1.
|
|
2.
|
Chromatic and Wakefield Effects in PSI-XFEL Linac
/ Grigoryan, B (CANDLE, Yerevan) ; Amatuni, G A (CANDLE, Yerevan) ; Bakker, R J (PSI, Villigen) ; Kim, Y (PSI, Villigen) ; Pedrozzi, M (PSI, Villigen) ; Raguin, J Y (PSI, Villigen) ; Tsakanov, V M (CANDLE, Yerevan)
2008 - 3 p.
External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.THPC004
|
|
3.
|
PSI XFEL Simulations with SIMPLEX and GENESIS
/ Khachatryan, V G (CANDLE, Yerevan) ; Bakker, R J (PSI, Villigen) ; Sahakyan, V V (Yerevan State U.) ; Tarloyan, A (Yerevan State U.) ; Tsakanov, V M (CANDLE, Yerevan)
2008 - 3 p.
External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.MOPC012
|
|
4.
|
Start-to-End Simulations of the PSI 250 MeV Injector Test Facility
/ Kim, Y (PSI, Villigen) ; Adelmann, A (PSI, Villigen) ; Bakker, R J (PSI, Villigen) ; Dehler, M (PSI, Villigen) ; Ganter, R (PSI, Villigen) ; Garvey, T (PSI, Villigen) ; Oppelt, A (PSI, Villigen) ; Pedrozzi, M (PSI, Villigen) ; Raguin, J Y (PSI, Villigen) ; Rivkin, L (PSI, Villigen) et al.
2008 - 3 p.
External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.MOPC015
|
|
5.
|
First Measurement Results of the PSI 500kV Low Emittance Electron Source
/ Pedrozzi, M (PSI, Villigen) ; Andersson, A (PSI, Villigen) ; Bakker, R J (PSI, Villigen) ; Ganter, R (PSI, Villigen) ; Gough, C (PSI, Villigen) ; Hauri, C P (PSI, Villigen) ; Ischebeck, R (PSI, Villigen) ; Ivkovic, S (PSI, Villigen) ; Kim, Y (PSI, Villigen) ; Leemann, S C (Lund U., MAX-lab) et al.
2008 - 3 p.
External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.MOPC045
|
|
6.
|
Progress in the Design of a Two-Frequency RF Cavity for an Ultra-Low Emittance Pre-Accelerated Beam
/ Raguin, Jean-Yves (PSI, Villigen) ; Anghel, Alexander (PSI, Villigen) ; Bakker, Rene Johan (PSI, Villigen) ; Dehler, Micha (PSI, Villigen) ; Ganter, Romain (PSI, Villigen) ; Gough, Christopher (PSI, Villigen) ; Ivkovic, Sladjana (PSI, Villigen) ; Kirk, Eugenie (PSI, Villigen) ; Leemann, Simon Christian (PSI, Villigen) ; Li, Kevin (PSI, Villigen) et al.
2006 - 3 p.
External link: Published version from JACoW
In : 10th European Particle Accelerator Conference, Edinburgh, UK, 26 - 30 Jun 2006, pp.133
|
|
7.
|
|
8.
|
Electron beam simulations for the FERMI project at ELETTRA
/ Di Mitri, S ; Bakker, Rene J ; Bocchetta, Carlo J ; Craievich, Paolo ; D'Auria, Gerardo ; De Ninno, G ; Diviacco, Bruno ; Tosi, Lidia ; Verzilov, Victor
FERMI at ELETTRA is a project aims at the construction of a single-pass user facility for the spectral range from 100 nm to 10 nm. Starting point is the existing 1.2 GeV, 3-GHz linac. [...]
2004
External link: Published version from JACoW
In : 26th International Free Electron Laser Conference and 11th FEL User Workshop 2004, Trieste, Italy, 29 Aug - 3 Sep 2004, pp.e-proc. MOPOS25
|
|
9.
|
VUV/Soft X-Ray FEL Projects on the Horizon
/ Bakker, Rene J
Free-Electron Lasers (FELs) combine the properties of lasers and synchrotron radiation: the possibility to produce high-power, short-pulsed, laser-like radiation in spectral regions not accessible by other light-sources. Operation of an FEL in the Vacuum Ultra Violet (VUV) to X-ray spectral region has proven challenging, however, mainly because of the increased demands set to the accelerator technology as the wavelength becomes shorter (higher peak currents and beam energy, combined with a high stability and a lower emittance and/or energy spread). [...]
2005
In : 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.e-proc. TOAB001
|
|
10.
|
Linac Upgrades for FERMI@ELETTRA
/ D'Auria, G ; Bakker, R J ; Craievich, P ; De Ninno, G ; Di Mitri, S ; Ferianis, M ; Pangon, G ; Rumiz, R L ; Tosi, T L ; Zangrando, D
To fulfill the stringent requirements expected from the FERMI project, the existing Linac needs some modifications in the layout and an upgrading of the present plants. Moreover, for the next two years, until the new injection system (now under construction) is fully commissioned, the Linac has to be kept in operation as injector for the ELETTRA Storage Ring. [...]
2004
External link: Published version from JACoW
In : 22nd International Linear Accelerator Conference, Lubeck, Germany, 16 - 20 Aug 2004, pp.366
|
|