CERN Accelerating science

CERN Document Server 找到 5 筆記錄  檢索需時 0.55 秒. 
1.
RF Performance Results of RF Double Quarter Wave Resonators for LHC High Luminosity Project / Turaj, Katarzyna (CERN) ; Bastard, Jeremy (CERN) ; Calaga, Rama (CERN) ; Calvo, Sebastien (CERN) ; Capatina, Ofelia (CERN) ; Castilla, Alejandro (CERN ; Jefferson Lab) ; Chiodini, Marco (CERN) ; Duval, Christophe (CERN) ; Edwards, Amelia (CERN ; Lancaster U.) ; Ferreira, Leonel (CERN) et al.
The LHC High Luminosity (HL-LHC) project includes, among other key items, the installation of superconducting crab cavities in the LHC machine. The Double Quarter Wave (DQW) crab cavity will be utilised to compensate for the effects of the vertical crossing angle [...]
2023 - 7 p. - Published in : JACoW SRF 2023 (2023) 925-928 Fulltext: PDF;
In : 21st International Conference on Radio-Frequency Superconductivity (SRF 2023), Grand Rapids, MI, United States, 22 - 30 Jun 2023, pp.925-928
2.
RF Dipole Crab Cavity Testing for HL-LHC / Valverde Alonso, Nuria (CERN) ; Calaga, Rama (CERN) ; Calvo, Sebastien (CERN) ; Capatina, Ofelia (CERN) ; Castilla, Alejandro (CERN ; Lancaster U. (main)) ; Chiodini, Marco (CERN) ; Duval, Christophe (CERN) ; Ferreira, Leonel (CERN) ; Gourragne, Max (CERN) ; Kohler, Paul (CERN) et al.
RF Crab Cavities are an essential element of the High Luminosity LHC (HL-LHC) upgrade at CERN. Two RF dipole crab cavity used for the compensation of the horizontal crossing angle were recently manufactured and integrated into Titanium Helium tank and RF ancillaries necessary for the beam operation. [...]
2022 - 7 p. - Published in : JACoW SRF 2021 (2022) 687-693 Fulltext: PDF;
In : 20th International Conference on RF Superconductivity (SRF 2021), Online, US, 28 Jun - 2 Jul 2021, pp.687-693
3.
Assembling experience of the first two HIE-ISOLDE cryomodules / Therasse, Mathieu (CERN) ; Barlow, Graeme (CERN) ; Bizzaglia, Sauro (CERN) ; Capatina, Ofelia (CERN) ; Chrul, Anna (CERN) ; Demarest, Paul (CERN) ; Dequaire, Julien (Intitek, Lyon, France) ; Deschamps, Jean-Baptiste (CERN) ; Gayde, Jean-Christophe (CERN) ; Gourragne, Max (CERN) et al.
The assembly of the first two cryomodules (CM1 and CM2) of the new superconducting linear accelerator HIE-ISOLDE (High Intensity and Energy ISOLDE), located downstream of the REX-ISOLDE normal conducting accelerator, started one year and half ago. After a delicate assembly phase in the cleanroom which lasted nine months, the first cryomodule was transported to the ISOLDE hall on 2 May 2015 and coupled to the existing REX-ISOLDE accelerator, increasing the energy of the radioactive ion beams from 2.8 to 4.3 MeV per nucleon. [...]
CERN-ACC-2017-347.- 2017 - 3 p. - Published in : 10.18429/JACoW-LINAC2016-THPRC016 Fulltext: PDF;
In : 28th Linear Accelerator Conference, East Lansing, Michigan, 25 - 30 Sep 2016, pp.THPRC016
4.
First HIE-ISOLDE cryo-module assembly at CERN / Therasse, Mathieu (CERN) ; Barlow, Graeme (CERN) ; Bizzaglia, Sauro (CERN) ; Bousquet, Jean-Alexandre (CERN) ; Chrul, Anna (CERN) ; Demarest, Paul (CERN) ; Dequaire, Julien (Unlisted, FR) ; Deschamps, Jean-Baptiste (CERN) ; Ferreira Somoza, Jose (CERN) ; Gayde, Jean-Christophe (CERN) et al.
The first phase of the HIE-ISOLDE project aims to increase the energy of the existing REX ISOLDE facilities from 3MeV/m to 5MeV/m. It involves the assembly of two superconducting cryo-modules based on quarter wave resonators made by niobium sputtered on copper. [...]
2015 - 5 p. - Published in : 10.18429/JACoW-SRF2015-TUPB106 Fulltext: PDF;
In : 17th International Conference on RF Superconductivity, Whistler, Canada, 13 - 18 Sep 2015, pp.TUPB106
5.
The Assembly Experience of the First Cryo-module for HIE-ISOLDE at CERN / Leclercq, Yann (CERN) ; Barlow, Graeme (CERN) ; Bousquet, Jean-Alexandre (CERN) ; Chrul, Anna (CERN) ; Demarest, Paul (CERN) ; Dequaire, Julien (Intitek, Lyon) ; Deschamps, Jean-Baptiste (CERN) ; Ferreira Somoza, Jose (CERN) ; Gayde, Jean-Christophe (CERN) ; Gourragne, Max (CERN) et al.
The HIE ISOLDE project aims at increasing the energy of the radioactive ion beams of the existing REX ISOLDE facility from the present 3 MeV/u up to 10 MeV/u for A/q to 4.5. The upgrade includes the installation of a superconducting linac in successive phases, for a final layout containing two low-β and four high-β cryo-modules. [...]
CERN-ACC-2015-236.- 2015 - 3 p. - Published in : (2015) , pp. WEPHA013 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.WEPHA013

您想得到有關這檢索條件的最新結果嗎?
建立您的 電郵警報 或訂閱 RSS feed.
沒有尋找到什麼? 嘗試在以下的服務器查尋:
Gourragne, Max 在 Amazon
Gourragne, Max 在 CERN EDMS
Gourragne, Max 在 CERN Intranet
Gourragne, Max 在 CiteSeer
Gourragne, Max 在 Google Books
Gourragne, Max 在 Google Scholar
Gourragne, Max 在 Google Web
Gourragne, Max 在 IEC
Gourragne, Max 在 IHS
Gourragne, Max 在 INSPIRE
Gourragne, Max 在 ISO
Gourragne, Max 在 KISS Books/Journals
Gourragne, Max 在 KISS Preprints
Gourragne, Max 在 NEBIS
Gourragne, Max 在 SLAC Library Catalog
Gourragne, Max 在 Scirus