 tramo
M2
11.95
1.55
1.00
18.52
350.62
M2
7.18
7.60
3.00
163.70
M2
1.76
7.60
6.00
80.26
M2
10.85
0.60
2.00
13.02
INTERIOR
M2
11.56
6.34
1.00
73.29
LATERAL
M2
11.56
0.80
1.00
9.25
PASADIZO
M2
7.40
1.50
1.00
11.10
Rampa
04.15.04
04.15.04.01
04.15.04.02
04.15.04.03
04.15.04.04
34.20
ML
ML
10.15
1.00
10.15
ML
2.95
1.00
2.95
ML
10.55
2.00
21.10
22.60
ML
ML
4.52
5.00
22.60
13.02
ML
EN MUROS
ML
5.84
2.00
11.68
ML
1.34
1.00
1.34
64.15
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
04.15.04.05
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AULAS
ML
24.68
2.00
49.35
Rampa
ML
7.40
2.00
14.80
AREA
VOL.
KG.
TOTAL
80.90
M2
2.52
1.60
3.00
12.10
V-3
M2
0.84
0.60
3.00
1.51
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
V-7
M2
2.42
1.60
3.00
11.62
V-1
M2
3.52
1.60
3.00
16.90
V-2
M2
2.52
1.60
3.00
12.10
V-3
M2
0.84
0.60
3.00
1.51
V-4
M2
2.42
0.70
3.00
5.08
V-5
M2
3.52
0.70
3.00
7.39
ML
0.45
0.50
1.00
0.23
Segundo nivel
ESCALERA
V-8
04.16.00
04.16.01
04.16.01.01
04.16.01.02
04.16.01.03
64.15
AULAS
ML
24.68
2.00
49.35
Rampa
ML
7.40
2.00
14.80
41.56
ML
9.10
1.00
9.10
ML
9.10
2.00
18.20
ML
7.13
2.00
14.26
PZA
3.00
5.00
04.16.02
04.16.02.01
0.40
M3
0.25
04.16.02.02
15.00
0.20
1.60
5.00
0.40
5.20
04.16.03
04.16.03.01
M3
1.60
5.00
5.20
19.55
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
MEDIDAS
DESCRIPCION
SUB TOTAL
LONG.
AREA
VOL.
28.54
1.00
0.21
5.99
Posterior
M3
32.23
1.00
0.21
6.77
Laterales
M3
10.16
2.00
0.21
4.27
M3
12.00
1.00
0.21
2.52
1.00
0.11
3.33
1.00
0.11
2.91
Frontal
M3
30.63
Posterior
M3
26.75
M3
1.30
0.08
0.65
2.00
0.13
1.30
0.65
0.10
1.00
0.08
0.42
0.10
0.55
1.00
0.02
1.44
0.15
0.51
1.00
0.11
0.95
0.60
0.10
1.00
0.06
30.63
0.42
1.00
13.00
30.63
0.30
1.00
9.19
26.75
0.42
1.00
11.35
26.75
0.30
1.00
8.03
1.30
0.65
2.00
1.69
M3
Posterior
M2
M2
TOTAL
47.16
KG.
6.63
Frontal
04.16.03.04
N
DE
VECES
M3
04.16.03.03
ALTO
Frontal
Desfogue
04.16.03.02
1.45
0.65
2.00
1.89
M2
0.43
0.65
2.00
0.55
M3
1.44
0.51
2.00
1.47
ML
Frontal
ML
0.74
8.00
5.89
Posterior
ML
0.74
8.00
5.89
57.38
1.00
57.38
69.17
04.16.03.05
ML
3.00
04.17.00
04.17.01
04.17.02
Debajo de rampa
PRIMER NIVEL
3.00
2.00
1.00
2.00
2.00
1.00
6.00
6.00
12.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
54
MEDIDAS
N
DESCRIPCION
SEGUNDO NIVEL
04.17.03
04.17.05
04.17.06
04.17.07
6.00
6.00
1.00
2.00
2.00
6.00
6.00
6.00
TOTAL
14.00
1.00
6.00
6.00
SEGUNDO NIVEL
1.00
6.00
6.00
Debajo de rampa
1.00
2.00
2.00
PRIMER NIVEL
1.00
6.00
6.00
SEGUNDO NIVEL
1.00
6.00
6.00
Debajo de rampa
1.00
2.00
2.00
14.00
UND
14.00
1.00
6.00
6.00
SEGUNDO NIVEL
1.00
6.00
6.00
Debajo de rampa
1.00
2.00
2.00
14.00
PTO
6.00
SEGUNDO NIVEL
PTO
6.00
Debajo de rampa
PTO
2.00
KG.
12.00
UND
6.00
VOL.
2.00
1.00
SALIDAS DE DESAGUE
04.18.02
1.00
1.00
INSTALACIONES SANITARIAS
04.18.02.01
AREA
PRIMER NIVEL
04.18.01
04.18.01.02
SUB TOTAL
LONG.
