South Australia is a leader in utility-scale renewable energy generation, and also produces gas and uranium for electricity generation. Gas production is mostly concentrated in the Cooper Basin in the state's north-east. Gas is delivered from these fields by pipeline to users interstate and to Port Adelaide where it fuels three separate gas-fired power plants. Uranium is also mined in South Australia, though nuclear power generation is prohibited nationally. The Olympic Dam mine is the world's single largest known deposit of uranium and represents 30% of the world's total uranium resource.[1] Many utility-scale wind farms and solar farms have been commissioned during the 21st century and geology with potential for geothermal energy has also been identified but is yet to be developed.[2]
During the Rann government, South Australia advanced plans to make South Australia a green energy hub for Australia's eastern seaboard.[3] Wind power[4] and solar power, including distributed roof-top solar, now provide much of the state's electricity.[5] In the 2020s, proposals emerged to develop green hydrogen production and export capacity.[6] In December 2021, South Australia set a new record for renewable energy generation and resilience, after running entirely on renewable energy for 6.5 consecutive days.[7] In 2022, it was stated that South Australia could soon be powered by only renewable energy. [8]
Electricity
editFossil fuels
editHistorically, much of South Australia's electricity was generated by coal-fueled power stations. As late as 2002, South Australia obtained 100% of its electricity supply from fossil fuels, with 30% being imported from coal generators in other states.[9] The Electricity Trust of South Australia nationalized the main private generator and the electricity grid that covered most of the populated parts of the state in the 1940s. Initially, the power stations burned coal imported from the eastern states of Australia. The government decided that South Australia needed to be more self-sufficient. In the 1950s, it established the Telford Cut coal mine near Leigh Creek and built the Playford A Power Station near Port Augusta specifically designed to burn South Australian coal. It was followed in the 1960s by the Playford B Power Station. The last and largest coal power station built in South Australia was the Northern Power Station, built near the Playford stations in the 1980s. It was also the last coal-fired power station to close, in 2016.
Since the commencement of gas field development at Moomba in the 1950s and 1960s, electricity has been produced by gas-fueled generators at utility scale.[10] The largest fossil-fuel generation precinct is located on the Le Fevre Peninsula near Port Adelaide, where multiple separate power plants are in operation. The largest of these is the Torrens Island Power Station operated by AGL with a generating capacity of 1,280 MW. The next largest is Pelican Point Power Station, operated by Engie, with a capacity of 478 MW. Fossil fuel generators are also used to power remote mining operations and some townships.[citation needed]
Renewable energy
editAfter the 2002 South Australian state election, the Australian Labor Party formed a government under new premier Mike Rann. The Rann government outlined a plan to transition from fossil fuels to renewable energy sources, targeting that 15% of electricity would come from renewables by 2014, and 26% by 2020 (this compares with the federally legislated target at the time of 2% by 2020). This plan aimed to both reduce carbon emissions to combat climate change and reduce South Australia's reliance on importing electricity from other states. At the time the plan was seen as highly ambitious because the state government had very little direct control over the direction of electricity generation. The entire electricity grid was privately owned due to the neoliberal politics of the 1990's, and the federal government had the greatest regulatory power over the energy market.[9] Despite the disadvantages the state government faced, South Australia exceeded their targets and by 2009, 20% of the state's electricity came from wind power.[9]
South Australia has since led the nation in renewable energy commercialization. In 2011 it had 7.14% of the nation's population, capturing 56% of the grid connected wind power, 30% of solar power and 90% of its geothermal developments.[11] Public policy has been one of the main drivers of the development.[9] Given its reputation as having some of the windiest and sunniest places in Australia, South Australia is considered to be a target for green energy investors. The Rann government comprehensively mapped the state for both solar and wind resources, and identified that one of the best locations for generating wind power was in close proximity to the already-existing Port Augusta power stations.[9]
The Australian Government invested AUD 1 million dollars in 2011 commissioning a study by Macquarie Capital, WorleyParsons and Baker & McKenzie to investigate the state's electricity transmission capacity and potential for expansion of renewable energy in South Australia.[12] This study proposed that increasing the transmission capacity will unlock an estimated AUD 6 billion in renewable energy investment that would generate up to 5000 MW of clean and green energy The Economic Development Board recommended that the State make use of its unique natural advantages in generating wind, solar, geothermal and wave energy enabling the region to maintain its leading position in the development and use of "green" energy and establishing a significant renewable energy industry. An AUD 20 million renewable energy fund under the supervision of the Renewable SA Board were established. The first investment of AUD 1.6 million will be spent over two years to create a South Australian Centre for Geothermal Research, in conjunction with the University of Adelaide. The Fund will boost up investment in research and development, examine opportunities for manufacturing, and help assess how to develop a "green grid" based in South Australia but linked directly into the national power grid.[13][14][15] Two utilities have deployed house batteries to provide grid services in a virtual power plant and reduce need for network upgrades.[16][17] However, such installations only provide synthetic inertia which was excluded from the 2017 energy security target,[18][19] and included in later targets.
