Guangzhou–Shenzhen railway: Difference between revisions
No edit summary Tags: Mobile edit Mobile web edit |
→CR200J trains running "Demand-relief": Removing problem link, use another ref. source Tags: Mobile edit Mobile web edit |
||
Line 149: | Line 149: | ||
===CR200J trains running "Demand-relief"=== |
===CR200J trains running "Demand-relief"=== |
||
The emergence of CR200J trains in Shenzhen city was started in December 2019 serving regular long-distance service numbered D727、D728 between [[Shenzhen Railway Station]] and [[Beijing West railway station|Beijing West]]<ref>{{Cite web|url=https:// |
The emergence of CR200J trains in Shenzhen city was started in December 2019 serving regular long-distance service numbered D727、D728 between [[Shenzhen Railway Station]] and [[Beijing West railway station|Beijing West]]<ref>{{Cite web|url=https://m.dutenews.com/n/article/218277|title= 绿色“复兴号”首跑深圳-北京西!全程运行21小时37分钟 |website=m.dutenews.com|access-date=23 February 2024}}</ref>. |
||
The use of CR200J trains that serve both Guangzhou and Shenzhen, if not counting cross-line services, was rare as observed within year 2023-2024 but not non-exist. One noteworthy example is, to begin with, an internet media reported that a temporally added service was available at several selected days from September to October of year 2023<ref>{{Cite web |url=https://view.inews.qq.com/k/20230928A040RF00|title=复兴号"绿巨人"助力株洲假期出行 |access-date=2024-02-16 }}</ref>, mentioning a pair of cross-line service numbered D7495、D7496. D7496 made stop at [[Guangzhou North railway station]] according to observation from the ticket-selling machine. |
The use of CR200J trains that serve both Guangzhou and Shenzhen, if not counting cross-line services, was rare as observed within year 2023-2024 but not non-exist. One noteworthy example is, to begin with, an internet media reported that a temporally added service was available at several selected days from September to October of year 2023<ref>{{Cite web |url=https://view.inews.qq.com/k/20230928A040RF00|title=复兴号"绿巨人"助力株洲假期出行 |access-date=2024-02-16 }}</ref>, mentioning a pair of cross-line service numbered D7495、D7496. D7496 made stop at [[Guangzhou North railway station]] according to observation from the ticket-selling machine. |
Revision as of 10:25, 23 February 2024
Guangzhou–Shenzhen railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Guangshen railway Kowloon–Canton railway (Chinese section) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | 广深铁路 广深线 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | China Railway Guangzhou Group | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 22 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Higher-speed rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | China Railway Guangzhou Group Guangshen Railway Company | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | CRH1A EMU,CRH6A EMU (Regular service),
CR200J (Mainly for "Demand-relief" between Guangzhou and Shenzhen station (or Shenzhen East station according to platform availability) CRH1A-A EMU (e.g. Guangzhou East to Xiamen EMU service), CRH1E-250 EMU (e.g. Guangzhou East to Ganzhou West EMU train service), CRH2A EMU (e.g. Nanchang West to Guangzhou East EMU train service via Shenzhen city and Dongguan), CRH380A EMU (e.g. Guangzhou East to Ganzhou West EMU train service via Dongguan) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 8 October 1911 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 147 km (91 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC (Overhead line) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 180 km/h (110 mph) (tracks 1 and 2) 140 km/h (87 mph) (tracks 3 and 4) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | Centralized CTCS Automatic closing block system (UM-70, ZPW-2000) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Guangshen Railway | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 广深铁路 | ||||||||||||||
Traditional Chinese | 廣深鐵路 | ||||||||||||||
| |||||||||||||||
Kowloon–Canton railway, Chinese section | |||||||||||||||
Simplified Chinese | 广九铁路华段 | ||||||||||||||
Traditional Chinese | 廣九鐵路華段 | ||||||||||||||
|
Guangshen railway or Guangzhou–Shenzhen railway (Chinese: 广深铁路 or 广深线), also known as the Chinese section of the Kowloon–Canton railway (廣九鐵路華段) in 1911–1949, is a railway in Guangdong province in the People's Republic of China, between Guangzhou and Shenzhen. It is operated by Guangshen Railway Co., Ltd., a publicly traded company.
