General performance issues summary, 1998 (p. 1) |
by Bailey, R |
Summary of the injection and ramping session (p. 3) |
by Lamont, M |
Summary : optics(p. 5) |
by Arduini, Gianluigi |
Summary : performance at high energy(p. 8) |
by Herr, Werner |
Summary of session5 : RF(p. 11) |
by Geschonke, Günther |
A review of the recommendations from Chamonix VII (p. 15) |
by Poole, John |
Statistics and operational review of 1997 (p. 23) |
by Uythoven, J |
97 : a hot year for the vacuum system(p. 28) |
Improvements in polarization (p. 34) |
by Böge, M |
Energy calibration results and implications from 1997 (p. 40) |
by Wells, P S |
Perspectives for energy calibration and extrapolation (p. 46) |
by Placidi, Massimo |
General performance issues : discussion(p. 49) |
by Roy, G |
To LEP (p. 51) |
by Giachino, R |
Turnaround in more than 69 minutes...what went wrong? (p. 55) |
by Billen, R |
What limits the bunch current? (p. 59) |
by Wenninger, J |
Transverse feedback (p. 63) |
by Sladen, Jonathan P H |
Overview of intensity limits (p. 65) |
by Uythoven, J |
Ramping '97 (p. 68) |
by Jonker, M |
Q-loop (p. 73) |
by Morpurgo, G |
Orbit in the ramp (p. 77) |
by Wenninger, J |
Injection and ramping : Discussion(p. 79) |
by Wenninger, J |
Aperture measurements and implications (p. 80) |
by Burkhardt, H |
Experience with a $(108^{o}, 90^{o})$ optics in 1997 (p. 85) |
by Jowett, John M |
Vertical beamsize (and other calculations) in various optics (p. 91) |
by Jowett, John M |
First experience with $102^{o} / 90^{o}$ optics (p. 101) |
by Meddahi, Malika |
Measurements of horizontal detuning with amplitude (p. 104) |
by Müller, A S |
Possible new developments (p. 107) |
by Verdier, A |
Which optics allows the highest energy ? (p. 112) |
by Herr, Werner |
Optics : Discussion(p. 116) |
by Arduini, Gianluigi |
Physics results and future requirements (p. 118) |
by Wells, P S |
Beam instrumentation at high energies (p. 126) |
by Schmickler, Hermann |
LEP performance in 1997 (p. 134) |
by Lamont, M |
Performance and running scenarios in the future (p. 138) |
by Brandt, D |
CAN the operators 'forget' about the RF system (before 2001)? (p. 150) |
by Arduini, Gianluigi |
RF system reliabilty and performance in 1997 (p. 154) |
by Brunner, O C |
Developments and news on RF hardware (p. 158) |
by Brown, P |
RF controls : what's new in hardware and software?(p. 163) |
by Butterworth, A |
LEP2 in 1998 and beyond : cryogenic issues(p. 166) |
by Gayet, P |
LEP towards 100 GeV ? (p. 172) |
by Boussard, Daniel |
RF : Discussion(p. 176) |
by Uythoven, J |