By 2017, the increase in renewable energy could sometimes satisfy the entire electricity grid demand in South Australia. However many of the facilities did not provide technical system strength to ensure that the grid remained stable and reliable under fluctuations in supply or demand. This meant that even when the wind was blowing strongly, the Australian Energy Market Operator demanded that a number of gas-fired generators be turned on to provide system inertia.[20] Such interventions by AEMO amounted to $34 million per year. ElectraNet sought tenders to provide this system strength to the network, however determined that all of the offers were too expensive.[21] Batteries and syncons were installed to increase grid security. In 2019, ElectraNet announced that it proposed to install four synchronous condensers on the grid in South Australia. It proposes to build a pair at Davenport near Port Augusta and a second pair near Robertstown. They were expected to be fully operational by the end of 2020.[22] In August 2021, the installation of the synchronous condensers was complete, and they were undergoing commissioning and testing.[23] They were operational in October 2021, increasing the limit on solar and wind power from 1,700 MW to 2,500 MW.[24] In 2020, wind and solar supplied the equivalent of 60% of electricity in South Australia.[25] During the financial year 2020-21, consumption was 11,614 GWh, of which wind provided 41% at 5,738 GWh, and gas provided 37%. Average pollution reached a low point, at 0.26 tonnes per MWh in 2020-21, and power cost at $48/MWh was the lowest of the mainland states. Power price became high less often and negative more often, usually around noon, and solar power production received lower average price while gas and batteries received higher prices.[26][27]
Transmission infrastructure and grid reliability
editTransmission developments have been proposed to support the grid and renewable energy. These include Project EnergyConnect, a 900 km, 800 MW, 330 kV double circuit transmission line between South Australia and New South Wales,[28] with commissioning expected in 2024, and the A$300m Eyre Peninsula Link, a 275 km, 132 kV double circuit transmission line on the Eyre Peninsula, with commissioning expected in 2022 and a section able to be upgraded to 275 kV when required.[29][30]
Political backlash
editDuring South Australia's transition to renewable energy, Australia's federal government has been often ambivalent or hostile towards renewables.[9] South Australia experienced a widespread power outage in September 2016 due to storm damage. Two tornadoes damaged transmission lines, which caused a cascading failure in the electricity network.[31] Members of the federal government, including Deputy Prime Minister Barnaby Joyce, blamed the blackout on South Australia's reliance on renewable energy despite the lack of evidence that this was the cause.[32] Federal energy minister Josh Frydenberg held a press conference in South Australia, which South Australian premier Jay Weatherill gatecrashed. Weatherill lambasted Frydenberg and referred to the federal government as "the most anti-South Australian Commonwealth government in living history."[33] The Australian Energy Market Operator ultimately cited overly sensitive protection mechanisms as the cause of the blackout.[31][34]
South Australia had another, smaller blackout in February 2017, this time caused by a mishap by the AEMO. The operator ordered load shedding because it did not believe that there was the capacity to meet the state's electricity demands. 90,000 users instead of 30,000 users were taken off the network due to a computer glitch. The Australian Energy Regulator later alleged that the Pelican Point Power Station had failed to inform the AEMO that it could operate at full capacity, which would have prevented the need for offloading and the blackout.[35] In response to this blackout Scott Morrison, then federal Treasurer, brought a lump of coal into Parliament House and again argued that this blackout was the fault of South Australia's shift to renewable energy, saying "the South Australian Labor government is switching off jobs, switching off lights and switching off air conditioners and forcing Australian families to boil in the dark as a result of their Dark Ages policies."[36]