With a length of 147 kilometres (91 mi), it was the first railway in the People's Republic of China to reach the speed of 220 km/h (137 mph) in some sections, though it is limited to about 180 km/h (112 mph) during commercial operation. Now it has four tracks between Guangzhou East and Shenzhen railway station. Line 1 and 2 are up-direction and down-direction 200 km/h (124 mph) (currently restricted to 180 km/h (112 mph) in operation) passenger lines for CRH EMU respectively, and Lines 3 and 4 are up-direction and down-direction 160 km/h (99 mph) (currently restricted to 140 km/h (87 mph) in operation) mixed passenger and freight line respectively. In order to reduce the interference to passenger trains in the daytime from lower-speed freight trains, most freight trains will be scheduled to run at night.
Guangshen railway connects with several other important railways to different directions. It links Jingguang railway and Guangmao railway in Guangzhou, Jingjiu railway in Dongguan (with which shares two regular speed track), and the East Rail line to Hong Kong at the southern end of the railway. Besides, there are some branch lines along Guangshen Railway, such as Pingyan railway to Yantian Port, Pingnan railway to Shenzhen West railway station and also the line to Huangbu Port.
Border-crossing services, from Hong Kong to Dongguan (Changping), Guangzhou East, Foshan and Zhaoqing, as well as to Beijing West and Shanghai use its route. However, this service was suspended since the manifestation of COVID-19 pandemic.
History
The idea of constructing a railway linking Canton (now Guangzhou) and Kowloon in Hong Kong, a British crown colony germinated in the late Qing dynasty. In 1899, Britain and the Qing government agreed to construct the KCR British Section, but Britain postponed the construction as Britain was busy at the Second Boer War in Africa. In 1907, Qing government and Britain formally signed an agreement in Peking on issuing a £100-million bond as part of loan for the construction of the Chinese section of the Kowloon–Canton railway. In July 1907, construction of the British Section of the KCR began. The construction of Chinese section was delayed and only started in 1909. Under the loan contract, China needed to employ the British engineers for the construction of Chinese section, but China still employed famous Chinese railway engineer, Zhan Tianyou, as a consultant. On 8 October 1911, the Chinese section of KCR with total length of 142.77 km (88.71 mi) was opened.[1] The northern end of railway at that time was located in Dashatou (大沙頭), Guangzhou, was demolished in 1951. The through train service between Kowloon and Guangzhou also started to operate at the same time.
After the establishment of People's Republic of China in October 1949, the 'Chinese section of the Canton–Kowloon railway' was renamed 'Guangshen railway', and repairs were made to sections of the railroad damaged during the war. In 1967, railway department carried out a comprehensive maintenance on Guangshen railway to improve the transport capacity. Beginning in the 1980s economic reform policies of China, the establishment of Shenzhen Special Economic Zone and rapid economic development in the Pearl River Delta region has brought large volume of imported goods and increased passenger demand to the railway. Therefore, the second line of Guangshen Railway was constructed during 1984 to 1987 in order to meet the huge demand. Simultaneously Guangshen Railway Company (the predecessor of Guangshen Railway Company), which was directly subordinated to the Guangzhou Railway Bureau (now Guangzhou Railway Group), was established. This company was in charge of the construction projects and operational management of Guangshen Railway. In 1987, Guangshen railway became the first double-track railway in Guangdong province.
Guangshen railway is the first place in China to carry out successfully speed-up on the existing railroad. At the beginning of the 1990s, Guangzhou Railway Bureau and the Ministry of Railways carried out the pre-feasibility research about raising the maximum speed of passenger trains to 160 km/h (99 mph). At 28 December 1991, the construction of the third line of Guangshen railway, and the speed-up improvement works of original double tracks started. In October 1994, the maximum speed of a train reached 174 km/h (108 mph) during the test. At 22 December 1994, the first sub-high speed (160 km/h (99 mph)) passenger train in China started commercial operation between Guangzhou and Shenzhen.
In 1998, the electrification of two sub-high speed lines of Guangshen railway was finished. After the improvement the 200 km/h (124 mph) high speed trains are allowed to run on the existing subhigh speed railroad. A Swedish-built X 2000 tilting train called 'Xinshisu' began to serve intercity train service between Guangzhou and Shenzhen, as well as the through train to Hong Kong. The train are 165m long, consisting of a power car, five passenger cars, and a trailing car. The non-power cars can have a pitch of up to 8 degrees. They are noted for being very quiet (less than 65 dBA) even at 200 km/h (124 mph).