SEGUNDO NIVEL
04.18.00
04.18.01.01
N
DE
VECES
04.17.04
ALTO
8.00
PTO
PRIMER NIVEL
PTO
6.00
Debajo de Rampa
PTO
2.00
RED COLECTORA
TUBERIA DE DESAGUE PVC SAL 4"
92.30
ML
C.R. del 22 al 31
ML
25.30
1.00
25.30
C.R. del 31 al 20
ML
33.00
1.00
33.00
C.R. del 27 al 31
ML
34.00
1.00
34.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
55
MEDIDAS
N
04.18.02.02
04.18.02.03
04.18.03
04.18.03.01
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
VOL.
KG.
TOTAL
92.30
ML
25.30
1.00
25.30
C.R. del 31 al 20
ML
33.00
1.00
33.00
C.R. del 27 al 31
ML
34.00
1.00
34.00
AREA
92.30
ML
C.R. del 22 al 31
ML
25.30
1.00
25.30
C.R. del 31 al 20
ML
33.00
1.00
33.00
C.R. del 27 al 31
ML
34.00
1.00
34.00
ML
2.80
6.00
16.80
ML
0.70
6.00
4.20
ML
3.50
6.00
21.00
ML
0.90
6.00
5.40
ML
0.80
6.00
4.80
RED DISTRIBUCION
TUBERIA DE DESAGUE PVC SAL 4"
PRIMER NIVEL
52.20
ML
ML
04.18.03.02
ML
1.60
6.00
9.60
ML
0.30
6.00
1.80
0.30
6.00
1.80
Montante de ventilacion
SEGUNDO NIVEL
3.50
6.00
21.00
ML
1.40
6.00
8.40
ML
0.30
6.00
1.80
ML
0.40
6.00
2.40
3.50
6.00
21.00
21.00
1.00
21.00
13.20
1.00
13.20
Montante de ventilacion
04.18.03.03
34.20
ML
67.80
ML
2.00
UND
UND
2.00
22.00
UND
UND
6.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
56
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
2do nivel
UND
6.00
3ro nivel
UND
6.00
Azotea
UND
4.00
3.00
2do nivel
UND
3.00
3ro nivel
UND
3.00
6.00
8.00
UND
1er nivel
UND
3.00
2do nivel
UND
2.00
3ro nivel
UND
2.00
Azotea
UND
1.00
2.00
UND
UND
TOTAL
6.00
UND
UND
KG.
9.00
UND
UND
1er nivel
VOL.
2.00
1er nivel
AREA
2.00
UND
UND
SUB TOTAL
LONG.
2.00
11.00
UND
1er nivel
UND
3.00
2do nivel
UND
3.00
3ro nivel
UND
3.00
Azotea
UND
2.00
ADITAMENTO VARIOS
SUMIDERO CROMADO 2" EN PISO
12.00
UND
1er nivel
UND
5.00
2do nivel
UND
3.00
3ro nivel
UND
3.00
Azotea
UND
1.00
UND
8.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
57
MEDIDAS
DESCRIPCION
ALTO
1er nivel
UND
3.00
2do nivel
UND
2.00
3ro nivel
UND
2.00
Azotea
UND
1.00
2do nivel
#REF!
6.00
12.00
2do nivel
12.00
PTO
9.00
2do nivel
PTO
9.00
3ro nivel
PTO
9.00
Azotea
PTO
3.00
1er nivel
Tuberia de Subida
2do nivel
Tuberia de Subida
3er nivel
Tuberia de Subida
Azotea
Tanque Elevado
TOTAL
68.00
UND
85.80
ML
ML
25.10
1.00
25.10
ML
2.90
1.00
2.90
ML
18.00
1.00
18.00
ML
2.90
1.00
2.90
ML
18.00
1.00
18.00
ML
2.90
1.00
2.90
ML
9.00
1.00
9.00
ML
7.00
1.00
7.00
42.00
ML
PRIMER NIVEL
ML
14.00
1.00
14.00
SEGUNDO NIVEL
ML
12.50
1.00
12.50
TERCER NIVEL
ML
12.50
1.00
12.50
AZOTEA
ML
3.00
1.00
3.00
39.10
14.00
1.00
14.00
25.10
1.00
25.10
KG.
30.00
PTO
1er nivel
VOL.
6.00
1er nivel
AREA
2.00
UND
1er nivel
SUB TOTAL
LONG.
6.00
N
DE
VECES
ML
39.10
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
58
MEDIDAS
N
DESCRIPCION
ALTO
N
DE
VECES
SUB TOTAL
LONG.
14.00
1.00
14.00
25.10
1.00
25.10
1er nivel
2.00
2do nivel
6.00
5.00
2do nivel
3.00
3er nivel
3.00
Azotea
1.00
5.00
2do nivel
3.00
3er nivel
3.00
Azotea
1.00
5.00
2do nivel
3.00
3er nivel
3.00
Azotea
1.00
14.00
UND
1er nivel
12.00
2do nivel
2.00
TOTAL
12.00
UND
1er nivel
KG.
12.00
UND
1er nivel
VOL.
12.00
UND
1er nivel
AREA
9.00
UND
1er nivel
6.00
2do nivel
3.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
59
MEDIDAS
N
DESCRIPCION
ADITAMENTO VARIOS
#REF!
