An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Scout Moor Wind Farm is the second largest onshore wind farm in England. The wind farm, which was built for Peel Wind Power Ltd, produces electricity from 26 Nordex N80 wind turbines. It has a total nameplate capacity of 65 MW of electricity, providing 154,000 MW·h per year; enough to serve the average needs of 40,000 homes. The site occupies 1,347 acres (545 ha) of open moorland between Edenfield, Rawtenstall and Rochdale, and is split between the Metropolitan Borough of Rochdale in northern Greater Manchester and the Borough of Rossendale in south-eastern Lancashire. The turbines are visible from as far away as south Manchester, 15–20 miles (24–32 km) away.

Property Value
dbo:abstract
  • Le Parc éolien de Scout Moor est le plus grand parc éolien terrestre d'Angleterre. Construit pour Peel Wind Power Ltd, le parc éolien produit de l'électricité à partir de 26 éoliennes Nordex N80. Il possède une puissance nominale totale de 65 MW d'électricité, fournissant 154 000 MWh par an (une puissance moyenne de 17,6 MW, un facteur de charge de 27 %); assez pour servir les besoins moyens de 40 000 foyers. Le site occupe 1 347 acres de lande ouverte entre , Rawtenstall et Rochdale, et est divisé entre le district métropolitain de Rochdale dans le nord du Grand Manchester et le district de Rossendale dans le sud-est du Lancashire. Les éoliennes sont visibles depuis le sud de Manchester, à 24–32 km. Un groupe de protestation s'est formé pour résister à la proposition de construction et a attiré le soutien du botaniste et militant écologiste David Bellamy. En dépit de l'opposition, les permis de construire ont été accordés en 2005 et sa construction a commencé en 2007. Bien que les travaux sur le projet ont été entravés par les intempéries, la difficulté du terrain, et les précédentes activités minières, le parc éolien a été inauguré officiellement le 25 septembre 2008, après « des années de controverse », à un coût de 50 millions de livres sterling (56 millions d'euros). (fr)
  • Scout Moor Wind Farm is the second largest onshore wind farm in England. The wind farm, which was built for Peel Wind Power Ltd, produces electricity from 26 Nordex N80 wind turbines. It has a total nameplate capacity of 65 MW of electricity, providing 154,000 MW·h per year; enough to serve the average needs of 40,000 homes. The site occupies 1,347 acres (545 ha) of open moorland between Edenfield, Rawtenstall and Rochdale, and is split between the Metropolitan Borough of Rochdale in northern Greater Manchester and the Borough of Rossendale in south-eastern Lancashire. The turbines are visible from as far away as south Manchester, 15–20 miles (24–32 km) away. A protest group was formed to resist the proposed construction, and attracted support from the botanist and environmental campaigner David Bellamy. Despite the opposition, planning permission was granted in 2005 and construction began in 2007. Although work on the project was hampered by harsh weather, difficult terrain, and previous mining activity, the wind farm was officially opened on 25 September 2008 after "years of controversy", at a cost of £50 million. In 2012 Peel Energy sold its 50% share in the facility to Munich Re's asset management division MEAG. The other 50% holding was also purchased by MEAG from HgCapital Renewable Power Partners. (en)
