1.
|
Beam-based alignment of the SuperKEKB linac quadrupoles
/ Ogur, S (Bogazici U. ; CERN) ; Iida, N (KEK, Tsukuba) ; Kamitani, T (KEK, Tsukuba) ; Oide, K (CERN ; KEK, Tsukuba) ; Zimmermann, F (CERN)
The positron linac of SuperKEKB contains accelerating structures surrounded by quadrupoles without nearby beam-position-monitors (BPMs) or steering magnets. In this situation, standard techniques for beam steering or beam-based-alignment are not efficient. [...]
2019 - 13 p.
- Published in : Nucl. Instrum. Methods Phys. Res., A 925 (2019) 199-211
|
|
2.
|
|
3.
|
|
4.
|
|
5.
|
Impact of Bunch Current on Optics Measurements in SuperKEKB
/ Keintzel, Jacqueline (CERN ; TU Vienna) ; Ishibashi, Takuya (KEK, Tsukuba) ; Koiso, Haruyo (KEK, Tsukuba) ; Mitsuka, Gaku (KEK, Tsukuba) ; Morita, Akio (KEK, Tsukuba) ; Ohmi, Kazuhito (KEK, Tsukuba) ; Ohnishi, Yukiyoshi (KEK, Tsukuba) ; Sugimoto, Hiroshi (KEK, Tsukuba) ; Terui, Shinji (KEK, Tsukuba) ; Tobiyama, Makoto (KEK, Tsukuba) et al.
SuperKEKB has recently achieved the world record instantaneous luminosity of 2.8 × 10³⁴ \si{cm⁻²s⁻¹} and aims at reaching a target luminosity of about 6 × 10³⁵ \si{cm⁻²s⁻¹}. To accomplish this goal it is planned to increase beam currents up to §I{3.6}{A} and §I{2.6}{A} for the positron and the electron ring, respectively. [...]
Geneva : JACoW, 2021 - 4 p.
- Published in : JACoW IPAC 2021 (2021) 1356-1359
Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.1356-1359
|
|
6.
|
Developments in Beam-Based Alignment and Steering of the Next Linear Collider Main Linac
/ Tenenbaum, P G ; Hendrickson, L ; Raubenheimer, T O
SLAC-PUB-8933.-
Stanford, CA : SLAC, 2001
IEEE Published version, local copy: PDF; External link: Fulltext from SLAC
In : 19th IEEE Particle Accelerator Conference, Chicago, IL, USA, 18 - 22 Jun 2001, pp.e-proc. 3837
|
|
7.
|
Beam-based Alignment Strategy for the Group Controlled Magnets System
/ Hayashi, Naoki (JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken) ; Lee, Seishu (KEK, Ibaraki) ; Toyama, Takeshi (KEK, Ibaraki)
2006 - 3 p.
External link: Published version from JACoW
In : 10th European Particle Accelerator Conference, Edinburgh, UK, 26 - 30 Jun 2006, pp.1160
|
|
8.
|
Optics measurements and corrections at the early commissioning of SuperKEKB
/ Ohnishi, Y (KEK, Tsukuba, Kapan) ; Sugimoto, H (KEK, Tsukuba, Kapan) ; Morita, A (KEK, Tsukuba, Kapan) ; Koiso, H (KEK, Tsukuba, Kapan) ; Oide, K (KEK, Tsukuba, Kapan) ; Ohmi, K (KEK, Tsukuba, Kapan) ; Zhou, D (KEK, Tsukuba, Kapan) ; Funakoshi, Y (KEK, Tsukuba, Kapan) ; Carmignani, N (ESRF, Grenoble, France) ; Liuzzo, S M (ESRF, grenoble, France) et al.
We present experimental results of measurements and corrections for the optics at the early Phase-1 commissioning of SuperKEKB. The aim of SuperKEKB is a positron-electron collider built to achieve the target luminosity of 8x10^35 cm^−2s^−1. [...]
CERN-ACC-2017-0039.-
Geneva : CERN, 2017
- Published in : 10.18429/JACoW-IPAC2016-THPOR007
Fulltext: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.THPOR007
|
|
9.
|
|
10.
|
Electron cloud effects in SuperKEKB commissioning
/ Ohmi, K (KEK, Tsukuba ; Sokendai, Tsukuba) ; Flanagan, J (KEK, Tsukuba ; Sokendai, Tsukuba) ; Fukuma, H (KEK, Tsukuba ; Sokendai, Tsukuba) ; Ikeda, H (KEK, Tsukuba ; Sokendai, Tsukuba) ; Mulyani, E (KEK, Tsukuba ; Sokendai, Tsukuba) ; Shibata, K (KEK, Tsukuba ; Sokendai, Tsukuba) ; Suetsugu, Y (KEK, Tsukuba ; Sokendai, Tsukuba) ; Tobiyama, M (KEK, Tsukuba ; Sokendai, Tsukuba)
A vertical emittance growth (beam size blow-up) due to electron cloud has been observed in the positron low energy ring (LER) in Phase-I commissioning (2016) of SuperKEKB. The emittance growth is caused by fast head-tail instability due to wake force induced by electron cloud. [...]
2020 - 4 p.
Fulltext from publisher: PDF;
In : ECLOUD’18: Proceedings of the Joint INFN-CERN-ARIES Workshop on Electron-Cloud Effects, La Biodola, Isola d'Elba, Italy, 3 - 7 Jun 2018, pp.179-182 (CERN-2020-007)
|
|