CERN Accelerating science

CERN Document Server 11 records found  1 - 10próximo  jump to record: Search took 0.54 seconds. 
1.
Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex / Vergara Fernandez, Estrella (CERN) ; Ansel, Antoine (CERN) ; Barberan Marin, Maria (CERN) ; Bernardini, Marzia (CERN) ; Chemli, Samy (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Hay, David (CERN) ; Jimenez, José (CERN) ; Mcfarlane, David (CERN) et al.
The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 2048-2051 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2048-2051
2.
The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group / Perrot, Anne-Laure (CERN) ; Bernardini, Marzia (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Dos Santos Pedrosa, Fernando (CERN) ; Etheridge, John (CERN) ; Foraz, Katy (CERN) ; Grillot, Serge (CERN) ; Jimenez, José (CERN) et al.
The operation of the Large Hadron Collider (LHC) at CERN started in September 2008. Every 5 or 6 years, Long Shutdowns (LS) are programmed to execute time-intensive ordinary and extra-ordinary maintenance of the LHC and its injectors [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 2052-2055 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2052-2055
3.
Programmed Stops Coordination: from Preparation to Completion / Vergara Fernandez, Estrella (CERN) ; Bernardini, Marzia (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Etheridge, John Robert (CERN) ; Grillot, Serge (CERN) ; Muttoni, Yvon (CERN) ; Nicquevert, Bertrand (CERN) ; Perrot, Anne-Laure (CERN) et al.
The exploitation of the CERN accelerator complex requires programmed stops of the operation, to execute various activities as standard maintenances, upgrades, consolidations and projects implementations [...]
CERN-ACC-NOTE-2022-0036.
- 2022. - 5 p.
Full text
4.
A Quality Service for the CERN Accelerators and Technology Sector / Petit, Stephan (CERN) ; Chemli, Samy (CERN) ; Nicquevert, Bertrand (CERN) ; Tock, Jean-Philippe (CERN)
This paper describes one definition of the large spectrum word: “quality” and what it means in the daily work at CERN. [...]
CERN-ACC-NOTE-2022-0035.
- 2022. - 6 p.
Full text
5.
New Coordination Tools to Prepare the Programmed Stops in the LHC and its Injectors / Chemli, Samy (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Bolognesi, Andrea (CERN) ; Brito de Palma, Bernardo (CERN) ; Bustamante, Sebastien (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Kleszcz, Emil (CERN) ; Kotsolakos, Nikitas (CERN) et al.
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics delivery to Experiments with a two-year long stop, also known as Long Shutdown (LS). The years of physics delivery are ended by a programmed stop for the immediate preventive and corrective maintenance, also known as (Extended)-Year-End Technical Stop - (E)YETS. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF044
6.
CERN Accelerators Topology Configuration: Facing the Next Long Shutdown / Bartolome-Jimenez, Sonia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Gilbert, Nicolas (CERN) ; Perrot, Anne-Laure (CERN) ; Piar, Juraj (CERN) ; Simetka, Vojtech (CERN) ; Vazquez de Prada Planas, Blanca (CERN)
The Configuration and Layout (CL) team at CERN ensures that there is a clear and coherent representation of the status of the CERN underground facilities (about 60 km of equipment) and main accelerator projects at a given point in time. In view of the major equipment changes to be carried out during the extended end of year technical stop (EYETS), the next Long Shutdown (LS2), and to facilitate the associated preparatory work of multiple CERN groups, the CL team has developed an immersive visualisation tool, displaying 360 degree panoramic images of CERN underground facilities. [...]
CERN-ACC-2017-235.- 2017 - 3 p. - Published in : 10.18429/JACoW-IPAC2017-THPAB145 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.THPAB145
7.
Integration, Configuration and Coordination: from Project to Reality, at CERN / Barberan Marin, Maria (CERN) ; Bartolome-Jimenez, Sonia (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Grillot, Serge (CERN) ; Muttoni, Yvon (CERN) et al.
The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. [...]
CERN-ACC-2016-267.- 2016 - 3 p. - Published in : 10.18429/JACoW-IPAC2016-TUPMW003 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.TUPMW003
8.
Status and Plans for the Upgrade of the CERN PS Booster / Hanke, Klaus (CERN) ; Aguglia, Davide (CERN) ; Angoletta, Maria Elena (CERN) ; Bartmann, Wolfgang (CERN) ; Bedel, Cyrille (CERN) ; Benedetto, Elena (CERN) ; Bertolasi, Stefano (CERN) ; Bertone, Caterina (CERN) ; Betz, Jochen (CERN) ; Birtwistle, Thomas (CERN) et al.
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. [...]
CERN-ACC-2015-011.- 2015 - 3 p. - Published in : (2015) , pp. THPF090 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF090
9.
The machine configuration management as working framework / CHEMLI, Samy (speaker) (CERN)
2014 - 1478. Technical Coordination meetings; HL-LHC Standards and Best Practices Workshop External links: Talk details; Event details In : HL-LHC Standards and Best Practices Workshop
10.
Layout Drawings of the LHC Collider / Vergara-Fernández, Antonio ; Chemli, Samy ; Maire, Bernard ; Muttoni, Yvon ; Kournossenko, Alexei ; Zalyalov, Rashid
Geneva : CERN, 2004 - 3 p. External link: Published version from JACoW
In : 9th European Particle Accelerator Conference, Lucerne, Switzerland, 5 - 9 Jul 2004, pp.1921

CERN Document Server : 11 records found   1 - 10próximo  jump to record:
Veja também: nomes de autores similares
11 CHEMLI, Samy
21 Chemli, S
1 Chemli, S.
Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.
Haven't found what you were looking for? Try your search on other servers:
Chemli, Samy em Amazon
Chemli, Samy em CERN EDMS
Chemli, Samy em CERN Intranet
Chemli, Samy em CiteSeer
Chemli, Samy em Google Books
Chemli, Samy em Google Scholar
Chemli, Samy em Google Web
Chemli, Samy em IEC
Chemli, Samy em IHS
Chemli, Samy em INSPIRE
Chemli, Samy em ISO
Chemli, Samy em KISS Books/Journals
Chemli, Samy em KISS Preprints
Chemli, Samy em NEBIS
Chemli, Samy em SLAC Library Catalog
Chemli, Samy em Scirus