  • 斯高特荒原风力发电厂(英語:Scout Moor Wind Farm)是英国内陆最大的风力发电厂,系为皮尔风力电力有限公司而建。尽管兴建之中一直颇有争论,英国政府仍於2005年给电厂颁发了规划许可证,2007年动工。由于受恶劣天气、复杂地形以及之前采矿活动的影响,工程一度受阻。2008年9月25日耗资5000万英镑的电厂正式竣工投产。现共有26台诺德克斯N80型风力涡轮机,电厂涡轮机支柱高度为60米,外部旋转叶片长40米,总高100米,远在15至20英里外的南曼彻斯特也能看到。电厂总装机容量65 MW,年供电1.54亿千瓦时,可满足4万个家庭的用电需求。 (zh)
dbo:averageAnnualGeneration
  • 596160000000000.000000 (xsd:double)
dbo:buildingStartDate
  • January 2007
dbo:buildingStartYear
  • 2007-01-01 (xsd:gYear)
dbo:capacityFactor
  • 29.000000 (xsd:float)
dbo:installedCapacity
  • 65000000.000000 (xsd:double)
dbo:location
dbo:openingDate
  • 2008-09-25 (xsd:date)
dbo:openingYear
  • 2008-01-01 (xsd:gYear)
dbo:owner
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 20034019 (xsd:integer)
dbo:wikiPageLength
  • 35721 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1102497519 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 2008-09-25 (xsd:date)
dbp:constructionBegan
  • January 2007 (en)
dbp:cost
  • 5.0E7
dbp:country
  • England, United Kingdom (en)
dbp:imageCaption
  • An aerial view of Scout Moor Wind Farm (en)
dbp:location
  • Scout Moor, Hail Storm Hill, and Knowle Moor, North West England (en)
dbp:name
  • Scout Moor Wind Farm (en)
dbp:owner
dbp:psAnnualGeneration
  • 165.6
dbp:psElectricalCapFac
  • 29.0
dbp:psElectricalCapacity
  • 65.0
dbp:psUnitsManuModel
  • Nordex: Nordex N80 2.5 MW (en)
dbp:psUnitsOperational
  • 26 (xsd:integer)
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 53.659444444444446 -2.2519444444444443
rdf:type
rdfs:comment
  • 斯高特荒原风力发电厂(英語:Scout Moor Wind Farm)是英国内陆最大的风力发电厂,系为皮尔风力电力有限公司而建。尽管兴建之中一直颇有争论,英国政府仍於2005年给电厂颁发了规划许可证,2007年动工。由于受恶劣天气、复杂地形以及之前采矿活动的影响,工程一度受阻。2008年9月25日耗资5000万英镑的电厂正式竣工投产。现共有26台诺德克斯N80型风力涡轮机,电厂涡轮机支柱高度为60米,外部旋转叶片长40米,总高100米,远在15至20英里外的南曼彻斯特也能看到。电厂总装机容量65 MW,年供电1.54亿千瓦时,可满足4万个家庭的用电需求。 (zh)
  • Le Parc éolien de Scout Moor est le plus grand parc éolien terrestre d'Angleterre. Construit pour Peel Wind Power Ltd, le parc éolien produit de l'électricité à partir de 26 éoliennes Nordex N80. Il possède une puissance nominale totale de 65 MW d'électricité, fournissant 154 000 MWh par an (une puissance moyenne de 17,6 MW, un facteur de charge de 27 %); assez pour servir les besoins moyens de 40 000 foyers. Le site occupe 1 347 acres de lande ouverte entre , Rawtenstall et Rochdale, et est divisé entre le district métropolitain de Rochdale dans le nord du Grand Manchester et le district de Rossendale dans le sud-est du Lancashire. Les éoliennes sont visibles depuis le sud de Manchester, à 24–32 km. (fr)
  • Scout Moor Wind Farm is the second largest onshore wind farm in England. The wind farm, which was built for Peel Wind Power Ltd, produces electricity from 26 Nordex N80 wind turbines. It has a total nameplate capacity of 65 MW of electricity, providing 154,000 MW·h per year; enough to serve the average needs of 40,000 homes. The site occupies 1,347 acres (545 ha) of open moorland between Edenfield, Rawtenstall and Rochdale, and is split between the Metropolitan Borough of Rochdale in northern Greater Manchester and the Borough of Rossendale in south-eastern Lancashire. The turbines are visible from as far away as south Manchester, 15–20 miles (24–32 km) away. (en)
rdfs:label
  • Parc éolien de Scout Moor (fr)
  • Scout Moor Wind Farm (en)
  • 斯高特荒原风力发电厂 (zh)
owl:sameAs
geo:geometry
  • POINT(-2.2519445419312 53.659442901611)
geo:lat
  • 53.659443 (xsd:float)
geo:long
  • -2.251945 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Scout Moor Wind Farm (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License