CERN Accelerating science

CERN Document Server Sök i 6 journaler efter:  Sökningen tog 0.53 sekunder. 
1.
Design, fabrication and RF measurements of the storage and correction cavity prototypes of the RF pulse compression system for the klystron-based CLIC main linac / Wang, Ping ; Grudiev, Alexej (CERN) ; Riffaud, Benoit (CERN) ; Berthome, Emmanuel ; Motschmann, Fritz ; Syratchev, Igor (CERN) ; Scibor, Karol (CERN) ; Giordanino, Laurene ; Catalan Lasheras, Nuria (CERN) ; Morales Sanchez, Pedro (CERN)
An RF pulse compression system based on double-height waveguides was studied for the Klystron-based CLIC main linac. [...]
CERN-ACC-2024-0003 ; CLIC-Note-1198.
- 2024 - 17.
Full text
2.
Design and Fabrication of FRESCA2 Cryostat / Dallocchio, Alessandro (CERN) ; Carra, Federico (CERN) ; Tabian, Iuliana (CERN) ; Masci, Marco (CERN) ; Riffaud, Benoit (CERN) ; Zuccalli, Laurent ; Maire, Vincent ; Lombardo, Davide Maria (Universita e INFN, Firenze (IT)) ; Debeux, Julien ; Rigutto, Emilien (CERN) et al.
In the framework of the High Field Magnet activities, a new FRESCA2 test station (Facility for Reception of Superconducting Cables 2) was designed and fabricated at CERN to measure superconducting cables in background magnetic fields. [...]
CERN-ACC-NOTE-2022-0050.
- 2022. - 5 p.
Full text
3.
CERN BDF Prototype Target Operation, Removal and Autopsy Steps / Franqueira Ximenes, Rui (CERN) ; Aberle, Oliver (CERN) ; Ahdida, Claudia (CERN) ; Avigni, Pietro (CERN) ; Battistin, Michele (CERN) ; Bianchi, Laura (CERN) ; Buonocore, Luca Rosario (CERN) ; Burger, Stephane (CERN) ; Busom Descarrega, Josep (CERN) ; Calviani, Marco (CERN) et al.
The Beam Dump Facility (BDF), currently in the study phase, is a proposed general-purpose fixed target facility at CERN. Initially will host the Search for Hidden Particles (SHiP) experiment, intended to investigate the origin of dark matter and other weakly interacting particles. [...]
Geneva : JACoW, 2021 - 4 p. - Published in : JACoW IPAC 2021 (2021) 3559-3562 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.3559-3562
4.
X-Band RF Spiral Load Optimization for Additive Manufacturing Mass Production / Bursali, Hikmet (CERN ; Rome U.) ; Catalán Lasheras, Nuria (CERN) ; Gerard, Romain Louis (CERN) ; Grudiev, Alexej (CERN) ; Gumenyuk, Oleg (CERN) ; Morales Sánchez, Pedro (CERN) ; Riffaud, Benoit (CERN) ; Sauza-Bedolla, Joel (Lancaster U.)
The CLIC main linac uses X-band traveling-wave normal conducting accelerating structures. The RF power not used for beam acceleration nor dissipated in the resistive wall is absorbed in two high power RF loads that should be as compact as possible to minimize the total footprint of the machine. [...]
Geneva : JACoW, 2021 - 4 p. - Published in : JACoW IPAC 2021 (2021) 1143-1146 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.1143-1146
5.
Beam Dump Facility Target: Design Status and Beam Tests in 2018 / Lopez Sola, Edmundo (CERN) ; Aberle, Oliver (CERN) ; Avigni, Pietro (CERN) ; Bianchi, Laura (CERN) ; Busom, Josep (CERN) ; Calviani, Marco (CERN) ; Casolino, Mirkoantonio (CERN) ; Espadanal, Joao (CERN) ; Fraser, Matthew (CERN) ; Girod, Sylvain (CERN) et al.
The Beam Dump Facility (BDF) Project, currently in its design phase, is a proposed general-purpose fixed target facility at CERN, dedicated to the Search for Hidden Particles (SHiP) experiment in its initial phase. At the core of the installation resides the target/dump assembly, whose aim is to fully absorb the high intensity 400 GeV/c SPS beam and produce charmed mesons. [...]
CERN-ACC-2018-154; CERN-PBC-CONF-2021-013.- 2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-WEPMG002 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPMG002
6.
Construction and RF Conditioning of the Cell-Coupled Drift Tube Linac (CCDTL) for Linac4 at CERN / Tribendis, Alexey ; Biryuchevsky, Yuri ; Kendjebulatov, Ermek ; Kruchkov, Yaroslav ; Rotov, Evgeniy ; Zhukov, Alexandr ; Cuvet, Yves (CERN) ; Dallocchio, Alessandro (CERN) ; Fuchs, Jean-Frederic (CERN) ; Gerigk, Frank (CERN) et al.
This paper reports on the construction experience of the Linac4 CCDTL, which took place in two Russian institutes in the framework of three ISTC projects in close collaboration with CERN. The tanks were constructed at VNIITF, Snezhinsk, while the drift tubes and supports were made at BINP, Novosibirsk. [...]
CERN-ACC-2014-377.- 2014 - 5 p. - Published in : (2014) , pp. WEIOA01 Fulltext: weioa01_2 - PDF; weioa01 - PDF; External link: JACoW server
In : 27th Linear Accelerator Conference, Geneva, Switzerland, 31 Aug - 5 Sep 2014, pp.WEIOA01

Se också: liknande författarnamn
8 RIFFAUD, Benoit
8 Riffaud, B
3 Riffaud, B.
Vill du bli notifierad om nya resultat till den här sökfrågan?
Sätta upp ett epost-alarm eller starta en prenumeration på RSS-strömmen.
Har du inte funnit vad du söker efter? Försök på andra platser:
Riffaud, Benoit i Amazon
Riffaud, Benoit i CERN EDMS
Riffaud, Benoit i CERN Intranet
Riffaud, Benoit i CiteSeer
Riffaud, Benoit i Google Books
Riffaud, Benoit i Google Scholar
Riffaud, Benoit i Google Web
Riffaud, Benoit i IEC
Riffaud, Benoit i IHS
Riffaud, Benoit i INSPIRE
Riffaud, Benoit i ISO
Riffaud, Benoit i KISS Books/Journals
Riffaud, Benoit i KISS Preprints
Riffaud, Benoit i NEBIS
Riffaud, Benoit i SLAC Library Catalog
Riffaud, Benoit i Scirus