Title |
Intra-beam IP Feedback Studies for the 380 GeV CLIC Beam Delivery System |
Authors |
- R.M. Bodenstein, P. Burrows, J. Snuverink
JAI, Oxford, United Kingdom
- F. Plassard
CERN, Geneva, Switzerland
|
Abstract |
In its currently-envisaged initial stage, the Compact Linear Collider (CLIC) will collide beams with a 380 GeV center of mass energy. To maintain the luminosity within a few percent of the design value, beam stability at the interaction point (IP) must be controlled at the sub-nanometer level. To help achieve such control, use of an intra-pulse IP feedback system is planned. With CLIC's very short bunch spacing of 0.5 ns, and nominal pulse duration of 176 ns, this feedback system presents a significant technical challenge. Furthermore, as part of a study to optimize the design of the beam delivery system (BDS), several L* configurations have been studied. In this paper, we will review the IP feedback simulations for the 380 GeV machine for two L* configurations, and compare luminosity recovery performance with that of the original L* configuration in the 3 TeV machine.
|
Paper |
download WEPOR009.PDF [0.677 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2016, Busan, Korea |
Series |
International Particle Accelerator Conference (7th) |
Proceedings |
Link to full IPAC2016 Proccedings |
Session |
Poster Session |
Date |
11-May-16 16:00–18:00 |
Main Classification |
06 Beam Instrumentation, Controls, Feedback and Operational Aspects |
Sub Classification |
T05 Beam Feedback Systems |
Keywords |
luminosity, feedback, ground-motion, kicker, simulation |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
ISBN |
978-3-95450-147-2 |
Published |
June 2016 |
Copyright |
|