1.
|
Chapter 4: Beamline – main components
/ Carlsen, B (CERN) ; Carvalho, F (CERN) ; De Jesus, V (CERN) ; De La Gama, J (CERN) ; Ebn Rahmoun, A (CERN) ; Froeschl, Robert (CERN) ; Gourber-Pace, Marine (CERN) ; Grenier-Boley, Edouard (CERN) ; Lopez, R (CERN) ; Mompo, Richard (CERN) et al.
The East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. [...]
2021 - 45 p.
Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.43-87
|
|
2.
|
ebook
|
3.
|
The Linac4 vacuum control system
/ Blanchard, Sebastien (CERN) ; De La Gama, Jose (CERN) ; Ferreira, Rodrigo (CERN) ; Gomes, Paulo (CERN) ; Gutierrez, Abel (CERN) ; Kopylov, Leonid (Serpukhov, IHEP) ; Mikheev, Mikhail (Serpukhov, IHEP) ; Pigny, Gregory (CERN) ; Rocha, Andre (CERN)
Linac4 is 160 MeV H⁻ linear accelerator replacing Linac2 as the first injector to the CERN accelerator complex, which culminates with the Large Hadron Collider. This new Linac will increase the beam brightness by a factor of two. [...]
2018 - 4 p.
- Published in : 10.18429/JACoW-ICALEPCS2017-THPHA056
Fulltext: PDF;
In : International Conference on Accelerator and Large Experimental Physics Control Systems, Barcelona, Spain, 8 - 13 Oct 2017, pp.THPHA056
|
|
4.
|
Measurements, Alarms and Interlocks in the Vacuum Control System of the LHC
/ Pigny, Gregory (CERN) ; Antoniotti, Fabien (CERN) ; Boivin, Jean-Pierre (CERN) ; Chatzigeorgiou, Nikolaos (CERN) ; Gama, Jose (CERN) ; Gomes, Paulo (CERN) ; Krakowski, Pawel (CERN) ; Pereira, Helder (CERN)
In the LHC beam pipes and cryostats, the pressure measurement covers a wide range, from 1500 mbar down to 10⁻¹¹ mbar and even lower. If vacuum deteriorates, alarm signals are generated and sent to other systems, e.g. [...]
2015 - 4 p.
- Published in : 10.18429/JACoW-ICALEPCS2015-MOPGF112
Fulltext: PDF; External link: JACoW
In : 15th International Conference on Accelerator and Large Experimental Physics Control Systems, Melbourne, Australia, 17 - 23 Oct 2015, pp.MOPGF112
|
|
5.
|
Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC
/ Gomes, Paulo (CERN) ; Antoniotti, Fabien (CERN) ; Aragon, Fernando (CERN) ; Bellorini, François (CERN) ; Blanchard, Sebastien (CERN) ; Boivin, Jean-Pierre (CERN) ; Chatzigeorgiou, Nikolaos (CERN) ; Daligault, Frederic (CERN) ; Ferreira, Rodrigo (CERN) ; Fraga, Jorge (CERN) et al.
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It was mainly motivated by the consolidation of magnet interconnects, to allow operation with 6.5 TeV proton beams. [...]
2015 - 4 p.
- Published in : 10.18429/JACoW-ICALEPCS2015-MOPGF104
Fulltext: PDF; External link: JACoW
In : 15th International Conference on Accelerator and Large Experimental Physics Control Systems, Melbourne, Australia, 17 - 23 Oct 2015, pp.MOPGF104
|
|
6.
|
The Control System of CERN Accelerators Vacuum (LS1 Activities and New Developments)
/ Gomes, P (CERN) ; Antoniotti, F (CERN) ; Bellorini, F (CERN) ; Blanchard, S (CERN) ; Boivin, J P (CERN) ; Gama, J (CERN) ; Girardot, G (CERN) ; Pigny, G (CERN) ; Rio, B (CERN) ; Vestergard, H (CERN) et al.
After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [1]. Major consolidation and maintenance works are being performed across the whole CERN’s Accelerator chain, in order to prepare the LHC to restart at higher energy, in 2015. [...]