Construction of the fourth track was commenced at 31 December 2005, and was finished at 18 April 2007 in time for the Sixth Speed-Up Campaign. Since then Guangshen railway has been the first four-track railway in mainland China and it allows passenger trains and freight trains to run on separate lines.
As of 2007, intercity train service between Guangzhou and Shenzhen uses 8-car CRH1A highspeed EMU. There are 100 pairs of trains operated daily.
Guangshen intercity service
Regular service
Regular service between Guangzhou and Shenzhen uses 8-car CRH1A EMU or CRH6A EMU. In Shenzhen, regular service uses Shenzhen railway station.
CR200J trains running "Demand-relief"
The emergence of CR200J trains in Shenzhen city was started in December 2019 serving regular long-distance service numbered D727、D728 between Shenzhen Railway Station and Beijing West[2].
The use of CR200J trains that serve both Guangzhou and Shenzhen, if not counting cross-line services, was rare as observed within year 2023-2024 but not non-exist. One noteworthy example is, to begin with, an internet media reported that a temporally added service was available at several selected days from September to October of year 2023[3], mentioning a pair of cross-line service numbered D7495、D7496. D7496 made stop at Guangzhou North railway station according to observation from the ticket-selling machine.
The captioned pair of D7495、D7496 service terminates and departs at Shenzhen East railway station with a "very considerably long time span" staying in Shenzhen city in-between according to the official train service timetable of those selected days. This provided a quite obvious although "indirect" clue that "something may happen" if more demand-relief services were considered or anticipated as necesssary. Train numbers D7498、D7497, representing a shorter service travelling only within the Guangzhou-and-Shenzhen region, was eventually found to have providing service, with only limited ways (perhaps due to ad-hoc nature), if not the only two ways (if only counting those manifested before the departure) can confirm its existence as: (1) the official ticket-selling system or (2) obtaining information at Shenzhen East railway station or at Guangzhou East railway station.
Examples of temporally added service in peak-demand holidays between Guangzhou city and Shenzhen city, at which documented notice has been announced via the internet beforehand, include train number D9785-D9786[4] serving between Shenzhen East railway station and Guangzhou East railway station, and D9791-D9796[5] serving between Guangzhou East railway station and Shenzhen railway station.
Rolling stock
Stations
Stations with services
Most of the existing stations on the line are abandoned for passenger service, while reopening of a previously abandoned station after refurbishment can occur. Examples include Pinghu in year 2016 and Xintang in year 2024 [6].
As at year 2023, major stations on the line offering passengers service are, in order:
Station No. |
Station Name | Chinese | Distance km |
PRD MIR (CR C-train) transfers/connections |
Metro transfers/connections |
Location | ||||
---|---|---|---|---|---|---|---|---|---|---|
GZQ | Guangzhou | 广州 | 0 | 0 | GFZ * GQ | 2 5 | Yuexiu | Guangzhou | ||
GGQ | Guangzhou East Guangzhoudong |
广州东 | 8 | 8 | SS * | 1 3 | Tianhe | |||
RTQ | Dongguan | 东莞 | 64 | 72 | 2 | Shilong | Dongguan | |||
DAQ | Changping | 常平 | 18 | 90 | Changping | |||||
ZOQ | Zhangmutou | 樟木头 | 13 | 103 | Zhangmutou | |||||
PHQ | Pinghu | 平湖 | 24 | 127 | 10 | Longgang | Shenzhen | |||
BJQ | Shenzhen East Shenzhendong |
深圳东 | 12 | 139 | 3 5 | |||||
SZQ | Shenzhen | 深圳 | 8 | 147 |
|
Luohu | ||||
All existing stations
Existing stations | ||||||||
---|---|---|---|---|---|---|---|---|
Station Name English |
Station Name Chinese |
