An Entity of Type: Hang Glider, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The construction of the "Maulwurf I" was carried out under adverse conditions and lack of resources. It was only completed once Major General Ing Pedretti generously provided some rooms for final assembly in the artillery laboratory. The first preliminary test flights were completed on 18 February 1923 at the military firing range Feliferhof. Under the expert guidance of Major Erich Kahler, the former commander of the airfield Thalerhof, the apparatus was prepared for first flight.

Property Value
dbo:abstract
  • The construction of the "Maulwurf I" was carried out under adverse conditions and lack of resources. It was only completed once Major General Ing Pedretti generously provided some rooms for final assembly in the artillery laboratory. The first preliminary test flights were completed on 18 February 1923 at the military firing range Feliferhof. Under the expert guidance of Major Erich Kahler, the former commander of the airfield Thalerhof, the apparatus was prepared for first flight. (en)
dbo:manufacturer
dbo:numberBuilt
  • 1 (xsd:nonNegativeInteger)
dbo:origin
dbo:type
dbo:wikiPageID
  • 33679868 (xsd:integer)
dbo:wikiPageLength
  • 2096 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 993435452 (xsd:integer)
dbo:wikiPageWikiLink
dbp:capacity
  • one pilot (en)
dbp:crew
  • one (en)
dbp:emptyWeightKg
  • 25 (xsd:integer)
dbp:firstFlight
  • 1923-02-18 (xsd:date)
dbp:lengthM
  • 4.300000 (xsd:double)
dbp:manufacturer
dbp:nationalOrigin
dbp:numberBuilt
  • 1 (xsd:integer)
dbp:perfhide
  • Y (en)
dbp:primeUnits?_
  • met (en)
dbp:ref
  • Akaflieg Graz VL1 Maulwurf (en)
dbp:spanM
  • 7 (xsd:integer)
dbp:status
  • Prototype (en)
dbp:type
  • Single-seat Hang Glider (en)
dbp:wikiPageUsesTemplate
dbp:wingAreaSqm
  • 10 (xsd:integer)
dcterms:subject
rdf:type
rdfs:comment
  • The construction of the "Maulwurf I" was carried out under adverse conditions and lack of resources. It was only completed once Major General Ing Pedretti generously provided some rooms for final assembly in the artillery laboratory. The first preliminary test flights were completed on 18 February 1923 at the military firing range Feliferhof. Under the expert guidance of Major Erich Kahler, the former commander of the airfield Thalerhof, the apparatus was prepared for first flight. (en)
rdfs:label
  • Graz VL-1 Maulwurf I (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License