Title |
CERN Beam Interlock Redundant Dump Trigger Module Performance during LHC Run 2 |
Authors |
- D.O. Calcoen, S. Gabourin, A.P. Siemko
CERN, Geneva, Switzerland
|
Abstract |
During the Long Shutdown 1 an additional link between the Beam Interlocks System and the LHC Beam Dumping System was installed. This third channel is a direct access from the BIS to the asynchronous dump triggering lines. This paper describes the experience collected for the first 10 months of operation and the improvements proposed for a future upgrade of the module.
|
Footnotes & References |
IPAC 2014 THPRI021 |
Paper |
download THPOY041.PDF [0.489 MB / 3 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2016, Busan, Korea |
Series |
International Particle Accelerator Conference (7th) |
Proceedings |
Link to full IPAC2016 Proccedings |
Session |
Poster Session |
Date |
12-May-16 16:00–18:00 |
Main Classification |
06 Beam Instrumentation, Controls, Feedback and Operational Aspects |
Sub Classification |
T23 Machine Protection |
Keywords |
operation, dumping, extraction, collider, radiation |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
ISBN |
978-3-95450-147-2 |
Published |
June 2016 |
Copyright |
|