Title Chapter 15: Integration, (de-)installation and alignment
Author(s) Fessia, Paolo (CERN) ; Mainaud Durand, Helene (CERN)
Publication 2020
Number of pages 15
In: High-Luminosity Large Hadron Collider (HL-LHC): Technical design report, pp.269-283
DOI 10.23731/CYRM-2020-0010.269
Subject category Accelerators and Storage Rings
Accelerator/Facility, Experiment CERN LHC
Project CERN HL-LHC
Abstract The HL-LHC will require modifying the machine and infrastructure installations of the LHC in several points along the Accelerator Ring, in particular: P1, P2, P4, P5, P6, P7 and P8. Part of the modifications and improvement in P2, P4, P7 and P8 shall be completed during Long Shutdown 2 (LS2) and be operational for LHC Run 3, while the largest part of the interventions will take place in Long Shutdown 3 (LS3) and they will affect primarily P1, P4, P5, P6 and P7. The activities required point by point will be therefore listed and analysed here below.
Copyright/License © 2020-2025 CERN (License: CC-BY-4.0)

Corresponding record in: Inspire


 Registre creat el 2021-01-27, darrera modificació el 2021-03-24


Text complet:
Descarregar el text complet
PDF