CERN Accelerating science

CERN Document Server Encontrados 41 registros  1 - 10siguientefinal  ir al registro: La búsqueda tardó 0.59 segundos. 
1.
Betatron and dispersion matching of the TT2/TT10 transfer line for the 26 GeV/C fast extraction / Arduini, G ; Crockford, G ; Despas, C ; Giovannozzi, M ; Hanke, K ; Manglunki, D ; Martini, M ; Metral, G ; Niquille, C
CERN-PS-CA-Note-99-07; CERN-SL-Note-99-003-MD.- Geneva : CERN, 1999 - 18 p. Note Fulltext: PDF;
2.
TT2/TT10 transfer line studies for the 14 GEV/C continuous transfer / Arduini, G ; Crockford, G ; Despas, C ; Giovannozzi, M ; Hanke, K ; Manglunki, D ; Martini, M ; Métrai, G ; Niquille, C
CERN-PS-CA-Note-99-08.- Geneva : CERN, 1999 - 13 p. Note Fulltext: PDF;
3.
Beam-induced heat loads on the LHC arc beam screens with different beam and machine configurations: experiments and comparison against simulations / Iadarola, Giovanni (CERN) ; Skripka, Galina (Joint Institute for Nuclear Research (RU)) ; Albert, Markus (CERN) ; Amorim, David (Universite Grenoble-Alpes (FR)) ; Andujar, Oscar (CERN) ; Antipov, Sergey (CERN) ; Arduini, Gianluigi (CERN) ; Argyropoulos, Theodoros (CERN) ; Bradu, Benjamin (CERN) ; Bartosik, Hannes (CERN) et al.
Electron cloud (e-cloud) effects are among the main performance limitations for the operation of the Large Hadron Collider (LHC) with 25 ns bunch spacing. [...]
CERN-ACC-NOTE-2019-0057.
- 2019. - 50 p.
Full text
4.
Operation and performance of the CERN Large Hadron Collider during proton Run 2 / Steerenberg, Rende (CERN) ; Albert, Markus (CERN) ; Alemany-Fernández, Reyes (CERN) ; Argyropoulos, Theodoros (CERN) ; Bravin, Enrico (CERN) ; Crockford, Guy (CERN) ; Dumont, Jean-Charles (CERN) ; Fuchsberger, Kajetan (CERN) ; Giachino, Rossano (CERN) ; Giovannozzi, Massimo (CERN) et al.
Run 2 of the CERN Large Hadron Collider (LHC) started in April 2015 and was successfully completed on 10th December 2018, achieving largely all goals set in terms of luminosity production. Following the first two-year long shutdown and the re-commissioning in 2015 at 6.5 TeV, the beam performance was increased to reach a peak luminosity of more than twice the design value and a colliding beam time ratio of 50%. [...]
CERN-ACC-2019-067.- 2019 - 4 p. - Published in : 10.18429/JACoW-IPAC2019-MOPMP031 Fulltext from publisher: PDF;
In : 10th International Particle Accelerator Conference, Melbourne, Australia, 19 - 24 May 2019, pp.MOPMP031
5.
Intensity dependance of the train instability threshold and high pile-up test with 12b trains (MD3294) / Buffat, Xavier (CERN) ; Amorim, David (Universite Grenoble-Alpes (FR)) ; Antipov, Sergey (CERN) ; Bartosik, Hannes (CERN) ; Crockford, Guy (CERN) ; Furuseth, Sondre (EPFL - Ecole Polytechnique Federale Lausanne (CH)) ; Iadarola, Giovanni (CERN) ; Levens, Tom (CERN) ; Metral, Elias (CERN) ; Mounet, Nicolas (CERN) et al.
As signs of electron cloud driven instabilities at top energy were observed in MDs in 2017 even with short trains(12b), an additional experiment was performed in 2018 to assess the intensity scaling of this instability mechanism using high intensity 12b trains available from the existing injector chain, i.e [...]
CERN-ACC-NOTE-2019-0027.
- 2019. - 8 p.
Full text
6.
Noise studies with new ADT pickups (MD4143) / Buffat, Xavier (CERN) ; Albert, Markus (CERN) ; Amorim, David (Universite Grenoble-Alpes (FR)) ; Antipov, Sergey (CERN) ; Crockford, Guy (CERN) ; Furuseth, Sondre (EPFL - Ecole Polytechnique Federale Lausanne (CH)) ; Komppula, Jani Paavo Olavi ; Kotzian, Gerd (CERN) ; Mounet, Nicolas (CERN) ; Oeftiger, Adrian (GSI - Helmholtzzentrum fur Schwerionenforschung GmbH (DE)) et al.