Wind
editThe Australian Energy Market Operator (AEMO) 2010 SA Supply Demand Outlook estimated that in 2009–10, 18% of the state's energy production came from wind power.[37] In 2022-2023, South Australian wind farms produced enough power to meet 47% of the state's electricity needs.[38]
South Australia was the largest producer of wind energy in Australia, as of April 2011 hosting 49% of the nation's installed capacity.[4] In mid-2009, RenewablesSA was established to encourage further investment in renewable energy to the state.[39] As of October 2024, South Australia had 24 operational wind farms, with an installed capacity of 2,348 MW.[40]
Solar
editThe South Australian Government's Retailer Energy Efficiency Scheme supplies rebates for the installation of solar hot water heat pumps.
There are four large-scale (30 MW and above) operational solar farms in South Australia.[41]
In October 2020, South Australia solar power exceeded 100% of the state's electricity demand for the first time;[42]
Interconnection
editThe South Australian grid is connected to the National Electricity Market via the 650 MW 275 KV AC Heywood interconnector to Victoria.
In addition, as of 2024, construction of Project EnergyConnect is ongoing, which will connect South Australia's grid to that of New South Wales.
Storage
editThe 150 MW (194 MWh) Hornsdale Power Reserve is a bank of grid-connected batteries adjacent to the Hornsdale Wind Farm. It was the largest lithium-ion battery in the world for some time.[43] It will be surpassed by Maoneng's Gould Creek battery project, which was approved in late 2021 and once constructed will have a storage capacity of 450 MWh.[44]
Smaller batteries also play a role in maintaining grid stability as renewable energy production rises and falls. The Dalrymple ESCRI battery is a 30 MW / 8 MWh battery installed on Yorke Peninsula owned by Electranet and operated by AGL Energy. It was commissioned in June 2018.[45][46]
In September 2018, the South Australian Government announced that it would offer $100M in state government subsidies for up to 40,000 households to install battery storage in their homes. Eligible home owners and renters could receive $500 per kWh up to a maximum of $6,000 for eligible solar and battery systems.[47]
Geothermal
editGeothermal energy refers to the heat generated naturally by the earth, which can be used for the production of electricity. One of the greatest advantages of geothermal energy is said to be the reduction in CO2 emission. Unlike some other energy alternatives, which rely on intermittent supply of sunlight or wind, geothermal power generation can be used, like more traditional sources, for long term base-load power 24/7.[48] South Australia hosts significant geothermal resources, with a surface heat flow of 92 ± 10 mW m2, compared to a heat flow of 49-54 mW m2 in geologically similar regions.[49]
Unlike many other parts of the world such as New Zealand and Iceland where geothermal energy sources result from circulating groundwater heated by a shallow magma source, heat flow in South Australia primarily results from elevated concentrations of radiogenic nuclides such as uranium-238, thorium-232 and potassium-40 in granitic basement rocks.[50] The radiogenic concentration of basement rock in the South Australian Heat Flow Anomaly (SAHFA) is over three times greater than the global mean for similar regions.[49] Thick layers of overlying sediment insulate and trap in the deeper heat.[51] Due to the low permeability of granite, the hot rocks must undergo hydraulic fracturing and be stimulated to allow a flow of water through the system to produce energy.[52] This heat is slowly conducted to shallower rocks near the surface.[53]
Petratherm propose developing the geothermal energy in the more permeable sedimentary rocks that overlay the hot granite, a process called Heat Exchange Within Insulator (HEWI).[54] While somewhat cooler, in many cases they do not require hydraulic fracturing.
