CERN Accelerating science

CERN Document Server 2,049 записей найдено  1 - 10следующийконец  перейти к записи: Поиск длился 0.44 секунд. 
1.
Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation / Renner, Elisabeth (CERN ; TU Vienna) ; Barnes, Michael (CERN) ; Bartmann, Wolfgang (CERN) ; Burkart, Florian (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Goddard, Brennan (CERN) ; Kramer, Thomas (CERN) ; Lechner, Anton (CERN) ; Magnin, Nicolas (CERN) et al.
A core part of the Future Circular Collider (FCC) study is a high energy hadron-hadron collider with a circumference of nearly 100~km and a center of mass beam energy of 100~TeV. The energy stored in one beam at top energy is 8.3~GJ, more than 20 times that of the LHC beams. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF058 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF058
2.
LHC Beam Dump Performance in View of the High Luminosity Upgrade / Wiesner, Christoph (CERN) ; Bartmann, Wolfgang (CERN) ; Bracco, Chiara (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Frankl, Matthias (CERN) ; Fraser, Matthew (CERN) ; Goddard, Brennan (CERN) ; Kramer, Thomas (CERN) ; Lechner, Anton (CERN) et al.
The High Luminosity Large Hadron Collider (HL-LHC) project will increase the total beam intensity in the LHC by nearly a factor of two. Analysis and follow-up of recent operational issues as well as dedicated studies of the LHC Beam Dump System (LBDS) have been carried out to ensure the safe operation with HL-LHC parameters and to decide on possible hardware upgrades to meet the HL-LHC requirements. [...]
CERN-ACC-2017-159.- 2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-WEPIK033 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.WEPIK033
3.
Asynchronous Beam Dump Tests at LHC / Wiesner, Christoph (CERN) ; Bartmann, Wolfgang (CERN) ; Bracco, Chiara (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Frankl, Matthias (CERN) ; Fraser, Matthew (CERN) ; Goddard, Brennan (CERN) ; Heßler, Christoph (CERN) ; Kramer, Thomas (CERN) et al.
The detailed understanding of the beam-loss pattern in case of an asynchronous beam dump is essential for the safe operation of the future High Luminosity LHC (HL-LHC) with nearly twice the nominal LHC beam intensity, leading to correspondingly higher energy deposition on the protection elements. An asynchronous beam dump is provoked when the rise time of the extraction kickers is not synchronized to the 3 us long particle-free abort gap. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF063 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF063
4.
Considerations for the Injection and Extraction Kicker Systems of a 100 TeV Centre-of-Mass FCC-hh Collider / Kramer, Thomas (CERN) ; Barna, Daniel (Wigner RCP, Budapest) ; Barnes, Michael (CERN) ; Bartmann, Wolfgang (CERN) ; Burkart, Florian (CERN) ; Ducimetière, Laurent (CERN) ; Goddard, Brennan (CERN) ; Senaj, Viliam (CERN) ; Stadlbauer, Tobias (CERN) ; Woog, David (CERN)
A 100 TeV center-of-mass energy frontier proton collider in a new tunnel of ~100 km circumference is a central part of CERN's Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam injection and extraction. [...]
CERN-ACC-2016-139.- 2016 - 4 p. - Published in : 10.18429/JACoW-IPAC2016-THPOR049 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.THPOR049
5.
Conceptual Design Considerations for the 50 TeV FCC Beam Dump Insertion / Burkart, Florian (CERN) ; Atanasov, Miroslav (CERN) ; Barna, Daniel (CERN) ; Bartmann, Wolfgang (CERN) ; Goddard, Brennan (CERN) ; Kramer, Thomas (CERN) ; Lechner, Anton (CERN) ; Sanz Ull, Alejandro (CERN) ; Schulte, Daniel (CERN) ; Stoel, Linda (CERN)
Safely extracting and absorbing the 50 TeV proton beams of the FCC-hh collider will be a major challenge. Two extended straight sections (ESS) are dedicated to beam dumping system and collimation. [...]
CERN-ACC-2016-232.- 2016 - 4 p. - Published in : 10.18429/JACoW-IPAC2016-TUPMR047 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.TUPMR047
6.
Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC / Bartmann, Wolfgang (CERN) ; Barnes, Michael (CERN) ; Ducimetière, Laurent (CERN) ; Goddard, Brennan (CERN) ; Hofer, Michael (CERN) ; Kramer, Thomas (CERN) ; Lechner, Anton (CERN) ; Renner, Elisabeth (CERN) ; Sanz Ull, Alejandro (CERN) ; Senaj, Viliam (CERN) et al.