An experiment aiming at characterizing the performance of a new engineering prototype for the ADT pickup readout electronics with a low noise floor from the point of view of beam stability and emittance growth in collision is described in this note [...]
CERN-ACC-NOTE-2019-0026.
- 2019. - 12 p.
Full text
7.
LHC Operational Scenarios During 2017 Run / Salvachua, Belen (CERN) ; Albert, Markus (CERN) ; Alemany-Fernández, Reyes (CERN) ; Argyropoulos, Theodoros (CERN) ; Bravin, Enrico (CERN) ; Burkhardt, Helmut (CERN) ; Crockford, Guy (CERN) ; Dumont, Jean-Charles (CERN) ; Fartoukh, Stephane (CERN) ; Fuchsberger, Kajetan (CERN) et al.
During 2017, the Large Hadron Collider LHC delivered luminosity for different physics configuration in addtion to the nominal 6.5 TeV proton-proton run. About 18.5 days were dedicated to commission and to deliver special physics to the experiments. [...]
CERN-ACC-2018-165.- 2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF051 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF051
8.
LHC Operational Experience of the 6.5 TeV Proton Run with ATS Optics / Pojer, Mirko (CERN) ; Albert, Markus (CERN) ; Alemany-Fernández, Reyes (CERN) ; Argyropoulos, Theodoros (CERN) ; Bravin, Enrico (CERN) ; Calia, Andrea (CERN) ; Crockford, Guy (CERN) ; Fartoukh, Stephane (CERN) ; Fuchsberger, Kajetan (CERN) ; Giachino, Rossano (CERN) et al.
In May 2017, the CERN Large Hadron Collider (LHC) restarted operations at 6.5 TeV using the Achromatic Telescopic Squeeze (ATS) scheme with a target beta-star of 40 cm in ATLAS and CMS. The number of bunches was progressively increased to a maximum of 2556 with emittances of 2.5 um. [...]
CERN-ACC-2018-166.- 2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF050 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF050
9.
A momentum calibration of the SPS proton beam / Altuna, X ; Arimatea, C ; Bailey, R ; Baudrenghien, P ; Crockford, G ; De Rijk, G ; Despas, C ; Faugier, A ; Ferrari, A ; Frammery, V et al.
CERN-SL-92-32-EA.
- 1992. - 14 p.
Full text
10.
LHC Operation at 6.5 TeV: Status and Beam Physics Issues / Papotti, Giulia (CERN) ; Albert, Markus (CERN) ; Alemany-Fernandez, Reyes (CERN) ; Bravin, Enrico (CERN) ; Crockford, Guy (CERN) ; Fuchsberger, Kajetan (CERN) ; Giachino, Rossano (CERN) ; Giovannozzi, Massimo (CERN) ; Hemelsoet, Georges-Henry (CERN) ; Höfle, Wolfgang (CERN) et al.
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until the end of 2018 (called Run 2). The beam energy was fixed at 6.5 TeV. [...]
NAPAC-2016-MOB3IO02.- 2017 - 5 p. - Published in : 10.18429/JACoW-NAPAC2016-MOB3IO02 Fulltext: PDF; External link: JACoW
In : 2016 North American Particle Accelerator Conference, Chicago, IL, USA, 9 - 14 Oct 2016, pp.MOB3IO02

CERN Document Server : Encontrados 41 registros   1 - 10siguientefinal  ir al registro:
Vea también: autores con nombres similares
14 Crockford, Guy
¿Le interesa recibir alertas sobre nuevos resultados de esta búsqueda?
Defina una alerta personal vía correo electrónico o subscríbase al canal RSS.
¿No ha encontrado lo que estaba buscando? Intente su búsqueda en:
Crockford, G en Amazon
Crockford, G en CERN EDMS
Crockford, G en CERN Intranet
Crockford, G en CiteSeer
Crockford, G en Google Books
Crockford, G en Google Scholar
Crockford, G en Google Web
Crockford, G en IEC
Crockford, G en IHS
Crockford, G en INSPIRE
Crockford, G en ISO
Crockford, G en KISS Books/Journals
Crockford, G en KISS Preprints
Crockford, G en NEBIS
Crockford, G en SLAC Library Catalog
Crockford, G en Scirus