It is estimated that one percent of geothermal energy shallower than five kilometres below the earth's surface and hotter than 150 °C can supply Australia's total energy requirement for 26,000 years.[55] South Australia and Tasmania, where the granite basement rocks are suitable, are the main locations where geothermal energy is being developed in Australia. Sedimentary style geothermal resources have also been located near the south Victorian coastline stretching across South Australia.[56]
Both the state and federal government are making efforts to support and sponsor research for realizing geothermal energy commercially. The South Australian Centre for Geothermal Energy Research (SACGER) was established in 2010 as a part of the state government's Renewable Energy Fund in order to promote a world class hub for practical, high priority geothermal energy research. This 3.6 million dollar funding will help South Australia to reach its target of producing 33% of renewable energy by 2020.[57] Apart from designing geophysical tools, imaging the possible geothermal reservoirs, improving simulation of fracture and fluid networks in geothermal reservoirs, SACGER is also involved in developing trace elements micro-analytical imaging facilities for South Australia through key analytical infrastructure advances and mapping fracture systems in South Australian geothermal reservoir analogues.[58]
Geoscience Australia has taken initiatives to identify the hot spots of active geothermal regions for supporting geothermal industry. Onshore Energy Security Program, an initiative by the federal government, has been set up a field logging program to improve the heat flow coverage of Australia. OzTemp database is designed to measure temperature from different sources and extrapolate these to five kilometres' depth.[59]
Other
editSouth Australia's only hydroelectric generation is the 3 MW Terminal Storage Mini Hydro installed in SA Water supply pipes in a northeastern suburb of Adelaide. It generates electricity from water flowing downhill from one storage dam to the "terminal storage" facility that feeds into the metropolitan water distribution network.
An investigation into the feasibility of constructing pumped hydroelectric energy storage in Cultana was completed in 2020, which determined that the revenue uncertainty and high capital cost made it unviable.[60]
There are also small electricity generators using collected waste gases at several of the metropolitan waste water treatment plants and the large landfill dump at Wingfield, north of Adelaide.[citation needed]
Prices
editThe 2013 South Australian Electricity Report noted that increases in prices were "largely driven by transmission and distribution network price increases".[61] In contrast, the Australian Energy Market Operator (AEMO) has noted that the South Australian wholesale prices are lower than they have been since the start of the national electricity market, and that the wind "tends to depress the South Australian regional prices".[62] The Government stated that the price increase due to the Carbon Tax was approximately half of that experienced by other states, due to the high installed capacity of wind and gas-fired generation.[63]
Following the 2016 South Australian blackout, the South Australian government increased its ministerial powers to direct energy corporations in times of peak demand.[64]
It was claimed in 2017 that South Australia had the most expensive electricity in the world[65][66][67] Another analysis claimed that South Australia has the second cheapest electricity in Australia.[68] During the COVID-19 pandemic in Australia, demand and electricity prices in South Australia fell to the lowest since 2012.[69][70]
References
edit- ^ Uranium 2009: Resources, Production and Demand. Paris, France: International Atomic Energy Agency (IAEA). OECD. 2010. p. 456. ISBN 978-92-64-04789-1.
- ^ "Clean energy grid for solar australia". The Greens. Greens.org. 17 August 2010. Archived from the original on 30 March 2012. Retrieved 5 October 2011.
- ^ "South Australia to become green energy hub". West Australian Publishers. 21 August 2009. Archived from the original on 5 September 2021. Retrieved 1 December 2012.
- ^ a b "Wind Energy – How it works". Clearenergycouncil. Archived from the original on 21 June 2011. Retrieved 6 October 2011.