Total Distance |
Transfer | Location | Grade | Notes | ||
● | ● | Guangzhou | 广州 | 0 | 2 5 |
Yuexiu, Guangzhou | T [note 1] |
Stop station for a few number Guangzhou – Shenzhen trains (CRH) |
| | | | 云麓 | 4 | 4 | Not for passenger service. Decommissioned in 2009. | |||
● | ● | Guangzhou East | 广州东 | 8 | 1 3 |
Tianhe, Guangzhou | 1 | The stop and departure station for all Guangzhou–Shenzhen trains (CRH) |
| | ● | Shipai | 石牌 | 14 | 4 | Not for passenger service. | ||
| | | | Huangpu | 黄埔 | 18 | 2 | Not for passenger service. | ||
| | | | 九运会 | Decommissioned in 2002. | |||||
| | ● | Jishan | 吉山 | 20 | 3 | Not for passenger service. | ||
● | ● | Xiayuan | 下元 | 27 | Huangpu, Guangzhou | 3 | Not for passenger service. | |
| | | | 南岗 | 32 | 4 | Decommissioned in 2009. | |||
| | ● | Xintang | 新塘 | 39 | Zengcheng, Guangzhou | 4 | Reopened for passenger service since year 2024 [6] | |
| | | | 沙浦 | 45 | 5 | Decommissioned in 2007. | |||
| | | | 塘美 | 4 | Decommissioned in 2007. | ||||
● | ● | Xiancun | 仙村 | 51 | 4 | Not for passenger service. | ||
| | | | 石滩 | 60 | 4 | Decommissioned in 2009. | |||
| | | | 红海 | 64 | 4 | Not for passenger service. Decommissioned in 2006. | |||
| | | | 石龙 | 69 | Shilong, Dongguan | 3 | Decommissioned in 2014. | ||
● | ● | Dongguan | 东莞 | 72 | 2 |
2 | Stopping station for all Guangzhou–Shenzhen trains (CRH) | |
| | ● | Chashan | 茶山 | 75 | Chashan, Dongguan | 4 | Not for passenger service. | |
| | | | 南社 | 78 | 4 | Decommissioned in 2007. | |||
| | | | 横沥 | 84 | Hengli, Dongguan | 4 | Decommissioned in 2009. | ||
● | ● | Changping | 常平 | 90 | Changping, Dongguan | 2 | Stopping station for Guangzhou–Shenzhen trains (CRH) | |
| | | | 土塘 | 94 | 5 | Decommissioned | |||
● | ● | Zhangmutou | 樟木头 | 103 | Zhangmutou, Dongguan | 3 | Stopping station for Guangzhou–Shenzhen trains (CRH) | |
| | | | 林村 | Tangxia, Dongguan | 4 | Decommissioned in 2010. | |||
● | ● | Tangtouxia | 塘头厦 | 114 | 4 | Not for passenger service. | ||
| | | | 石鼓 | 119 | 4 | Decommissioned in 2007. | |||
| | | | 天堂围 | 122 | Fenggang, Dongguan | 4 | Decommissioned in 2007. | ||
● | ● | Pinghu | 平湖 | 127 | 10 |
Longgang, Shenzhen | 4 | Stopping station for some Guangzhou–Shenzhen intercity trains (CRH) |
| | ● | Pinghu South | 平湖南 | 131 | Not for passenger service. | |||
| | | | 李朗 | 4 | Decommissioned in 2007. | ||||
● | ● | Shenzhen East | 深圳东 | 139 | 35 |
3 | Departure station for some non-high-speed trains. Regular CRH trains normally DO NOT stop here. In very limited occasions, or for demand-relief purpose mostly at those "ultimately most busiest" dates during peak demand periods, some trains, for example some of those "demand-relief trains", may depart or terminate here. | |
● | ● | Sungang | 笋岗 | 144 | Luohu, Shenzhen | 1 | Not for passenger service. | |
● | ● | Shenzhen | 深圳 | 147 | 1 9 |
1 | The departure station for all regular service trains (CRH) | |
↓ Through-service to/from Hung Hom (Kowloon) via East Rail line ↓ | ||||||||
Cross-Line Traffic
Service heading to Guangzhou Baiyun Railway Station
As mentioned in the Stations list in the "Stations" section in above, a few number of departures, using CRH trains, provide service to Guangzhou railway station. Starting year 2024[7], the captioned are further extended to Guangzhou Baiyun Railway Station as the terminal station, located at a short distance beyond the Guang-shen line.
Service heading to other cities
For traffic heading to other cities, there are services of EMUs using Guangzhou–Shenzhen railway as part of the route.
Daily trains are offered between Guangzhou East Railway Station and Chaoshan Railway Station, a few of them will continue to Shantou Railway Station; in addition, starting from 1 July 2018, one departure serving the Guangzhou East to Chaoshan service will continue to Xiamen.