#REF!
N
DE
VECES
AREA
VOL.
KG.
TOTAL
4.00
4.00
14.00
UND
1er nivel
6.00
2do nivel
6.00
2.00
SUB TOTAL
LONG.
1.00
UND
1er nivel
#REF!
ALTO
7.00
UND
1er nivel
6.00
2do nivel
1.00
#REF!
CAMARA DE INSPECCION
#REF!
1.00
12.00
12.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
60
MEDIDAS
N
DESCRIPCION
04.19.00
04.19.01
04.19.01.01
04.19.02
04.19.02.01
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
34.00
PTO
1er nivel
12.00
2do nivel
12.00
10.00
REDES DE DISTRIBUCION
TUBERIA PVC SAP CLASE - 10 3/4"
71.60
ML
1er nivel
De 2 a 4
33.50
1.00
33.50
De caja de valvula
5.70
3.00
17.10
3.50
6.00
21.00
Tuberia de Subida
04.19.02.02
04.19.02.03
04.19.02.04
04.19.03
04.19.03.01
ML
3.50
6.00
21.00
SEGUNDO NIVEL
ML
3.50
6.00
21.00
ML
22.00
1.00
22.00
43.00
1.00
43.00
50.60
1.00
50.60
43.00
1.00
43.00
50.60
1.00
50.60
13.00
0.00
6.00
6.00
13.00
UND
1er nivel
7.00
2do nivel
CODO PVC SAP 1/2"
12.00
UND
2do nivel
CODO PVC SAP 3/4"
13.00
UND
1er nivel
04.19.03.04
93.60
ML
2do nivel
04.19.03.03
93.60
1er nivel
04.19.03.02
64.00
ML
PRIMER NIVEL
6.00
UND
30.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
61
MEDIDAS
DESCRIPCION
1er nivel
04.19.04
04.19.04.01
04.19.05
18.00
2do nivel
6.00
TOTAL
5.00
14.00
UND
1er nivel
8.00
2do nivel
6.00
PIEZAS VARIAS
1er nivel
5.00
5.00
14.00
1er nivel
8.00
2do nivel
6.00
04.20.00
INSTALACIONES ELECTRICAS
04.20.01
04.20.02
KG.
5.00
UND
04.19.05.02
04.20.01.03
VOL.
LLAVES Y VALVULAS
04.20.01.02
AREA
24.00
1er nivel
04.19.05.01
04.20.01.01
SUB TOTAL
LONG.
12.00
UND
1er nivel
04.19.04.02
N
DE
VECES
18.00
2do nivel
04.19.03.05
ALTO
62.00
PTO
PTO
18.00
PTO
18.00
Circulacuin
CIRCULACION
PTO
12.00
Rampa
ESCALERA
PTO
14.00
36.00
PTO
18.00
PTO
18.00
PTO
1.00
1.00
TABLEROS Y CUCHILLAS
04.20.02.01
04.20.02.02
TD-3
UND
1.00
1.00
1.00
1.00
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
62
MEDIDAS
DESCRIPCION
04.20.03
04.20.03.01
04.20.04
04.20.04.01
04.20.04.02
04.20.04.03
04.20.05
ALTO
N
DE
VECES
SUB TOTAL
LONG.
AREA
VOL.
KG.
TOTAL
GLB
1.00
1.00
ARTEFACTOS
24.00
PZA
12.00
PZA
12.00
24.00
PZA
12.00
Rampa
PZA
12.00
UNID
14.00
En SS.HH.
12.00
En SS.HH. Rampa
2.00
CONEXIONES INTERNAS
04.20.05.01
42.00
04.20.05.02
10.08
42.00
04.20.05.03
0.60
1.00
10.08
10.08
0.40
M2
6.71
0.40
1.00
2.68
M2
1.50
0.40
1.00
0.60
M2
4.65
0.65
1.00
3.02
PARAPETO
M2
1.00
0.13
1.00
0.13
M2
4.25
0.25
1.00
1.06
M2
4.75
0.30
1.00
1.43
PARAPETO RAMPA
M2
1.00
0.13
1.00
0.13
M2
58.00
0.40
1.00
23.20
ML
ML
04.21.00
OTROS
04.21.01
04.21.02
0.40
0.60
1.00
10.08
32.25
78.03
2.14
9.00
19.22
HOJA DE METRADO
PROYECTO
OBRA
FECHA
NOVIEMBRE 2007
ESPECIALIDAD
ACERO KG/ML
1/4"
0,25
3/8"
0,58
1/2"
1,02
5/8"
1,6
3/4"
2,26
1"
4,04
HOJA N
63
MEDIDAS
DESCRIPCION
04.21.03
04.21.05
ALTO
N
DE
VECES
SUB TOTAL
LONG.
ML
2.14
9.00
19.22
ML
1.65
12.00
19.80
ML
1.65
12.00
19.80
5.84
2.00
11.68
1.34
1.00
1.34
AREA
04.21.04
ML
ML
M2
KG.
TOTAL
11.68
VOL.
1.34
324.12
30.42
9.80
1.00
298.12
3.94
6.60
1.00
26.00
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127