- ^ Parkinson, Giles (2 November 2021). ""Remarkable:" South Australia reached 100 pct renewables nearly every day in October". RenewEconomy. Archived from the original on 2 November 2021.
- ^ Marshall, Steven; van Holst Pellekaan, Dan (9 December 2021). "$750 million Green Hydrogen Project for Port Pirie" (Press release). Premier of South Australia. Retrieved 13 December 2021.
- ^ "South Australia sets renewable energy record". planetark.org. Retrieved 1 June 2022.
- ^ ""Remarkable:" South Australia may soon be first big grid to run on renewables only". 15 September 2022.
- ^ a b c d e f McGreevy, Dr Michael; MacDougall, Colin; Fisher, Dr Matt; Henley, Mark; Baum, Fran (January 2021). "Expediting a renewable energy transition in a privatised market via public policy: The case of South Australia 2004-18". Energy Policy. 148: 111940. doi:10.1016/j.enpol.2020.111940.
- ^ Parkinson, Giles (5 November 2019). "South Australia's stunning renewable energy transition, and what comes next". RenewEconomy. Archived from the original on 21 February 2021.
- ^ "Green Grid Pdf" (PDF). Government of SA. Archived (PDF) from the original on 22 April 2011. Retrieved 2 October 2011.
- ^ "Final geen grid report" (PDF). Renewablessa government of SA. Archived (PDF) from the original on 25 April 2012. Retrieved 10 November 2011.
- ^ "Ministerial statement" (PDF). Response to EDB's Economic Statement. Government of South Australia. 28 April 2009. Archived (PDF) from the original on 17 March 2012. Retrieved 10 November 2011.
- ^ "EDB South Australia". Southaustralianbiz. Archived from the original on 3 September 2011. Retrieved 7 October 2011.
- ^ "Economic Development Board and the office of Economic Development". South Australian Government. Archived from the original on 28 March 2011. Retrieved 28 September 2011.
- ^ "World's largest virtual power plant trial a big hit with SA consumers". Renew Economy. 15 December 2016. Archived from the original on 26 December 2016. Retrieved 25 December 2016.
- ^ "SAPN completes battery installs for northern Adelaide solar + storage trial". One Step Off The Grid. 15 December 2016. Archived from the original on 26 December 2016. Retrieved 25 December 2016.
- ^ "South Australia energy security target may exclude battery storage". 11 May 2017. Archived from the original on 15 May 2017. Retrieved 15 May 2017.
Battery storage can provide both inertia and fault current, but in the terminology used in the industry it is known as "synthetic inertia". Asked for a clarification about the eligibility of battery storage, a spokesman for Koutsantonis replied in an emailed statement: "Not if that storage provides synthetic inertia".
- ^ "Archived copy" (PDF). Archived (PDF) from the original on 6 April 2018. Retrieved 15 May 2017.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ Wills, Daniel (24 February 2019). "Progress in plans for synchronous condensers to strengthen renewable-rich grid". The Advertiser. Archived from the original on 5 September 2021. Retrieved 18 June 2019.
- ^ Parkinson, Giles (22 May 2018). "Cheap condensers to displace gas as renewable energy back-up". Renew Economy. Archived from the original on 18 June 2019. Retrieved 18 June 2019.
- ^ "Power System Strength – Strengthening South Australia's power system". Electranet. Archived from the original on 18 May 2019. Retrieved 18 June 2019.
- ^ "Power System Strength project". ElectraNet. Retrieved 5 September 2021.
- ^ Parkinson, Giles (25 October 2021). "Wind and solar limits relaxed after four big spinning machines installed". RenewEconomy. Archived from the original on 26 October 2021.
- ^ Parkinson, Giles (8 February 2021). "South Australia achieves world-leading 60pct wind and solar share over last year". RenewEconomy. Archived from the original on 8 February 2021.
Wind energy accounted for 42.2 per cent, followed by rooftop solar (13.7 per cent) and utility scale solar (4.3 per cent).