Since not later than 26 June 2021, more EMU trains are available for service between Xiamen (or Xiamen North Station) and Guangzhou, at which two of them (using Xiamen North Station at the time of writing in June 2023) will continue to Nanning East Station.[8][9] CRH2A EMU trains are in use for service between Xiamen North and Nanning.[9] However, with effective from 11 October 2023 the captioned trains, formerly from Fujian heading to Guangxi province, are shorten to serve only between Fujian province and Guangzhou city.
Between 15 January 2022[11] to 9 January 2024,[12] train departures are available between Guangzhou East station and Ganzhou West railway station, with a pair of departures using CRH380A EMU trains, at which train G2775/G2778 departs from Guangzhou East station, and train G2777/G2776 departs from Ganzhou West station, as at June 2023 this service serves Dongguan station as well; in addition, another pair for the Guangzhou East to Ganzhou West service was added since 11 October 2022, with train number D1695/D1698 and D1697/D1696, [13] at which CRH1E-250 train is in use as at June 2023.
Starting 10 July 2019 to 10 October 2023, there was a daily service between Shenzhen Railway Station and Huaiji Railway Station on Guiyang-Guangzhou HSR,[14] which is the first utilizing the whole Guangzhou-Shenzhen line in full as part of the route; however, according to the new railway timetable effective from 11 October 2023, such direct train service no longer exist.
Starting from 10 January 2024, the cross-line traffic between Guangzhou East station and Ganzhou West railway station no longer serves the Dongguan city.
For CRH2A EMU trains running on the entire Guangzhou-Shenzhen line fully, since not later than year 2023, EMU train service is previously available between Shenzhen Station (the one near the Hong Kong border) and Liuzhou via Guangzhou, at which CRH2A EMU train is in use for this daily service (numbered D3665/D3666); however, with effective from 11 October 2023, train number D3665/D3666 no longer serves Shenzhen and Dongguan, and for Guangzhou the train stops at Guangzhou South Station instead.
Image gallery
-
Bond agreement signed in 1907
-
Foundation ceremony of the Chinese Section of KCR in 1909. Group photo of both Chinese and British officials.
See also
- China Railway
- List of railway lines in China
- Rail transport in China
- Kowloon–Canton Railway
- Guangzhou–Shenzhen–Hong Kong Express Rail Link
- Guangzhou–Shanwei high-speed railway
References
- ^ "Canton-Kowloon Chinese Railway 5% Loan – 1938". Archived from the original on 1 December 2008. Retrieved 23 June 2009.
- ^ "绿色"复兴号"首跑深圳-北京西!全程运行21小时37分钟". m.dutenews.com. Retrieved 23 February 2024.
- ^ "复兴号"绿巨人"助力株洲假期出行". Retrieved 16 February 2024.
- ^ "中国铁路广州局集团有限公司关于2024年2月1日至2月29日期间增开部分旅客列车的公告". Retrieved 6 February 2024.
- ^ "中国铁路广州局集团有限公司关于2024年2月17日增开D9791次等旅客列车的公告". 中国铁路12306. Retrieved 22 February 2024.
- ^ a b "九市速遞:廣深線下周起可抵增城 停新塘站 全線車程長3分鐘". 明报. 6 January 2024.
- ^ "廣鐵將啟用新的列車運行圖 廣州白雲站運力大幅增加". portal.sina.com.hk. 31 December 2023. Retrieved 18 February 2024.
- ^ "实现高铁直连!南宁至厦门、福州高铁动车开跑!". www.gxnews.com.cn. Retrieved 28 June 2023.
- ^ a b "6月25日起全國鐵路實施新列車運行圖 新增南寧至廈門直通動車". gx.people.com.cn. Retrieved 28 June 2023.
- ^ "6月25日起全國鐵路實施新列車運行圖 新增南寧至廈門直通動車". gx.people.com.cn. Retrieved 28 June 2023.
- ^ "高铁首次开进广州市中心车站 正式步入高铁时代". m.lwgcw.com. Retrieved 12 July 2023.
- ^ "1月10日起调整铁路运行图!广州车站有什么变化". www.gz.gov.cn. Retrieved 29 January 2024.
- ^ "廣鐵集團實施新的列車運行圖". hn.people.com.cn. Retrieved 12 July 2023.
- ^ "深圳站7月将开行第一对跨线动车组列车(深圳到肇庆怀集) – 深圳本地宝". jt.sz.bendibao.com. Retrieved 18 August 2019.