One option for a future circular collider at CERN is to build a 13.5 TeV hadron synchrotron, or High Energy LHC (HE-LHC) in the LHC tunnel. Injection and dump systems will have to be upgraded to cope with the higher beam rigidity and increased damage potential of the beam. [...]
2018 - 4 p. - Published in : (2018) , pp. TUPAF060
- Published in : J. Phys.: Conf. Ser. 1067 (2018) 052021 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF060
7.
Upgrade of the Dilution System for HL-LHC / Wiesner, Christoph (CERN) ; Bartmann, Wolfgang (CERN) ; Bracco, Chiara (CERN) ; Calviani, Marco (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Frankl, Matthias (CERN) ; Fraser, Matthew (CERN) ; Gilardoni, Simone (CERN) ; Goddard, Brennan (CERN) et al.
The LHC Beam Dump System is one of the most critical systems for reliable and safe operation of the LHC. A dedicated dilution system is required to sweep the beam over the front face of the graphite dump core in order to reduce the deposited energy density. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF062 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF062
8.
Consolidation of Re-Triggering System of LHC Beam Dumping System at CERN / Magnin, Nicolas (CERN) ; Bartmann, Wolfgang (CERN) ; Bracco, Chiara (CERN) ; Carlier, Etienne (CERN) ; Gräwer, Gregor (CERN) ; Mottram, Timothy (CERN) ; Renner, Elisabeth (CERN) ; Rodziewicz, Janusz (CERN) ; Senaj, Viliam (CERN) ; Wiesner, Christoph (CERN)
The Trigger Synchronization and Distribution System (TSDS) is a core part of the LHC Beam Dump System (LBDS). It comprises redundant Re-Trigger Lines (RTLs) that allow fast re-triggering of all high-voltage pulsed generators in case one self-triggers, resulting in a so-called asynchronous dump. [...]
2020 - 5 p. - Published in : 10.18429/JACoW-ICALEPCS2019-MOPHA088 Fulltext: PDF;
In : 17th Biennial International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS), New York, United States, 5 - 11 Oct 2019, pp.MOPHA088
9.
Design and evaluation of injection protection schemes for the FCC-hh injector options / Renner, Elisabeth (CERN ; TU Vienna) ; Barnes, Michael (CERN) ; Bartmann, Wolfgang (CERN) ; Bracco, Chiara (CERN) ; Bruce, Roderik (CERN) ; Burkart, Florian (CERN) ; Goddard, Brennan (CERN) ; Lechner, Anton (CERN) ; Stoel, Linda (CERN ; TU Vienna) ; Velotti, Francesco (CERN) et al.
The Future Circular Collider (FCC) study considers several injector scenarios for FCC-hh, the proposed 100~TeV centre of mass hadron collider located at CERN. The investigated options include amongst others to use the LHC at 3.3~TeV or a superconducting SPS at 1.3~TeV as a High Energy Booster (HEB). [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF059 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF059
10.
Machine protection aspects of high-voltage flashovers of the LHC beam dump dilution kickers / Wiesner, Christoph (CERN) ; Bartmann, Wolfgang (CERN) ; Bracco, Chiara (CERN) ; Calviani, Marco (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Frankl, Matthias (CERN) ; Fraser, Matthew (CERN) ; Gilardoni, Simone (CERN) ; Goddard, Brennan (CERN) et al.
The LHC Beam Dump System is required to safely dispose of the energy of the stored beam. In order to reduce the energy density deposited in the beam dump, a dedicated dilution system is installed. [...]
CERN-ACC-2019-208.- 2019 - 4 p. - Published in : 10.18429/JACoW-IPAC2019-WEPMP040 Fulltext from publisher: PDF;
In : 10th International Particle Accelerator Conference, Melbourne, Australia, 19 - 24 May 2019, pp.WEPMP040

не нашли то, что искали? Попробуйте поискать на других серверах
recid:2666549 в Amazon
recid:2666549 в CERN EDMS
recid:2666549 в CERN Intranet
recid:2666549 в CiteSeer
recid:2666549 в Google Books
recid:2666549 в Google Scholar
recid:2666549 в Google Web
recid:2666549 в IEC
recid:2666549 в IHS
recid:2666549 в INSPIRE
recid:2666549 в ISO
recid:2666549 в KISS Books/Journals
recid:2666549 в KISS Preprints
recid:2666549 в NEBIS
recid:2666549 в SLAC Library Catalog