Title |
Performance of the PS Injection Kicker System Short Circuit Mode Upgrade for Operation with 2 GeV LIU Beams |
Authors |
- T. Kramer, W. Bartmann, J.C.C.M. Borburgh, L. Ducimetière, L.M.C. Feliciano, A. Ferrero Colomo, B. Goddard, L. Sermeus
CERN, Geneva, Switzerland
|
Abstract |
In the framework of the LHC Injector Upgrade (LIU) project an upgrade of the existing PS proton injection kicker system for 2 GeV operation is in progress. The upgrade is based on the operation of the existing kicker system in short circuit mode. This paper briefly reviews the deployed modifications to the system to obtain the specified reduction of pulse reflections unavoidably induced by such a configuration. The implementation of improvements to the magnet entry box, transmission cables and the short circuit plug with integrated LC-filter are described as well as tests and measurements during the 2016/17 annual shutdown. The impact of the residual pulse shape structure on the beam performance for the reference LIU beam is quantified. The paper concludes with a performance analysis, a comparison of measurements vs. simulations and an outlook to the remaining modifications during the next long shut down.
|
Paper |
download WEPVA023.PDF [0.610 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2017, Copenhagen, Denmark |
Series |
International Particle Accelerator Conference (8th) |
Proceedings |
Link to full IPAC2017 Proccedings |
Session |
Posters Wednesday 3 |
Date |
17-May-17 16:00–18:00 |
Main Classification |
07 Accelerator Technology |
Sub Classification |
T16 Pulsed Power Technology |
Keywords |
flattop, kicker, injection, simulation, operation |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Gianluigi Arduini (CERN, Geneva, Switzerland); Juliana Pranke (ESS, Lund, Sweden); Mike Seidel (PSI, Villigen, Switzerland); Mats Lindroos (ESS, Lund, Sweden) |
ISBN |
978-3-95450-182-3 |
Published |
May 2017 |
Copyright |
|