- ^ Parkinson, Giles (8 November 2021). "Cheaper, cleaner, more reliable: The stunning success of South Australia's renewable transition". RenewEconomy. Archived from the original on 8 November 2021.
- ^ "South Australian Electricity Report" (PDF). AEMO. October 2021. pp. 19, 28, 45–49.
- ^ "ElectraNet confirms Project EnergyConnect will be built". ElectraNet. Archived from the original on 7 June 2021. Retrieved 5 September 2021.
- ^ "Eyre Peninsula Major Construction Works Under Way". ElectraNet. Archived from the original on 20 May 2021. Retrieved 5 September 2021.
- ^ "EYRE PENINSULA LINK PROJECT INFORMATION" (PDF). Archived (PDF) from the original on 5 September 2021. Retrieved 5 September 2021.
- ^ a b Harmsen, Nick (28 March 2017). "AEMO releases final report into SA blackout, blames wind farm settings for state-wide power failure". ABC News. Retrieved 14 October 2022.
- ^ King, Andrew; McConnell, Dylan; Saddler, Hugh; Ison, Nicky; Dargaville, Roger (29 September 2016). "What caused South Australia's state-wide blackout?". The Conversation. Retrieved 14 October 2022.
- ^ Keane, Daniel (28 September 2021). "SA's statewide blackout was five years ago — here's how energy supply has evolved since then". ABC News. Retrieved 14 October 2022.
- ^ Australian Energy Market Operator (23 March 2017). "Black System South Australia" (PDF). Retrieved 14 October 2022.
- ^ "South Australia gas-fired power station sued over 2017 blackout". The Guardian. 27 August 2019. Retrieved 14 October 2022.
- ^ Morrison, Scott (9 February 2017). "Hansard - House of Representatives 9/02/2017". Parliament of Australia. Retrieved 14 October 2022.
- ^ "Enotes wind power south australia". Enotes. Archived from the original on 5 September 2021. Retrieved 5 October 2011.
- ^ "2023 South Australian Electricity Report" (PDF). AEMO. October 2024.
- ^ "Renewable Energy: – Wind Energy in South Australia". Wind Energy South Australia. Government of South Australia. Archived from the original on 18 October 2012. Retrieved 7 October 2011.
- ^ Government of South Australia: "Wind farms in South Australia" retrieved 13 October 2024
- ^ Government of South Australia: "Solar energy projects" retrieved 13 October 2024.
- ^ "Solar meets 100 per cent of South Australia demand for first time | RenewEconomy". 11 October 2020. Archived from the original on 28 January 2021. Retrieved 29 January 2021.
- ^ "Hornsdale Power Reserve". Archived from the original on 7 December 2017. Retrieved 4 December 2017.
- ^ "Maoneng's 450MWh battery, South Australia's biggest, approved without significant changes". pv magazine Australia. Retrieved 1 June 2022.
- ^ "Dalrymple ESCRI-SA Battery Project". ElectraNet. Archived from the original on 3 July 2018. Retrieved 3 July 2018.
- ^ Parkinson, Giles (26 June 2018). "South Australia's second big battery charges into action". RenewEconomy. Archived from the original on 3 July 2018. Retrieved 3 July 2018.
- ^ "Solar Choice SA Government's Battery Scheme". Archived from the original on 25 February 2019. Retrieved 23 December 2018.
- ^ "QA Fact Sheet" (PDF). Petratherm. Retrieved 14 October 2011.
- ^ a b Neumann, N; Sandiford, M; Foden, John (2000). "Regional geochemistry and continental heat flow: implications for the origin of the South Australia heat flow anomaly" (PDF). Earth and Planetary Science Letters. 183 (1–2): 107–120. Bibcode:2000E&PSL.183..107N. doi:10.1016/s0012-821x(00)00268-5. Archived (PDF) from the original on 23 March 2015. Retrieved 26 February 2015.
- ^ Dello-Iacovo, Michael (2014). South Australian Heat Flow Anomaly: Source and implications for geothermal energy (PDF) (Honours). University of Adelaide. Archived (PDF) from the original on 5 September 2021. Retrieved 28 February 2015.