CERN-ACC-2014-0352.-
Geneva : CERN, 2014 - 5 p.
Fulltext: PDF; External link: Published version from JACoW
In : 14th International Conference on Accelerator & Large Experimental Physics Control Systems, San Francisco, CA, USA, 6 - 11 Oct 2013, pp.moppc027
|
|
7.
|
Quality Management of CERN Vacuum Controls
/ Antoniotti, F (CERN) ; Boivin, JP (CERN) ; Fortescue-Beck, E (CERN) ; Gama, J (CERN) ; Gomes, P (CERN) ; Le Roux, P (CERN) ; Pereira, H (CERN) ; Pigny, G (CERN)
The vacuum controls Section (TE-VSC-ICM) is in charge of the monitoring, maintenance and consolidation of the control systems of all accelerators and detectors in CERN; this represents 6 000 instruments distributed along 128 km of vacuum chambers, often of heterogeneous architectures and of diverse technical generations. In order to improve the efficiency of the services provided by ICM, to vacuum experts and to accelerator operators, a Quality Management Plan is being put into place. [...]
CERN-ACC-2014-0351.-
Geneva : CERN, 2014 - 5 p.
Fulltext: PDF; External link: Published version from JACoW
In : 14th International Conference on Accelerator & Large Experimental Physics Control Systems, San Francisco, CA, USA, 6 - 11 Oct 2013, pp.tuppc027
|
|
8.
|
The Control System of CERN Accelerators Vacuum [LS1 Activities and New Developments]
/ Gomes, P (CERN) ; Antoniotti, F (CERN) ; Bellorini, F (CERN) ; Blanchard, S (CERN) ; Boivin, J-P (CERN) ; Gama, J (CERN) ; Girardot, G (CERN) ; Pigny, G (CERN) ; Rio, B (CERN) ; Vestergard, H (CERN) et al.
After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [1]. Major consolidation and maintenance works are being performed across the whole CERN’s accelerator chain, in order to prepare the LHC to restart at higher energy, in 2015 [...]
2014
External link: Published version from JaCoW
In : 14th International Conference on Accelerator & Large Experimental Physics Control Systems, San Francisco, CA, USA, 6 - 11 Oct 2013, pp.moppc027
|
|
9.
|
Quality Management of CERN Vacuum Controls
/ Antoniotti, F (CERN) ; Boivin, J-P (CERN) ; Fortescue-Beck, E (CERN) ; Gama, J (CERN) ; Gomes, P (CERN) ; Le Roux, P (CERN) ; Pereira, H F (CERN) ; Pigny, G (CERN)
The vacuum controls Section (TE-VSC-ICM) is in charge of the monitoring, maintenance and consolidation of the control systems of all accelerators and detectors in CERN; this represents 6 000 instruments distributed along 128 km of vacuum chambers, often of heterogeneous architectures and of diverse
2014
External link: Published version from JaCoW
In : 14th International Conference on Accelerator & Large Experimental Physics Control Systems, San Francisco, CA, USA, 6 - 11 Oct 2013, pp.tuppc027
|
|
10.
|
Radiation Tests on the Complete System of the Instrumentation of the LHC Cryogenics at the CERN Neutrinos to Gran Sasso (CNGS) Test Facility
/ Gousiou, E (CERN) ; Fernandez Penacoba, G (CERN) ; Casas Cubillos, J (CERN) ; de la Gama Serrano, J (CERN)
There are more than 6000 electronic cards for the instrumentation of the LHC cryogenics, housed in crates and distributed around the 27 km tunnel. Cards and crates will be exposed to a complex radiation field during the 10 years of LHC operation. [...]
CERN-ATS-2010-013.-
Geneva : CERN, 2009 - 5 p.
Fulltext: PDF; Published version from CERN: PDF;
In : Topical Workshop on Electronics for Particle Physics, Paris, France, 21 - 25 Sep 2009, pp.161-164 (CERN-2009-006)
|
|