- ^ Abul Khair, H; Cooke, D; Hand, M (2015). "Hydraulic fracturing in a sedimentary geothermal reservoir: results and implicationsSeismic mapping and geochemical analyses of faults within deep hot granites, a workflow for enhanced geothermal system projects". Geothermics. 53: 46–56. doi:10.1016/j.geothermics.2014.04.007.
- ^ Legarth, B; Huenges, E; Zimmermann, G (2005). "Hydraulic fracturing in a sedimentary geothermal reservoir: results and implications". International Journal of Rock Mechanics and Mining Sciences. 42 (7–8): 1028–1041. doi:10.1016/j.ijrmms.2005.05.014. S2CID 129177837.
- ^ "AGEA: – FAQs geothermal energy". Information about geo thermal energy. Australian Goethermal Energy Association Inc. Archived from the original on 25 April 2012. Retrieved 14 October 2011.
- ^ "Petratherm: -Projects". Information about HEWI. Petratherm. Archived from the original on 12 March 2015. Retrieved 28 February 2015.
- ^ "Geothermal Energy Resources". Geoscience Australia. 15 May 2014. Archived from the original on 28 May 2014. Retrieved 16 May 2014.
- ^ "Geothermal Energy Resources". geothermal energy. Australian Government geo science. Archived from the original on 17 September 2011. Retrieved 24 September 2011.
- ^ "Geothermal Energy Adelaide.edu". Geothermal Energy. adelaide.edu. Archived from the original on 16 October 2011. Retrieved 8 October 2011.
- ^ ASMS. "ASMS Geothermal power". Geo thermal energy. Australian Science and Mathematical School. Archived from the original on 27 March 2012. Retrieved 16 October 2011.
- ^ "Formulating the Geothermal Energy Project". AusGeo News. Geoscience Australia. September 2007. Archived from the original on 2 June 2011. Retrieved 22 September 2011.
- ^ "Cultana Pumped Hydro Energy Storage Phase 2". Australian Renewable Energy Agency. Australian Renewable Energy Agency. Retrieved 13 October 2024.
- ^ "Australian Energy Market Operator". 17 September 2013. Archived from the original on 7 January 2016. Retrieved 12 August 2014.
- ^ "Power of the wind – how renewables are lowering SA electricity bills". Archived from the original on 22 February 2014. Retrieved 14 February 2014.
- ^ "Electricity and gas prices to jump 18% in SA". Australian Broadcasting Corporation. Archived from the original on 23 July 2012. Retrieved 24 July 2012.
- ^ Chan, Gabrielle (13 March 2017). "SA to spend $500m on Australia's largest battery storage and gas-fired power plant – as it happened". The Guardian. Archived from the original on 16 March 2017. Retrieved 16 March 2017.
- ^ Chang, Charis (9 August 2017). "South Australia has the highest power prices in the world". news.com.au. Archived from the original on 9 March 2018. Retrieved 9 March 2018.
- ^ McConnell, Dylan (March 2018). "FactCheck: does South Australia have the 'highest energy prices' in the nation and 'the least reliable grid'?". The Conversation. Archived from the original on 20 February 2021.
- ^ "Annual volume weighted average spot prices – regions, 1999-2020". Australian Energy Regulator. Archived from the original on 23 February 2021. Retrieved 28 February 2021.
- ^ "South Australia Is Actually Second Cheapest State For Household Electricity". 3 May 2017. Archived from the original on 21 December 2018. Retrieved 21 December 2018.
- ^ Parkinson, Giles (28 January 2021). ""World first": South Australia achieves 100pct solar, and lowest prices in Australia". RenewEconomy. Archived from the original on 21 February 2021.
- ^ "Quarterly volume weighted average price by contribution of price bands – South Australia, 2016-2020". Australian Energy Regulator. Archived from the original on 1 April 2021. Retrieved 28 February 2021.